Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Paket | Pagu | Paket | Pagu | Paket | Pagu | Paket | Pagu |
Tender | 60 | 869.560.199.650 | 0 | 0 | 60 | 869.560.199.650 | 0 | 0 |
Seleksi | 74 | 71.846.030.994 | 2 | 2.294.875.000 | 74 | 71.846.030.994 | 0 | 0 |
Tender Cepat | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total | 134 | 941.406.230.644 | 2 | 2.294.875.000 | 134 | 941.406.230.644 | 0 | 0 |
Persentase | 1.49 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2024 | Peningkatan Jalan Pulang Pisau - Pangkoh (DAK) | Tender | Pekerjaan Konstruksi | 13918012 | 45849241 | APBD | 29,245,098,300 | 29,245,097,880 | 0 | 0 | 0 | 28,610,877,000 | 0 | 0 | 2023-12-22 11:00:00 | 2024-02-05 | 2024-02-19 | 29,245,098,300 | 100 % | ||||||
2 | 2024 | Peningkatan Jalan Dadahup /G1 - Lamunti (DAK) | Tender | Pekerjaan Konstruksi | 13920012 | 45859276 | APBD | 17,033,748,900 | 17,033,748,242 | 0 | 0 | 0 | 16,745,000,000 | 0 | 0 | 2023-12-22 11:00:00 | 2024-01-10 | 2024-01-29 | 17,033,748,900 | 100 % | ||||||
3 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (Penugasan) - Tematik 01 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13921012 | 45859525 | APBD | 546,873,150 | 546,873,148 | 0 | 0 | 0 | 541,600,648 | 0 | 0 | 2023-12-22 11:00:00 | 2024-02-07 | 2024-02-19 | 546,873,150 | 100 % | ||||||
4 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (Penugasan) - Tematik 04 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13922012 | 45859587 | APBD | 1,539,215,700 | 1,539,215,688 | 0 | 0 | 0 | 1,522,924,440 | 0 | 0 | 2023-12-22 11:00:00 | 2024-02-07 | 2024-02-19 | 1,539,215,700 | 100 % | ||||||
5 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (Penugasan) - Tematik 05 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13923012 | 45859632 | APBD | 896,513,100 | 896,512,923 | 0 | 0 | 0 | 888,765,345 | 0 | 0 | 2023-12-22 11:00:00 | 2024-02-07 | 2024-02-19 | 896,513,100 | 100 % | ||||||
6 | 2024 | Rehabilitasi Jaringan Irigasi D.I.R. Unit Mentaren II Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13924012 | 46341856 | APBD | 3,550,000,000 | 3,550,000,000 | 0 | 0 | 0 | 3,442,900,000 | 0 | 0 | 2024-01-16 08:00:00 | 2024-02-07 | 2024-02-21 | 3,550,000,000 | 100 % | ||||||
7 | 2024 | Rehabilitasi Jaringan Irigasi D.I.R. Kuala Jelai I Kabupaten Sukamara | Tender | Pekerjaan Konstruksi | 13925012 | 46342156 | APBD | 5,071,625,000 | 5,071,625,000 | 0 | 0 | 0 | 4,994,000,000 | 0 | 0 | 2024-01-16 08:00:00 | 2024-02-07 | 2024-02-21 | 5,071,625,000 | 100 % | ||||||
8 | 2024 | Rehabilitasi Jaringan Irigasi D.I.R. Maliku Baru Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13926012 | 46342039 | APBD | 4,600,000,000 | 4,600,000,000 | 0 | 0 | 0 | 4,453,700,000 | 0 | 0 | 2024-01-16 08:00:00 | 2024-02-07 | 2024-02-21 | 4,600,000,000 | 100 % | ||||||
9 | 2024 | Peningkatan Jalan Bangkal - Telaga Pulang - Kuala Pembuang (DAK) | Tender | Pekerjaan Konstruksi | 13927012 | 45859361 | APBD | 10,390,589,850 | 10,390,579,809 | 0 | 0 | 0 | 10,000,000,000 | 0 | 0 | 2024-01-12 08:00:00 | 2024-01-31 | 2024-02-05 | 10,390,589,850 | 100 % | ||||||
10 | 2024 | ,Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Poros Bahaur menuju Desa Bahaur Kecamatan Hanau | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13932012 | 47513309;49048455 | APBD | 830,500,000 | 830,500,000 | 0 | 0 | 0 | 822,282,117 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 830,500,000 | 100 % | ||||||
11 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (DBH Sawit 2023) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13933012 | 48219050 | APBD | 1,400,000,000 | 1,400,000,000 | 0 | 0 | 0 | 1,385,835,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 1,400,000,000 | 100 % | ||||||
12 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan di Kecamatan Pandih Batu Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13934012 | 48920057 | APBD | 3,940,000,000 | 3,940,000,000 | 0 | 0 | 0 | 3,908,400,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 3,940,000,000 | 100 % | ||||||
13 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan di Kecamatan Maliku Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13935012 | 48920332 | APBD | 2,440,000,000 | 2,440,000,000 | 0 | 0 | 0 | 2,421,200,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 2,440,000,000 | 100 % | ||||||
14 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Bahaur I Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13936012 | 48920497 | APBD | 1,940,000,000 | 1,940,000,000 | 0 | 0 | 0 | 1,885,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 1,940,000,000 | 100 % | ||||||
15 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan di Kecamatan Mantangai Kabupaten Kapuas | Tender | Pekerjaan Konstruksi | 13937012 | 48920763 | APBD | 3,920,000,000 | 3,920,000,000 | 0 | 0 | 0 | 3,894,800,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 3,920,000,000 | 100 % | ||||||
16 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Kuin Kabupaten Kotawaringin Timur | Tender | Pekerjaan Konstruksi | 13938012 | 48921227 | APBD | 1,920,000,000 | 1,920,000,000 | 0 | 0 | 0 | 1,843,471,543 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 1,920,000,000 | 100 % | ||||||
17 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Lampuyang Kabupaten Kotawaringin Timur | Tender | Pekerjaan Konstruksi | 13939012 | 48921559 | APBD | 1,930,000,000 | 1,930,000,000 | 0 | 0 | 0 | 1,872,275,515 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 1,930,000,000 | 100 % | ||||||
18 | 2024 | Pembangunan BreakWater Desa Sebuai Timur Kabupaten Kotawaringin Barat | Tender | Pekerjaan Konstruksi | 13941012 | 48933221 | APBD | 1,330,000,000 | 1,330,000,000 | 0 | 0 | 0 | 1,321,616,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 1,330,000,000 | 100 % | ||||||
19 | 2024 | Normalisasi Sungai Hijau Kecamatan Pangkalan Banteng Kabupaten Kotawaringin Barat | Tender | Pekerjaan Konstruksi | 13942012 | 48935331 | APBD | 2,920,000,000 | 2,920,000,000 | 0 | 0 | 0 | 2,855,103,710 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 2,920,000,000 | 100 % | ||||||
20 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Natai Apung Kabupaten Sukamara | Tender | Pekerjaan Konstruksi | 13943012 | 48938496 | APBD | 2,910,000,000 | 2,910,000,000 | 0 | 0 | 0 | 2,847,032,803 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 2,910,000,000 | 100 % | ||||||
21 | 2024 | Pola dan Rencana Pengelolaan Sumber Daya Air Wilayah Sungai Seruyan (Tahap II) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13944012 | 49066232 | APBD | 1,900,000,000 | 1,900,000,000 | 0 | 0 | 0 | 1,888,110,000 | 0 | 0 | 2024-02-23 19:00:00 | 2024-03-25 | 2024-04-26 | 1,900,000,000 | 100 % | ||||||
22 | 2024 | Perencanaan Tanggul Banjir Daerah Irigasi Tampa | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13945012 | 48948442 | APBD | 650,000,000 | 650,000,000 | 0 | 0 | 0 | 646,464,000 | 0 | 0 | 2024-02-23 19:00:00 | 2024-04-01 | 2024-04-26 | 650,000,000 | 100 % | ||||||
23 | 2024 | Supervisi Kegiatan Fisik Bidang SDA | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13946012 | 49066098 | APBD | 700,000,000 | 700,000,000 | 0 | 0 | 0 | 695,082,000 | 0 | 0 | 2024-02-21 20:00:00 | 2024-03-18 | 2024-04-24 | 700,000,000 | 100 % | ||||||
24 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Sp.Kenawan - Riam Durian | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13948012 | 47511057 | APBD | 880,500,000 | 880,500,000 | 0 | 0 | 0 | 875,790,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 880,500,000 | 100 % | ||||||
25 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Simpang Patas -Tabak Kanilan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13949012 | 47512313 | APBD | 930,500,000 | 930,500,000 | 0 | 0 | 0 | 918,536,100 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 930,500,000 | 100 % | ||||||
26 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Lunci - Jelai | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13950012 | 47512807 | APBD | 930,500,000 | 930,500,000 | 0 | 0 | 0 | 918,636,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 930,500,000 | 100 % | ||||||
27 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Pulang Pisau - Pangkoh 1 dan Peningkatan Jalan Pulang Pisau - Pangkoh 2 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13951012 | 47515097 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,167,231,600 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 1,180,500,000 | 100 % | ||||||
28 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Pangkoh - Bahaur | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13952012 | 47515477 | APBD | 1,380,500,000 | 1,380,500,000 | 0 | 0 | 0 | 1,360,278,360 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 1,380,500,000 | 100 % | ||||||
29 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Kuala Kapuas - Palingkau, Peningkatan Jalan Palingkau - Dadahup dan Peningkatan Jalan Dadahup/G1 - Lamunti | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13953012 | 47515841 | APBD | 1,230,500,000 | 1,230,500,000 | 0 | 0 | 0 | 1,221,002,220 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 1,230,500,000 | 100 % | ||||||
30 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Tb. Sangai - Tb Kalang | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13954012 | 47521602 | APBD | 930,500,000 | 930,500,000 | 0 | 0 | 0 | 918,347,400 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 930,500,000 | 100 % | ||||||
31 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Amin Jaya - Rantau Pulut | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13955012 | 47521893 | APBD | 980,500,000 | 980,500,000 | 0 | 0 | 0 | 960,749,400 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 980,500,000 | 100 % | ||||||
32 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Bangkal - Telaga Pulang - Kuala Pembuang 1 dan Peningkatan Jalan Bangkal - Telaga Pulang - Kuala Pembuang 2 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13956012 | 47522282 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,175,418,960 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 73.168.264.7-322.000 | SURYA CIPTA ENGINEERING, PT | 1,180,500,000 | 100 % | ||||
33 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Sampit - Samuda dan Peningkatan Jalan Samuda - Ujung Pandaran | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13957012 | 47522556 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,168,192,305 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 1,180,500,000 | 100 % | ||||||
34 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Lingkar Kota Muara Teweh | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13958012 | 47522912 | APBD | 1,012,555,044 | 1,012,555,044 | 0 | 0 | 0 | 1,000,221,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 1,012,555,044 | 100 % | ||||||
35 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Simpang Pundu - Tumbang Samba | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13959012 | 47523379 | APBD | 830,500,000 | 830,500,000 | 0 | 0 | 0 | 819,191,100 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 830,500,000 | 100 % | ||||||
36 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jalan Wilayah Barat di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13960012 | 47524408 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,171,439,610 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 1,180,500,000 | 100 % | ||||||
37 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jalan Wilayah Tengah di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13961012 | 47525098 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,172,508,540 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 1,180,500,000 | 100 % | ||||||
38 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jalan Wilayah Timur di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13962012 | 47525555 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,168,120,710 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 1,180,500,000 | 100 % | ||||||
39 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Penggantian Jembatan di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13964012 | 47527470 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,174,169,211 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 1,180,500,000 | 100 % | ||||||
40 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jembatan Tersebar Di Provinsi Kalimantan Tengah dan Peningkatan Jalan Kuala Kurun - Linau Kab. Gunung Mas | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13965012 | 47529311 | APBD | 980,500,000 | 980,500,000 | 0 | 0 | 0 | 958,586,010 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 980,500,000 | 100 % | ||||||
41 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Telang Siong - Bangkuang | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13966012 | 49041370 | APBD | 930,500,000 | 930,500,000 | 0 | 0 | 0 | 928,132,050 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 930,500,000 | 100 % | ||||||
42 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Kuala Kuayan - Tanjung Jariangau dan Peningkatan Jalan Tanjung Jariangau - Sp Jalan Provinsi | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13967012 | 49042368 | APBD | 1,080,500,000 | 1,080,500,000 | 0 | 0 | 0 | 1,071,415,290 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 1,080,500,000 | 100 % | ||||||
43 | 2024 | Konsultan Pengawasan Pembangunan Kawasan beserta Tugu Simpang Mahir-Mahar Palangka Raya (Lanjutan) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13971012 | 49795789 | APBD | 800,660,000 | 800,660,000 | 0 | 0 | 0 | 791,319,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-24 | 2024-05-22 | 800,660,000 | 100 % | ||||||
44 | 2024 | Konsultan Manajemen Konstruksi Pembangunan Sarana dan Prasarana Pendukung RSUD Kelas B di Wilayah Barat Prov. Kalteng (Lanjutan)(Tahap 2) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13976012 | 49795786 | APBD | 1,002,593,000 | 999,754,800 | 0 | 0 | 0 | 967,387,200 | 0 | 0 | 2024-03-05 14:00:00 | 2024-04-24 | 2024-05-06 | 1,002,593,000 | 100 % | ||||||
45 | 2024 | Konsultan MK Pembangunan RSUD Kelas B di Wilayah Barat Provinsi Kalimantan Tengah (Pengawasan 2 Paket Fisik) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13977012 | 47589303 | APBD | 3,050,887,000 | 3,041,700,000 | 0 | 0 | 0 | 3,002,229,210 | 0 | 0 | 2024-03-05 14:00:00 | 2024-04-18 | 2024-05-02 | 01.906.008.6-805.000 | PT. ESA PRATAMA CIPTA SELEBES | 3,050,887,000 | 100 % | ||||
46 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Gadabung - Terusan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13978012 | 49043025 | APBD | 880,500,000 | 880,500,000 | 0 | 0 | 0 | 861,069,180 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 880,500,000 | 100 % | ||||||
47 | 2024 | Pengawasan Teknis Jalan dan Jembatan Untuk Peningkatan Jalan Ujung Pandaran - Kuala Pembuang dan Peningkatan Jalan Kuala Pembuang - Teluk Segintung | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13979012 | 49043904 | APBD | 1,280,500,000 | 1,280,500,000 | 0 | 0 | 0 | 1,272,613,890 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 1,280,500,000 | 100 % | ||||||
48 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Pelantaran - Parenggean | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13980012 | 49044916 | APBD | 880,500,000 | 880,500,000 | 0 | 0 | 0 | 869,696,100 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 880,500,000 | 100 % | ||||||
49 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Sudirman dan Jalan Yos Sudarso Puruk Cahu | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13981012 | 49046935 | APBD | 930,500,000 | 930,500,000 | 0 | 0 | 0 | 918,680,400 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 930,500,000 | 100 % | ||||||
50 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Penggantian Jembatan Sei Pudu Ruas Jalan Provinsi Parenggean - Tumbang Sangai | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13982012 | 49049862 | APBD | 880,500,000 | 880,500,000 | 0 | 0 | 0 | 866,577,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 880,500,000 | 100 % | ||||||
51 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Rehabilitasi Jembatan Patake Kecamatan Montalat Barito Utara | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13983012 | 49050482 | APBD | 830,500,000 | 830,500,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 830,500,000 | 100 % | |||||||
52 | 2024 | Penyusunan Program Jalan dan Jembatan Core Team Perencanaan Jalan dan Jembatan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13984012 | 48806501 | APBD | 1,823,580,000 | 1,823,580,000 | 0 | 0 | 0 | 1,809,596,370 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 1,823,580,000 | 100 % | ||||||
53 | 2024 | Pengelolaan Leger Jalan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13986012 | 48807938 | APBD | 935,500,000 | 935,500,000 | 0 | 0 | 0 | 925,057,350 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 935,500,000 | 100 % | ||||||
54 | 2024 | Survey Kondisi Jalan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13987012 | 48808237 | APBD | 935,500,000 | 935,500,000 | 0 | 0 | 0 | 930,739,440 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-13 | 935,500,000 | 100 % | ||||||
55 | 2024 | Peningkatan Jalan Simpang Kenawan - Riam Durian | Tender | Pekerjaan Konstruksi | 13989012 | 46588070 | APBD | 8,915,500,000 | 8,915,500,000 | 0 | 0 | 0 | 8,737,190,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-04-19 | 2024-05-08 | 8,915,500,000 | 100 % | ||||||
56 | 2024 | Peningkatan Jalan RSUD Hanau | Tender | Pekerjaan Konstruksi | 13991012 | 46588647 | APBD | 8,925,500,000 | 8,925,500,000 | 0 | 0 | 0 | 8,720,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-25 | 8,925,500,000 | 100 % | ||||||
57 | 2024 | Pembangunan Sarana dan Prasarana Pendukung RSUD Kelas B di Wilayah Barat Prov. Kalteng (Lanjutan)(Tahap 2) | Tender | Pekerjaan Konstruksi | 13993012 | 47594522 | APBD | 24,850,000,000 | 24,850,000,000 | 0 | 0 | 0 | 24,701,272,565 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-05 | 2024-04-29 | 24,850,000,000 | 100 % | ||||||
58 | 2024 | Peningkatan Jalan Lunci - Jelai | Tender | Pekerjaan Konstruksi | 13994012 | 46590157 | APBD | 18,915,500,000 | 18,915,500,000 | 0 | 0 | 0 | 18,626,500,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-05-08 | 2024-05-30 | 18,915,500,000 | 100 % | ||||||
59 | 2024 | Peningkatan Jalan Pulang Pisau Pangkoh I | Tender | Pekerjaan Konstruksi | 13995012 | 46590837 | APBD | 21,767,824,000 | 21,767,824,000 | 0 | 0 | 0 | 21,289,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 21,767,824,000 | 100 % | ||||||
60 | 2024 | Peningkatan Jalan Pulang Pisau Pangkoh 2 | Tender | Pekerjaan Konstruksi | 13996012 | 46591902 | APBD | 13,935,500,000 | 13,935,500,000 | 0 | 0 | 0 | 13,652,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-03-24 | 13,935,500,000 | 100 % | ||||||
61 | 2024 | Peningkatan Jalan Pangkoh - Bahaur | Tender | Pekerjaan Konstruksi | 13997012 | 46592217 | APBD | 34,435,500,000 | 34,435,500,000 | 0 | 0 | 0 | 34,151,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-30 | 2024-05-20 | 34,435,500,000 | 100 % | ||||||
62 | 2024 | Peningkatan Jalan Telang Siong Bangkoang | Tender | Pekerjaan Konstruksi | 13998012 | 46594436 | APBD | 8,778,500,000 | 8,778,500,000 | 0 | 0 | 0 | 8,601,800,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-05 | 2024-04-24 | 8,778,500,000 | 100 % | ||||||
63 | 2024 | Peningkatan Jalan Tumbang Sangai Tumbang Kalang | Tender | Pekerjaan Konstruksi | 13999012 | 46595195 | APBD | 8,925,500,000 | 8,925,500,000 | 0 | 0 | 0 | 8,724,600,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-25 | 8,925,500,000 | 100 % | ||||||
64 | 2024 | Peningkatan Jalan Amin Jaya Rantau Pulut | Tender | Pekerjaan Konstruksi | 14000012 | 46595672 | APBD | 25,175,500,000 | 25,175,500,000 | 0 | 0 | 0 | 24,411,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-25 | 25,175,500,000 | 100 % | ||||||
65 | 2024 | Peningkatan Jalan Kuala Kuayan Tanjung Jariangau | Tender | Pekerjaan Konstruksi | 14001012 | 46592645 | APBD | 8,925,500,000 | 8,925,500,000 | 0 | 0 | 0 | 8,698,800,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-24 | 8,925,500,000 | 100 % | ||||||
66 | 2024 | Peningkatan Jalan Bangkal Telaga Pulang Kuala Pembuang I | Tender | Pekerjaan Konstruksi | 14002012 | 46593125 | APBD | 26,725,500,000 | 26,725,500,000 | 0 | 0 | 0 | 26,000,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 26,725,500,000 | 100 % | ||||||
67 | 2024 | Peningkatan Jalan Bangkal Telaga Pulang Kuala Pembuang II | Tender | Pekerjaan Konstruksi | 14004012 | 46593510 | APBD | 17,925,500,000 | 17,925,500,000 | 0 | 0 | 0 | 17,436,300,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 17,925,500,000 | 100 % | ||||||
68 | 2024 | Peningkatan Jalan Sampit - Samuda | Tender | Pekerjaan Konstruksi | 14005012 | 46596013 | APBD | 13,925,500,000 | 13,925,500,000 | 0 | 0 | 0 | 13,624,000,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-30 | 13,925,500,000 | 100 % | ||||||
69 | 2024 | Peningkatan Jalan Samuda Ujung Pandaran | Tender | Pekerjaan Konstruksi | 14006012 | 46596180 | APBD | 12,925,500,000 | 12,925,500,000 | 0 | 0 | 0 | 12,650,700,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-30 | 12,925,500,000 | 100 % | ||||||
70 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pembangunan Jembatan Tumbang Gugup | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14007012 | 47526644 | APBD | 1,280,500,000 | 1,280,500,000 | 0 | 0 | 0 | 1,269,840,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 1,280,500,000 | 100 % | ||||||
71 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan RSUD Hanau | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14008012 | 47513309 | APBD | 830,500,000 | 830,500,000 | 0 | 0 | 0 | 814,271,580 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 830,500,000 | 100 % | ||||||
72 | 2024 | Peningkatan Jalan Gadabung - Terusan | Tender | Pekerjaan Konstruksi | 14010012 | 46594045 | APBD | 12,935,500,000 | 12,935,500,000 | 0 | 0 | 0 | 12,618,600,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-05 | 2024-04-25 | 12,935,500,000 | 100 % | ||||||
73 | 2024 | Peningkatan Jalan Ujung Pandaran Kuala Pembuang | Tender | Pekerjaan Konstruksi | 14011012 | 46597017 | APBD | 9,925,500,000 | 9,925,500,000 | 0 | 0 | 0 | 9,610,000,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-19 | 2024-05-08 | 9,925,500,000 | 100 % | ||||||
74 | 2024 | Peningkatan Jalan Simpang Pundu Tumbang Samba | Tender | Pekerjaan Konstruksi | 14012012 | 46596857 | APBD | 6,110,500,000 | 6,110,500,000 | 0 | 0 | 0 | 5,976,500,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-05 | 2024-04-24 | 6,110,500,000 | 100 % | ||||||
75 | 2024 | Peningkatan Jalan Kuala Kurun Linau Tumbang Jutuh | Tender | Pekerjaan Konstruksi | 14013012 | 46604753 | APBD | 3,735,500,000 | 3,735,500,000 | 0 | 0 | 0 | 3,659,200,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-05 | 2024-04-24 | 3,735,500,000 | 100 % | ||||||
76 | 2024 | Peningkatan Jalan Poros Bahaur menuju Desa Bahaur Kecamatan Hanau | Tender | Pekerjaan Konstruksi | 14018012 | 49034739 | APBD | 3,925,500,000 | 3,925,500,000 | 0 | 0 | 0 | 3,834,000,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-05 | 2024-04-22 | 3,925,500,000 | 100 % | ||||||
77 | 2024 | Penggantian Jembatan Sei Pudu Ruas Jalan Provinsi Parenggean - Tumbang Sangai | Tender | Pekerjaan Konstruksi | 14019012 | 49041610 | APBD | 6,925,500,000 | 6,925,500,000 | 0 | 0 | 0 | 6,755,900,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-04-05 | 2024-04-25 | 6,925,500,000 | 100 % | ||||||
78 | 2024 | Peningkatan Jalan Parenggean - Tumbang Sangai (DBH Sawit 2023) | Tender | Pekerjaan Konstruksi | 14020012 | 47290459 | APBD | 46,417,540,000 | 46,417,540,000 | 0 | 0 | 0 | 45,228,600,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-30 | 2024-05-27 | 46,417,540,000 | 100 % | ||||||
79 | 2024 | Peningkatan Jalan Kuala Kapuas - Palingkau | Tender | Pekerjaan Konstruksi | 14023012 | 46597337 | APBD | 8,485,500,000 | 8,485,500,000 | 0 | 0 | 0 | 8,290,300,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-25 | 8,485,500,000 | 100 % | ||||||
80 | 2024 | Peningkatan Jalan Pelantaran - Parenggean | Tender | Pekerjaan Konstruksi | 14024012 | 46604970 | APBD | 3,725,500,000 | 3,725,500,000 | 0 | 0 | 0 | 3,644,500,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-24 | 3,725,500,000 | 100 % | ||||||
81 | 2024 | Peningkatan Jalan Kuala Pembuang - Teluk Segintung | Tender | Pekerjaan Konstruksi | 14025012 | 49031998 | APBD | 8,925,500,000 | 8,925,500,000 | 0 | 0 | 0 | 8,641,000,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-05-22 | 2024-06-05 | 8,925,500,000 | 100 % | ||||||
82 | 2024 | Peningkatan Jalan Palingkau - Dadahup | Tender | Pekerjaan Konstruksi | 14026012 | 49032514 | APBD | 3,935,500,000 | 3,935,500,000 | 0 | 0 | 0 | 3,852,100,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-24 | 3,935,500,000 | 100 % | ||||||
83 | 2024 | Peningkatan Jalan Dadahup - Lamunti | Tender | Pekerjaan Konstruksi | 14027012 | 49033224 | APBD | 5,935,500,000 | 5,935,500,000 | 0 | 0 | 0 | 5,830,800,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-24 | 5,935,500,000 | 100 % | ||||||
84 | 2024 | Peningkatan Jalan Parenggean - Tb.Sangai (DBH Sawit 2024) | Tender | Pekerjaan Konstruksi | 14028012 | 49035764 | APBD | 40,815,873,600 | 40,815,873,600 | 0 | 0 | 0 | 39,796,500,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-30 | 2024-05-27 | 40,815,873,600 | 100 % | ||||||
85 | 2024 | Penggantian Jembatan di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14029012 | 47299129 | APBD | 23,665,500,000 | 23,665,500,000 | 0 | 0 | 0 | 23,020,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-25 | 23,665,500,000 | 100 % | ||||||
86 | 2024 | Pemeliharaan Berkala Jalan Wilayah Barat di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14030012 | 49039032 | APBD | 25,915,500,000 | 25,915,500,000 | 0 | 0 | 0 | 25,058,500,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-04-05 | 2024-04-25 | 25,915,500,000 | 100 % | ||||||
87 | 2024 | Pemeliharaan Berkala Jalan Wilayah Timur di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14031012 | 49040457 | APBD | 14,165,500,000 | 14,165,500,000 | 0 | 0 | 0 | 13,873,300,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-04-05 | 2024-04-29 | 14,165,500,000 | 100 % | ||||||
88 | 2024 | Peningkatan Jalan Tanjung Jariangau - Sp Jalan Provinsi | Tender | Pekerjaan Konstruksi | 14040012 | 49033869 | APBD | 3,925,500,000 | 3,925,500,000 | 0 | 0 | 0 | 3,824,000,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-24 | 3,925,500,000 | 100 % | ||||||
89 | 2024 | Pembangunan RTH, JPO dan Tempat Parkir Kawasan Bundaran Besar Palangka Raya | Tender | Pekerjaan Konstruksi | 14042012 | 50235018 | APBD | 89,918,400,000 | 89,918,400,000 | 0 | 0 | 0 | 87,003,338,381 | 0 | 0 | 2024-03-08 16:00:00 | 2024-04-02 | 2024-04-30 | 89,918,400,000 | 100 % | ||||||
90 | 2024 | Study Kelayakan Pembangunan Sekolah Unggulan (SLTA) di Kab. Kotawaringin Barat | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14044012 | 50234970 | APBD | 500,791,000 | 500,700,000 | 0 | 0 | 0 | 496,725,000 | 0 | 0 | 2024-03-08 16:00:00 | 2024-04-30 | 2024-06-04 | 500,791,000 | 100 % | ||||||
91 | 2024 | Study Kelayakan Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14045012 | 50234988 | APBD | 500,791,000 | 500,700,000 | 0 | 0 | 0 | 495,337,500 | 0 | 0 | 2024-03-08 15:30:00 | 2024-04-30 | 2024-06-03 | 500,791,000 | 100 % | ||||||
92 | 2024 | Study Kelayakan Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14046012 | 50234957 | APBD | 502,315,000 | 502,300,000 | 0 | 0 | 0 | 497,613,000 | 0 | 0 | 2024-03-08 15:30:00 | 2024-04-25 | 2024-05-17 | 502,315,000 | 100 % | ||||||
93 | 2024 | Penyusunan Dokumen Lingkungan Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14048012 | 50235000 | APBD | 500,791,000 | 500,700,000 | 0 | 0 | 0 | 493,728,000 | 0 | 0 | 2024-07-26 18:00:00 | 2024-09-04 | 2024-10-15 | 500,791,000 | 100 % | ||||||
94 | 2024 | Amdal Lalu Lintas Pembangunan Kawasan beserta Tugu Simpang Mahir Mahar Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14051012 | 50235006 | APBD | 202,284,000 | 202,200,000 | 0 | 0 | 0 | 199,006,350 | 0 | 0 | 2024-03-08 16:00:00 | 2024-04-30 | 2024-06-03 | 202,284,000 | 100 % | ||||||
95 | 2024 | Penyusunan Dokumen Lingkungan Lalu Lintas Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14052012 | 50234965 | APBD | 202,284,000 | 202,200,000 | 0 | 0 | 0 | 200,688,000 | 0 | 0 | 2024-07-25 14:00:00 | 2024-08-27 | 2024-10-15 | 202,284,000 | 100 % | ||||||
96 | 2024 | Penyusunan Dokumen Lingkungan Lalu Lintas Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14053012 | 50235003 | APBD | 204,259,000 | 204,200,000 | 0 | 0 | 0 | 200,355,000 | 0 | 0 | 2024-07-26 18:00:00 | 2024-09-04 | 2024-10-15 | 204,259,000 | 100 % | ||||||
97 | 2024 | Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Murung Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14055012 | 50235013 | APBD | 126,960,000 | 126,960,000 | 0 | 0 | 0 | 124,701,840 | 0 | 0 | 2024-03-08 15:30:00 | 2024-04-30 | 2024-05-15 | 126,960,000 | 100 % | ||||||
98 | 2024 | Peningkatan Jalan Lingkar Kota Muara Teweh | Tender | Pekerjaan Konstruksi | 14069012 | 46597210 | APBD | 26,915,500,000 | 26,915,500,000 | 0 | 0 | 0 | 26,634,600,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-05-28 | 2024-06-26 | 26,915,500,000 | 100 % | ||||||
99 | 2024 | Pemeliharaan Berkala Jalan Wilayah Tengah di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14070012 | 49039650 | APBD | 18,935,500,000 | 18,935,500,000 | 0 | 0 | 0 | 18,508,400,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-04-05 | 2024-04-24 | 18,935,500,000 | 100 % | ||||||
100 | 2024 | Pembuatan dan Penataan Landscape beserta Sarana dan Prasarana Penunjang Bundaran Besar Palangka Raya (Lanjutan) | Tender | Pekerjaan Konstruksi | 14080012 | 50782256 | APBD | 17,200,000,000 | 17,200,000,000 | 0 | 0 | 0 | 17,059,289,000 | 0 | 0 | 2024-03-28 09:00:00 | 2024-05-01 | 2024-05-27 | 17,200,000,000 | 100 % | ||||||
101 | 2024 | Pembangunan Kawasan beserta Tugu Simpang Mahir-Mahar Palangka Raya (Lanjutan) | Tender | Pekerjaan Konstruksi | 14081012 | 50782418 | APBD | 19,050,000,000 | 19,050,000,000 | 0 | 0 | 0 | 18,783,700,000 | 0 | 0 | 2024-03-28 09:00:00 | 2024-04-30 | 2024-05-22 | 19,050,000,000 | 100 % | ||||||
102 | 2024 | Perencanaan Pembangunan/Peningkatan Khatolic Center Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14084012 | 50782945 | APBD | 406,513,000 | 406,513,000 | 0 | 0 | 0 | 400,421,400 | 0 | 0 | 2024-03-22 08:00:00 | 2024-04-23 | 2024-05-15 | 406,513,000 | 100 % | ||||||
103 | 2024 | Perencanaan Pembangunan Gedung Kantor MUI Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14085012 | 48931138 | APBD | 286,896,000 | 286,896,000 | 0 | 0 | 0 | 270,828,900 | 0 | 0 | 2024-03-22 08:00:00 | 2024-04-23 | 2024-05-28 | 286,896,000 | 100 % | ||||||
104 | 2024 | Konsultan Pengawasan Pembangunan Gedung Balai Basarah dan Sarana Prasarana pada Kawasan Hindu Kaharingan Center Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14087012 | 50783503 | APBD | 298,908,000 | 298,900,000 | 0 | 0 | 0 | 292,351,800 | 0 | 0 | 2024-03-22 08:00:00 | 2024-04-23 | 2024-05-16 | 298,908,000 | 100 % | ||||||
105 | 2024 | Konsultan Pengawasan Penyediaan/Peningkatan Sarana dan Prasarana Persampahan di Kab. Kotawaringin Timur | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14088012 | 50783639 | APBD | 150,263,000 | 150,263,000 | 0 | 0 | 0 | 148,557,960 | 0 | 0 | 2024-03-22 08:00:00 | 2024-04-23 | 2024-05-20 | 150,263,000 | 100 % | ||||||
106 | 2024 | Peningkatan Jalan Sudirman dan Jalan Yos Sudarso Puruk Cahu | Tender | Pekerjaan Konstruksi | 14089012 | 49034329 | APBD | 4,915,500,000 | 4,915,500,000 | 0 | 0 | 0 | 4,876,700,000 | 0 | 0 | 2024-05-08 15:00:00 | 2024-06-14 | 2024-06-28 | 4,915,500,000 | 100 % | ||||||
107 | 2024 | Konsultan Manajemen Konstruksi Pembangunan RTH, JPO dan Tempat Parkir Kawasan Bundaran Besar Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14090012 | 50235016 | APBD | 1,183,486,000 | 1,183,486,000 | 0 | 0 | 0 | 1,167,187,200 | 0 | 0 | 2024-03-26 14:00:00 | 2024-05-08 | 2024-05-15 | 1,183,486,000 | 100 % | ||||||
108 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (DBH Sawit) 2024 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14101012 | 47534701 | APBD | 1,400,000,000 | 1,400,000,000 | 0 | 0 | 0 | 1,372,487,250 | 0 | 0 | 2024-03-28 11:00:00 | 2024-05-13 | 2024-05-22 | 1,400,000,000 | 100 % | ||||||
109 | 2024 | Konsultan Pengawasan Rehabilitasi/Pemeliharaan Sarana dan Prasarana Kawasan Tugu Soekarno Palangka Raya (Lanjutan) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14103012 | 50783378 | APBD | 177,598,000 | 177,598,000 | 0 | 0 | 0 | 167,757,630 | 0 | 0 | 2024-03-28 12:00:00 | 2024-04-29 | 2024-05-22 | 177,598,000 | 100 % | ||||||
110 | 2024 | Perencanaan Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14104012 | 49795804 | APBD | 701,335,000 | 701,335,000 | 0 | 0 | 0 | 693,972,000 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-15 | 2024-05-27 | 701,335,000 | 100 % | ||||||
111 | 2024 | Perencanaan Pembangunan dan Penataan Sarana dan Prasarana POLDA Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14105012 | 49795799 | APBD | 2,440,000,000 | 2,440,000,000 | 0 | 0 | 0 | 2,419,356,000 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-15 | 2024-05-27 | 2,440,000,000 | 100 % | ||||||
112 | 2024 | Penyusunan Masterplan dan DED Pembangunan Sekolah Unggulan (SLTA) di Kab. Kotawaringin Barat | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14107012 | 49795793 | APBD | 1,014,353,000 | 999,500,000 | 0 | 0 | 0 | 990,120,000 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-15 | 2024-05-30 | 1,014,353,000 | 100 % | ||||||
113 | 2024 | Perencanaan Pemeliharaan Bangunan dan Lingkungan Aset Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14108012 | 47823288 | APBD | 406,513,000 | 406,513,000 | 0 | 0 | 0 | 401,953,200 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-15 | 2024-05-28 | 406,513,000 | 100 % | ||||||
114 | 2024 | Perencanaan Rehabilitasi/Pemeliharaan Masjid Raya Darussalam, Menara beserta Sarana & Prasarana | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14109012 | 47824032 | APBD | 740,220,000 | 740,220,000 | 0 | 0 | 0 | 721,733,100 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-15 | 2024-05-28 | 740,220,000 | 100 % | ||||||
115 | 2024 | Penyusunan Masterplan dan DED Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14110012 | 50234953 | APBD | 701,335,000 | 701,335,000 | 0 | 0 | 0 | 694,971,000 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-17 | 2024-05-29 | 701,335,000 | 100 % | ||||||
116 | 2024 | Pembangunan Sarana dan Prasarana Penunjang RSUD Kelas B di Wilayah Barat Prov. Kalteng (Lanjutan) | Tender | Pekerjaan Konstruksi | 14111012 | 51260072 | APBD | 29,930,000,000 | 29,930,000,000 | 0 | 0 | 0 | 29,323,000,000 | 0 | 0 | 2024-05-08 08:00:00 | 2024-05-31 | 2024-07-24 | 29,930,000,000 | 100 % | ||||||
117 | 2024 | Pembangunan/Peningkatan Jalan Inspeksi Desa Jaya Makmur Kec. Katingan Kuala Kabupaten Katingan | Tender | Pekerjaan Konstruksi | 14119012 | 48922419 | APBD | 930,000,000 | 930,000,000 | 0 | 0 | 0 | 922,376,594 | 0 | 0 | 2024-04-19 10:00:00 | 2024-05-03 | 2024-05-22 | 930,000,000 | 100 % | ||||||
118 | 2024 | Perencanaan Teknis Jalan dan Jembatan (DED) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14120012 | 48810279 | APBD | 1,435,500,000 | 1,435,500,000 | 0 | 0 | 0 | 1,424,352,000 | 0 | 0 | 2024-04-16 15:00:00 | 2024-05-22 | 2024-06-03 | 1,435,500,000 | 100 % | ||||||
119 | 2024 | Konsultan Manajemen Konstruksi Pembuatan dan Penataan Landscape beserta Sarana dan Prasarana Penunjang Bundaran Besar Palangka raya (Lanjutan) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14121012 | 47832782 | APBD | 1,542,427,000 | 1,542,427,000 | 0 | 0 | 0 | 1,535,141,100 | 0 | 0 | 2024-04-16 15:00:00 | 2024-05-21 | 2024-05-30 | 1,542,427,000 | 100 % | ||||||
120 | 2024 | Pembangunan Jembatan Tumbang Gugup | Tender | Pekerjaan Konstruksi | 14138012 | 46910850 | APBD | 23,675,500,000 | 23,675,500,000 | 0 | 0 | 0 | 23,300,000,000 | 0 | 0 | 2024-05-08 15:00:00 | 2024-06-07 | 2024-06-26 | 23,675,500,000 | 100 % | ||||||
121 | 2024 | Perencanaan Pembangunan dan Penataan Sarana dan Prasarana Korem 102/Panju Panjung | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14155012 | 50782815 | APBD | 1,521,881,000 | 1,521,881,000 | 0 | 0 | 0 | 1,513,715,880 | 0 | 0 | 2024-05-08 17:30:00 | 2024-06-21 | 2024-07-05 | 1,521,881,000 | 100 % | ||||||
122 | 2024 | Study Kelayakan dan DED Pembangunan Rumah Sakit Provinsi di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14156012 | 50782627 | APBD | 1,464,375,000 | 1,464,375,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2024-05-08 17:30:00 | 2024-06-21 | 1,464,375,000 | 100 % | |||||||
123 | 2024 | Penyusunan Masterplan dan DED Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14157012 | 49795795 | APBD | 2,650,074,000 | 2,650,074,000 | 0 | 0 | 0 | 2,616,980,400 | 0 | 0 | 2024-05-17 16:00:00 | 2024-06-28 | 2024-07-15 | 2,650,074,000 | 100 % | ||||||
124 | 2024 | Peningkatan Jalan Simpang Patas Tabak Kanilan | Tender | Pekerjaan Konstruksi | 14175012 | 46589731 | APBD | 9,925,500,000 | 9,925,500,000 | 0 | 0 | 0 | 9,672,100,000 | 0 | 0 | 2024-05-22 15:00:00 | 2024-06-14 | 2024-06-25 | 9,925,500,000 | 100 % | ||||||
125 | 2024 | Perencanaan Teknis Pekerjaan Fisik Bidang Cipta Karya; | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15183012 | 47737732 | APBD | 1,205,939,000 | 1,205,939,000 | 0 | 0 | 0 | 1,186,750,950 | 0 | 0 | 2024-06-27 10:00:00 | 2024-08-05 | 2024-07-15 | 1,205,939,000 | 100 % | ||||||
126 | 2024 | Pemeliharaan Berkala Jembatan Tersebar Di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 15186012 | 47434440 | APBD | 14,250,000,000 | 14,250,000,000 | 0 | 0 | 0 | 13,794,900,000 | 0 | 0 | 2024-06-07 14:00:00 | 2024-06-28 | 2024-07-09 | 14,250,000,000 | 100 % | ||||||
127 | 2024 | Konsultan MK Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15190012 | 47589302 | APBD | 803,363,000 | 803,363,000 | 0 | 0 | 0 | 801,472,170 | 0 | 0 | 2024-06-20 15:00:00 | 2024-07-24 | 2024-08-26 | 803,363,000 | 100 % | ||||||
128 | 2024 | Konsultan Pengawasan Pembangunan dan Penataan Sarana dan Prasarana Korem 102/Panju Panjung | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15191012 | 47826749 | APBD | 1,106,846,000 | 1,106,846,000 | 0 | 0 | 0 | 1,101,783,780 | 0 | 0 | 2024-06-20 15:00:00 | 2024-07-24 | 2024-08-26 | 1,106,846,000 | 100 % | ||||||
129 | 2024 | Konsultan Pengawasan Pembangunan Rumah sakit Provinsi di Kota Palangka Raya (Tahap I) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15196012 | 48898841 | APBD | 874,560,000 | 874,560,000 | 0 | 0 | 0 | 868,420,000 | 0 | 0 | 2024-06-20 12:00:00 | 2024-08-09 | 2024-08-21 | 874,560,000 | 100 % | ||||||
130 | 2024 | Konsultan Pengawasan Rehabilitasi/Pemeliharaan Masjid Raya Darussalam, Menara beserta Sarana & Prasarana | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15197012 | 47831952 | APBD | 680,039,000 | 680,039,000 | 0 | 0 | 0 | 670,360,000 | 0 | 0 | 2024-06-20 12:00:00 | 2024-08-09 | 2024-08-16 | 680,039,000 | 100 % | ||||||
131 | 2024 | Konsultan Pengawasan Pemeliharaan Bangunan dan Lingkungan Aset Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15199012 | 47830314 | APBD | 243,440,000 | 234,440,000 | 0 | 0 | 0 | 231,110,000 | 0 | 0 | 2024-06-20 12:00:00 | 2024-08-09 | 2024-08-16 | 243,440,000 | 100 % | ||||||
132 | 2024 | Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 15228012 | 47589300 | APBD | 19,000,000,000 | 19,000,000,000 | 0 | 0 | 0 | 18,683,900,000 | 0 | 0 | 2024-07-16 17:30:00 | 2024-08-02 | 2024-08-26 | 19,000,000,000 | 100 % | ||||||
133 | 2024 | Pembangunan dan Penataan Sarana dan Prasarana Korem 102/Panju Panjung | Tender | Pekerjaan Konstruksi | 15231012 | 47855243 | APBD | 17,250,000,000 | 17,250,000,000 | 0 | 0 | 0 | 17,063,500,000 | 0 | 0 | 2024-07-16 16:00:00 | 2024-08-09 | 2024-08-26 | 17,250,000,000 | 100 % | ||||||
134 | 2024 | Penyusunan Dokumen Lingkungan Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15234012 | 50234959 | APBD | 502,315,000 | 502,315,000 | 0 | 0 | 0 | 498,001,500 | 0 | 0 | 2024-07-26 18:00:00 | 2024-09-04 | 2024-10-15 | 502,315,000 | 100 % | ||||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2024 | Peningkatan Jalan Pulang Pisau - Pangkoh (DAK) | Tender | Pekerjaan Konstruksi | 13918012 | 45849241 | APBD | 29,245,098,300 | 29,245,097,880 | 0 | 0 | 0 | 28,610,877,000 | 0 | 0 | 2023-12-22 11:00:00 | 2024-02-05 | 2024-02-19 | 29,245,098,300 | 100 % | ||||||
2 | 2024 | Peningkatan Jalan Dadahup /G1 - Lamunti (DAK) | Tender | Pekerjaan Konstruksi | 13920012 | 45859276 | APBD | 17,033,748,900 | 17,033,748,242 | 0 | 0 | 0 | 16,745,000,000 | 0 | 0 | 2023-12-22 11:00:00 | 2024-01-10 | 2024-01-29 | 17,033,748,900 | 100 % | ||||||
3 | 2024 | Rehabilitasi Jaringan Irigasi D.I.R. Unit Mentaren II Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13924012 | 46341856 | APBD | 3,550,000,000 | 3,550,000,000 | 0 | 0 | 0 | 3,442,900,000 | 0 | 0 | 2024-01-16 08:00:00 | 2024-02-07 | 2024-02-21 | 3,550,000,000 | 100 % | ||||||
4 | 2024 | Rehabilitasi Jaringan Irigasi D.I.R. Kuala Jelai I Kabupaten Sukamara | Tender | Pekerjaan Konstruksi | 13925012 | 46342156 | APBD | 5,071,625,000 | 5,071,625,000 | 0 | 0 | 0 | 4,994,000,000 | 0 | 0 | 2024-01-16 08:00:00 | 2024-02-07 | 2024-02-21 | 5,071,625,000 | 100 % | ||||||
5 | 2024 | Rehabilitasi Jaringan Irigasi D.I.R. Maliku Baru Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13926012 | 46342039 | APBD | 4,600,000,000 | 4,600,000,000 | 0 | 0 | 0 | 4,453,700,000 | 0 | 0 | 2024-01-16 08:00:00 | 2024-02-07 | 2024-02-21 | 4,600,000,000 | 100 % | ||||||
6 | 2024 | Peningkatan Jalan Bangkal - Telaga Pulang - Kuala Pembuang (DAK) | Tender | Pekerjaan Konstruksi | 13927012 | 45859361 | APBD | 10,390,589,850 | 10,390,579,809 | 0 | 0 | 0 | 10,000,000,000 | 0 | 0 | 2024-01-12 08:00:00 | 2024-01-31 | 2024-02-05 | 10,390,589,850 | 100 % | ||||||
7 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan di Kecamatan Pandih Batu Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13934012 | 48920057 | APBD | 3,940,000,000 | 3,940,000,000 | 0 | 0 | 0 | 3,908,400,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 3,940,000,000 | 100 % | ||||||
8 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan di Kecamatan Maliku Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13935012 | 48920332 | APBD | 2,440,000,000 | 2,440,000,000 | 0 | 0 | 0 | 2,421,200,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 2,440,000,000 | 100 % | ||||||
9 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Bahaur I Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13936012 | 48920497 | APBD | 1,940,000,000 | 1,940,000,000 | 0 | 0 | 0 | 1,885,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 1,940,000,000 | 100 % | ||||||
10 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan di Kecamatan Mantangai Kabupaten Kapuas | Tender | Pekerjaan Konstruksi | 13937012 | 48920763 | APBD | 3,920,000,000 | 3,920,000,000 | 0 | 0 | 0 | 3,894,800,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 3,920,000,000 | 100 % | ||||||
11 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Kuin Kabupaten Kotawaringin Timur | Tender | Pekerjaan Konstruksi | 13938012 | 48921227 | APBD | 1,920,000,000 | 1,920,000,000 | 0 | 0 | 0 | 1,843,471,543 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 1,920,000,000 | 100 % | ||||||
12 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Lampuyang Kabupaten Kotawaringin Timur | Tender | Pekerjaan Konstruksi | 13939012 | 48921559 | APBD | 1,930,000,000 | 1,930,000,000 | 0 | 0 | 0 | 1,872,275,515 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 1,930,000,000 | 100 % | ||||||
13 | 2024 | Pembangunan BreakWater Desa Sebuai Timur Kabupaten Kotawaringin Barat | Tender | Pekerjaan Konstruksi | 13941012 | 48933221 | APBD | 1,330,000,000 | 1,330,000,000 | 0 | 0 | 0 | 1,321,616,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 1,330,000,000 | 100 % | ||||||
14 | 2024 | Normalisasi Sungai Hijau Kecamatan Pangkalan Banteng Kabupaten Kotawaringin Barat | Tender | Pekerjaan Konstruksi | 13942012 | 48935331 | APBD | 2,920,000,000 | 2,920,000,000 | 0 | 0 | 0 | 2,855,103,710 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 2,920,000,000 | 100 % | ||||||
15 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Natai Apung Kabupaten Sukamara | Tender | Pekerjaan Konstruksi | 13943012 | 48938496 | APBD | 2,910,000,000 | 2,910,000,000 | 0 | 0 | 0 | 2,847,032,803 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 2,910,000,000 | 100 % | ||||||
16 | 2024 | Peningkatan Jalan Simpang Kenawan - Riam Durian | Tender | Pekerjaan Konstruksi | 13989012 | 46588070 | APBD | 8,915,500,000 | 8,915,500,000 | 0 | 0 | 0 | 8,737,190,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-04-19 | 2024-05-08 | 8,915,500,000 | 100 % | ||||||
17 | 2024 | Peningkatan Jalan RSUD Hanau | Tender | Pekerjaan Konstruksi | 13991012 | 46588647 | APBD | 8,925,500,000 | 8,925,500,000 | 0 | 0 | 0 | 8,720,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-25 | 8,925,500,000 | 100 % | ||||||
18 | 2024 | Pembangunan Sarana dan Prasarana Pendukung RSUD Kelas B di Wilayah Barat Prov. Kalteng (Lanjutan)(Tahap 2) | Tender | Pekerjaan Konstruksi | 13993012 | 47594522 | APBD | 24,850,000,000 | 24,850,000,000 | 0 | 0 | 0 | 24,701,272,565 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-05 | 2024-04-29 | 24,850,000,000 | 100 % | ||||||
19 | 2024 | Peningkatan Jalan Lunci - Jelai | Tender | Pekerjaan Konstruksi | 13994012 | 46590157 | APBD | 18,915,500,000 | 18,915,500,000 | 0 | 0 | 0 | 18,626,500,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-05-08 | 2024-05-30 | 18,915,500,000 | 100 % | ||||||
20 | 2024 | Peningkatan Jalan Pulang Pisau Pangkoh I | Tender | Pekerjaan Konstruksi | 13995012 | 46590837 | APBD | 21,767,824,000 | 21,767,824,000 | 0 | 0 | 0 | 21,289,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 21,767,824,000 | 100 % | ||||||
21 | 2024 | Peningkatan Jalan Pulang Pisau Pangkoh 2 | Tender | Pekerjaan Konstruksi | 13996012 | 46591902 | APBD | 13,935,500,000 | 13,935,500,000 | 0 | 0 | 0 | 13,652,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-03-24 | 13,935,500,000 | 100 % | ||||||
22 | 2024 | Peningkatan Jalan Pangkoh - Bahaur | Tender | Pekerjaan Konstruksi | 13997012 | 46592217 | APBD | 34,435,500,000 | 34,435,500,000 | 0 | 0 | 0 | 34,151,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-30 | 2024-05-20 | 34,435,500,000 | 100 % | ||||||
23 | 2024 | Peningkatan Jalan Telang Siong Bangkoang | Tender | Pekerjaan Konstruksi | 13998012 | 46594436 | APBD | 8,778,500,000 | 8,778,500,000 | 0 | 0 | 0 | 8,601,800,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-05 | 2024-04-24 | 8,778,500,000 | 100 % | ||||||
24 | 2024 | Peningkatan Jalan Tumbang Sangai Tumbang Kalang | Tender | Pekerjaan Konstruksi | 13999012 | 46595195 | APBD | 8,925,500,000 | 8,925,500,000 | 0 | 0 | 0 | 8,724,600,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-25 | 8,925,500,000 | 100 % | ||||||
25 | 2024 | Peningkatan Jalan Amin Jaya Rantau Pulut | Tender | Pekerjaan Konstruksi | 14000012 | 46595672 | APBD | 25,175,500,000 | 25,175,500,000 | 0 | 0 | 0 | 24,411,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-25 | 25,175,500,000 | 100 % | ||||||
26 | 2024 | Peningkatan Jalan Kuala Kuayan Tanjung Jariangau | Tender | Pekerjaan Konstruksi | 14001012 | 46592645 | APBD | 8,925,500,000 | 8,925,500,000 | 0 | 0 | 0 | 8,698,800,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-24 | 8,925,500,000 | 100 % | ||||||
27 | 2024 | Peningkatan Jalan Bangkal Telaga Pulang Kuala Pembuang I | Tender | Pekerjaan Konstruksi | 14002012 | 46593125 | APBD | 26,725,500,000 | 26,725,500,000 | 0 | 0 | 0 | 26,000,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 26,725,500,000 | 100 % | ||||||
28 | 2024 | Peningkatan Jalan Bangkal Telaga Pulang Kuala Pembuang II | Tender | Pekerjaan Konstruksi | 14004012 | 46593510 | APBD | 17,925,500,000 | 17,925,500,000 | 0 | 0 | 0 | 17,436,300,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-24 | 17,925,500,000 | 100 % | ||||||
29 | 2024 | Peningkatan Jalan Sampit - Samuda | Tender | Pekerjaan Konstruksi | 14005012 | 46596013 | APBD | 13,925,500,000 | 13,925,500,000 | 0 | 0 | 0 | 13,624,000,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-30 | 13,925,500,000 | 100 % | ||||||
30 | 2024 | Peningkatan Jalan Samuda Ujung Pandaran | Tender | Pekerjaan Konstruksi | 14006012 | 46596180 | APBD | 12,925,500,000 | 12,925,500,000 | 0 | 0 | 0 | 12,650,700,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-30 | 12,925,500,000 | 100 % | ||||||
31 | 2024 | Peningkatan Jalan Gadabung - Terusan | Tender | Pekerjaan Konstruksi | 14010012 | 46594045 | APBD | 12,935,500,000 | 12,935,500,000 | 0 | 0 | 0 | 12,618,600,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-05 | 2024-04-25 | 12,935,500,000 | 100 % | ||||||
32 | 2024 | Peningkatan Jalan Ujung Pandaran Kuala Pembuang | Tender | Pekerjaan Konstruksi | 14011012 | 46597017 | APBD | 9,925,500,000 | 9,925,500,000 | 0 | 0 | 0 | 9,610,000,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-19 | 2024-05-08 | 9,925,500,000 | 100 % | ||||||
33 | 2024 | Peningkatan Jalan Simpang Pundu Tumbang Samba | Tender | Pekerjaan Konstruksi | 14012012 | 46596857 | APBD | 6,110,500,000 | 6,110,500,000 | 0 | 0 | 0 | 5,976,500,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-05 | 2024-04-24 | 6,110,500,000 | 100 % | ||||||
34 | 2024 | Peningkatan Jalan Kuala Kurun Linau Tumbang Jutuh | Tender | Pekerjaan Konstruksi | 14013012 | 46604753 | APBD | 3,735,500,000 | 3,735,500,000 | 0 | 0 | 0 | 3,659,200,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-05 | 2024-04-24 | 3,735,500,000 | 100 % | ||||||
35 | 2024 | Peningkatan Jalan Poros Bahaur menuju Desa Bahaur Kecamatan Hanau | Tender | Pekerjaan Konstruksi | 14018012 | 49034739 | APBD | 3,925,500,000 | 3,925,500,000 | 0 | 0 | 0 | 3,834,000,000 | 0 | 0 | 2024-03-15 09:00:00 | 2024-04-05 | 2024-04-22 | 3,925,500,000 | 100 % | ||||||
36 | 2024 | Penggantian Jembatan Sei Pudu Ruas Jalan Provinsi Parenggean - Tumbang Sangai | Tender | Pekerjaan Konstruksi | 14019012 | 49041610 | APBD | 6,925,500,000 | 6,925,500,000 | 0 | 0 | 0 | 6,755,900,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-04-05 | 2024-04-25 | 6,925,500,000 | 100 % | ||||||
37 | 2024 | Peningkatan Jalan Parenggean - Tumbang Sangai (DBH Sawit 2023) | Tender | Pekerjaan Konstruksi | 14020012 | 47290459 | APBD | 46,417,540,000 | 46,417,540,000 | 0 | 0 | 0 | 45,228,600,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-30 | 2024-05-27 | 46,417,540,000 | 100 % | ||||||
38 | 2024 | Peningkatan Jalan Kuala Kapuas - Palingkau | Tender | Pekerjaan Konstruksi | 14023012 | 46597337 | APBD | 8,485,500,000 | 8,485,500,000 | 0 | 0 | 0 | 8,290,300,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-25 | 8,485,500,000 | 100 % | ||||||
39 | 2024 | Peningkatan Jalan Pelantaran - Parenggean | Tender | Pekerjaan Konstruksi | 14024012 | 46604970 | APBD | 3,725,500,000 | 3,725,500,000 | 0 | 0 | 0 | 3,644,500,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-24 | 3,725,500,000 | 100 % | ||||||
40 | 2024 | Peningkatan Jalan Kuala Pembuang - Teluk Segintung | Tender | Pekerjaan Konstruksi | 14025012 | 49031998 | APBD | 8,925,500,000 | 8,925,500,000 | 0 | 0 | 0 | 8,641,000,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-05-22 | 2024-06-05 | 8,925,500,000 | 100 % | ||||||
41 | 2024 | Peningkatan Jalan Palingkau - Dadahup | Tender | Pekerjaan Konstruksi | 14026012 | 49032514 | APBD | 3,935,500,000 | 3,935,500,000 | 0 | 0 | 0 | 3,852,100,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-24 | 3,935,500,000 | 100 % | ||||||
42 | 2024 | Peningkatan Jalan Dadahup - Lamunti | Tender | Pekerjaan Konstruksi | 14027012 | 49033224 | APBD | 5,935,500,000 | 5,935,500,000 | 0 | 0 | 0 | 5,830,800,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-24 | 5,935,500,000 | 100 % | ||||||
43 | 2024 | Peningkatan Jalan Parenggean - Tb.Sangai (DBH Sawit 2024) | Tender | Pekerjaan Konstruksi | 14028012 | 49035764 | APBD | 40,815,873,600 | 40,815,873,600 | 0 | 0 | 0 | 39,796,500,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-30 | 2024-05-27 | 40,815,873,600 | 100 % | ||||||
44 | 2024 | Penggantian Jembatan di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14029012 | 47299129 | APBD | 23,665,500,000 | 23,665,500,000 | 0 | 0 | 0 | 23,020,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 2024-04-05 | 2024-04-25 | 23,665,500,000 | 100 % | ||||||
45 | 2024 | Pemeliharaan Berkala Jalan Wilayah Barat di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14030012 | 49039032 | APBD | 25,915,500,000 | 25,915,500,000 | 0 | 0 | 0 | 25,058,500,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-04-05 | 2024-04-25 | 25,915,500,000 | 100 % | ||||||
46 | 2024 | Pemeliharaan Berkala Jalan Wilayah Timur di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14031012 | 49040457 | APBD | 14,165,500,000 | 14,165,500,000 | 0 | 0 | 0 | 13,873,300,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-04-05 | 2024-04-29 | 14,165,500,000 | 100 % | ||||||
47 | 2024 | Peningkatan Jalan Tanjung Jariangau - Sp Jalan Provinsi | Tender | Pekerjaan Konstruksi | 14040012 | 49033869 | APBD | 3,925,500,000 | 3,925,500,000 | 0 | 0 | 0 | 3,824,000,000 | 0 | 0 | 2024-03-13 08:00:00 | 2024-04-05 | 2024-04-24 | 3,925,500,000 | 100 % | ||||||
48 | 2024 | Pembangunan RTH, JPO dan Tempat Parkir Kawasan Bundaran Besar Palangka Raya | Tender | Pekerjaan Konstruksi | 14042012 | 50235018 | APBD | 89,918,400,000 | 89,918,400,000 | 0 | 0 | 0 | 87,003,338,381 | 0 | 0 | 2024-03-08 16:00:00 | 2024-04-02 | 2024-04-30 | 89,918,400,000 | 100 % | ||||||
49 | 2024 | Peningkatan Jalan Lingkar Kota Muara Teweh | Tender | Pekerjaan Konstruksi | 14069012 | 46597210 | APBD | 26,915,500,000 | 26,915,500,000 | 0 | 0 | 0 | 26,634,600,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-05-28 | 2024-06-26 | 26,915,500,000 | 100 % | ||||||
50 | 2024 | Pemeliharaan Berkala Jalan Wilayah Tengah di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14070012 | 49039650 | APBD | 18,935,500,000 | 18,935,500,000 | 0 | 0 | 0 | 18,508,400,000 | 0 | 0 | 2024-03-15 11:00:00 | 2024-04-05 | 2024-04-24 | 18,935,500,000 | 100 % | ||||||
51 | 2024 | Pembuatan dan Penataan Landscape beserta Sarana dan Prasarana Penunjang Bundaran Besar Palangka Raya (Lanjutan) | Tender | Pekerjaan Konstruksi | 14080012 | 50782256 | APBD | 17,200,000,000 | 17,200,000,000 | 0 | 0 | 0 | 17,059,289,000 | 0 | 0 | 2024-03-28 09:00:00 | 2024-05-01 | 2024-05-27 | 17,200,000,000 | 100 % | ||||||
52 | 2024 | Pembangunan Kawasan beserta Tugu Simpang Mahir-Mahar Palangka Raya (Lanjutan) | Tender | Pekerjaan Konstruksi | 14081012 | 50782418 | APBD | 19,050,000,000 | 19,050,000,000 | 0 | 0 | 0 | 18,783,700,000 | 0 | 0 | 2024-03-28 09:00:00 | 2024-04-30 | 2024-05-22 | 19,050,000,000 | 100 % | ||||||
53 | 2024 | Peningkatan Jalan Sudirman dan Jalan Yos Sudarso Puruk Cahu | Tender | Pekerjaan Konstruksi | 14089012 | 49034329 | APBD | 4,915,500,000 | 4,915,500,000 | 0 | 0 | 0 | 4,876,700,000 | 0 | 0 | 2024-05-08 15:00:00 | 2024-06-14 | 2024-06-28 | 4,915,500,000 | 100 % | ||||||
54 | 2024 | Pembangunan Sarana dan Prasarana Penunjang RSUD Kelas B di Wilayah Barat Prov. Kalteng (Lanjutan) | Tender | Pekerjaan Konstruksi | 14111012 | 51260072 | APBD | 29,930,000,000 | 29,930,000,000 | 0 | 0 | 0 | 29,323,000,000 | 0 | 0 | 2024-05-08 08:00:00 | 2024-05-31 | 2024-07-24 | 29,930,000,000 | 100 % | ||||||
55 | 2024 | Pembangunan/Peningkatan Jalan Inspeksi Desa Jaya Makmur Kec. Katingan Kuala Kabupaten Katingan | Tender | Pekerjaan Konstruksi | 14119012 | 48922419 | APBD | 930,000,000 | 930,000,000 | 0 | 0 | 0 | 922,376,594 | 0 | 0 | 2024-04-19 10:00:00 | 2024-05-03 | 2024-05-22 | 930,000,000 | 100 % | ||||||
56 | 2024 | Pembangunan Jembatan Tumbang Gugup | Tender | Pekerjaan Konstruksi | 14138012 | 46910850 | APBD | 23,675,500,000 | 23,675,500,000 | 0 | 0 | 0 | 23,300,000,000 | 0 | 0 | 2024-05-08 15:00:00 | 2024-06-07 | 2024-06-26 | 23,675,500,000 | 100 % | ||||||
57 | 2024 | Peningkatan Jalan Simpang Patas Tabak Kanilan | Tender | Pekerjaan Konstruksi | 14175012 | 46589731 | APBD | 9,925,500,000 | 9,925,500,000 | 0 | 0 | 0 | 9,672,100,000 | 0 | 0 | 2024-05-22 15:00:00 | 2024-06-14 | 2024-06-25 | 9,925,500,000 | 100 % | ||||||
58 | 2024 | Pemeliharaan Berkala Jembatan Tersebar Di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 15186012 | 47434440 | APBD | 14,250,000,000 | 14,250,000,000 | 0 | 0 | 0 | 13,794,900,000 | 0 | 0 | 2024-06-07 14:00:00 | 2024-06-28 | 2024-07-09 | 14,250,000,000 | 100 % | ||||||
59 | 2024 | Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 15228012 | 47589300 | APBD | 19,000,000,000 | 19,000,000,000 | 0 | 0 | 0 | 18,683,900,000 | 0 | 0 | 2024-07-16 17:30:00 | 2024-08-02 | 2024-08-26 | 19,000,000,000 | 100 % | ||||||
60 | 2024 | Pembangunan dan Penataan Sarana dan Prasarana Korem 102/Panju Panjung | Tender | Pekerjaan Konstruksi | 15231012 | 47855243 | APBD | 17,250,000,000 | 17,250,000,000 | 0 | 0 | 0 | 17,063,500,000 | 0 | 0 | 2024-07-16 16:00:00 | 2024-08-09 | 2024-08-26 | 17,250,000,000 | 100 % | ||||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (Penugasan) - Tematik 01 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13921012 | 45859525 | APBD | 546,873,150 | 546,873,148 | 0 | 0 | 0 | 541,600,648 | 0 | 0 | 2023-12-22 11:00:00 | 2024-02-07 | 2024-02-19 | 546,873,150 | 100 % | ||||||
2 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (Penugasan) - Tematik 04 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13922012 | 45859587 | APBD | 1,539,215,700 | 1,539,215,688 | 0 | 0 | 0 | 1,522,924,440 | 0 | 0 | 2023-12-22 11:00:00 | 2024-02-07 | 2024-02-19 | 1,539,215,700 | 100 % | ||||||
3 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (Penugasan) - Tematik 05 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13923012 | 45859632 | APBD | 896,513,100 | 896,512,923 | 0 | 0 | 0 | 888,765,345 | 0 | 0 | 2023-12-22 11:00:00 | 2024-02-07 | 2024-02-19 | 896,513,100 | 100 % | ||||||
4 | 2024 | ,Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Poros Bahaur menuju Desa Bahaur Kecamatan Hanau | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13932012 | 47513309;49048455 | APBD | 830,500,000 | 830,500,000 | 0 | 0 | 0 | 822,282,117 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 830,500,000 | 100 % | ||||||
5 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (DBH Sawit 2023) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13933012 | 48219050 | APBD | 1,400,000,000 | 1,400,000,000 | 0 | 0 | 0 | 1,385,835,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 1,400,000,000 | 100 % | ||||||
6 | 2024 | Pola dan Rencana Pengelolaan Sumber Daya Air Wilayah Sungai Seruyan (Tahap II) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13944012 | 49066232 | APBD | 1,900,000,000 | 1,900,000,000 | 0 | 0 | 0 | 1,888,110,000 | 0 | 0 | 2024-02-23 19:00:00 | 2024-03-25 | 2024-04-26 | 1,900,000,000 | 100 % | ||||||
7 | 2024 | Perencanaan Tanggul Banjir Daerah Irigasi Tampa | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13945012 | 48948442 | APBD | 650,000,000 | 650,000,000 | 0 | 0 | 0 | 646,464,000 | 0 | 0 | 2024-02-23 19:00:00 | 2024-04-01 | 2024-04-26 | 650,000,000 | 100 % | ||||||
8 | 2024 | Supervisi Kegiatan Fisik Bidang SDA | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13946012 | 49066098 | APBD | 700,000,000 | 700,000,000 | 0 | 0 | 0 | 695,082,000 | 0 | 0 | 2024-02-21 20:00:00 | 2024-03-18 | 2024-04-24 | 700,000,000 | 100 % | ||||||
9 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Sp.Kenawan - Riam Durian | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13948012 | 47511057 | APBD | 880,500,000 | 880,500,000 | 0 | 0 | 0 | 875,790,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 880,500,000 | 100 % | ||||||
10 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Simpang Patas -Tabak Kanilan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13949012 | 47512313 | APBD | 930,500,000 | 930,500,000 | 0 | 0 | 0 | 918,536,100 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 930,500,000 | 100 % | ||||||
11 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Lunci - Jelai | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13950012 | 47512807 | APBD | 930,500,000 | 930,500,000 | 0 | 0 | 0 | 918,636,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 930,500,000 | 100 % | ||||||
12 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Pulang Pisau - Pangkoh 1 dan Peningkatan Jalan Pulang Pisau - Pangkoh 2 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13951012 | 47515097 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,167,231,600 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 1,180,500,000 | 100 % | ||||||
13 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Pangkoh - Bahaur | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13952012 | 47515477 | APBD | 1,380,500,000 | 1,380,500,000 | 0 | 0 | 0 | 1,360,278,360 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 1,380,500,000 | 100 % | ||||||
14 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Kuala Kapuas - Palingkau, Peningkatan Jalan Palingkau - Dadahup dan Peningkatan Jalan Dadahup/G1 - Lamunti | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13953012 | 47515841 | APBD | 1,230,500,000 | 1,230,500,000 | 0 | 0 | 0 | 1,221,002,220 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 1,230,500,000 | 100 % | ||||||
15 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Tb. Sangai - Tb Kalang | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13954012 | 47521602 | APBD | 930,500,000 | 930,500,000 | 0 | 0 | 0 | 918,347,400 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 930,500,000 | 100 % | ||||||
16 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Amin Jaya - Rantau Pulut | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13955012 | 47521893 | APBD | 980,500,000 | 980,500,000 | 0 | 0 | 0 | 960,749,400 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 980,500,000 | 100 % | ||||||
17 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Bangkal - Telaga Pulang - Kuala Pembuang 1 dan Peningkatan Jalan Bangkal - Telaga Pulang - Kuala Pembuang 2 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13956012 | 47522282 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,175,418,960 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 73.168.264.7-322.000 | SURYA CIPTA ENGINEERING, PT | 1,180,500,000 | 100 % | ||||
18 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Sampit - Samuda dan Peningkatan Jalan Samuda - Ujung Pandaran | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13957012 | 47522556 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,168,192,305 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 1,180,500,000 | 100 % | ||||||
19 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Lingkar Kota Muara Teweh | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13958012 | 47522912 | APBD | 1,012,555,044 | 1,012,555,044 | 0 | 0 | 0 | 1,000,221,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 1,012,555,044 | 100 % | ||||||
20 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Simpang Pundu - Tumbang Samba | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13959012 | 47523379 | APBD | 830,500,000 | 830,500,000 | 0 | 0 | 0 | 819,191,100 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 830,500,000 | 100 % | ||||||
21 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jalan Wilayah Barat di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13960012 | 47524408 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,171,439,610 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 1,180,500,000 | 100 % | ||||||
22 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jalan Wilayah Tengah di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13961012 | 47525098 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,172,508,540 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 1,180,500,000 | 100 % | ||||||
23 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jalan Wilayah Timur di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13962012 | 47525555 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,168,120,710 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 1,180,500,000 | 100 % | ||||||
24 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Penggantian Jembatan di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13964012 | 47527470 | APBD | 1,180,500,000 | 1,180,500,000 | 0 | 0 | 0 | 1,174,169,211 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 1,180,500,000 | 100 % | ||||||
25 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jembatan Tersebar Di Provinsi Kalimantan Tengah dan Peningkatan Jalan Kuala Kurun - Linau Kab. Gunung Mas | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13965012 | 47529311 | APBD | 980,500,000 | 980,500,000 | 0 | 0 | 0 | 958,586,010 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 980,500,000 | 100 % | ||||||
26 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Telang Siong - Bangkuang | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13966012 | 49041370 | APBD | 930,500,000 | 930,500,000 | 0 | 0 | 0 | 928,132,050 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 930,500,000 | 100 % | ||||||
27 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Kuala Kuayan - Tanjung Jariangau dan Peningkatan Jalan Tanjung Jariangau - Sp Jalan Provinsi | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13967012 | 49042368 | APBD | 1,080,500,000 | 1,080,500,000 | 0 | 0 | 0 | 1,071,415,290 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 1,080,500,000 | 100 % | ||||||
28 | 2024 | Konsultan Pengawasan Pembangunan Kawasan beserta Tugu Simpang Mahir-Mahar Palangka Raya (Lanjutan) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13971012 | 49795789 | APBD | 800,660,000 | 800,660,000 | 0 | 0 | 0 | 791,319,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-24 | 2024-05-22 | 800,660,000 | 100 % | ||||||
29 | 2024 | Konsultan Manajemen Konstruksi Pembangunan Sarana dan Prasarana Pendukung RSUD Kelas B di Wilayah Barat Prov. Kalteng (Lanjutan)(Tahap 2) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13976012 | 49795786 | APBD | 1,002,593,000 | 999,754,800 | 0 | 0 | 0 | 967,387,200 | 0 | 0 | 2024-03-05 14:00:00 | 2024-04-24 | 2024-05-06 | 1,002,593,000 | 100 % | ||||||
30 | 2024 | Konsultan MK Pembangunan RSUD Kelas B di Wilayah Barat Provinsi Kalimantan Tengah (Pengawasan 2 Paket Fisik) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13977012 | 47589303 | APBD | 3,050,887,000 | 3,041,700,000 | 0 | 0 | 0 | 3,002,229,210 | 0 | 0 | 2024-03-05 14:00:00 | 2024-04-18 | 2024-05-02 | 01.906.008.6-805.000 | PT. ESA PRATAMA CIPTA SELEBES | 3,050,887,000 | 100 % | ||||
31 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Gadabung - Terusan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13978012 | 49043025 | APBD | 880,500,000 | 880,500,000 | 0 | 0 | 0 | 861,069,180 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 880,500,000 | 100 % | ||||||
32 | 2024 | Pengawasan Teknis Jalan dan Jembatan Untuk Peningkatan Jalan Ujung Pandaran - Kuala Pembuang dan Peningkatan Jalan Kuala Pembuang - Teluk Segintung | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13979012 | 49043904 | APBD | 1,280,500,000 | 1,280,500,000 | 0 | 0 | 0 | 1,272,613,890 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 1,280,500,000 | 100 % | ||||||
33 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Pelantaran - Parenggean | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13980012 | 49044916 | APBD | 880,500,000 | 880,500,000 | 0 | 0 | 0 | 869,696,100 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 880,500,000 | 100 % | ||||||
34 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Sudirman dan Jalan Yos Sudarso Puruk Cahu | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13981012 | 49046935 | APBD | 930,500,000 | 930,500,000 | 0 | 0 | 0 | 918,680,400 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 930,500,000 | 100 % | ||||||
35 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Penggantian Jembatan Sei Pudu Ruas Jalan Provinsi Parenggean - Tumbang Sangai | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13982012 | 49049862 | APBD | 880,500,000 | 880,500,000 | 0 | 0 | 0 | 866,577,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 2024-05-03 | 880,500,000 | 100 % | ||||||
36 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Rehabilitasi Jembatan Patake Kecamatan Montalat Barito Utara | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13983012 | 49050482 | APBD | 830,500,000 | 830,500,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-19 | 830,500,000 | 100 % | |||||||
37 | 2024 | Penyusunan Program Jalan dan Jembatan Core Team Perencanaan Jalan dan Jembatan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13984012 | 48806501 | APBD | 1,823,580,000 | 1,823,580,000 | 0 | 0 | 0 | 1,809,596,370 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 1,823,580,000 | 100 % | ||||||
38 | 2024 | Pengelolaan Leger Jalan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13986012 | 48807938 | APBD | 935,500,000 | 935,500,000 | 0 | 0 | 0 | 925,057,350 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-08 | 935,500,000 | 100 % | ||||||
39 | 2024 | Survey Kondisi Jalan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13987012 | 48808237 | APBD | 935,500,000 | 935,500,000 | 0 | 0 | 0 | 930,739,440 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-25 | 2024-05-13 | 935,500,000 | 100 % | ||||||
40 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pembangunan Jembatan Tumbang Gugup | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14007012 | 47526644 | APBD | 1,280,500,000 | 1,280,500,000 | 0 | 0 | 0 | 1,269,840,000 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 1,280,500,000 | 100 % | ||||||
41 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan RSUD Hanau | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14008012 | 47513309 | APBD | 830,500,000 | 830,500,000 | 0 | 0 | 0 | 814,271,580 | 0 | 0 | 2024-03-08 15:00:00 | 2024-04-26 | 2024-05-08 | 830,500,000 | 100 % | ||||||
42 | 2024 | Study Kelayakan Pembangunan Sekolah Unggulan (SLTA) di Kab. Kotawaringin Barat | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14044012 | 50234970 | APBD | 500,791,000 | 500,700,000 | 0 | 0 | 0 | 496,725,000 | 0 | 0 | 2024-03-08 16:00:00 | 2024-04-30 | 2024-06-04 | 500,791,000 | 100 % | ||||||
43 | 2024 | Study Kelayakan Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14045012 | 50234988 | APBD | 500,791,000 | 500,700,000 | 0 | 0 | 0 | 495,337,500 | 0 | 0 | 2024-03-08 15:30:00 | 2024-04-30 | 2024-06-03 | 500,791,000 | 100 % | ||||||
44 | 2024 | Study Kelayakan Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14046012 | 50234957 | APBD | 502,315,000 | 502,300,000 | 0 | 0 | 0 | 497,613,000 | 0 | 0 | 2024-03-08 15:30:00 | 2024-04-25 | 2024-05-17 | 502,315,000 | 100 % | ||||||
45 | 2024 | Penyusunan Dokumen Lingkungan Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14048012 | 50235000 | APBD | 500,791,000 | 500,700,000 | 0 | 0 | 0 | 493,728,000 | 0 | 0 | 2024-07-26 18:00:00 | 2024-09-04 | 2024-10-15 | 500,791,000 | 100 % | ||||||
46 | 2024 | Amdal Lalu Lintas Pembangunan Kawasan beserta Tugu Simpang Mahir Mahar Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14051012 | 50235006 | APBD | 202,284,000 | 202,200,000 | 0 | 0 | 0 | 199,006,350 | 0 | 0 | 2024-03-08 16:00:00 | 2024-04-30 | 2024-06-03 | 202,284,000 | 100 % | ||||||
47 | 2024 | Penyusunan Dokumen Lingkungan Lalu Lintas Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14052012 | 50234965 | APBD | 202,284,000 | 202,200,000 | 0 | 0 | 0 | 200,688,000 | 0 | 0 | 2024-07-25 14:00:00 | 2024-08-27 | 2024-10-15 | 202,284,000 | 100 % | ||||||
48 | 2024 | Penyusunan Dokumen Lingkungan Lalu Lintas Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14053012 | 50235003 | APBD | 204,259,000 | 204,200,000 | 0 | 0 | 0 | 200,355,000 | 0 | 0 | 2024-07-26 18:00:00 | 2024-09-04 | 2024-10-15 | 204,259,000 | 100 % | ||||||
49 | 2024 | Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Murung Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14055012 | 50235013 | APBD | 126,960,000 | 126,960,000 | 0 | 0 | 0 | 124,701,840 | 0 | 0 | 2024-03-08 15:30:00 | 2024-04-30 | 2024-05-15 | 126,960,000 | 100 % | ||||||
50 | 2024 | Perencanaan Pembangunan/Peningkatan Khatolic Center Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14084012 | 50782945 | APBD | 406,513,000 | 406,513,000 | 0 | 0 | 0 | 400,421,400 | 0 | 0 | 2024-03-22 08:00:00 | 2024-04-23 | 2024-05-15 | 406,513,000 | 100 % | ||||||
51 | 2024 | Perencanaan Pembangunan Gedung Kantor MUI Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14085012 | 48931138 | APBD | 286,896,000 | 286,896,000 | 0 | 0 | 0 | 270,828,900 | 0 | 0 | 2024-03-22 08:00:00 | 2024-04-23 | 2024-05-28 | 286,896,000 | 100 % | ||||||
52 | 2024 | Konsultan Pengawasan Pembangunan Gedung Balai Basarah dan Sarana Prasarana pada Kawasan Hindu Kaharingan Center Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14087012 | 50783503 | APBD | 298,908,000 | 298,900,000 | 0 | 0 | 0 | 292,351,800 | 0 | 0 | 2024-03-22 08:00:00 | 2024-04-23 | 2024-05-16 | 298,908,000 | 100 % | ||||||
53 | 2024 | Konsultan Pengawasan Penyediaan/Peningkatan Sarana dan Prasarana Persampahan di Kab. Kotawaringin Timur | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14088012 | 50783639 | APBD | 150,263,000 | 150,263,000 | 0 | 0 | 0 | 148,557,960 | 0 | 0 | 2024-03-22 08:00:00 | 2024-04-23 | 2024-05-20 | 150,263,000 | 100 % | ||||||
54 | 2024 | Konsultan Manajemen Konstruksi Pembangunan RTH, JPO dan Tempat Parkir Kawasan Bundaran Besar Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14090012 | 50235016 | APBD | 1,183,486,000 | 1,183,486,000 | 0 | 0 | 0 | 1,167,187,200 | 0 | 0 | 2024-03-26 14:00:00 | 2024-05-08 | 2024-05-15 | 1,183,486,000 | 100 % | ||||||
55 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (DBH Sawit) 2024 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14101012 | 47534701 | APBD | 1,400,000,000 | 1,400,000,000 | 0 | 0 | 0 | 1,372,487,250 | 0 | 0 | 2024-03-28 11:00:00 | 2024-05-13 | 2024-05-22 | 1,400,000,000 | 100 % | ||||||
56 | 2024 | Konsultan Pengawasan Rehabilitasi/Pemeliharaan Sarana dan Prasarana Kawasan Tugu Soekarno Palangka Raya (Lanjutan) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14103012 | 50783378 | APBD | 177,598,000 | 177,598,000 | 0 | 0 | 0 | 167,757,630 | 0 | 0 | 2024-03-28 12:00:00 | 2024-04-29 | 2024-05-22 | 177,598,000 | 100 % | ||||||
57 | 2024 | Perencanaan Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14104012 | 49795804 | APBD | 701,335,000 | 701,335,000 | 0 | 0 | 0 | 693,972,000 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-15 | 2024-05-27 | 701,335,000 | 100 % | ||||||
58 | 2024 | Perencanaan Pembangunan dan Penataan Sarana dan Prasarana POLDA Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14105012 | 49795799 | APBD | 2,440,000,000 | 2,440,000,000 | 0 | 0 | 0 | 2,419,356,000 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-15 | 2024-05-27 | 2,440,000,000 | 100 % | ||||||
59 | 2024 | Penyusunan Masterplan dan DED Pembangunan Sekolah Unggulan (SLTA) di Kab. Kotawaringin Barat | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14107012 | 49795793 | APBD | 1,014,353,000 | 999,500,000 | 0 | 0 | 0 | 990,120,000 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-15 | 2024-05-30 | 1,014,353,000 | 100 % | ||||||
60 | 2024 | Perencanaan Pemeliharaan Bangunan dan Lingkungan Aset Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14108012 | 47823288 | APBD | 406,513,000 | 406,513,000 | 0 | 0 | 0 | 401,953,200 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-15 | 2024-05-28 | 406,513,000 | 100 % | ||||||
61 | 2024 | Perencanaan Rehabilitasi/Pemeliharaan Masjid Raya Darussalam, Menara beserta Sarana & Prasarana | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14109012 | 47824032 | APBD | 740,220,000 | 740,220,000 | 0 | 0 | 0 | 721,733,100 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-15 | 2024-05-28 | 740,220,000 | 100 % | ||||||
62 | 2024 | Penyusunan Masterplan dan DED Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14110012 | 50234953 | APBD | 701,335,000 | 701,335,000 | 0 | 0 | 0 | 694,971,000 | 0 | 0 | 2024-03-28 12:00:00 | 2024-05-17 | 2024-05-29 | 701,335,000 | 100 % | ||||||
63 | 2024 | Perencanaan Teknis Jalan dan Jembatan (DED) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14120012 | 48810279 | APBD | 1,435,500,000 | 1,435,500,000 | 0 | 0 | 0 | 1,424,352,000 | 0 | 0 | 2024-04-16 15:00:00 | 2024-05-22 | 2024-06-03 | 1,435,500,000 | 100 % | ||||||
64 | 2024 | Konsultan Manajemen Konstruksi Pembuatan dan Penataan Landscape beserta Sarana dan Prasarana Penunjang Bundaran Besar Palangka raya (Lanjutan) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14121012 | 47832782 | APBD | 1,542,427,000 | 1,542,427,000 | 0 | 0 | 0 | 1,535,141,100 | 0 | 0 | 2024-04-16 15:00:00 | 2024-05-21 | 2024-05-30 | 1,542,427,000 | 100 % | ||||||
65 | 2024 | Perencanaan Pembangunan dan Penataan Sarana dan Prasarana Korem 102/Panju Panjung | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14155012 | 50782815 | APBD | 1,521,881,000 | 1,521,881,000 | 0 | 0 | 0 | 1,513,715,880 | 0 | 0 | 2024-05-08 17:30:00 | 2024-06-21 | 2024-07-05 | 1,521,881,000 | 100 % | ||||||
66 | 2024 | Study Kelayakan dan DED Pembangunan Rumah Sakit Provinsi di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14156012 | 50782627 | APBD | 1,464,375,000 | 1,464,375,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2024-05-08 17:30:00 | 2024-06-21 | 1,464,375,000 | 100 % | |||||||
67 | 2024 | Penyusunan Masterplan dan DED Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14157012 | 49795795 | APBD | 2,650,074,000 | 2,650,074,000 | 0 | 0 | 0 | 2,616,980,400 | 0 | 0 | 2024-05-17 16:00:00 | 2024-06-28 | 2024-07-15 | 2,650,074,000 | 100 % | ||||||
68 | 2024 | Perencanaan Teknis Pekerjaan Fisik Bidang Cipta Karya; | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15183012 | 47737732 | APBD | 1,205,939,000 | 1,205,939,000 | 0 | 0 | 0 | 1,186,750,950 | 0 | 0 | 2024-06-27 10:00:00 | 2024-08-05 | 2024-07-15 | 1,205,939,000 | 100 % | ||||||
69 | 2024 | Konsultan MK Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15190012 | 47589302 | APBD | 803,363,000 | 803,363,000 | 0 | 0 | 0 | 801,472,170 | 0 | 0 | 2024-06-20 15:00:00 | 2024-07-24 | 2024-08-26 | 803,363,000 | 100 % | ||||||
70 | 2024 | Konsultan Pengawasan Pembangunan dan Penataan Sarana dan Prasarana Korem 102/Panju Panjung | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15191012 | 47826749 | APBD | 1,106,846,000 | 1,106,846,000 | 0 | 0 | 0 | 1,101,783,780 | 0 | 0 | 2024-06-20 15:00:00 | 2024-07-24 | 2024-08-26 | 1,106,846,000 | 100 % | ||||||
71 | 2024 | Konsultan Pengawasan Pembangunan Rumah sakit Provinsi di Kota Palangka Raya (Tahap I) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15196012 | 48898841 | APBD | 874,560,000 | 874,560,000 | 0 | 0 | 0 | 868,420,000 | 0 | 0 | 2024-06-20 12:00:00 | 2024-08-09 | 2024-08-21 | 874,560,000 | 100 % | ||||||
72 | 2024 | Konsultan Pengawasan Rehabilitasi/Pemeliharaan Masjid Raya Darussalam, Menara beserta Sarana & Prasarana | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15197012 | 47831952 | APBD | 680,039,000 | 680,039,000 | 0 | 0 | 0 | 670,360,000 | 0 | 0 | 2024-06-20 12:00:00 | 2024-08-09 | 2024-08-16 | 680,039,000 | 100 % | ||||||
73 | 2024 | Konsultan Pengawasan Pemeliharaan Bangunan dan Lingkungan Aset Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15199012 | 47830314 | APBD | 243,440,000 | 234,440,000 | 0 | 0 | 0 | 231,110,000 | 0 | 0 | 2024-06-20 12:00:00 | 2024-08-09 | 2024-08-16 | 243,440,000 | 100 % | ||||||
74 | 2024 | Penyusunan Dokumen Lingkungan Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15234012 | 50234959 | APBD | 502,315,000 | 502,315,000 | 0 | 0 | 0 | 498,001,500 | 0 | 0 | 2024-07-26 18:00:00 | 2024-09-04 | 2024-10-15 | 502,315,000 | 100 % | ||||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Rehabilitasi Jembatan Patake Kecamatan Montalat Barito Utara | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13983012 | 49050482 | 830,500,000 | 830,500,000 | 0 | 0 | 0 | 0 | 2024-03-08 15:00:00 | 830,500,000 | 100 % | ||||||
2 | 2024 | Study Kelayakan dan DED Pembangunan Rumah Sakit Provinsi di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14156012 | 50782627 | 1,464,375,000 | 1,464,375,000 | 0 | 0 | 0 | 0 | 2024-05-08 17:30:00 | 1,464,375,000 | 100 % | ||||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2024 | Peningkatan Jalan Pulang Pisau - Pangkoh (DAK) | Tender | Pekerjaan Konstruksi | 13918012 | 45849241 | 29,245,098,300 | 29,245,097,880 | 0 | 28,610,877,000 | 0 | 0 | 2023-12-22 11:00:00 | 29,245,098,300 | 100 % | ||||||
2 | 2024 | Peningkatan Jalan Dadahup /G1 - Lamunti (DAK) | Tender | Pekerjaan Konstruksi | 13920012 | 45859276 | 17,033,748,900 | 17,033,748,242 | 0 | 16,745,000,000 | 0 | 0 | 2023-12-22 11:00:00 | 17,033,748,900 | 100 % | ||||||
3 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (Penugasan) - Tematik 01 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13921012 | 45859525 | 546,873,150 | 546,873,148 | 0 | 541,600,648 | 0 | 0 | 2023-12-22 11:00:00 | 546,873,150 | 100 % | ||||||
4 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (Penugasan) - Tematik 04 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13922012 | 45859587 | 1,539,215,700 | 1,539,215,688 | 0 | 1,522,924,440 | 0 | 0 | 2023-12-22 11:00:00 | 1,539,215,700 | 100 % | ||||||
5 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (Penugasan) - Tematik 05 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13923012 | 45859632 | 896,513,100 | 896,512,923 | 0 | 888,765,345 | 0 | 0 | 2023-12-22 11:00:00 | 896,513,100 | 100 % | ||||||
6 | 2024 | Rehabilitasi Jaringan Irigasi D.I.R. Unit Mentaren II Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13924012 | 46341856 | 3,550,000,000 | 3,550,000,000 | 0 | 3,442,900,000 | 0 | 0 | 2024-01-16 08:00:00 | 3,550,000,000 | 100 % | ||||||
7 | 2024 | Rehabilitasi Jaringan Irigasi D.I.R. Kuala Jelai I Kabupaten Sukamara | Tender | Pekerjaan Konstruksi | 13925012 | 46342156 | 5,071,625,000 | 5,071,625,000 | 0 | 4,994,000,000 | 0 | 0 | 2024-01-16 08:00:00 | 5,071,625,000 | 100 % | ||||||
8 | 2024 | Rehabilitasi Jaringan Irigasi D.I.R. Maliku Baru Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13926012 | 46342039 | 4,600,000,000 | 4,600,000,000 | 0 | 4,453,700,000 | 0 | 0 | 2024-01-16 08:00:00 | 4,600,000,000 | 100 % | ||||||
9 | 2024 | Peningkatan Jalan Bangkal - Telaga Pulang - Kuala Pembuang (DAK) | Tender | Pekerjaan Konstruksi | 13927012 | 45859361 | 10,390,589,850 | 10,390,579,809 | 0 | 10,000,000,000 | 0 | 0 | 2024-01-12 08:00:00 | 10,390,589,850 | 100 % | ||||||
10 | 2024 | ,Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Poros Bahaur menuju Desa Bahaur Kecamatan Hanau | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13932012 | 47513309;49048455 | 830,500,000 | 830,500,000 | 0 | 822,282,117 | 0 | 0 | 2024-03-08 15:00:00 | 830,500,000 | 100 % | ||||||
11 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (DBH Sawit 2023) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13933012 | 48219050 | 1,400,000,000 | 1,400,000,000 | 0 | 1,385,835,000 | 0 | 0 | 2024-03-08 15:00:00 | 1,400,000,000 | 100 % | ||||||
12 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan di Kecamatan Pandih Batu Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13934012 | 48920057 | 3,940,000,000 | 3,940,000,000 | 0 | 3,908,400,000 | 0 | 0 | 2024-03-15 08:00:00 | 3,940,000,000 | 100 % | ||||||
13 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan di Kecamatan Maliku Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13935012 | 48920332 | 2,440,000,000 | 2,440,000,000 | 0 | 2,421,200,000 | 0 | 0 | 2024-03-15 08:00:00 | 2,440,000,000 | 100 % | ||||||
14 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Bahaur I Kabupaten Pulang Pisau | Tender | Pekerjaan Konstruksi | 13936012 | 48920497 | 1,940,000,000 | 1,940,000,000 | 0 | 1,885,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 1,940,000,000 | 100 % | ||||||
15 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan di Kecamatan Mantangai Kabupaten Kapuas | Tender | Pekerjaan Konstruksi | 13937012 | 48920763 | 3,920,000,000 | 3,920,000,000 | 0 | 3,894,800,000 | 0 | 0 | 2024-03-15 08:00:00 | 3,920,000,000 | 100 % | ||||||
16 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Kuin Kabupaten Kotawaringin Timur | Tender | Pekerjaan Konstruksi | 13938012 | 48921227 | 1,920,000,000 | 1,920,000,000 | 0 | 1,843,471,543 | 0 | 0 | 2024-03-15 08:00:00 | 1,920,000,000 | 100 % | ||||||
17 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Lampuyang Kabupaten Kotawaringin Timur | Tender | Pekerjaan Konstruksi | 13939012 | 48921559 | 1,930,000,000 | 1,930,000,000 | 0 | 1,872,275,515 | 0 | 0 | 2024-03-15 08:00:00 | 1,930,000,000 | 100 % | ||||||
18 | 2024 | Pembangunan BreakWater Desa Sebuai Timur Kabupaten Kotawaringin Barat | Tender | Pekerjaan Konstruksi | 13941012 | 48933221 | 1,330,000,000 | 1,330,000,000 | 0 | 1,321,616,000 | 0 | 0 | 2024-03-15 08:00:00 | 1,330,000,000 | 100 % | ||||||
19 | 2024 | Normalisasi Sungai Hijau Kecamatan Pangkalan Banteng Kabupaten Kotawaringin Barat | Tender | Pekerjaan Konstruksi | 13942012 | 48935331 | 2,920,000,000 | 2,920,000,000 | 0 | 2,855,103,710 | 0 | 0 | 2024-03-15 08:00:00 | 2,920,000,000 | 100 % | ||||||
20 | 2024 | Rehabilitasi/Peningkatan Jaringan Pengairan D.I.R. Natai Apung Kabupaten Sukamara | Tender | Pekerjaan Konstruksi | 13943012 | 48938496 | 2,910,000,000 | 2,910,000,000 | 0 | 2,847,032,803 | 0 | 0 | 2024-03-15 08:00:00 | 2,910,000,000 | 100 % | ||||||
21 | 2024 | Pola dan Rencana Pengelolaan Sumber Daya Air Wilayah Sungai Seruyan (Tahap II) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13944012 | 49066232 | 1,900,000,000 | 1,900,000,000 | 0 | 1,888,110,000 | 0 | 0 | 2024-02-23 19:00:00 | 1,900,000,000 | 100 % | ||||||
22 | 2024 | Perencanaan Tanggul Banjir Daerah Irigasi Tampa | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13945012 | 48948442 | 650,000,000 | 650,000,000 | 0 | 646,464,000 | 0 | 0 | 2024-02-23 19:00:00 | 650,000,000 | 100 % | ||||||
23 | 2024 | Supervisi Kegiatan Fisik Bidang SDA | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13946012 | 49066098 | 700,000,000 | 700,000,000 | 0 | 695,082,000 | 0 | 0 | 2024-02-21 20:00:00 | 700,000,000 | 100 % | ||||||
24 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Sp.Kenawan - Riam Durian | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13948012 | 47511057 | 880,500,000 | 880,500,000 | 0 | 875,790,000 | 0 | 0 | 2024-03-08 15:00:00 | 880,500,000 | 100 % | ||||||
25 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Simpang Patas -Tabak Kanilan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13949012 | 47512313 | 930,500,000 | 930,500,000 | 0 | 918,536,100 | 0 | 0 | 2024-03-08 15:00:00 | 930,500,000 | 100 % | ||||||
26 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Lunci - Jelai | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13950012 | 47512807 | 930,500,000 | 930,500,000 | 0 | 918,636,000 | 0 | 0 | 2024-03-08 15:00:00 | 930,500,000 | 100 % | ||||||
27 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Pulang Pisau - Pangkoh 1 dan Peningkatan Jalan Pulang Pisau - Pangkoh 2 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13951012 | 47515097 | 1,180,500,000 | 1,180,500,000 | 0 | 1,167,231,600 | 0 | 0 | 2024-03-08 15:00:00 | 1,180,500,000 | 100 % | ||||||
28 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Pangkoh - Bahaur | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13952012 | 47515477 | 1,380,500,000 | 1,380,500,000 | 0 | 1,360,278,360 | 0 | 0 | 2024-03-08 15:00:00 | 1,380,500,000 | 100 % | ||||||
29 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Kuala Kapuas - Palingkau, Peningkatan Jalan Palingkau - Dadahup dan Peningkatan Jalan Dadahup/G1 - Lamunti | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13953012 | 47515841 | 1,230,500,000 | 1,230,500,000 | 0 | 1,221,002,220 | 0 | 0 | 2024-03-08 15:00:00 | 1,230,500,000 | 100 % | ||||||
30 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Tb. Sangai - Tb Kalang | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13954012 | 47521602 | 930,500,000 | 930,500,000 | 0 | 918,347,400 | 0 | 0 | 2024-03-08 15:00:00 | 930,500,000 | 100 % | ||||||
31 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Amin Jaya - Rantau Pulut | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13955012 | 47521893 | 980,500,000 | 980,500,000 | 0 | 960,749,400 | 0 | 0 | 2024-03-08 15:00:00 | 980,500,000 | 100 % | ||||||
32 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Bangkal - Telaga Pulang - Kuala Pembuang 1 dan Peningkatan Jalan Bangkal - Telaga Pulang - Kuala Pembuang 2 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13956012 | 47522282 | 1,180,500,000 | 1,180,500,000 | 0 | 1,175,418,960 | 0 | 0 | 2024-03-08 15:00:00 | 73.168.264.7-322.000 | SURYA CIPTA ENGINEERING, PT | 1,180,500,000 | 100 % | ||||
33 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Sampit - Samuda dan Peningkatan Jalan Samuda - Ujung Pandaran | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13957012 | 47522556 | 1,180,500,000 | 1,180,500,000 | 0 | 1,168,192,305 | 0 | 0 | 2024-03-08 15:00:00 | 1,180,500,000 | 100 % | ||||||
34 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Lingkar Kota Muara Teweh | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13958012 | 47522912 | 1,012,555,044 | 1,012,555,044 | 0 | 1,000,221,000 | 0 | 0 | 2024-03-08 15:00:00 | 1,012,555,044 | 100 % | ||||||
35 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan Simpang Pundu - Tumbang Samba | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13959012 | 47523379 | 830,500,000 | 830,500,000 | 0 | 819,191,100 | 0 | 0 | 2024-03-08 15:00:00 | 830,500,000 | 100 % | ||||||
36 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jalan Wilayah Barat di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13960012 | 47524408 | 1,180,500,000 | 1,180,500,000 | 0 | 1,171,439,610 | 0 | 0 | 2024-03-08 15:00:00 | 1,180,500,000 | 100 % | ||||||
37 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jalan Wilayah Tengah di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13961012 | 47525098 | 1,180,500,000 | 1,180,500,000 | 0 | 1,172,508,540 | 0 | 0 | 2024-03-08 15:00:00 | 1,180,500,000 | 100 % | ||||||
38 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jalan Wilayah Timur di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13962012 | 47525555 | 1,180,500,000 | 1,180,500,000 | 0 | 1,168,120,710 | 0 | 0 | 2024-03-08 15:00:00 | 1,180,500,000 | 100 % | ||||||
39 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Penggantian Jembatan di Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13964012 | 47527470 | 1,180,500,000 | 1,180,500,000 | 0 | 1,174,169,211 | 0 | 0 | 2024-03-08 15:00:00 | 1,180,500,000 | 100 % | ||||||
40 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pemeliharaan Berkala Jembatan Tersebar Di Provinsi Kalimantan Tengah dan Peningkatan Jalan Kuala Kurun - Linau Kab. Gunung Mas | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13965012 | 47529311 | 980,500,000 | 980,500,000 | 0 | 958,586,010 | 0 | 0 | 2024-03-08 15:00:00 | 980,500,000 | 100 % | ||||||
41 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Telang Siong - Bangkuang | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13966012 | 49041370 | 930,500,000 | 930,500,000 | 0 | 928,132,050 | 0 | 0 | 2024-03-08 15:00:00 | 930,500,000 | 100 % | ||||||
42 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Kuala Kuayan - Tanjung Jariangau dan Peningkatan Jalan Tanjung Jariangau - Sp Jalan Provinsi | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13967012 | 49042368 | 1,080,500,000 | 1,080,500,000 | 0 | 1,071,415,290 | 0 | 0 | 2024-03-08 15:00:00 | 1,080,500,000 | 100 % | ||||||
43 | 2024 | Konsultan Pengawasan Pembangunan Kawasan beserta Tugu Simpang Mahir-Mahar Palangka Raya (Lanjutan) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13971012 | 49795789 | 800,660,000 | 800,660,000 | 0 | 791,319,000 | 0 | 0 | 2024-03-08 15:00:00 | 800,660,000 | 100 % | ||||||
44 | 2024 | Konsultan Manajemen Konstruksi Pembangunan Sarana dan Prasarana Pendukung RSUD Kelas B di Wilayah Barat Prov. Kalteng (Lanjutan)(Tahap 2) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13976012 | 49795786 | 1,002,593,000 | 999,754,800 | 0 | 967,387,200 | 0 | 0 | 2024-03-05 14:00:00 | 1,002,593,000 | 100 % | ||||||
45 | 2024 | Konsultan MK Pembangunan RSUD Kelas B di Wilayah Barat Provinsi Kalimantan Tengah (Pengawasan 2 Paket Fisik) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13977012 | 47589303 | 3,050,887,000 | 3,041,700,000 | 0 | 3,002,229,210 | 0 | 0 | 2024-03-05 14:00:00 | 01.906.008.6-805.000 | PT. ESA PRATAMA CIPTA SELEBES | 3,050,887,000 | 100 % | ||||
46 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Gadabung - Terusan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13978012 | 49043025 | 880,500,000 | 880,500,000 | 0 | 861,069,180 | 0 | 0 | 2024-03-08 15:00:00 | 880,500,000 | 100 % | ||||||
47 | 2024 | Pengawasan Teknis Jalan dan Jembatan Untuk Peningkatan Jalan Ujung Pandaran - Kuala Pembuang dan Peningkatan Jalan Kuala Pembuang - Teluk Segintung | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13979012 | 49043904 | 1,280,500,000 | 1,280,500,000 | 0 | 1,272,613,890 | 0 | 0 | 2024-03-08 15:00:00 | 1,280,500,000 | 100 % | ||||||
48 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Pelantaran - Parenggean | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13980012 | 49044916 | 880,500,000 | 880,500,000 | 0 | 869,696,100 | 0 | 0 | 2024-03-08 15:00:00 | 880,500,000 | 100 % | ||||||
49 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Peningkatan Jalan Sudirman dan Jalan Yos Sudarso Puruk Cahu | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13981012 | 49046935 | 930,500,000 | 930,500,000 | 0 | 918,680,400 | 0 | 0 | 2024-03-08 15:00:00 | 930,500,000 | 100 % | ||||||
50 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Penggantian Jembatan Sei Pudu Ruas Jalan Provinsi Parenggean - Tumbang Sangai | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13982012 | 49049862 | 880,500,000 | 880,500,000 | 0 | 866,577,000 | 0 | 0 | 2024-03-08 15:00:00 | 880,500,000 | 100 % | ||||||
51 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Rehabilitasi Jembatan Patake Kecamatan Montalat Barito Utara | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13983012 | 49050482 | 830,500,000 | 830,500,000 | 0 | 0 | 0 | 0 | 2024-03-08 15:00:00 | 830,500,000 | 100 % | ||||||
52 | 2024 | Penyusunan Program Jalan dan Jembatan Core Team Perencanaan Jalan dan Jembatan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13984012 | 48806501 | 1,823,580,000 | 1,823,580,000 | 0 | 1,809,596,370 | 0 | 0 | 2024-03-08 15:00:00 | 1,823,580,000 | 100 % | ||||||
53 | 2024 | Pengelolaan Leger Jalan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13986012 | 48807938 | 935,500,000 | 935,500,000 | 0 | 925,057,350 | 0 | 0 | 2024-03-08 15:00:00 | 935,500,000 | 100 % | ||||||
54 | 2024 | Survey Kondisi Jalan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 13987012 | 48808237 | 935,500,000 | 935,500,000 | 0 | 930,739,440 | 0 | 0 | 2024-03-08 15:00:00 | 935,500,000 | 100 % | ||||||
55 | 2024 | Peningkatan Jalan Simpang Kenawan - Riam Durian | Tender | Pekerjaan Konstruksi | 13989012 | 46588070 | 8,915,500,000 | 8,915,500,000 | 0 | 8,737,190,000 | 0 | 0 | 2024-03-15 11:00:00 | 8,915,500,000 | 100 % | ||||||
56 | 2024 | Peningkatan Jalan RSUD Hanau | Tender | Pekerjaan Konstruksi | 13991012 | 46588647 | 8,925,500,000 | 8,925,500,000 | 0 | 8,720,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 8,925,500,000 | 100 % | ||||||
57 | 2024 | Pembangunan Sarana dan Prasarana Pendukung RSUD Kelas B di Wilayah Barat Prov. Kalteng (Lanjutan)(Tahap 2) | Tender | Pekerjaan Konstruksi | 13993012 | 47594522 | 24,850,000,000 | 24,850,000,000 | 0 | 24,701,272,565 | 0 | 0 | 2024-03-08 15:00:00 | 24,850,000,000 | 100 % | ||||||
58 | 2024 | Peningkatan Jalan Lunci - Jelai | Tender | Pekerjaan Konstruksi | 13994012 | 46590157 | 18,915,500,000 | 18,915,500,000 | 0 | 18,626,500,000 | 0 | 0 | 2024-03-15 11:00:00 | 18,915,500,000 | 100 % | ||||||
59 | 2024 | Peningkatan Jalan Pulang Pisau Pangkoh I | Tender | Pekerjaan Konstruksi | 13995012 | 46590837 | 21,767,824,000 | 21,767,824,000 | 0 | 21,289,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 21,767,824,000 | 100 % | ||||||
60 | 2024 | Peningkatan Jalan Pulang Pisau Pangkoh 2 | Tender | Pekerjaan Konstruksi | 13996012 | 46591902 | 13,935,500,000 | 13,935,500,000 | 0 | 13,652,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 13,935,500,000 | 100 % | ||||||
61 | 2024 | Peningkatan Jalan Pangkoh - Bahaur | Tender | Pekerjaan Konstruksi | 13997012 | 46592217 | 34,435,500,000 | 34,435,500,000 | 0 | 34,151,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 34,435,500,000 | 100 % | ||||||
62 | 2024 | Peningkatan Jalan Telang Siong Bangkoang | Tender | Pekerjaan Konstruksi | 13998012 | 46594436 | 8,778,500,000 | 8,778,500,000 | 0 | 8,601,800,000 | 0 | 0 | 2024-03-15 09:00:00 | 8,778,500,000 | 100 % | ||||||
63 | 2024 | Peningkatan Jalan Tumbang Sangai Tumbang Kalang | Tender | Pekerjaan Konstruksi | 13999012 | 46595195 | 8,925,500,000 | 8,925,500,000 | 0 | 8,724,600,000 | 0 | 0 | 2024-03-13 08:00:00 | 8,925,500,000 | 100 % | ||||||
64 | 2024 | Peningkatan Jalan Amin Jaya Rantau Pulut | Tender | Pekerjaan Konstruksi | 14000012 | 46595672 | 25,175,500,000 | 25,175,500,000 | 0 | 24,411,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 25,175,500,000 | 100 % | ||||||
65 | 2024 | Peningkatan Jalan Kuala Kuayan Tanjung Jariangau | Tender | Pekerjaan Konstruksi | 14001012 | 46592645 | 8,925,500,000 | 8,925,500,000 | 0 | 8,698,800,000 | 0 | 0 | 2024-03-13 08:00:00 | 8,925,500,000 | 100 % | ||||||
66 | 2024 | Peningkatan Jalan Bangkal Telaga Pulang Kuala Pembuang I | Tender | Pekerjaan Konstruksi | 14002012 | 46593125 | 26,725,500,000 | 26,725,500,000 | 0 | 26,000,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 26,725,500,000 | 100 % | ||||||
67 | 2024 | Peningkatan Jalan Bangkal Telaga Pulang Kuala Pembuang II | Tender | Pekerjaan Konstruksi | 14004012 | 46593510 | 17,925,500,000 | 17,925,500,000 | 0 | 17,436,300,000 | 0 | 0 | 2024-03-15 08:00:00 | 17,925,500,000 | 100 % | ||||||
68 | 2024 | Peningkatan Jalan Sampit - Samuda | Tender | Pekerjaan Konstruksi | 14005012 | 46596013 | 13,925,500,000 | 13,925,500,000 | 0 | 13,624,000,000 | 0 | 0 | 2024-03-13 08:00:00 | 13,925,500,000 | 100 % | ||||||
69 | 2024 | Peningkatan Jalan Samuda Ujung Pandaran | Tender | Pekerjaan Konstruksi | 14006012 | 46596180 | 12,925,500,000 | 12,925,500,000 | 0 | 12,650,700,000 | 0 | 0 | 2024-03-13 08:00:00 | 12,925,500,000 | 100 % | ||||||
70 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Pembangunan Jembatan Tumbang Gugup | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14007012 | 47526644 | 1,280,500,000 | 1,280,500,000 | 0 | 1,269,840,000 | 0 | 0 | 2024-03-08 15:00:00 | 1,280,500,000 | 100 % | ||||||
71 | 2024 | Pengawasan teknis jalan dan jembatan Untuk Kegiatan Peningkatan Jalan RSUD Hanau | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14008012 | 47513309 | 830,500,000 | 830,500,000 | 0 | 814,271,580 | 0 | 0 | 2024-03-08 15:00:00 | 830,500,000 | 100 % | ||||||
72 | 2024 | Peningkatan Jalan Gadabung - Terusan | Tender | Pekerjaan Konstruksi | 14010012 | 46594045 | 12,935,500,000 | 12,935,500,000 | 0 | 12,618,600,000 | 0 | 0 | 2024-03-15 09:00:00 | 12,935,500,000 | 100 % | ||||||
73 | 2024 | Peningkatan Jalan Ujung Pandaran Kuala Pembuang | Tender | Pekerjaan Konstruksi | 14011012 | 46597017 | 9,925,500,000 | 9,925,500,000 | 0 | 9,610,000,000 | 0 | 0 | 2024-03-15 09:00:00 | 9,925,500,000 | 100 % | ||||||
74 | 2024 | Peningkatan Jalan Simpang Pundu Tumbang Samba | Tender | Pekerjaan Konstruksi | 14012012 | 46596857 | 6,110,500,000 | 6,110,500,000 | 0 | 5,976,500,000 | 0 | 0 | 2024-03-15 09:00:00 | 6,110,500,000 | 100 % | ||||||
75 | 2024 | Peningkatan Jalan Kuala Kurun Linau Tumbang Jutuh | Tender | Pekerjaan Konstruksi | 14013012 | 46604753 | 3,735,500,000 | 3,735,500,000 | 0 | 3,659,200,000 | 0 | 0 | 2024-03-15 09:00:00 | 3,735,500,000 | 100 % | ||||||
76 | 2024 | Peningkatan Jalan Poros Bahaur menuju Desa Bahaur Kecamatan Hanau | Tender | Pekerjaan Konstruksi | 14018012 | 49034739 | 3,925,500,000 | 3,925,500,000 | 0 | 3,834,000,000 | 0 | 0 | 2024-03-15 09:00:00 | 3,925,500,000 | 100 % | ||||||
77 | 2024 | Penggantian Jembatan Sei Pudu Ruas Jalan Provinsi Parenggean - Tumbang Sangai | Tender | Pekerjaan Konstruksi | 14019012 | 49041610 | 6,925,500,000 | 6,925,500,000 | 0 | 6,755,900,000 | 0 | 0 | 2024-03-15 11:00:00 | 6,925,500,000 | 100 % | ||||||
78 | 2024 | Peningkatan Jalan Parenggean - Tumbang Sangai (DBH Sawit 2023) | Tender | Pekerjaan Konstruksi | 14020012 | 47290459 | 46,417,540,000 | 46,417,540,000 | 0 | 45,228,600,000 | 0 | 0 | 2024-03-15 08:00:00 | 46,417,540,000 | 100 % | ||||||
79 | 2024 | Peningkatan Jalan Kuala Kapuas - Palingkau | Tender | Pekerjaan Konstruksi | 14023012 | 46597337 | 8,485,500,000 | 8,485,500,000 | 0 | 8,290,300,000 | 0 | 0 | 2024-03-13 08:00:00 | 8,485,500,000 | 100 % | ||||||
80 | 2024 | Peningkatan Jalan Pelantaran - Parenggean | Tender | Pekerjaan Konstruksi | 14024012 | 46604970 | 3,725,500,000 | 3,725,500,000 | 0 | 3,644,500,000 | 0 | 0 | 2024-03-13 08:00:00 | 3,725,500,000 | 100 % | ||||||
81 | 2024 | Peningkatan Jalan Kuala Pembuang - Teluk Segintung | Tender | Pekerjaan Konstruksi | 14025012 | 49031998 | 8,925,500,000 | 8,925,500,000 | 0 | 8,641,000,000 | 0 | 0 | 2024-03-13 08:00:00 | 8,925,500,000 | 100 % | ||||||
82 | 2024 | Peningkatan Jalan Palingkau - Dadahup | Tender | Pekerjaan Konstruksi | 14026012 | 49032514 | 3,935,500,000 | 3,935,500,000 | 0 | 3,852,100,000 | 0 | 0 | 2024-03-13 08:00:00 | 3,935,500,000 | 100 % | ||||||
83 | 2024 | Peningkatan Jalan Dadahup - Lamunti | Tender | Pekerjaan Konstruksi | 14027012 | 49033224 | 5,935,500,000 | 5,935,500,000 | 0 | 5,830,800,000 | 0 | 0 | 2024-03-13 08:00:00 | 5,935,500,000 | 100 % | ||||||
84 | 2024 | Peningkatan Jalan Parenggean - Tb.Sangai (DBH Sawit 2024) | Tender | Pekerjaan Konstruksi | 14028012 | 49035764 | 40,815,873,600 | 40,815,873,600 | 0 | 39,796,500,000 | 0 | 0 | 2024-03-15 08:00:00 | 40,815,873,600 | 100 % | ||||||
85 | 2024 | Penggantian Jembatan di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14029012 | 47299129 | 23,665,500,000 | 23,665,500,000 | 0 | 23,020,000,000 | 0 | 0 | 2024-03-15 08:00:00 | 23,665,500,000 | 100 % | ||||||
86 | 2024 | Pemeliharaan Berkala Jalan Wilayah Barat di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14030012 | 49039032 | 25,915,500,000 | 25,915,500,000 | 0 | 25,058,500,000 | 0 | 0 | 2024-03-15 11:00:00 | 25,915,500,000 | 100 % | ||||||
87 | 2024 | Pemeliharaan Berkala Jalan Wilayah Timur di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14031012 | 49040457 | 14,165,500,000 | 14,165,500,000 | 0 | 13,873,300,000 | 0 | 0 | 2024-03-15 11:00:00 | 14,165,500,000 | 100 % | ||||||
88 | 2024 | Peningkatan Jalan Tanjung Jariangau - Sp Jalan Provinsi | Tender | Pekerjaan Konstruksi | 14040012 | 49033869 | 3,925,500,000 | 3,925,500,000 | 0 | 3,824,000,000 | 0 | 0 | 2024-03-13 08:00:00 | 3,925,500,000 | 100 % | ||||||
89 | 2024 | Pembangunan RTH, JPO dan Tempat Parkir Kawasan Bundaran Besar Palangka Raya | Tender | Pekerjaan Konstruksi | 14042012 | 50235018 | 89,918,400,000 | 89,918,400,000 | 0 | 87,003,338,381 | 0 | 0 | 2024-03-08 16:00:00 | 89,918,400,000 | 100 % | ||||||
90 | 2024 | Study Kelayakan Pembangunan Sekolah Unggulan (SLTA) di Kab. Kotawaringin Barat | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14044012 | 50234970 | 500,791,000 | 500,700,000 | 0 | 496,725,000 | 0 | 0 | 2024-03-08 16:00:00 | 500,791,000 | 100 % | ||||||
91 | 2024 | Study Kelayakan Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14045012 | 50234988 | 500,791,000 | 500,700,000 | 0 | 495,337,500 | 0 | 0 | 2024-03-08 15:30:00 | 500,791,000 | 100 % | ||||||
92 | 2024 | Study Kelayakan Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14046012 | 50234957 | 502,315,000 | 502,300,000 | 0 | 497,613,000 | 0 | 0 | 2024-03-08 15:30:00 | 502,315,000 | 100 % | ||||||
93 | 2024 | Penyusunan Dokumen Lingkungan Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14048012 | 50235000 | 500,791,000 | 500,700,000 | 0 | 493,728,000 | 0 | 0 | 2024-07-26 18:00:00 | 500,791,000 | 100 % | ||||||
94 | 2024 | Amdal Lalu Lintas Pembangunan Kawasan beserta Tugu Simpang Mahir Mahar Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14051012 | 50235006 | 202,284,000 | 202,200,000 | 0 | 199,006,350 | 0 | 0 | 2024-03-08 16:00:00 | 202,284,000 | 100 % | ||||||
95 | 2024 | Penyusunan Dokumen Lingkungan Lalu Lintas Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14052012 | 50234965 | 202,284,000 | 202,200,000 | 0 | 200,688,000 | 0 | 0 | 2024-07-25 14:00:00 | 202,284,000 | 100 % | ||||||
96 | 2024 | Penyusunan Dokumen Lingkungan Lalu Lintas Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14053012 | 50235003 | 204,259,000 | 204,200,000 | 0 | 200,355,000 | 0 | 0 | 2024-07-26 18:00:00 | 204,259,000 | 100 % | ||||||
97 | 2024 | Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Murung Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14055012 | 50235013 | 126,960,000 | 126,960,000 | 0 | 124,701,840 | 0 | 0 | 2024-03-08 15:30:00 | 126,960,000 | 100 % | ||||||
98 | 2024 | Peningkatan Jalan Lingkar Kota Muara Teweh | Tender | Pekerjaan Konstruksi | 14069012 | 46597210 | 26,915,500,000 | 26,915,500,000 | 0 | 26,634,600,000 | 0 | 0 | 2024-03-15 11:00:00 | 26,915,500,000 | 100 % | ||||||
99 | 2024 | Pemeliharaan Berkala Jalan Wilayah Tengah di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 14070012 | 49039650 | 18,935,500,000 | 18,935,500,000 | 0 | 18,508,400,000 | 0 | 0 | 2024-03-15 11:00:00 | 18,935,500,000 | 100 % | ||||||
100 | 2024 | Pembuatan dan Penataan Landscape beserta Sarana dan Prasarana Penunjang Bundaran Besar Palangka Raya (Lanjutan) | Tender | Pekerjaan Konstruksi | 14080012 | 50782256 | 17,200,000,000 | 17,200,000,000 | 0 | 17,059,289,000 | 0 | 0 | 2024-03-28 09:00:00 | 17,200,000,000 | 100 % | ||||||
101 | 2024 | Pembangunan Kawasan beserta Tugu Simpang Mahir-Mahar Palangka Raya (Lanjutan) | Tender | Pekerjaan Konstruksi | 14081012 | 50782418 | 19,050,000,000 | 19,050,000,000 | 0 | 18,783,700,000 | 0 | 0 | 2024-03-28 09:00:00 | 19,050,000,000 | 100 % | ||||||
102 | 2024 | Perencanaan Pembangunan/Peningkatan Khatolic Center Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14084012 | 50782945 | 406,513,000 | 406,513,000 | 0 | 400,421,400 | 0 | 0 | 2024-03-22 08:00:00 | 406,513,000 | 100 % | ||||||
103 | 2024 | Perencanaan Pembangunan Gedung Kantor MUI Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14085012 | 48931138 | 286,896,000 | 286,896,000 | 0 | 270,828,900 | 0 | 0 | 2024-03-22 08:00:00 | 286,896,000 | 100 % | ||||||
104 | 2024 | Konsultan Pengawasan Pembangunan Gedung Balai Basarah dan Sarana Prasarana pada Kawasan Hindu Kaharingan Center Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14087012 | 50783503 | 298,908,000 | 298,900,000 | 0 | 292,351,800 | 0 | 0 | 2024-03-22 08:00:00 | 298,908,000 | 100 % | ||||||
105 | 2024 | Konsultan Pengawasan Penyediaan/Peningkatan Sarana dan Prasarana Persampahan di Kab. Kotawaringin Timur | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14088012 | 50783639 | 150,263,000 | 150,263,000 | 0 | 148,557,960 | 0 | 0 | 2024-03-22 08:00:00 | 150,263,000 | 100 % | ||||||
106 | 2024 | Peningkatan Jalan Sudirman dan Jalan Yos Sudarso Puruk Cahu | Tender | Pekerjaan Konstruksi | 14089012 | 49034329 | 4,915,500,000 | 4,915,500,000 | 0 | 4,876,700,000 | 0 | 0 | 2024-05-08 15:00:00 | 4,915,500,000 | 100 % | ||||||
107 | 2024 | Konsultan Manajemen Konstruksi Pembangunan RTH, JPO dan Tempat Parkir Kawasan Bundaran Besar Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14090012 | 50235016 | 1,183,486,000 | 1,183,486,000 | 0 | 1,167,187,200 | 0 | 0 | 2024-03-26 14:00:00 | 1,183,486,000 | 100 % | ||||||
108 | 2024 | Jasa Konsultan Pengawas Kegiatan Kontraktual (DBH Sawit) 2024 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14101012 | 47534701 | 1,400,000,000 | 1,400,000,000 | 0 | 1,372,487,250 | 0 | 0 | 2024-03-28 11:00:00 | 1,400,000,000 | 100 % | ||||||
109 | 2024 | Konsultan Pengawasan Rehabilitasi/Pemeliharaan Sarana dan Prasarana Kawasan Tugu Soekarno Palangka Raya (Lanjutan) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14103012 | 50783378 | 177,598,000 | 177,598,000 | 0 | 167,757,630 | 0 | 0 | 2024-03-28 12:00:00 | 177,598,000 | 100 % | ||||||
110 | 2024 | Perencanaan Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14104012 | 49795804 | 701,335,000 | 701,335,000 | 0 | 693,972,000 | 0 | 0 | 2024-03-28 12:00:00 | 701,335,000 | 100 % | ||||||
111 | 2024 | Perencanaan Pembangunan dan Penataan Sarana dan Prasarana POLDA Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14105012 | 49795799 | 2,440,000,000 | 2,440,000,000 | 0 | 2,419,356,000 | 0 | 0 | 2024-03-28 12:00:00 | 2,440,000,000 | 100 % | ||||||
112 | 2024 | Penyusunan Masterplan dan DED Pembangunan Sekolah Unggulan (SLTA) di Kab. Kotawaringin Barat | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14107012 | 49795793 | 1,014,353,000 | 999,500,000 | 0 | 990,120,000 | 0 | 0 | 2024-03-28 12:00:00 | 1,014,353,000 | 100 % | ||||||
113 | 2024 | Perencanaan Pemeliharaan Bangunan dan Lingkungan Aset Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14108012 | 47823288 | 406,513,000 | 406,513,000 | 0 | 401,953,200 | 0 | 0 | 2024-03-28 12:00:00 | 406,513,000 | 100 % | ||||||
114 | 2024 | Perencanaan Rehabilitasi/Pemeliharaan Masjid Raya Darussalam, Menara beserta Sarana & Prasarana | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14109012 | 47824032 | 740,220,000 | 740,220,000 | 0 | 721,733,100 | 0 | 0 | 2024-03-28 12:00:00 | 740,220,000 | 100 % | ||||||
115 | 2024 | Penyusunan Masterplan dan DED Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14110012 | 50234953 | 701,335,000 | 701,335,000 | 0 | 694,971,000 | 0 | 0 | 2024-03-28 12:00:00 | 701,335,000 | 100 % | ||||||
116 | 2024 | Pembangunan Sarana dan Prasarana Penunjang RSUD Kelas B di Wilayah Barat Prov. Kalteng (Lanjutan) | Tender | Pekerjaan Konstruksi | 14111012 | 51260072 | 29,930,000,000 | 29,930,000,000 | 0 | 29,323,000,000 | 0 | 0 | 2024-05-08 08:00:00 | 29,930,000,000 | 100 % | ||||||
117 | 2024 | Pembangunan/Peningkatan Jalan Inspeksi Desa Jaya Makmur Kec. Katingan Kuala Kabupaten Katingan | Tender | Pekerjaan Konstruksi | 14119012 | 48922419 | 930,000,000 | 930,000,000 | 0 | 922,376,594 | 0 | 0 | 2024-04-19 10:00:00 | 930,000,000 | 100 % | ||||||
118 | 2024 | Perencanaan Teknis Jalan dan Jembatan (DED) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14120012 | 48810279 | 1,435,500,000 | 1,435,500,000 | 0 | 1,424,352,000 | 0 | 0 | 2024-04-16 15:00:00 | 1,435,500,000 | 100 % | ||||||
119 | 2024 | Konsultan Manajemen Konstruksi Pembuatan dan Penataan Landscape beserta Sarana dan Prasarana Penunjang Bundaran Besar Palangka raya (Lanjutan) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14121012 | 47832782 | 1,542,427,000 | 1,542,427,000 | 0 | 1,535,141,100 | 0 | 0 | 2024-04-16 15:00:00 | 1,542,427,000 | 100 % | ||||||
120 | 2024 | Pembangunan Jembatan Tumbang Gugup | Tender | Pekerjaan Konstruksi | 14138012 | 46910850 | 23,675,500,000 | 23,675,500,000 | 0 | 23,300,000,000 | 0 | 0 | 2024-05-08 15:00:00 | 23,675,500,000 | 100 % | ||||||
121 | 2024 | Perencanaan Pembangunan dan Penataan Sarana dan Prasarana Korem 102/Panju Panjung | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14155012 | 50782815 | 1,521,881,000 | 1,521,881,000 | 0 | 1,513,715,880 | 0 | 0 | 2024-05-08 17:30:00 | 1,521,881,000 | 100 % | ||||||
122 | 2024 | Study Kelayakan dan DED Pembangunan Rumah Sakit Provinsi di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14156012 | 50782627 | 1,464,375,000 | 1,464,375,000 | 0 | 0 | 0 | 0 | 2024-05-08 17:30:00 | 1,464,375,000 | 100 % | ||||||
123 | 2024 | Penyusunan Masterplan dan DED Pembangunan Universitas Unggulan di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 14157012 | 49795795 | 2,650,074,000 | 2,650,074,000 | 0 | 2,616,980,400 | 0 | 0 | 2024-05-17 16:00:00 | 2,650,074,000 | 100 % | ||||||
124 | 2024 | Peningkatan Jalan Simpang Patas Tabak Kanilan | Tender | Pekerjaan Konstruksi | 14175012 | 46589731 | 9,925,500,000 | 9,925,500,000 | 0 | 9,672,100,000 | 0 | 0 | 2024-05-22 15:00:00 | 9,925,500,000 | 100 % | ||||||
125 | 2024 | Perencanaan Teknis Pekerjaan Fisik Bidang Cipta Karya; | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15183012 | 47737732 | 1,205,939,000 | 1,205,939,000 | 0 | 1,186,750,950 | 0 | 0 | 2024-06-27 10:00:00 | 1,205,939,000 | 100 % | ||||||
126 | 2024 | Pemeliharaan Berkala Jembatan Tersebar Di Provinsi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 15186012 | 47434440 | 14,250,000,000 | 14,250,000,000 | 0 | 13,794,900,000 | 0 | 0 | 2024-06-07 14:00:00 | 14,250,000,000 | 100 % | ||||||
127 | 2024 | Konsultan MK Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15190012 | 47589302 | 803,363,000 | 803,363,000 | 0 | 801,472,170 | 0 | 0 | 2024-06-20 15:00:00 | 803,363,000 | 100 % | ||||||
128 | 2024 | Konsultan Pengawasan Pembangunan dan Penataan Sarana dan Prasarana Korem 102/Panju Panjung | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15191012 | 47826749 | 1,106,846,000 | 1,106,846,000 | 0 | 1,101,783,780 | 0 | 0 | 2024-06-20 15:00:00 | 1,106,846,000 | 100 % | ||||||
129 | 2024 | Konsultan Pengawasan Pembangunan Rumah sakit Provinsi di Kota Palangka Raya (Tahap I) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15196012 | 48898841 | 874,560,000 | 874,560,000 | 0 | 868,420,000 | 0 | 0 | 2024-06-20 12:00:00 | 874,560,000 | 100 % | ||||||
130 | 2024 | Konsultan Pengawasan Rehabilitasi/Pemeliharaan Masjid Raya Darussalam, Menara beserta Sarana & Prasarana | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15197012 | 47831952 | 680,039,000 | 680,039,000 | 0 | 670,360,000 | 0 | 0 | 2024-06-20 12:00:00 | 680,039,000 | 100 % | ||||||
131 | 2024 | Konsultan Pengawasan Pemeliharaan Bangunan dan Lingkungan Aset Provinsi Kalimantan Tengah | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15199012 | 47830314 | 243,440,000 | 234,440,000 | 0 | 231,110,000 | 0 | 0 | 2024-06-20 12:00:00 | 243,440,000 | 100 % | ||||||
132 | 2024 | Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah | Tender | Pekerjaan Konstruksi | 15228012 | 47589300 | 19,000,000,000 | 19,000,000,000 | 0 | 18,683,900,000 | 0 | 0 | 2024-07-16 17:30:00 | 19,000,000,000 | 100 % | ||||||
133 | 2024 | Pembangunan dan Penataan Sarana dan Prasarana Korem 102/Panju Panjung | Tender | Pekerjaan Konstruksi | 15231012 | 47855243 | 17,250,000,000 | 17,250,000,000 | 0 | 17,063,500,000 | 0 | 0 | 2024-07-16 16:00:00 | 17,250,000,000 | 100 % | ||||||
134 | 2024 | Penyusunan Dokumen Lingkungan Pembangunan Rumah Betang di Kota Palangka Raya | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 15234012 | 50234959 | 502,315,000 | 502,315,000 | 0 | 498,001,500 | 0 | 0 | 2024-07-26 18:00:00 | 502,315,000 | 100 % | ||||||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |