1 |
2024 |
Dinas Sosial |
Perencanaan Rehabilitasi Gedung Kantor Dinas Sosial Provinsi Kalimantan Tengah |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15766012 |
49514044 |
APBD |
68,900,000 |
68,890,000 |
68,300,206 |
68,300,206 |
68,055,781 |
68,055,781 |
68,055,781 |
68,055,781 |
2024-04-17 |
2024-05-02 |
CV. DAKSA RESWARA PRAKASA |
65.529.585.5-711.000 |
599,794
|
0.87 %
|
3 |
2 |
2024 |
Dinas Sosial |
Perencanaan Rehabilitasi Pagar Dinas Sosial Provinsi Kalimantan Tengah |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15968012 |
49514901 |
APBD |
68,900,000 |
68,890,000 |
68,300,206 |
68,300,206 |
68,055,781 |
68,055,781 |
68,055,781 |
68,055,781 |
2024-04-18 |
2024-05-03 |
CV. DAKSA RESWARA PRAKASA |
65.529.585.5-711.000 |
599,794
|
0.87 %
|
3 |
3 |
2024 |
Dinas Sosial |
Perencanaan Pembuatan Drainase UPT PSBL Pambelum (Lanjutan) |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15969012 |
49436019 |
APBD |
68,900,000 |
68,860,800 |
68,201,730 |
68,201,730 |
67,862,070 |
67,862,070 |
67,862,070 |
67,862,070 |
2024-04-17 |
2024-05-03 |
CV. PUTRA BAHARI ENGINEERING |
75.242.556.1-711.000 |
698,270
|
1.01 %
|
3 |
4 |
2024 |
Dinas Sosial |
Perencanaan Peningkatan Jalan dan Halaman UPT PSBL Pambelum |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15970012 |
49435669 |
APBD |
97,944,000 |
97,943,500 |
96,615,510 |
96,615,510 |
96,220,350 |
96,220,350 |
96,220,350 |
96,220,350 |
2024-04-18 |
2024-05-03 |
CV. PUTRA BAHARI ENGINEERING |
75.242.556.1-711.000 |
1,328,490
|
1.36 %
|
3 |
5 |
2024 |
Dinas Sosial |
Perencanaan Pembatas Antar Bangsal Klien UPT PSBL Pambelum |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15971012 |
49435003 |
APBD |
68,900,000 |
68,860,800 |
68,213,940 |
68,213,940 |
67,880,940 |
67,880,940 |
67,880,940 |
67,880,940 |
2024-04-17 |
2024-05-02 |
CV. ACE TAKABEYA |
02.676.279.9-711.000 |
686,060
|
1 %
|
3 |
6 |
2024 |
Dinas Sosial |
Pengawasan Rehabilitasi Bangunan (Dapur dan Kantor) DiLingkungan UPT PSBR Majar Tabela |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17453012 |
49931138 |
APBD |
49,820,000 |
49,820,000 |
49,203,525 |
49,203,525 |
48,581,925 |
48,581,925 |
48,581,925 |
48,581,925 |
2024-07-10 |
2024-07-19 |
PT. EDUKA REKAYASA KONSULTAN |
01.489.523.9-711.000 |
616,475
|
1.24 %
|
3 |
7 |
2024 |
Dinas Sosial |
Pengawasan Rehabilitasi Pagar Dinas Sosial Provinsi Kalimantan Tengah |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
17458012 |
49930579 |
APBD |
49,539,000 |
49,539,000 |
49,525,425 |
49,525,425 |
48,559,725 |
48,559,725 |
48,559,725 |
48,559,725 |
2024-08-08 |
2024-08-21 |
CV. TALINDO KONSULTAN |
84.303.935.5-711.000 |
13,575
|
0.03 %
|
3 |
8 |
2024 |
Dinas Sosial |
Pengawasan Rehabilitasi Kantor Dinas Sosial Provinsi Kalimantan Tengah (Ruang Kadis dan Toilet Kantor) |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
17459012 |
49929417 |
APBD |
49,820,000 |
49,820,000 |
49,804,035 |
49,804,035 |
48,893,280 |
48,893,280 |
48,893,280 |
48,893,280 |
2024-08-23 |
2024-09-12 |
CV. BAHARI ENGINEERING CONSULTANT |
02.809.277.3-711.000 |
15,965
|
0.03 %
|
3 |
9 |
2024 |
Dinas Sosial |
Pengawasan Pembangunan Musholla UPT PSBL (Lanjutan) |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17461012 |
49455370 |
APBD |
26,475,000 |
26,475,000 |
24,881,760 |
24,881,760 |
24,619,800 |
24,619,800 |
24,619,800 |
24,619,800 |
2024-07-10 |
2024-07-19 |
CV. MULTI TEKNIKA |
01.489.648.4-711.000 |
1,593,240
|
6.02 %
|
3 |
10 |
2024 |
Dinas Sosial |
Pengawasan Pembangunan Pembatas Antar Bangsal Klien UPT PSBL Pambelum |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17462012 |
49443403 |
APBD |
49,820,000 |
49,820,000 |
49,266,795 |
49,266,795 |
48,581,925 |
48,581,925 |
48,581,925 |
48,581,925 |
2024-07-10 |
2024-07-19 |
CV. PUTRA BAHARI ENGINEERING |
75.242.556.1-711.000 |
553,205
|
1.11 %
|
3 |
11 |
2024 |
Dinas Sosial |
Pengawasan Peningkatan Jalan dan Halaman UPT PSBL Pambelum |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17463012 |
49439011 |
APBD |
64,766,000 |
64,766,000 |
64,410,525 |
64,410,525 |
62,853,750 |
62,853,750 |
62,853,750 |
62,853,750 |
2024-07-10 |
2024-07-19 |
CV. MULTI TEKNIKA |
01.489.648.4-711.000 |
355,475
|
0.55 %
|
3 |
12 |
2024 |
Dinas Sosial |
Pengawasan Pembuatan Drainase UPT PSBL Pambelum (Lanjutan) |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17464012 |
49441832 |
APBD |
49,820,000 |
49,820,000 |
49,203,525 |
49,203,525 |
48,581,925 |
48,581,925 |
48,581,925 |
48,581,925 |
2024-07-10 |
2024-07-22 |
PT. EDUKA REKAYASA KONSULTAN |
01.489.523.9-711.000 |
616,475
|
1.24 %
|
3 |
13 |
2024 |
Dinas Sosial |
Pengawasan Rehabilitasi Bangunan di Lingkungan UPT. PSTW Sinta Rangkang |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17465012 |
51172971 |
APBD |
33,014,000 |
33,014,000 |
32,778,300 |
32,778,300 |
32,156,700 |
32,156,700 |
32,156,700 |
32,156,700 |
2024-07-10 |
2024-07-19 |
CV. ACE TAKABEYA |
02.676.279.9-711.000 |
235,700
|
0.71 %
|
3 |