1 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD NANGA BULIK |
|
Jasa Konsultansi Badan Usaha Konstruksi |
15763012 |
49205578 |
APBD |
13,582,500 |
13,505,000 |
13,331,100 |
13,331,100 |
13,064,700 |
13,064,700 |
13,064,700 |
13,064,700 |
2024-03-22 |
2024-03-29 |
CV. LISTRA ARCDIMENSI |
02.539.113.7-711.000 |
251,400
|
1.85 %
|
|
2 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KAPUAS |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16029012 |
49202880 |
APBD |
13,500,000 |
13,423,496 |
13,400,000 |
13,400,000 |
13,120,200 |
13,120,200 |
13,120,200 |
13,120,200 |
2024-05-01 |
2024-05-10 |
CV. LISTRA ARCDIMENSI |
02.539.113.7-711.000 |
100,000
|
0.74 %
|
|
3 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAAN PERENCANAAN PEMBANGUNAN PAGAR LANJUTAN UPTPPD MURUNG RAYA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16024012 |
49187791 |
APBD |
101,681,250 |
98,790,000 |
98,457,000 |
98,457,000 |
97,563,450 |
97,563,450 |
97,563,450 |
97,563,450 |
2024-04-29 |
2024-05-13 |
PT.TABENGAN INDAH DESIGN |
02.618.309.5-711.000 |
3,224,250
|
3.17 %
|
|
4 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PENATAAN HALAMAN BELAKANG UPTPPD MUARA TEWEH |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16023012 |
49254192 |
APBD |
63,000,000 |
48,118,500 |
48,074,100 |
48,074,100 |
47,175,000 |
47,175,000 |
47,175,000 |
47,175,000 |
2024-04-29 |
2024-05-13 |
PT.TABENGAN INDAH DESIGN |
02.618.309.5-711.000 |
14,925,900
|
23.69 %
|
|
5 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMASANGAN PAVING BLOK HALAMAN AULA UTAMA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16188012 |
49188273 |
APBD |
40,000,000 |
39,738,000 |
39,571,500 |
39,571,500 |
39,005,400 |
39,005,400 |
39,005,400 |
39,005,400 |
2024-05-22 |
2024-06-07 |
PT.TABENGAN INDAH DESIGN |
02.618.309.5-711.000 |
428,500
|
1.07 %
|
|
6 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE KANTOR UPTPPD MURUNG RAYA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16022012 |
49191281 |
APBD |
28,976,000 |
28,715,700 |
28,493,700 |
28,493,700 |
27,616,800 |
27,616,800 |
27,616,800 |
27,616,800 |
2024-04-29 |
2024-05-13 |
PT.TABENGAN INDAH DESIGN |
02.618.309.5-711.000 |
482,300
|
1.66 %
|
|
7 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN GEDUNG ARSIP UPTPPD PALANGKA RAYA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16018012 |
49197483 |
APBD |
86,761,976 |
81,813,632 |
81,400,879 |
81,400,879 |
81,173,273 |
81,173,273 |
81,173,273 |
81,173,273 |
2024-04-29 |
2024-05-13 |
CV. DAKSA RESWARA PRAKASA |
65.529.585.5-711.000 |
5,361,097
|
6.18 %
|
|
8 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN RUANG TUNGGU CEK FISIK MOBIL |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16017012 |
49211993 |
APBD |
32,832,000 |
32,648,930 |
32,458,250 |
32,458,250 |
32,230,756 |
32,230,756 |
32,230,756 |
32,230,756 |
2024-04-29 |
2024-05-13 |
CV. DAKSA RESWARA PRAKASA |
65.529.585.5-711.000 |
373,750
|
1.14 %
|
|
9 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Pembangunan Ruang Pantry Kantor Samsat Pangkalan Bun |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17524012 |
52118669 |
APBDP |
14,450,000 |
14,339,091 |
14,257,395 |
14,257,395 |
13,697,400 |
13,697,400 |
13,697,400 |
13,697,400 |
2024-07-22 |
2024-08-06 |
CV. Unika Citra Mandiri |
02.539.043.6-711.000 |
192,605
|
1.33 %
|
|
10 |
2024 |
Badan Pendapatan Daerah |
.PEKERJAAN PENGAWASAN RENOVASI RUANG PAJAK KANTOR INDUK |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17541012 |
49960741 |
APBD |
43,780,000 |
43,756,200 |
43,711,800 |
43,711,800 |
43,312,200 |
43,312,200 |
43,312,200 |
43,312,200 |
2024-07-26 |
2024-08-10 |
Roa Solution |
92.337.883.0-711.000 |
68,200
|
0.16 %
|
|
11 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE UPTPPD KASONGAN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17426012 |
49694303 |
APBD |
16,944,000 |
16,943,999 |
16,900,000 |
16,900,000 |
16,594,500 |
16,594,500 |
16,594,500 |
16,594,500 |
2024-07-03 |
2024-07-17 |
CV. KATIGA RANCANG PUTERA |
02.618.593.4-711.000 |
44,000
|
0.26 %
|
|
12 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI GEDUNG KANTOR LAMA UPTPPD KAPUAS |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17427012 |
49932954 |
APBD |
37,100,000 |
37,100,000 |
37,050,000 |
37,050,000 |
36,413,550 |
36,413,550 |
36,413,550 |
36,413,550 |
2024-07-03 |
2024-07-17 |
CV. KATIGA RANCANG PUTERA |
02.618.593.4-711.000 |
50,000
|
0.13 %
|
|
13 |
2024 |
Badan Pendapatan Daerah |
Perkerjaan Perencanaan Penataan Halaman Aula Utama Bapenda Tahap 4 |
|
Jasa Konsultansi Badan Usaha Konstruksi |
15905012 |
49114037 |
APBD |
81,000,000 |
80,952,300 |
80,375,100 |
80,375,100 |
79,675,800 |
79,675,800 |
79,675,800 |
79,675,800 |
2024-03-28 |
2024-04-12 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
624,900
|
0.77 %
|
|
14 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI PARKIR KANTOR INDUK |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15733012 |
49831172 |
APBD |
19,998,000 |
17,673,050 |
17,427,000 |
17,427,000 |
16,994,100 |
16,994,100 |
16,994,100 |
16,994,100 |
2024-03-07 |
2024-03-20 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
2,571,000
|
12.86 %
|
|
15 |
2024 |
Badan Pendapatan Daerah |
Belanja Modal Bangunan Gedung Kantor ( Perencanaan Penataan Halaman Kantor UPTPPD Sampit ) |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17428012 |
51957360 |
APBDP |
74,250,000 |
74,162,985 |
73,829,985 |
73,829,985 |
72,880,935 |
72,880,935 |
72,880,935 |
72,880,935 |
2024-07-03 |
2024-07-17 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
420,015
|
0.57 %
|
|
16 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD NANGA BULIK |
|
Jasa Konsultansi Badan Usaha Konstruksi |
15765012 |
49208240 |
APBD |
42,900,000 |
42,818,250 |
42,390,900 |
42,390,900 |
41,785,950 |
41,785,950 |
41,785,950 |
41,785,950 |
2024-03-28 |
2024-04-12 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
509,100
|
1.19 %
|
|
17 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN TOILET UMUM AULA UTAMA BAPENDA PROV.KAL-TENG |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15731012 |
49248464 |
APBD |
48,000,000 |
47,913,150 |
47,619,000 |
47,619,000 |
46,964,100 |
46,964,100 |
46,964,100 |
46,964,100 |
2024-03-11 |
2024-03-20 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
381,000
|
0.79 %
|
|
18 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI PARKIR KANTOR INDUK |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17255012 |
49955641 |
APBD |
11,110,000 |
11,100,000 |
10,933,500 |
10,933,500 |
10,589,400 |
10,589,400 |
10,589,400 |
10,589,400 |
2024-06-03 |
2024-06-18 |
CV. PRATAMA HUMA DESIGN |
99.430.054.9-711.000 |
176,500
|
1.59 %
|
|
19 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE KANTOR UPTPPD MURUNG RAYA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17256012 |
49693368 |
APBD |
16,944,000 |
16,927,500 |
16,872,000 |
16,872,000 |
16,272,600 |
16,272,600 |
16,272,600 |
16,272,600 |
2024-06-03 |
2024-06-18 |
CV. PRATAMA HUMA DESIGN |
99.430.054.9-711.000 |
72,000
|
0.42 %
|
|
20 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KURUN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16031012 |
49203740 |
APBD |
15,393,500 |
15,315,491 |
15,300,000 |
15,300,000 |
15,040,500 |
15,040,500 |
15,040,500 |
15,040,500 |
2024-05-01 |
2024-05-10 |
CV.EASTERN BANGUN PERKASA |
70.396.056.7-711.000 |
93,500
|
0.61 %
|
|
21 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD MURUNG RAYA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16027012 |
49204514 |
APBD |
13,582,500 |
13,504,993 |
13,480,000 |
13,480,000 |
13,231,200 |
13,231,200 |
13,231,200 |
13,231,200 |
2024-05-01 |
2024-05-10 |
CV.EASTERN BANGUN PERKASA |
70.396.056.7-711.000 |
102,500
|
0.75 %
|
|
22 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASANBPEMBANGUNAN PAPAN NAMA KANTOR UPTPPD MURUNG RAYA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
10006735000 |
49682748 |
APBD |
7,942,500 |
7,941,499 |
7,869,900 |
7,869,900 |
7,514,700 |
0 |
0 |
0 |
2024-11-15 |
2024-11-29 |
CV.EASTERN BANGUN PERKASA |
70.396.056.7-711.000 |
72,600
|
0.91 %
|
|
23 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SERUYAN |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15795012 |
49207360 |
APBD |
13,582,500 |
13,505,000 |
13,503,150 |
13,503,150 |
13,286,700 |
13,286,700 |
13,286,700 |
13,286,700 |
2024-03-15 |
2024-03-25 |
CV.EASTERN BANGUN PERKASA |
70.396.056.7-711.000 |
79,350
|
0.58 %
|
|
24 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SAMPIT |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15760012 |
49206656 |
APBD |
13,582,500 |
13,538,300 |
13,530,900 |
13,530,900 |
13,109,100 |
13,109,100 |
13,109,100 |
13,109,100 |
2024-03-07 |
2024-03-20 |
CV.EASTERN BANGUN PERKASA |
70.396.056.7-711.000 |
51,600
|
0.38 %
|
|
25 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN BAK SAMPAH DAN SEPTICTANK UPTPPD PALANGKA RAYA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17523012 |
49189038 |
APBD |
7,537,500 |
7,536,345 |
7,477,515 |
7,477,515 |
7,113,657 |
7,113,657 |
7,113,657 |
7,113,657 |
2024-07-22 |
2024-08-06 |
ROTASI DESIGN CONSULTANT |
90.011.802.7-711.000 |
59,985
|
0.8 %
|
|
26 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KURUN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
10006794000 |
49718725 |
APBD |
9,001,500 |
9,000,000 |
8,991,000 |
8,991,000 |
8,591,400 |
0 |
0 |
0 |
2024-11-15 |
2024-11-29 |
CV. UTUS DAMABA CONSULTANT |
03.229.884.6-711.000 |
10,500
|
0.12 %
|
|
27 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI PLAFON DAN TANGGA KANTOR INDUK |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15744012 |
49831359 |
APBD |
32,350,000 |
32,325,281 |
32,214,000 |
32,214,000 |
31,537,181 |
31,537,181 |
31,537,181 |
31,537,181 |
2024-03-07 |
2024-03-20 |
CV. UTUS DAMABA CONSULTANT |
03.229.884.6-711.000 |
136,000
|
0.42 %
|
|
28 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI RUANGAN LANTAI 1 DAN RUANGAN SEKRETARIAT |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15742012 |
49833275 |
APBD |
88,424,000 |
88,402,759 |
88,236,259 |
88,236,259 |
87,470,359 |
87,470,359 |
87,470,359 |
87,470,359 |
2024-03-11 |
2024-03-20 |
CV. UTUS DAMABA CONSULTANT |
03.229.884.6-711.000 |
187,741
|
0.21 %
|
|
29 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI KANTOR UPTPPD KUALA KURUN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17223012 |
49953914 |
APBD |
25,920,000 |
25,918,500 |
25,752,000 |
25,752,000 |
25,219,200 |
25,219,200 |
25,219,200 |
25,219,200 |
2024-05-29 |
2024-06-08 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
168,000
|
0.65 %
|
|
30 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAGAR LANJUTAN UPTPPD MURUNG RAYA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17398012 |
49716639 |
APBD |
59,606,250 |
59,534,850 |
59,312,850 |
59,312,850 |
58,463,700 |
58,463,700 |
58,463,700 |
58,463,700 |
2024-06-28 |
2024-07-12 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
293,400
|
0.49 %
|
|
31 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAGAR DEPAN DAN SAMPING KANAN UPTPPD SAMPIT |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17221012 |
49714080 |
APBD |
19,062,000 |
18,925,500 |
18,814,500 |
18,814,500 |
18,337,200 |
18,337,200 |
18,337,200 |
18,337,200 |
2024-05-29 |
2024-06-08 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
247,500
|
1.3 %
|
|
32 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN GUDANG KANTOR BAPENDA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16182012 |
49701640 |
APBD |
40,000,000 |
39,948,900 |
39,615,900 |
39,615,900 |
38,922,150 |
38,922,150 |
38,922,150 |
38,922,150 |
2024-05-29 |
2024-06-08 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
384,100
|
0.96 %
|
|
33 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Penataan Halaman ( Penimbunan ) Halaman Kantor UPTPPD Buntok |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17369012 |
51957090 |
APBDP |
23,543,000 |
23,542,999 |
23,450,000 |
23,450,000 |
23,026,395 |
23,026,395 |
23,026,395 |
23,026,395 |
2024-06-26 |
2024-07-12 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
93,000
|
0.4 %
|
|
34 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI GEDUNG KANTOR LAMA UPTPPD KAPUAS |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16025012 |
49824737 |
APBD |
64,925,000 |
64,924,973 |
64,800,000 |
64,800,000 |
64,265,485 |
64,265,485 |
64,265,485 |
64,265,485 |
2024-05-01 |
2024-05-10 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
125,000
|
0.19 %
|
|
35 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI MUSOLAH DAN AULA KANTOR INDUK |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15745012 |
49830795 |
APBD |
42,500,000 |
42,456,390 |
42,345,390 |
42,345,390 |
41,657,190 |
41,657,190 |
41,657,190 |
41,657,190 |
2024-03-07 |
2024-03-20 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
154,610
|
0.36 %
|
|
36 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI TOTAL RUMAH DINAS STAF UPTPPD BARITO SELATAN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17402012 |
49961204 |
APBD |
19,104,360 |
19,104,360 |
19,000,000 |
19,000,000 |
18,484,275 |
18,484,275 |
18,484,275 |
18,484,275 |
2024-07-03 |
2024-07-17 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
104,360
|
0.55 %
|
|
37 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN SIRING DAN PAGAR UPTPPD SERUYAN |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15746012 |
49212314 |
APBD |
113,643,750 |
99,945,788 |
99,834,788 |
99,834,788 |
99,213,188 |
99,213,188 |
99,213,188 |
99,213,188 |
2024-03-15 |
2024-03-25 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
13,808,963
|
12.15 %
|
|
38 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI GEDUNG KANTOR UPTPPD KASONGAN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16021012 |
49824839 |
APBD |
43,750,000 |
43,698,936 |
43,650,000 |
43,650,000 |
43,027,023 |
43,027,023 |
43,027,023 |
43,027,023 |
2024-05-01 |
2024-05-10 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
100,000
|
0.23 %
|
|
39 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI RUANGAN LANTAI 1 DAN RUANGAN SEKRETARIAT |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17519012 |
49960506 |
APBD |
50,528,000 |
50,505,000 |
50,449,500 |
50,449,500 |
49,683,600 |
49,683,600 |
49,683,600 |
49,683,600 |
2024-07-22 |
2024-08-06 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
78,500
|
0.16 %
|
|
40 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI RUANG PAJAK KANTOR INDUK |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15743012 |
49834659 |
APBD |
76,616,400 |
76,582,554 |
76,471,554 |
76,471,554 |
75,528,062 |
75,528,062 |
75,528,062 |
75,528,062 |
2024-03-11 |
2024-03-20 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
144,846
|
0.19 %
|
|
41 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE UPTPPD KASONGAN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16019012 |
49196120 |
APBD |
28,976,000 |
28,975,995 |
28,900,000 |
28,900,000 |
28,437,645 |
28,437,645 |
28,437,645 |
28,437,645 |
2024-04-29 |
2024-05-13 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
76,000
|
0.26 %
|
|
42 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN TOILET WAJIB PAJAK UPTPPD NANGA BULIK |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15764012 |
49250209 |
APBD |
17,204,500 |
17,105,100 |
16,994,100 |
16,994,100 |
16,572,300 |
16,572,300 |
16,572,300 |
16,572,300 |
2024-03-15 |
2024-03-25 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
210,400
|
1.22 %
|
|
43 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI GEDUNG KANTOR UPTPPD KASONGAN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17399012 |
49934979 |
APBD |
25,000,000 |
24,999,999 |
24,900,000 |
24,900,000 |
24,650,325 |
24,650,325 |
24,650,325 |
24,650,325 |
2024-07-03 |
2024-07-17 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
100,000
|
0.4 %
|
|
44 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SUKAMARA |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15793012 |
49207879 |
APBD |
13,582,500 |
13,538,300 |
13,475,400 |
13,475,400 |
13,220,100 |
13,220,100 |
13,220,100 |
13,220,100 |
2024-03-15 |
2024-03-25 |
CV. CENDRAWASIH MITRA PRATAMA |
03.229.883.8-711.000 |
107,100
|
0.79 %
|
|
45 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BUNTOK |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16030012 |
49200311 |
APBD |
13,582,500 |
13,504,993 |
13,500,000 |
13,500,000 |
13,231,200 |
13,231,200 |
13,231,200 |
13,231,200 |
2024-05-01 |
2024-05-10 |
CV. CENDRAWASIH MITRA PRATAMA |
03.229.883.8-711.000 |
82,500
|
0.61 %
|
|
46 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BARITO TIMUR |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16028012 |
49199689 |
APBD |
13,582,500 |
13,504,993 |
13,400,000 |
13,400,000 |
13,120,200 |
13,120,200 |
13,120,200 |
13,120,200 |
2024-05-01 |
2024-05-10 |
CV. CENDRAWASIH MITRA PRATAMA |
03.229.883.8-711.000 |
182,500
|
1.34 %
|
|
47 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD PANGKALAN BUN |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15762012 |
49206089 |
APBD |
13,582,500 |
13,505,000 |
13,364,400 |
13,364,400 |
13,075,800 |
13,075,800 |
13,075,800 |
13,075,800 |
2024-03-11 |
2024-03-20 |
CV. CENDRAWASIH MITRA PRATAMA |
03.229.883.8-711.000 |
218,100
|
1.61 %
|
|
48 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD SUKAMARA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17220012 |
49721716 |
APBD |
32,000,000 |
31,900,092 |
31,842,494 |
31,842,494 |
31,365,194 |
31,365,194 |
31,365,194 |
31,365,194 |
2024-05-29 |
2024-06-13 |
CV. WAHANA KARYA DESIGN |
02.292.590.3-711.000 |
157,506
|
0.49 %
|
|
49 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN TANDON AIR UPTPPD PANGKALAN BUN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17434012 |
49722036 |
APBD |
7,500,000 |
7,464,974 |
7,369,832 |
7,369,832 |
7,086,782 |
7,086,782 |
7,086,782 |
7,086,782 |
2024-07-03 |
2024-07-17 |
CV. WAHANA KARYA DESIGN |
02.292.590.3-711.000 |
130,168
|
1.74 %
|
|
50 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI GEDUNG UPTPPD PANGKALAN BUN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17435012 |
49953444 |
APBD |
21,180,000 |
21,172,082 |
20,978,369 |
20,978,369 |
20,118,119 |
20,118,119 |
20,118,119 |
20,118,119 |
2024-07-03 |
2024-07-17 |
CV. WAHANA KARYA DESIGN |
02.292.590.3-711.000 |
201,631
|
0.95 %
|
|
51 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE, KANOPI PENYAMBUNG KANTOR-GUDANG ARSIP UPTPPD SUKAMARA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17219012 |
49687870 |
APBD |
30,000,000 |
29,900,094 |
29,750,255 |
29,750,255 |
29,100,794 |
29,100,794 |
29,100,794 |
29,100,794 |
2024-05-29 |
2024-06-13 |
CV. WAHANA KARYA DESIGN |
02.292.590.3-711.000 |
249,745
|
0.83 %
|
|
52 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE, KANOPI PENYAMBUNG KANTOR-GUDANG ARSIP UPTPPD SUKAMARA |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15748012 |
49189732 |
APBD |
49,500,000 |
49,498,849 |
49,284,000 |
49,284,000 |
48,695,700 |
48,695,700 |
48,695,700 |
48,695,700 |
2024-03-07 |
2024-03-20 |
CV. PUTRA BAHARI ENGINEERING |
75.242.556.1-711.000 |
216,000
|
0.44 %
|
|
53 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD SUKAMARA |
|
Jasa Konsultansi Badan Usaha Konstruksi |
15907012 |
49211291 |
APBD |
52,800,000 |
52,700,036 |
51,953,550 |
51,953,550 |
51,629,430 |
51,629,430 |
51,629,430 |
51,629,430 |
2024-03-28 |
2024-04-12 |
CV. PUTRA BAHARI ENGINEERING |
75.242.556.1-711.000 |
846,450
|
1.6 %
|
|
54 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN TANDON AIR UPTPPD PANGKALAN BUN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
15902012 |
49246741 |
APBD |
9,792,012 |
9,768,000 |
9,573,750 |
9,573,750 |
9,351,750 |
9,351,750 |
9,351,750 |
9,351,750 |
2024-03-28 |
2024-04-12 |
CV. PUTRA BAHARI ENGINEERING |
75.242.556.1-711.000 |
218,262
|
2.23 %
|
|
55 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI GEDUNG UPTPPD PANGKALAN BUN |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15738012 |
49826772 |
APBD |
36,220,000 |
36,198,039 |
35,464,500 |
35,464,500 |
35,064,900 |
35,064,900 |
35,064,900 |
35,064,900 |
2024-03-07 |
2024-03-20 |
CV. ACE TAKABEYA |
02.676.279.9-711.000 |
755,500
|
2.09 %
|
|
56 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI GARASI RUMAH DINAS ESSELON UPTPPD PANGKALAN BUN |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15740012 |
49824504 |
APBD |
10,866,000 |
10,865,790 |
10,545,000 |
10,545,000 |
10,323,000 |
10,323,000 |
10,323,000 |
10,323,000 |
2024-03-11 |
2024-03-20 |
CV. ACE TAKABEYA |
02.676.279.9-711.000 |
321,000
|
2.95 %
|
|
57 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI TOTAL RUMAH DINAS STAF UPTPPD BARITO SELATAN |
|
Jasa Konsultansi Badan Usaha Konstruksi |
16020012 |
49834785 |
APBD |
32,670,440 |
32,670,439 |
32,600,000 |
32,600,000 |
31,968,000 |
31,968,000 |
31,968,000 |
31,968,000 |
2024-04-29 |
2024-05-13 |
KARYAMANDIRI MITRAUTAMA INDAHDESIGN |
63.313.382.2-711.000 |
70,440
|
0.22 %
|
|
58 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Renovasi Ruang Kantor UPTPPD Palangka Raya |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17370012 |
51957019 |
APBDP |
45,900,000 |
33,522,000 |
33,300,000 |
33,300,000 |
32,656,200 |
32,656,200 |
32,656,200 |
32,656,200 |
2024-06-26 |
2024-07-12 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
12,600,000
|
27.45 %
|
|
59 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAGAR DEPAN DAN SAMPING KANAN UPTPPD SAMPIT |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15730012 |
49198243 |
APBD |
32,598,000 |
30,870,950 |
30,691,500 |
30,691,500 |
30,125,400 |
30,125,400 |
30,125,400 |
30,125,400 |
2024-03-11 |
2024-03-20 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
1,906,500
|
5.85 %
|
|
60 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI KANTOR UPTPPD KUALA KURUN |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15732012 |
49828623 |
APBD |
45,360,000 |
44,716,905 |
44,244,600 |
44,244,600 |
43,323,300 |
43,323,300 |
43,323,300 |
43,323,300 |
2024-03-07 |
2024-03-20 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
1,115,400
|
2.46 %
|
|
61 |
2024 |
Badan Pendapatan Daerah |
Belanja Modal Bangunan Kantor ( Perencanaan Pemasangan Paving Blok Area UPTPPD Palangka Raya ) |
|
Jasa Konsultansi Badan Usaha Konstruksi |
17371012 |
51956964 |
APBDP |
74,931,750 |
55,050,450 |
54,772,950 |
54,772,950 |
53,818,350 |
53,818,350 |
53,818,350 |
53,818,350 |
2024-06-26 |
2024-07-12 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
20,158,800
|
26.9 %
|
|
62 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN GUDANG KANTOR BAPENDA |
|
Jasa Konsultansi Badan Usaha Non Konstruksi |
15728012 |
49258772 |
APBD |
67,500,000 |
67,293,750 |
67,071,750 |
67,071,750 |
66,361,350 |
66,361,350 |
66,361,350 |
66,361,350 |
2024-03-15 |
2024-03-25 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
428,250
|
0.63 %
|
|