Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu | Jumlah Paket | Total Pagu |
Pengadaan Langsung | 1036 | 57.164.577.228 | 177 | 11.160.789.516 | 1036 | 57.164.577.228 | 0 | 0 |
Penunjukan Langsung | 11 | 401.617.084.000 | 2 | 2.778.709.000 | 11 | 401.617.084.000 | 0 | 0 |
Total | 1047 | 458.781.661.228 | 179 | 13.939.498.516 | 1047 | 458.781.661.228 | 0 | 0 |
Persentase | 17.1 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | Tanggal Selesai Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2024 | Badan Penghubung | Belanja Pakaian Dinas dan Atribut Pimpinan dan Anggota DPRD | Pengadaan Langsung | Pengadaan Barang | 15758012 | 50432288 | APBD | 82,933,650 | 82,180,000 | 82,173,744 | 82,173,744 | 82,173,744 | 82,173,744 | 82,173,744 | 82,173,744 | 2024-03-13 | 2024-03-29 | 759,906 | 0.92 % | 3 | ||
2 | 2024 | Badan Penghubung | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15784012 | 50432359 | APBD | 139,920,000 | 99,950,000 | 99,254,757 | 99,254,757 | 98,726,286 | 98,726,286 | 98,726,286 | 98,726,286 | 2024-03-15 | 2024-03-28 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 40,665,243 | 29.06 % | 3 |
3 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Konsultan Perencanaan Konstruksi - Partisi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15847012 | 50964848 | APBD | 88,800,000 | 67,117,748 | 66,099,945 | 66,099,945 | 65,433,945 | 65,433,945 | 0 | 65,433,945 | 2024-03-20 | 2024-04-02 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 22,700,055 | 25.56 % | 3 |
4 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Mekanikal dan Elektrikal dalam Bangunan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15894012 | 49409036 | APBD | 100,000,000 | 87,725,520 | 85,925,100 | 85,925,100 | 85,120,350 | 85,120,350 | 0 | 85,120,350 | 2024-03-27 | 2024-04-05 | CV. KRUF STUDIO ENGINEERING | 81.075.394.7-711.000 | 14,074,900 | 14.07 % | 3 |
5 | 2024 | Dinas Pemberdayaan Perempuan,Perlindungan Anak, Pengendalian Penduduk dan Keluarga Berencana | Pengawasan pembangunan pagar samping kantor, pos jaga dan tempat parkir kendaraan roda 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15951012 | 51140509 | APBD | 10,700,000 | 10,700,000 | 10,644,500 | 10,644,500 | 10,545,000 | 10,545,000 | 10,545,000 | 10,545,000 | 2024-06-10 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 55,500 | 0.52 % | 3 | |
6 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kota Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15975012 | 49433582 | APBD | 55,457,148 | 55,457,000 | 55,400,100 | 55,400,100 | 55,400,000 | 55,400,000 | 0 | 55,400,000 | 2024-04-20 | 2024-05-10 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 57,048 | 0.1 % | 2.8 |
7 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Katingan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15980012 | 49437069 | APBD | 82,591,534 | 82,591,000 | 82,251,000 | 82,251,000 | 82,250,000 | 82,250,000 | 0 | 82,250,000 | 2024-04-20 | 2024-05-10 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 340,534 | 0.41 % | 2.8 |
8 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Konsultan Pengawasan Konstruksi - Partisi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16101012 | 50965966 | APBD | 61,250,000 | 61,177,519 | 60,421,740 | 60,421,740 | 60,144,240 | 60,144,240 | 60,144,240 | 60,144,240 | 2024-05-14 | 2024-05-24 | Roa Solution | 92.337.883.0-711.000 | 828,260 | 1.35 % | 3 |
9 | 2024 | Dinas Pemberdayaan Perempuan,Perlindungan Anak, Pengendalian Penduduk dan Keluarga Berencana | Rehabilitasi dinding koridor lantai1 DP3APPKB Prov. Kalteng | Pengadaan Langsung | Jasa Lainnya | 16130012 | 51678030 | APBD | 184,250,862 | 184,250,862 | 184,144,971 | 184,144,971 | 182,838,978 | 182,838,978 | 182,838,978 | 182,838,978 | 2024-05-21 | 2024-06-10 | CV. USAHA BANGUN SARANA | 02.978.028.5-711.000 | 105,891 | 0.06 % | 3 |
10 | 2024 | Dinas Perhubungan | Pemeliharaan Gedung VIP Room Isen Mulang | Pengadaan Langsung | Jasa Lainnya | 16141012 | 50017133 | APBD | 197,625,869 | 197,625,000 | 197,300,000 | 197,300,000 | 197,300,000 | 197,300,000 | 197,300,000 | 197,300,000 | 2024-06-11 | CV. KARYA SEPAKAT | 03.338.545.1-711.000 | 325,869 | 0.16 % | 3 | |
11 | 2024 | Dinas Sosial | Pengawasan Rehabilitasi Bangunan (Dapur dan Kantor) DiLingkungan UPT PSBR Majar Tabela | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17453012 | 49931138 | APBD | 49,820,000 | 49,820,000 | 49,203,525 | 49,203,525 | 48,581,925 | 48,581,925 | 48,581,925 | 48,581,925 | 2024-07-10 | 2024-07-19 | PT. EDUKA REKAYASA KONSULTAN | 01.489.523.9-711.000 | 616,475 | 1.24 % | 3 |
12 | 2024 | Dinas Sosial | Pengawasan Rehabilitasi Pagar Dinas Sosial Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17458012 | 49930579 | APBD | 49,539,000 | 49,539,000 | 49,525,425 | 49,525,425 | 48,559,725 | 48,559,725 | 48,559,725 | 48,559,725 | 2024-08-08 | 2024-08-21 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 13,575 | 0.03 % | 3 |
13 | 2024 | Dinas Sosial | Pengawasan Peningkatan Jalan dan Halaman UPT PSBL Pambelum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17463012 | 49439011 | APBD | 64,766,000 | 64,766,000 | 64,410,525 | 64,410,525 | 62,853,750 | 62,853,750 | 62,853,750 | 62,853,750 | 2024-07-10 | 2024-07-19 | CV. MULTI TEKNIKA | 01.489.648.4-711.000 | 355,475 | 0.55 % | 3 |
14 | 2024 | Dinas Sosial | Pengawasan Rehabilitasi Bangunan di Lingkungan UPT. PSTW Sinta Rangkang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17465012 | 51172971 | APBD | 33,014,000 | 33,014,000 | 32,778,300 | 32,778,300 | 32,156,700 | 32,156,700 | 32,156,700 | 32,156,700 | 2024-07-10 | 2024-07-19 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 235,700 | 0.71 % | 3 |
15 | 2024 | Badan Kesatuan Bangsa dan Politik | Jasa Konsultansi Perencanaan Peningkatan Jalan, Halaman dan Parit Keliling Motor, Perencanaan Renovasi Pagar Kantor, Perencanaan Renovasi Parkiran Motor, dan Perencanaan Renovasi Pos Jaga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17500012 | 52081754 | APBD | 69,329,000 | 69,329,000 | 69,197,400 | 69,197,400 | 68,886,600 | 68,886,600 | 0 | 68,886,600 | 2024-07-17 | 2024-07-26 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 131,600 | 0.19 % | 3 |
16 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kota Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17723012 | 52869487 | APBDP | 97,520,000 | 97,520,000 | 97,431,200 | 97,431,200 | 97,430,000 | 97,430,000 | 0 | 97,430,000 | 2024-10-12 | 2024-11-01 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 88,800 | 0.09 % | 3 |
17 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17726012 | 52869695 | APBDP | 99,640,000 | 99,640,000 | 99,418,000 | 99,418,000 | 99,418,000 | 99,418,000 | 0 | 99,418,000 | 2024-10-12 | 2024-11-01 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 222,000 | 0.22 % | 3 |
18 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Kotawaringin Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17729012 | 52869860 | APBDP | 99,640,000 | 99,640,000 | 99,567,000 | 99,567,000 | 99,567,000 | 99,567,000 | 0 | 99,567,000 | 2024-10-12 | 2024-11-01 | CV.ADIKON CITRABANGUN KONSULTAN | 02.618.694.0-711.000 | 73,000 | 0.07 % | 3 |
19 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15877012 | 50409728 | APBD | 43,927,800 | 43,927,800 | 43,816,800 | 43,816,800 | 43,816,800 | 43,816,800 | 0 | 43,816,800 | 2024-04-02 | 2024-04-24 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.25 % | |
20 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMA Garing Tarantang (Rehabilitasi Rg. Kelas, Rehabilitasi Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17246012 | 51239166 | APBD | 44,766,800 | 44,766,800 | 44,246,820 | 44,246,820 | 44,246,820 | 44,246,820 | 0 | 44,246,820 | 2024-05-31 | 2024-06-07 | 519,980 | 1.16 % | |||
21 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Bangsal dan Finishing Green House Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17635012 | 52365926 | APBDP | 100,000,000 | 100,000,000 | 99,589,200 | 99,589,200 | 99,589,200 | 99,589,200 | 99,589,200 | 99,589,200 | 2024-09-06 | 2024-09-16 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 410,800 | 0.41 % | |
22 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Gudang Bahan Baku dan Vertical Dryer Pada Kegiatan Pembangunan Pabrik Pakan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17602012 | 52123193 | APBD | 99,999,998 | 99,977,700 | 99,922,200 | 99,922,200 | 99,922,200 | 99,922,200 | 99,922,200 | 99,922,200 | 2024-08-14 | 2024-08-20 | 77,798 | 0.08 % | |||
23 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Pengecoran Jalan Lingkungan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17867012 | 53276889 | APBDP | 17,100,000 | 17,100,000 | 16,905,300 | 16,905,300 | 16,849,800 | 0 | 0 | 0 | 2024-11-04 | 2024-11-12 | 194,700 | 1.14 % | |||
24 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMA Garing Tarantang (Rehabilitasi Rg. Tata Usaha, Pembangunan Rg. Perpustakaan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15775012 | 50392033 | APBD | 52,895,700 | 52,866,525 | 52,811,025 | 52,811,025 | 52,811,025 | 52,811,025 | 0 | 52,811,025 | 2024-03-18 | 2024-03-28 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 84,675 | 0.16 % | |
25 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer,Bahasa SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16069012 | 50544561 | APBD | 50,668,000 | 50,668,000 | 50,627,100 | 50,627,100 | 50,627,100 | 50,627,100 | 50,627,100 | 50,627,100 | 2024-05-06 | 2024-05-18 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 40,900 | 0.08 % | |
26 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Banama Tingang (Pembangunan Rg. Lab. Fisika, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17249012 | 51239741 | APBD | 41,290,000 | 41,290,000 | 41,236,500 | 41,236,500 | 41,236,500 | 41,236,500 | 0 | 41,236,500 | 2024-05-31 | 2024-06-07 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 53,500 | 0.13 % | |
27 | 2024 | Dinas Kehutanan | Belanja Jasa Konsultansi Pengawasan Arsitektur - Bangunan Rumah Genset dan Tower Air - RPH Anjir Kalampan - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17719012 | 52528455 | APBDP | 25,128,000 | 25,127,900 | 25,106,258 | 25,106,258 | 24,551,258 | 0 | 0 | 0 | 2024-10-10 | 2024-10-18 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 21,743 | 0.09 % | |
28 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 2 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16059012 | 50541749 | APBD | 27,711,000 | 27,711,000 | 27,600,000 | 27,600,000 | 27,600,000 | 27,600,000 | 27,600,000 | 27,600,000 | 2024-05-06 | 2024-05-18 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.4 % | |
29 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16062012 | 50543691 | APBD | 25,329,000 | 25,329,000 | 25,230,300 | 25,230,300 | 25,230,300 | 25,230,300 | 25,230,300 | 25,230,300 | 2024-05-06 | 2024-05-18 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 98,700 | 0.39 % | |
30 | 2024 | Dinas Pendidikan | Jasa Konsultasi Pengawasan Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang PKBM Tilung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17690012 | 52093881 | APBD | 8,000,000 | 7,333,215 | 7,333,215 | 7,333,215 | 7,333,215 | 7,333,215 | 7,333,215 | 7,333,215 | 2024-10-01 | 2024-10-03 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 666,785 | 8.33 % | |
31 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Mess UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17699012 | 52528446 | APBDP | 49,539,000 | 49,538,900 | 49,474,000 | 49,474,000 | 48,896,832 | 0 | 0 | 0 | 2024-10-02 | 2024-10-11 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 65,000 | 0.13 % | |
32 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Bimbingan Konseling(BK) SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15931012 | 50546333 | APBD | 11,916,000 | 11,916,000 | 11,860,500 | 11,860,500 | 11,860,500 | 11,860,500 | 11,860,500 | 11,860,500 | 2024-04-01 | 2024-04-19 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 55,500 | 0.47 % | |
33 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Asrama Mahasiswa Kalteng di Jakarta Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15727012 | 49546549 | APBD | 25,000,000 | 24,739,000 | 24,461,625 | 24,461,625 | 24,461,625 | 24,461,625 | 24,461,625 | 24,461,625 | 2024-02-24 | 2024-03-12 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 538,375 | 2.15 % | |
34 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0018 Pengawasan Pembangunan Pabrik Es | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17554012 | 52151453 | APBD | 100,700,000 | 99,960,000 | 99,500,000 | 99,500,000 | 99,000,000 | 99,000,000 | 99,000,000 | 99,000,000 | 2024-07-26 | 2024-08-09 | PT. ANDAL CENDANAKA | 01.489.452.1-711.000 | 1,200,000 | 1.19 % | |
35 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Rehabilitasi Laboratorium IPA 2 Ruang SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17379012 | 51399414 | APBD | 22,000,000 | 22,000,000 | 21,940,060 | 21,940,060 | 21,940,060 | 21,940,060 | 21,940,060 | 21,940,060 | 2024-07-02 | 2024-07-11 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 59,940 | 0.27 % | |
36 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsuntansi Pengawasan Penataan Halaman, Pembangunan Rumah Genset dan Penerangan Gedung Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17676012 | 52283897 | APBD | 53,566,320 | 53,557,500 | 53,479,800 | 53,479,800 | 53,479,800 | 53,479,800 | 53,479,800 | 53,479,800 | 2024-09-30 | 2024-10-08 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 86,520 | 0.16 % | |
37 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Pengawasan Arsitektur (Pengawasan Drainase Lingkungan Kantor) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17640012 | 52036017 | APBDP | 52,000,000 | 8,000,000 | 7,925,400 | 7,925,400 | 7,858,800 | 7,858,800 | 7,858,800 | 7,858,800 | 2024-09-10 | 2024-09-12 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 44,074,600 | 84.76 % | |
38 | 2024 | Sekretariat DPRD | jasa konsultasi pengawasan arsitektur rehab bangunan induk lantai 1 Sekretariat DPRD Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17556012 | 52010380 | APBD | 100,000,000 | 99,982,140 | 99,211,800 | 99,211,800 | 98,079,600 | 98,079,600 | 0 | 98,079,600 | 2024-07-29 | 2024-08-05 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 788,200 | 0.79 % | |
39 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Jembatan Selasar SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17366012 | 51422583 | APBD | 43,000,000 | 43,000,000 | 42,910,935 | 42,910,935 | 42,910,935 | 42,910,935 | 42,910,935 | 42,910,935 | 2024-06-24 | 2024-07-01 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 89,065 | 0.21 % | |
40 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Mushola Komp. Pemda G. Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17871012 | 53293805 | APBD | 10,000,000 | 9,972,795 | 9,773,550 | 9,773,550 | 9,773,550 | 0 | 0 | 0 | 2024-11-07 | 2024-11-28 | Roa Solution | 92.337.883.0-711.000 | 226,450 | 2.26 % | |
41 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Gunung Bintang Awai (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15822012 | 50377997 | APBD | 58,977,700 | 58,977,700 | 58,968,002 | 58,968,002 | 58,968,002 | 58,968,002 | 0 | 58,968,002 | 2024-03-21 | 2024-04-08 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 9,698 | 0.02 % | |
42 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pekerjaan Pembangunan Jalan Menuju Embung dan Saluran Drainase Sekitarnya UPT BBPHMT Km. 38 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17685012 | 52433418 | APBDP | 20,000,000 | 20,000,000 | 19,795,740 | 19,795,740 | 19,103,100 | 19,103,100 | 19,103,100 | 19,103,100 | 2024-09-27 | 2024-10-14 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 204,260 | 1.02 % | |
43 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Pembangunan Parkir Terbuka Permanen UPT.KPHL Kapuas Kahayan - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17658012 | 52528445 | APBDP | 21,500,000 | 21,499,900 | 21,495,000 | 21,495,000 | 21,190,594 | 0 | 0 | 0 | 2024-09-24 | 2024-09-30 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 5,000 | 0.02 % | |
44 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BARITO TIMUR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17802012 | 49717101 | APBD | 7,942,500 | 7,941,499 | 7,869,900 | 7,869,900 | 7,259,400 | 0 | 0 | 0 | 2024-11-01 | 2024-11-15 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 72,600 | 0.91 % | |
45 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Bimbingan Konseling (BK) SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15854012 | 50525263 | APBD | 10,388,000 | 10,388,000 | 10,221,500 | 10,221,500 | 10,221,500 | 10,221,500 | 10,221,500 | 10,221,500 | 2024-03-25 | 2024-04-12 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 166,500 | 1.6 % | |
46 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Pengawasan Pembangunan Kandang Bebek/Itik UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17684012 | 51460059 | APBD | 4,803,153 | 4,803,000 | 4,780,001 | 4,780,001 | 4,778,550 | 0 | 0 | 0 | 2024-10-18 | 2024-10-28 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 23,152 | 0.48 % | |
47 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Kelas SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17832012 | 52898512 | APBDP | 25,000,000 | 25,000,000 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 2024-10-28 | 2024-11-05 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 160,864 | 0.64 % | |
48 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa konsultansi Perencanaan Rehabilitasi Pagar, WC dan Penataan Halaman di Graha Tani Serta Serana Pendukung Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17557012 | 52143274 | APBD | 14,000,000 | 14,000,000 | 13,974,900 | 13,974,900 | 13,786,200 | 13,786,200 | 13,786,200 | 13,786,200 | 2024-07-29 | 2024-08-02 | 25,100 | 0.18 % | |||
49 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Perpustakaan SMKN 1 Katingan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16180012 | 51424548 | APBD | 25,000,000 | 25,000,000 | 24,966,100 | 24,966,100 | 24,966,100 | 24,966,100 | 24,966,100 | 24,966,100 | 2024-05-22 | 2024-06-02 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 33,900 | 0.14 % | |
50 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Kelas SMAN 1 Sebangau Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17775012 | 52880011 | APBDP | 40,000,000 | 40,000,000 | 39,889,000 | 39,889,000 | 39,889,000 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 111,000 | 0.28 % | |
51 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN LABORATORIUM KOMPUTER DAN RUANG OSIS SMAN 2 KATINGAN TENGAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17876012 | 53267729 | APBDP | 75,000,000 | 75,000,000 | 74,925,000 | 74,925,000 | 74,925,000 | 0 | 0 | 0 | 2024-11-06 | 2024-11-14 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 75,000 | 0.1 % | |
52 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN LABORATORIUM KOMPUTER DAN RUANG OSIS SMAN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17875012 | 53267708 | APBDP | 75,000,000 | 75,000,000 | 74,925,000 | 74,925,000 | 74,925,000 | 0 | 0 | 0 | 2024-11-06 | 2024-11-14 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 75,000 | 0.1 % | |
53 | 2024 | Dinas Pemberdayaan Masyarakat dan Desa | Renovasi Panggung Gedung Aula Lewu Pancasila | Pengadaan Langsung | Pekerjaan Konstruksi | 17638012 | 52116395 | APBD | 235,000,000 | 85,000,000 | 84,947,301 | 84,947,301 | 84,237,900 | 0 | 0 | 0 | 2024-09-09 | 2024-09-20 | CV. USAHA BANGUN SARANA | 02.978.028.5-711.000 | 150,052,699 | 63.85 % | |
54 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17311012 | 51238254 | APBD | 33,753,000 | 33,753,000 | 33,577,500 | 33,577,500 | 33,577,500 | 33,577,500 | 33,577,500 | 33,577,500 | 2024-06-13 | 2024-06-26 | 175,500 | 0.52 % | |||
55 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Drainase | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17858012 | 53269288 | APBDP | 18,000,000 | 18,000,000 | 17,704,500 | 17,704,500 | 17,621,250 | 0 | 0 | 0 | 2024-11-04 | 2024-11-12 | 295,500 | 1.64 % | |||
56 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer SMK NEGERI 1 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15913012 | 50539334 | APBD | 18,198,000 | 18,198,000 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 2024-04-01 | 2024-04-19 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 55,500 | 0.3 % | |
57 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Parkiran Kantor KM 7.5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17789012 | 52993782 | APBDP | 7,159,500 | 7,147,500 | 7,104,000 | 7,104,000 | 7,104,000 | 0 | 0 | 0 | 2024-10-18 | 2024-10-25 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 55,500 | 0.78 % | |
58 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pengadaan Bahan-Bahan Pelatihan DBH-DR Melalui Pelatihan Tata Boga, Pengolahan Madu, Pengolahan Ikan dan Anyaman Rotan | Pengadaan Langsung | Pengadaan Barang | 17663012 | 52589992 | APBD | 43,000,000 | 42,828,589 | 42,618,228 | 42,618,228 | 42,618,228 | 42,618,228 | 42,618,228 | 42,618,228 | 2024-09-22 | 2024-09-27 | CV. DEDIKASI KARYA DELANTARA | 90.527.413.0-711.000 | 381,772 | 0.89 % | |
59 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS Kristen Palangka Raya (Rehabilitasi Rg. Kelas) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15804012 | 50409942 | APBD | 96,400,700 | 96,400,700 | 96,292,500 | 96,292,500 | 96,292,500 | 96,292,500 | 96,292,500 | 96,292,500 | 2024-03-15 | 2024-03-26 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 108,200 | 0.11 % | |
60 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Jasa Konsultansi Perencanaan Guest House | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17898012 | 53305818 | APBDP | 50,000,000 | 50,000,000 | 49,511,550 | 49,511,550 | 49,000,000 | 49,000,000 | 49,000,000 | 49,000,000 | 2024-11-07 | 2024-11-15 | 488,450 | 0.98 % | |||
61 | 2024 | Badan Pendapatan Daerah | Pengawasan Penataan Halaman Kantor UPTPPD Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17706012 | 52644943 | APBD | 45,000,000 | 44,721,695 | 44,500,045 | 44,500,045 | 43,389,689 | 43,389,689 | 43,389,689 | 43,389,689 | 2024-10-02 | 2024-10-11 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 499,955 | 1.11 % | |
62 | 2024 | Dinas Ketahanan Pangan | Jasa Konsultansi Perencanaan Rehab Sedang Kantor Dinas Ketahanan Pangan Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17737012 | 52888535 | APBD | 55,000,000 | 55,000,000 | 54,978,300 | 54,978,300 | 53,879,400 | 53,879,400 | 53,879,400 | 53,879,400 | 2024-10-12 | 2024-10-30 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 21,700 | 0.04 % | |
63 | 2024 | Dinas Pendidikan | Perencanaan Rehab Aula Dan Ruang Kerja Kantor Dinas Pendidikan Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15757012 | 49797907 | APBD | 50,000,000 | 50,000,000 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 0 | 49,900,000 | 2024-03-13 | 2024-03-22 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 100,000 | 0.2 % | |
64 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG PERPUSTAKAAN, RUANG UKS DAN RUANG BK SMAN 2 KATINGAN TENGAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17878012 | 53267718 | APBDP | 75,000,000 | 75,000,000 | 74,925,000 | 74,925,000 | 74,925,000 | 0 | 0 | 0 | 2024-11-06 | 2024-11-14 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 75,000 | 0.1 % | |
65 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Pengawasan Pembangunan Gudang Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10004515000 | 52921907 | APBDP | 27,389,620 | 27,389,620 | 27,000,000 | 27,000,000 | 27,000,000 | 27,000,000 | 27,000,000 | 27,000,000 | 2024-11-12 | 2024-11-21 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 389,620 | 1.42 % | |
66 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS PGRI 2 Sampit (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15768012 | 50408590 | APBD | 57,725,800 | 57,725,800 | 57,448,050 | 57,448,050 | 57,448,050 | 57,448,050 | 57,448,050 | 57,448,050 | 2024-03-18 | 2024-03-28 | 277,750 | 0.48 % | |||
67 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Perencanaan Pembangunan Pagar Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17853012 | 52921895 | APBDP | 36,135,330 | 30,259,900 | 30,100,000 | 30,100,000 | 30,036,156 | 30,036,156 | 30,036,156 | 30,036,156 | 2024-10-31 | 2024-11-08 | 6,035,330 | 16.7 % | |||
68 | 2024 | Badan Keuangan dan Aset Daerah | Belanja Alat/ Bahan untuk Kegiatan Kantor-Alat Tulis Kantor, Belanja Alat/ Bahan untuk Kegiatan Kantor- Kertas dan Cover | Pengadaan Langsung | Pengadaan Barang | 10013694000 | 53370718 | APBD | 98,053,950 | 92,730,895 | 92,730,895 | 92,730,895 | 91,943,000 | 91,943,000 | 91,943,000 | 91,943,000 | 2024-11-25 | 2024-12-13 | CV. Sinar Pratama Borneo | 65.376.111.4-711.000 | 5,323,055 | 5.43 % | |
69 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16027012 | 49204514 | APBD | 13,582,500 | 13,504,992 | 13,480,000 | 13,480,000 | 13,231,200 | 13,231,200 | 13,231,200 | 13,231,200 | 2024-05-01 | 2024-05-10 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 102,500 | 0.75 % | |
70 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Banama Tingang (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17358012 | 51239837 | APBD | 41,193,400 | 41,193,400 | 41,125,500 | 41,125,500 | 41,125,500 | 41,125,500 | 41,125,500 | 41,125,500 | 2024-07-09 | 2024-07-15 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 67,900 | 0.16 % | |
71 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Pagar UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17652012 | 52502761 | APBDP | 87,343,000 | 87,342,900 | 86,974,050 | 86,974,050 | 86,362,218 | 0 | 0 | 0 | 2024-09-18 | 2024-09-27 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 368,950 | 0.42 % | |
72 | 2024 | Satuan Polisi Pamong Praja | Pengawasan Belanja Modal Bangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17376012 | 49577185 | APBD | 22,480,000 | 22,480,000 | 22,466,400 | 22,466,400 | 22,288,800 | 0 | 0 | 0 | 2024-06-26 | 2024-07-18 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 13,600 | 0.06 % | |
73 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17231012 | 51737546 | APBD | 75,880,000 | 75,880,000 | 75,658,000 | 75,658,000 | 75,658,000 | 75,658,000 | 0 | 75,658,000 | 2024-05-30 | 2024-06-10 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 222,000 | 0.29 % | |
74 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17234012 | 51737679 | APBD | 75,880,000 | 75,880,000 | 75,824,100 | 75,824,100 | 75,824,100 | 75,824,100 | 0 | 75,824,100 | 2024-05-30 | 2024-06-10 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 55,900 | 0.07 % | |
75 | 2024 | Badan Keuangan dan Aset Daerah | Papan Nama Pengamanan BMD | Pengadaan Langsung | Pengadaan Barang | 10013247000 | 53509946 | APBDP | 155,500,000 | 153,942,200 | 153,928,000 | 153,928,000 | 152,650,000 | 152,650,000 | 152,650,000 | 152,650,000 | 2024-11-25 | 2024-12-13 | ANUGRAH DUA PUTRA | 86.917.332.8-711.000 | 1,572,000 | 1.01 % | |
76 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Timang (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15750012 | 50371727 | APBD | 55,227,700 | 55,227,700 | 54,723,000 | 54,723,000 | 54,723,000 | 54,723,000 | 0 | 54,723,000 | 2024-03-13 | 2024-03-22 | 504,700 | 0.91 % | |||
77 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15903012 | 50767349 | APBD | 52,000,000 | 52,000,000 | 51,900,000 | 51,900,000 | 51,900,000 | 51,900,000 | 0 | 51,900,000 | 2024-03-28 | 2024-04-08 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 100,000 | 0.19 % | |
78 | 2024 | Dinas Kesehatan | Pengadaan Belanja Konsultansi Siteplan Bapelkes Provinsi Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17900012 | 53315196 | APBDP | 50,000,000 | 49,967,000 | 49,412,000 | 49,412,000 | 49,195,500 | 49,195,500 | 49,195,500 | 49,195,500 | 2024-11-08 | 2024-11-13 | Roa Solution | 92.337.883.0-711.000 | 588,000 | 1.18 % | |
79 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Pemeliharaan Pengecatan Bangunan Gedung Admin RSUD dr. Doris Sylvanus | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16057012 | 51069199 | APBD | 20,000,000 | 19,500,000 | 19,400,000 | 19,400,000 | 19,228,800 | 19,228,800 | 19,228,800 | 19,228,800 | 2024-05-21 | 2024-05-31 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 600,000 | 3 % | |
80 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pemeliharan Jaringan Listrik Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17617012 | 51644088 | APBDP | 25,000,000 | 25,000,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 2024-09-10 | 2024-09-12 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 50,000 | 0.2 % | |
81 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Kimia) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15876012 | 50409580 | APBD | 43,927,800 | 43,927,800 | 43,839,000 | 43,839,000 | 43,839,000 | 43,839,000 | 0 | 43,839,000 | 2024-04-02 | 2024-04-24 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 88,800 | 0.2 % | |
82 | 2024 | Inspektorat | Pemasangan Interior Gedung Kantor Inspektorat | Pengadaan Langsung | Pekerjaan Konstruksi | 17627012 | 49894996 | APBD | 200,000,000 | 200,000,000 | 199,885,470 | 199,885,470 | 199,829,970 | 199,829,970 | 199,829,970 | 199,829,970 | 2024-09-03 | 2024-09-13 | CV.EL BARRA | 20.634.253.7-711.000 | 114,530 | 0.06 % | |
83 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembuatan Green House/Screen House dan Penyediaan Sarana Pengairan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17318012 | 51888534 | APBD | 43,529,000 | 43,510,000 | 43,456,500 | 43,456,500 | 43,147,920 | 43,147,920 | 43,147,920 | 43,147,920 | 2024-06-25 | 2024-07-02 | 72,500 | 0.17 % | |||
84 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa,Komputer SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15917012 | 50548309 | APBD | 36,396,000 | 36,396,000 | 36,340,500 | 36,340,500 | 36,340,500 | 36,340,500 | 36,340,500 | 36,340,500 | 2024-04-01 | 2024-04-19 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 55,500 | 0.15 % | |
85 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Perluasan SPAM Jaringan Perpipaan Kab. Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15985012 | 51420509 | APBD | 64,817,000 | 64,800,000 | 64,657,500 | 64,657,500 | 64,657,500 | 64,657,500 | 64,657,500 | 64,657,500 | 2024-04-19 | 2024-05-13 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 159,500 | 0.25 % | |
86 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17316012 | 51358477 | APBD | 17,490,000 | 17,490,000 | 17,445,600 | 17,445,600 | 17,445,600 | 17,445,600 | 17,445,600 | 17,445,600 | 2024-06-13 | 2024-06-17 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 44,400 | 0.25 % | |
87 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Jasa Konsultansi Pengawasan - Pengawasan Rehab Plafon, Pemasangan Interior dan Ornamen Lobby Admin Lt. 1 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17702012 | 52174226 | APBD | 12,000,000 | 12,000,000 | 11,950,260 | 11,950,260 | 11,710,500 | 0 | 0 | 0 | 2024-10-18 | 2024-10-28 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 49,740 | 0.41 % | |
88 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih ( SMAN 1 Teweh Baru, SMAN 1 Kapuas Tengah, SLBN 1 Muara Teweh)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15706012 | 49713446 | APBD | 45,000,000 | 45,000,000 | 44,950,000 | 44,950,000 | 44,950,000 | 0 | 0 | 0 | 2024-02-23 | 2024-03-11 | CV. PENDANG JAYA RAYA ENGINEERING | 01.662.432.2-711.000 | 50,000 | 0.11 % | |
89 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana dan Prasarana UPT.KPHP Kapuas Hulu dan UPT.KPHP Kapuas Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16189012 | 51728385 | APBDP | 53,874,000 | 53,873,850 | 53,776,170 | 53,776,170 | 53,113,500 | 53,113,500 | 53,113,500 | 53,113,500 | 2024-06-05 | 2024-06-21 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 97,830 | 0.18 % | |
90 | 2024 | Dinas Perhubungan | Pengawasan Rehabilitasi Sedang/Berat Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17564012 | 50017130 | APBD | 54,953,000 | 54,930,000 | 54,778,500 | 54,778,500 | 54,778,500 | 54,778,500 | 54,778,500 | 54,778,500 | 2024-08-02 | 2024-08-16 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 174,500 | 0.32 % | |
91 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17236012 | 51738298 | APBD | 37,940,000 | 37,940,000 | 37,873,600 | 37,873,600 | 37,873,600 | 37,873,600 | 0 | 37,873,600 | 2024-05-30 | 2024-06-10 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 66,400 | 0.18 % | |
92 | 2024 | Dinas Perpustakaan dan Arsip | Jasa Konsultansi Pengawasan Renovasi Gedung Fasilitas Layanan Perpustakaan Umum dan Gedung Kafe Literasi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17560012 | 52162091 | APBD | 93,060,000 | 93,006,900 | 92,840,400 | 92,800,000 | 92,400,000 | 92,400,000 | 92,400,000 | 92,400,000 | 2024-08-06 | 2024-08-23 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 219,600 | 0.24 % | |
93 | 2024 | Dinas Kependudukan dan Catatan Sipil | Pembangunan Bangunan Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 17299012 | 51884976 | APBD | 44,000,000 | 44,000,000 | 43,900,000 | 43,900,000 | 43,789,000 | 0 | 0 | 0 | 2024-06-20 | 2024-07-01 | 100,000 | 0.23 % | |||
94 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Pengawasan Arsitektur UPT Taman Budaya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17569012 | 49162747 | APBD | 115,520,000 | 99,950,000 | 99,678,000 | 99,678,000 | 98,124,000 | 98,124,000 | 98,124,000 | 98,124,000 | 2024-08-06 | 2024-08-16 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 15,842,000 | 13.71 % | |
95 | 2024 | KPHL GERBANG BARITO | Beban Jasa Konsultansi Pengawasan Arsitektur - Pengawas Kandang Kambing - Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011349000 | 49971022 | APBD | 20,140,000 | 20,140,000 | 19,980,000 | 19,980,000 | 19,591,500 | 19,591,500 | 19,591,500 | 19,591,500 | 2024-11-21 | 2024-11-29 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 160,000 | 0.79 % | |
96 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0005 Perencanaan Rehab Bangunan dan Kolam bioflok dan Peralatannya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17666012 | 48161437 | APBD | 17,500,000 | 17,500,000 | 17,349,300 | 17,349,300 | 17,000,000 | 17,000,000 | 17,000,000 | 17,000,000 | 2024-09-24 | 2024-10-11 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 150,700 | 0.86 % | |
97 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pengadaan Bahan Pelatihan Peluasan Kesempatan Kerja (DBH DR) TA. 2024 | Pengadaan Langsung | Pengadaan Barang | 17363012 | 51952410 | APBD | 104,750,000 | 104,748,351 | 104,743,716 | 104,743,716 | 104,533,140 | 104,533,140 | 0 | 104,533,140 | 2024-06-24 | 2024-07-02 | CV. DEDIKASI KARYA DELANTARA | 90.527.413.0-711.000 | 6,284 | 0.01 % | |
98 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang PKBM Tilung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17334012 | 51911612 | APBD | 10,000,000 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 2024-08-14 | 2024-08-20 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 4,450 | 0.04 % | |
99 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Penataan halaman SMAN 10 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17753012 | 52878446 | APBDP | 100,000,000 | 98,124,100 | 98,013,000 | 98,013,000 | 98,013,000 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 1,987,000 | 1.99 % | |
100 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang kelas SMAN 2 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17820012 | 52897866 | APBDP | 30,000,000 | 30,000,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 2024-10-28 | 2024-11-05 | Roa Solution | 92.337.883.0-711.000 | 200,000 | 0.67 % | |
101 | 2024 | Badan Pendapatan Daerah | Perencanaan Penataan Halaman Kantor UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17547012 | 52151703 | APBDP | 46,070,000 | 46,069,999 | 45,998,400 | 45,998,400 | 45,732,000 | 45,732,000 | 45,732,000 | 45,732,000 | 2024-07-26 | 2024-08-10 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 71,600 | 0.16 % | |
102 | 2024 | Dinas Kebudayaan dan Pariwisata | Pengawasan Rehab berat rumah jaga dan WC gedung pameran pada UPT museum Balanga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17562012 | 51982072 | APBD | 35,049,000 | 35,000,000 | 34,854,000 | 34,854,000 | 34,299,000 | 34,299,000 | 34,299,000 | 34,299,000 | 2024-08-02 | 2024-09-03 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 195,000 | 0.56 % | |
103 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16165012 | 51424796 | APBD | 34,500,000 | 34,500,000 | 34,400,000 | 34,400,000 | 34,400,000 | 34,400,000 | 34,400,000 | 34,400,000 | 2024-05-22 | 2024-06-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 100,000 | 0.29 % | |
104 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17240012 | 51737424 | APBD | 41,315,000 | 41,315,000 | 41,148,500 | 41,148,500 | 41,148,500 | 41,148,500 | 0 | 41,148,500 | 2024-05-30 | 2024-06-10 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 166,500 | 0.4 % | |
105 | 2024 | RSJ Kalawa Atei | Honor Tim Penilai dan Pengadaan Tanah dan Penambahan Lahan RSJ KA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17894012 | 53333825 | APBDP | 60,000,000 | 59,562,600 | 53,660,005 | 53,660,005 | 53,581,920 | 0 | 0 | 0 | 2024-11-12 | 2024-11-18 | 6,339,995 | 10.57 % | |||
106 | 2024 | Dinas Kebudayaan dan Pariwisata | Penyusunan Dokumen Analisis Dampak Lalu Lintas (ANDALALIN) Pembangunan Kawasan Wisata Sabangau Park | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17659012 | 52087806 | APBDP | 300,000,000 | 300,000,000 | 299,782,140 | 299,782,140 | 298,394,640 | 298,394,640 | 298,394,640 | 298,394,640 | 2024-09-23 | 2024-10-15 | CV. SEIPUTRA PERSADA | 02.539.098.0-711.000 | 217,860 | 0.07 % | |
107 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Pemutakhiran Dokumen SSK 2 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15709012 | 47521034 | APBD | 80,000,000 | 80,000,000 | 79,997,700 | 79,997,700 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | 2024-03-15 | Gusti Iqbal | 92.227.204.2-711.000 | 2,300 | 0 % | |
108 | 2024 | Badan Pendapatan Daerah | Perencanaan Penataan Halaman ( Penimbunan ) Halaman Kantor UPTPPD Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17369012 | 51957090 | APBDP | 23,543,000 | 23,542,998 | 23,450,000 | 23,450,000 | 23,026,395 | 23,026,395 | 23,026,395 | 23,026,395 | 2024-06-26 | 2024-07-12 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 93,000 | 0.4 % | |
109 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penataan Halaman Jalan Sekolah SMKN 4 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16163012 | 51425505 | APBD | 34,500,000 | 34,500,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 2024-05-22 | 2024-06-02 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,000 | 0.32 % | |
110 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16067012 | 50525715 | APBD | 25,329,000 | 25,329,000 | 25,280,250 | 25,280,250 | 25,280,250 | 25,280,250 | 25,280,250 | 25,280,250 | 2024-05-06 | 2024-05-18 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 48,750 | 0.19 % | |
111 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Tewah (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15777012 | 50388517 | APBD | 56,393,700 | 56,393,700 | 56,393,700 | 56,393,700 | 56,393,700 | 56,393,700 | 0 | 56,393,700 | 2024-03-15 | 2024-03-26 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 0 | 0 % | |
112 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS Muhammadiyah Katingan Tengah (Rehabilitasi Rg. Kelas, Rehabilitasi Toilet (Jamban) Beserta Sanitasinya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15802012 | 50391702 | APBD | 36,216,100 | 36,216,100 | 36,104,970 | 36,104,970 | 36,104,970 | 36,104,970 | 36,104,970 | 36,104,970 | 2024-03-15 | 2024-03-26 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 111,130 | 0.31 % | |
113 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Redesain Pembangunan Pagar (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10014309000 | 53523680 | APBDP | 50,000,000 | 50,000,000 | 49,472,700 | 49,472,700 | 49,000,000 | 49,000,000 | 49,000,000 | 49,000,000 | 2024-11-22 | 2024-11-29 | 527,300 | 1.05 % | |||
114 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Kantor SMAN 10 Palangka Ray | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17799012 | 52897785 | APBDP | 30,000,000 | 30,000,000 | 29,765,000 | 29,765,000 | 29,765,000 | 0 | 0 | 0 | 2024-10-26 | 2024-11-04 | 235,000 | 0.78 % | |||
115 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Kuala Kurun (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15770012 | 50387750 | APBD | 56,188,700 | 56,188,700 | 56,188,700 | 56,188,700 | 56,188,700 | 56,188,700 | 0 | 56,188,700 | 2024-03-15 | 2024-03-26 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 0 | 0 % | |
116 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16072012 | 50545076 | APBD | 17,256,000 | 17,256,000 | 17,200,500 | 17,200,500 | 17,200,500 | 17,200,500 | 17,200,500 | 17,200,500 | 2024-05-06 | 2024-05-18 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 55,500 | 0.32 % | |
117 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 3 Ruang SMAS Muhammadiyah Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17277012 | 51400318 | APBD | 75,000,000 | 75,000,000 | 74,891,700 | 74,891,700 | 74,891,700 | 74,891,700 | 74,891,700 | 74,891,700 | 2024-06-07 | 2024-06-19 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 108,300 | 0.14 % | |
118 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17242012 | 51735633 | APBD | 43,450,000 | 43,450,000 | 43,339,000 | 43,339,000 | 43,339,000 | 43,339,000 | 0 | 43,339,000 | 2024-05-30 | 2024-06-10 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 111,000 | 0.26 % | |
119 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Perencanaan Rehab/Rehabilitasi Rumah Jabatan Kepala UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16198012 | 51460060 | APBD | 17,182,550 | 17,182,550 | 17,150,000 | 17,150,000 | 17,149,500 | 17,149,500 | 17,149,500 | 17,149,500 | 2024-05-29 | 2024-06-03 | 32,550 | 0.19 % | |||
120 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa dan Rehab Ruang Kelas (2 Ruang)SMKN 1 Bulik Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16175012 | 51424566 | APBD | 53,500,000 | 53,500,000 | 53,389,000 | 53,389,000 | 53,389,000 | 53,389,000 | 53,389,000 | 53,389,000 | 2024-05-22 | 2024-06-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 111,000 | 0.21 % | |
121 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas SMKN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17810012 | 52613554 | APBDP | 28,000,000 | 28,000,000 | 27,944,500 | 27,944,500 | 27,944,500 | 0 | 0 | 0 | 2024-10-25 | 2024-10-31 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 55,500 | 0.2 % | |
122 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Palangka Raya (Pembangunan Rg. Baru (RKB), Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17281012 | 51240182 | APBD | 27,184,900 | 27,184,900 | 27,117,000 | 27,117,000 | 27,117,000 | 27,117,000 | 27,117,000 | 27,117,000 | 2024-06-12 | 2024-06-24 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 67,900 | 0.25 % | |
123 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Penataan Jaringan Listrik Kantor Disnakertrans Prov. Kalteng | Pengadaan Langsung | Pekerjaan Konstruksi | 10004680000 | 53409325 | APBDP | 165,000,000 | 165,000,000 | 164,877,846 | 164,877,846 | 164,156,790 | 0 | 0 | 0 | 2024-11-12 | 2024-11-20 | RIZKY PRATAMA JAYA BERSAUDARA | 76.683.857.7-711.000 | 122,154 | 0.07 % | |
124 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17439012 | 51230300 | APBD | 21,330,000 | 21,330,000 | 21,267,600 | 21,267,600 | 21,267,600 | 21,267,600 | 21,267,600 | 21,267,600 | 2024-07-06 | 2024-07-09 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 62,400 | 0.29 % | |
125 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASANBPEMBANGUNAN PAPAN NAMA KANTOR UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006735000 | 49682748 | APBD | 7,942,500 | 7,941,499 | 7,869,900 | 7,869,900 | 7,514,700 | 0 | 0 | 0 | 2024-11-15 | 2024-11-29 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 72,600 | 0.91 % | |
126 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika,Laboratorium Biologi SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17404012 | 51210835 | APBD | 99,090,000 | 99,090,000 | 98,989,000 | 98,989,000 | 98,989,000 | 98,989,000 | 98,989,000 | 98,989,000 | 2024-06-27 | 2024-07-02 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 101,000 | 0.1 % | |
127 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Biologi, Pembangunan Rg OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15780012 | 50378568 | APBD | 62,191,700 | 62,191,700 | 62,191,700 | 62,191,700 | 62,191,700 | 62,191,700 | 0 | 62,100,000 | 2024-03-15 | 2024-03-26 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 0 | 0 % | |
128 | 2024 | Dinas Kebudayaan dan Pariwisata | Konsultansi Perencanaan Interior Ruang Pamer Museum Balanga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17862012 | 53205444 | APBDP | 97,818,000 | 77,265,000 | 77,160,000 | 77,160,000 | 76,605,000 | 0 | 0 | 0 | 2024-11-07 | 2024-12-09 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 20,658,000 | 21.12 % | |
129 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Rehabilitasi Ruang Kelas (16 Ruang) SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17254012 | 51196683 | APBD | 100,000,000 | 100,000,000 | 99,766,900 | 99,766,900 | 99,766,900 | 99,766,900 | 0 | 99,766,900 | 2024-06-03 | 2024-06-07 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 233,100 | 0.23 % | |
130 | 2024 | Dinas Perhubungan | Pengawasan Rehabilitasi Kereng Bengkirai Bengkel di Kota Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17452012 | 51274965 | APBD | 10,070,000 | 10,070,000 | 10,030,501 | 10,030,501 | 9,992,220 | 9,992,220 | 9,992,220 | 9,992,220 | 2024-07-24 | 2024-08-09 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 39,499 | 0.39 % | |
131 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang SLBN 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17342012 | 51911520 | APBD | 7,000,000 | 6,999,660 | 6,972,000 | 6,972,000 | 6,972,000 | 6,972,000 | 6,972,000 | 6,972,000 | 2024-08-12 | 2024-08-19 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 28,000 | 0.4 % | |
132 | 2024 | Dinas Lingkungan Hidup | Senjata Lain-Lain | Penunjukan Langsung | Pengadaan Barang | 17291012 | 51541250 | APBD | 1,040,000,000 | 1,021,200,000 | 0 | 0 | 0 | 1,020,090,000 | 1,020,090,000 | 1,020,090,000 | 2024-07-16 | 2024-07-25 | 1,040,000,000 | 100 % | |||
133 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika,Laboratorium SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17448012 | 51851935 | APBD | 76,900,000 | 76,900,000 | 76,834,200 | 76,834,200 | 76,834,200 | 76,834,200 | 76,834,200 | 76,834,200 | 2024-07-07 | 2024-07-09 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 65,800 | 0.09 % | |
134 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Fisika, Pembangunan Rg BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16206012 | 51154406 | APBD | 39,570,100 | 39,570,100 | 39,570,000 | 39,570,000 | 39,570,000 | 39,570,000 | 0 | 39,570,000 | 2024-05-28 | 2024-06-05 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 100 | 0 % | |
135 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Ruang Kelas Baru SLBN Puruk Cahu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17502012 | 52082436 | APBD | 59,036,400 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,000 | 59,024,250 | 2024-07-18 | 2024-07-26 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 12,150 | 0.02 % | |
136 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penataan Halaman Sekolah SMK NEGERI 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16046012 | 50968770 | APBD | 34,500,000 | 34,500,000 | 34,167,000 | 34,167,000 | 34,167,000 | 34,167,000 | 34,167,000 | 34,167,000 | 2024-05-07 | 2024-05-18 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 333,000 | 0.97 % | |
137 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAGAR DEPAN DAN SAMPING KANAN UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15730012 | 49198243 | APBD | 32,598,000 | 30,870,950 | 30,691,500 | 30,691,500 | 30,125,400 | 30,125,400 | 30,125,400 | 30,125,400 | 2024-03-11 | 2024-03-20 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 1,906,500 | 5.85 % | |
138 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang OSIS SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17403012 | 51200734 | APBD | 19,320,000 | 19,320,000 | 19,266,720 | 19,266,720 | 19,266,720 | 19,266,720 | 19,266,720 | 19,266,720 | 2024-06-27 | 2024-07-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 53,280 | 0.28 % | |
139 | 2024 | Dinas Pendidikan | jasa Konsultansi Pengawasan Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang SLB YPLB Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17689012 | 52553559 | APBD | 8,000,000 | 7,999,215 | 7,999,215 | 7,999,215 | 7,999,215 | 7,999,215 | 7,999,215 | 7,999,215 | 2024-10-01 | 2024-10-03 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 785 | 0.01 % | |
140 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Balai Riam (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15873012 | 50408719 | APBD | 62,198,100 | 62,198,100 | 62,098,200 | 62,098,200 | 62,098,200 | 62,098,200 | 0 | 62,098,200 | 2024-04-02 | 2024-04-24 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 99,900 | 0.16 % | |
141 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15930012 | 50546008 | APBD | 29,003,000 | 29,003,000 | 28,914,200 | 28,914,200 | 28,914,200 | 28,914,200 | 28,914,200 | 28,914,200 | 2024-04-01 | 2024-04-19 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 88,800 | 0.31 % | |
142 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Muara Teweh (Rehabilitasi Rg. Lab. Biologi, Rehabilitasi Toilet (Jamban) beserta sanitasinya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15749012 | 50374075 | APBD | 30,478,700 | 30,478,700 | 30,247,500 | 30,247,500 | 30,247,500 | 30,247,500 | 0 | 30,247,500 | 2024-03-13 | 2024-03-22 | 231,200 | 0.76 % | |||
143 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI MUSOLAH DAN AULA KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15745012 | 49830795 | APBD | 42,500,000 | 42,456,390 | 42,345,390 | 42,345,390 | 41,657,190 | 41,657,190 | 41,657,190 | 41,657,190 | 2024-03-07 | 2024-03-20 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 154,610 | 0.36 % | |
144 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Pengawasan Arsitektur - Penataan Halaman Pesanggrahan Tjilik Riwut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10009924000 | 53104634 | APBDP | 49,820,000 | 49,820,000 | 49,705,800 | 49,705,800 | 49,594,800 | 49,594,800 | 0 | 49,594,800 | 2024-11-20 | 2024-12-20 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 114,200 | 0.23 % | |
145 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Timpah (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15855012 | 50388916 | APBD | 64,890,700 | 64,890,700 | 64,100,651 | 64,100,651 | 64,100,651 | 64,100,651 | 0 | 64,100,651 | 2024-03-21 | 2024-04-08 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 790,049 | 1.22 % | |
146 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17405012 | 51649746 | APBD | 18,440,000 | 18,440,000 | 18,391,013 | 18,391,013 | 18,391,013 | 18,391,013 | 18,391,013 | 18,391,013 | 2024-06-28 | 2024-07-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 48,987 | 0.27 % | |
147 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Renovasi Screen House di UPT BPPBTPH Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17749012 | 52433621 | APBDP | 28,620,000 | 28,620,000 | 28,471,500 | 28,471,500 | 24,695,835 | 24,695,835 | 24,695,835 | 24,695,835 | 2024-10-16 | 2024-10-22 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 148,500 | 0.52 % | |
148 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17792012 | 52993619 | APBDP | 7,101,000 | 7,100,670 | 7,045,500 | 7,045,500 | 7,045,500 | 0 | 0 | 0 | 2024-10-18 | 2024-10-22 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 55,500 | 0.78 % | |
149 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Guru SMAN 4 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16194012 | 50726568 | APBD | 50,000,000 | 50,000,000 | 49,913,370 | 49,913,370 | 49,913,370 | 49,913,370 | 49,913,370 | 49,913,370 | 2024-05-28 | 2024-06-05 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 86,630 | 0.17 % | |
150 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17442012 | 51852315 | APBD | 88,100,000 | 88,100,000 | 87,944,600 | 87,944,600 | 87,944,600 | 87,944,600 | 87,944,600 | 87,944,600 | 2024-07-06 | 2024-07-09 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 155,400 | 0.18 % | |
151 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Perpustakaan, Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17263012 | 51239442 | APBD | 45,306,200 | 45,306,200 | 45,255,000 | 45,255,000 | 45,255,000 | 45,255,000 | 0 | 45,255,000 | 2024-06-05 | 2024-06-14 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 51,200 | 0.11 % | |
152 | 2024 | Dinas Kebudayaan dan Pariwisata | Perencanaan Rehab Aula Museum Balanga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17633012 | 49098175 | APBD | 75,150,000 | 75,150,000 | 75,000,000 | 75,000,000 | 74,665,805 | 0 | 0 | 0 | 2024-09-12 | 2024-10-21 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 150,000 | 0.2 % | |
153 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Perencanaan Pembangunan Kandang Bebek/Itik UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17517012 | 51460058 | APBD | 6,421,894 | 6,421,894 | 6,405,894 | 6,405,894 | 6,371,400 | 6,371,400 | 6,371,400 | 6,371,400 | 2024-07-23 | 2024-07-30 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 16,000 | 0.25 % | |
154 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Pematang Karau (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17229012 | 51184113 | APBD | 35,678,500 | 35,678,500 | 35,675,400 | 35,675,400 | 35,675,400 | 35,675,400 | 0 | 35,675,400 | 2024-05-31 | 2024-06-07 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 3,100 | 0.01 % | |
155 | 2024 | Dinas Komunikasi, Informatika, Persandian dan Statistik | Video Produksi Iklan Layanan Masyarakat | Pengadaan Langsung | Jasa Lainnya | 17651012 | 50163783 | APBD | 100,000,000 | 100,000,000 | 99,888,900 | 99,888,900 | 99,789,000 | 99,789,000 | 99,789,000 | 99,789,000 | 2024-09-17 | 2024-09-19 | Maeztro Production | 80.107.943.5-711.000 | 111,100 | 0.11 % | |
156 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Banama Tingang (Rehabilitasi Rg. Lab. Fisika, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15857012 | 50408668 | APBD | 58,602,800 | 58,602,800 | 58,447,050 | 58,447,050 | 58,447,050 | 58,447,050 | 0 | 58,447,050 | 2024-03-25 | 2024-04-12 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 155,750 | 0.27 % | |
157 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Pagar & Penataan Halaman SMAN 2 Pandih Batu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15814012 | 50771469 | APBD | 78,000,000 | 78,000,000 | 77,850,000 | 77,850,000 | 77,850,000 | 77,850,000 | 77,850,000 | 77,850,000 | 2024-03-28 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 150,000 | 0.19 % | ||
158 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan Rumah Jaga Kebun Jabiren | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10005166000 | 53084161 | APBD | 20,140,000 | 20,140,000 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 2024-11-13 | 2024-11-21 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 204,400 | 1.01 % | |
159 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Ruang Guru SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17390012 | 51399306 | APBD | 52,200,000 | 52,200,000 | 52,000,000 | 52,000,000 | 52,000,000 | 52,000,000 | 52,000,000 | 52,000,000 | 2024-07-11 | 2024-07-18 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 200,000 | 0.38 % | |
160 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan 1).Rehab Ruang Kelas SMKN 1 PANDIH BATU,2).Pembangunan Toilet Beserta Sanitasinya SMKN 1 PULANG PISAU,3).Rehab Ruang Laboratorium Dan Pembangunan Toilet Beserta Sanitasinya SMKN 1 BANAMA TINGANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10004375000 | 53226383 | APBDP | 63,029,000 | 63,029,000 | 62,861,686 | 62,861,686 | 62,861,686 | 0 | 0 | 0 | 2024-11-12 | 2024-11-18 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 167,314 | 0.27 % | |
161 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pekerjaan Penimbunan dan Pengecoran Halaman Sekolah SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17365012 | 51425179 | APBD | 60,000,000 | 60,000,000 | 59,940,555 | 59,940,555 | 59,940,555 | 59,940,555 | 59,940,555 | 59,940,555 | 2024-06-24 | 2024-07-01 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 59,445 | 0.1 % | |
162 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Praktik Siswa(RPS) KK- Rekayasa Perangkat Lunak SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17540012 | 51214540 | APBD | 91,010,000 | 91,010,000 | 90,853,500 | 90,853,500 | 90,853,500 | 90,853,500 | 90,853,500 | 90,853,500 | 2024-07-25 | 2024-08-02 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 156,500 | 0.17 % | |
163 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Kelas Baru (2 Ruang)dan Rehab Ruang Kelas (1 Ruang) SMKN 1 PERMATA KECUBUNG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16169012 | 51423982 | APBD | 60,000,000 | 60,000,000 | 59,866,800 | 59,866,800 | 59,866,800 | 59,866,800 | 59,866,800 | 59,866,800 | 2024-05-22 | 2024-06-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 133,200 | 0.22 % | |
164 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 4 Palangka Raya (Pembangunan Toilet (jamban) beserta sanitasinya, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15801012 | 50409465 | APBD | 55,701,800 | 55,701,800 | 55,111,500 | 55,111,500 | 55,111,500 | 55,111,500 | 55,111,500 | 55,111,500 | 2024-03-15 | 2024-03-26 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 590,300 | 1.06 % | |
165 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0002.5.1.02.02.08.0005 Perencanaan Pembuatan Kolam Ikan Lengkap Dengan Perlengkapannya Di Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17751012 | 52927462 | APBDP | 30,337,200 | 30,247,500 | 30,197,550 | 30,197,550 | 30,000,000 | 30,000,000 | 30,000,000 | 30,000,000 | 2024-10-17 | 2024-11-01 | CV. ENGGANG PRATAMA CONSULINDO | 01.700.139.7-711.000 | 139,650 | 0.46 % | |
166 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 4 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15800012 | 50408997 | APBD | 43,927,800 | 43,927,800 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 2024-03-15 | 2024-03-26 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 693,300 | 1.58 % | |
167 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Gedung Hatchery Pada Kegiatan Pengembangan Ayam Kalimantan Super (Kalper) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16109012 | 50581654 | APBD | 27,165,000 | 20,992,800 | 20,773,650 | 20,773,650 | 20,579,400 | 20,579,400 | 20,579,400 | 20,579,400 | 2024-05-15 | 2024-05-21 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 6,391,350 | 23.53 % | |
168 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Peningkatan Jalan Madiun Ngawi dan Sekitarnya, Kabupaten Kotawaringin Timur, Provinsi Kalimantan Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 16112012 | 49565586 | APBD | 186,400,000 | 186,397,000 | 185,726,219 | 185,726,219 | 185,596,000 | 185,596,000 | 185,596,000 | 185,596,000 | 2024-05-20 | 2024-06-05 | 673,781 | 0.36 % | |||
169 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Awang Lapai (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15782012 | 50384485 | APBD | 50,597,700 | 50,597,700 | 50,547,584 | 50,547,584 | 50,547,584 | 50,547,584 | 0 | 50,547,584 | 2024-03-15 | 2024-03-26 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 50,116 | 0.1 % | |
170 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 4 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17259012 | 51240011 | APBD | 30,977,300 | 30,977,300 | 30,636,000 | 30,636,000 | 30,636,000 | 30,636,000 | 0 | 30,636,000 | 2024-06-04 | 2024-06-14 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 341,300 | 1.1 % | |
171 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kepala Sekolah/Guru Dan Rehab Ruang Kelas (3 Ruang) SMKN 6 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16142012 | 51421267 | APBD | 25,000,000 | 25,000,000 | 24,883,450 | 24,883,450 | 24,883,450 | 24,883,450 | 24,883,450 | 24,883,450 | 2024-05-22 | 2024-06-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 116,550 | 0.47 % | |
172 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Pengawasan Arsitektur - Rehab Pagar Pesanggrahan Tjilik Riwut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10009883000 | 53104942 | APBDP | 49,820,000 | 49,820,000 | 49,750,000 | 49,750,000 | 49,650,300 | 49,650,300 | 0 | 49,650,300 | 2024-11-20 | 2024-12-20 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 70,000 | 0.14 % | |
173 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Konsultan Perencanaan Pembangunan Kandang Ayam Kalimantan Super (Kalper) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16110012 | 50581512 | APBD | 27,165,000 | 27,165,000 | 27,072,900 | 27,072,900 | 26,895,300 | 26,895,300 | 26,895,300 | 26,895,300 | 2024-05-15 | 2024-05-21 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 92,100 | 0.34 % | |
174 | 2024 | Dinas Pendidikan | JASA KONSULTANSI PENGAWASAN PERBAIKAN PAGAR, LANTAI DAN PENGECATAN PADA GEDUNG HUMA BERKAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17750012 | 52940108 | APBDP | 45,000,000 | 45,000,000 | 44,955,000 | 44,955,000 | 44,955,000 | 0 | 0 | 0 | 2024-10-15 | 2024-10-18 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 45,000 | 0.1 % | |
175 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultansi Pengawasan Pemeliharaan Gedung Kantor DPUPR Pro. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16093012 | 49772646 | APBD | 85,000,000 | 85,000,000 | 84,800,000 | 84,800,000 | 84,800,000 | 0 | 0 | 0 | 2024-05-08 | 2024-05-31 | 200,000 | 0.24 % | |||
176 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Paju Epat (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17304012 | 51184217 | APBD | 45,643,400 | 45,643,400 | 45,621,000 | 45,621,000 | 45,621,000 | 45,621,000 | 45,621,000 | 45,621,000 | 2024-06-11 | 2024-06-24 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 22,400 | 0.05 % | |
177 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Arut Utara (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17286012 | 51602689 | APBD | 32,114,000 | 32,114,000 | 31,968,000 | 31,968,000 | 31,968,000 | 31,968,000 | 31,968,000 | 31,968,000 | 2024-06-07 | 2024-06-19 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 146,000 | 0.45 % | |
178 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Teras Aula | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17739012 | 52888554 | APBD | 14,992,770 | 14,992,770 | 14,781,704 | 14,781,704 | 14,781,704 | 0 | 0 | 0 | 2024-10-14 | 2024-11-05 | CV. FELI TIRTHA MANDIRI | 39.579.843.2-711.000 | 211,067 | 1.41 % | |
179 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Penataan Jaringan Listrik | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17796012 | 52994245 | APBDP | 18,000,000 | 17,988,660 | 17,900,000 | 17,900,000 | 17,900,000 | 0 | 0 | 0 | 2024-10-18 | 2024-10-22 | 100,000 | 0.56 % | |||
180 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.07.0010.5.1.02.02.08.0005 PERENCANAAN INSTALASI LISTRIK KANTOR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17643012 | 52466526 | APBD | 16,800,000 | 16,800,000 | 16,750,002 | 16,750,002 | 16,750,002 | 16,750,002 | 16,750,002 | 16,750,002 | 2024-09-10 | 2024-09-20 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 49,998 | 0.3 % | |
181 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Perencanaan Pembangunan Jembatan Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17614012 | 52283657 | APBD | 30,259,965 | 30,259,900 | 30,192,000 | 30,192,000 | 30,192,000 | 30,192,000 | 30,192,000 | 30,192,000 | 2024-08-23 | 2024-08-29 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 67,965 | 0.22 % | |
182 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Kotawaringin Lama (Rehabilitasi Rg. Lab. Biologi, Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15792012 | 50393286 | APBD | 46,504,100 | 46,504,098 | 46,176,000 | 46,176,000 | 46,176,000 | 46,176,000 | 0 | 46,176,000 | 2024-03-21 | 2024-04-08 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 328,100 | 0.71 % | |
183 | 2024 | Dinas Perpustakaan dan Arsip | Pengadaan Buku Tercetak Perpustakaan | Pengadaan Langsung | Pengadaan Barang | 10009519000 | 53268668 | APBD | 116,842,629 | 116,840,000 | 116,600,100 | 116,600,100 | 116,568,000 | 116,568,000 | 116,568,000 | 116,568,000 | 2024-11-19 | 2024-12-06 | CV.TRIO BARU INDAH | 75.522.314.6-711.000 | 242,529 | 0.21 % | |
184 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 3 Ruang SMAN 1 Sampit (Sistem Suntik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16043012 | 50729567 | APBD | 100,000,000 | 99,900,000 | 99,583,650 | 99,583,650 | 99,583,650 | 99,583,650 | 0 | 99,583,650 | 2024-05-03 | 2024-05-13 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 416,350 | 0.42 % | |
185 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Pembangunan Toilet(Jamban)beserta sanitasinya SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15849012 | 50468167 | APBD | 33,258,000 | 33,258,000 | 33,166,000 | 33,166,000 | 33,166,000 | 33,166,000 | 33,166,000 | 33,166,000 | 2024-03-25 | 2024-04-12 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 92,000 | 0.28 % | |
186 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Basawang Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15685012 | 46521079 | APBD | 160,000,000 | 160,000,000 | 159,760,303 | 159,760,303 | 159,621,938 | 159,620,000 | 0 | 159,620,000 | 2024-01-18 | 2024-01-31 | CV. RIMA JAYA | 01.407.576.6-711.000 | 239,697 | 0.15 % | |
187 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN SIRING DAN PAGAR UPTPPD SERUYAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15746012 | 49212314 | APBD | 113,643,750 | 99,945,787 | 99,834,788 | 99,834,788 | 99,213,188 | 99,213,188 | 99,213,188 | 99,213,188 | 2024-03-15 | 2024-03-25 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 13,808,963 | 12.15 % | |
188 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0008.5.1.02.02.08.0005 Perencanaan Revitalisasi tambak sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17469012 | 52046379 | APBD | 35,855,664 | 35,853,000 | 35,825,250 | 35,825,250 | 35,500,000 | 35,500,000 | 35,500,000 | 35,500,000 | 2024-07-09 | 2024-07-26 | PT. ANDAL CENDANAKA | 01.489.452.1-711.000 | 30,414 | 0.08 % | |
189 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15752012 | 50372597 | APBD | 47,759,700 | 47,759,700 | 47,397,000 | 47,397,000 | 47,397,000 | 47,397,000 | 47,397,000 | 47,397,000 | 2024-03-13 | 2024-03-22 | 362,700 | 0.76 % | |||
190 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17237012 | 51738316 | APBD | 75,880,000 | 75,880,000 | 75,824,100 | 75,824,100 | 75,824,100 | 75,824,100 | 0 | 75,824,100 | 2024-05-30 | 2024-06-10 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 55,900 | 0.07 % | |
191 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Timang (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15754012 | 50372924 | APBD | 55,049,700 | 55,049,700 | 54,612,000 | 54,612,000 | 54,612,000 | 54,612,000 | 0 | 54,612,000 | 2024-03-13 | 2024-03-22 | 437,700 | 0.8 % | |||
192 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Bahaur I Kabupaten Pulang Pisau | Pengadaan Langsung | Pekerjaan Konstruksi | 15677012 | 46522391 | APBD | 170,000,000 | 170,000,000 | 169,893,275 | 169,893,275 | 169,805,842 | 169,800,000 | 0 | 169,800,000 | 2024-01-05 | 2024-01-29 | CV.MAULANA ABADI | 02.809.446.4-711.000 | 106,725 | 0.06 % | |
193 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Siring SMKN 2 Gunung Timang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16158012 | 51424194 | APBD | 27,500,000 | 27,500,000 | 27,400,100 | 27,400,100 | 27,400,100 | 27,400,100 | 27,400,100 | 27,400,100 | 2024-05-22 | 2024-06-02 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 99,900 | 0.36 % | |
194 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembuatan Siring dan Drainase SMK NEGERI 1 KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16044012 | 51010446 | APBD | 51,000,000 | 51,000,000 | 50,778,000 | 50,778,000 | 50,778,000 | 50,778,000 | 50,778,000 | 50,778,000 | 2024-05-06 | 2024-05-18 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 222,000 | 0.44 % | |
195 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer,Bahasa SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15853012 | 50525083 | APBD | 50,708,000 | 50,708,000 | 50,641,400 | 50,641,400 | 50,641,400 | 50,641,400 | 50,641,400 | 50,641,400 | 2024-03-25 | 2024-04-12 | Roa Solution | 92.337.883.0-711.000 | 66,600 | 0.13 % | |
196 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Awang Lapai (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15783012 | 50378192 | APBD | 52,604,700 | 52,601,790 | 52,601,084 | 52,601,084 | 52,601,084 | 52,601,084 | 52,601,084 | 52,601,084 | 2024-03-15 | 2024-03-26 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 3,616 | 0.01 % | |
197 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan WC 2 Unit SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17224012 | 51398659 | APBD | 22,000,000 | 22,000,000 | 21,944,500 | 21,944,500 | 21,944,500 | 21,944,500 | 21,944,500 | 21,944,500 | 2024-05-29 | 2024-06-06 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 55,500 | 0.25 % | |
198 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS,Ruang Bimbingan Konseling(BK) SMKS PGRI SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16077012 | 50547386 | APBD | 17,317,000 | 17,317,000 | 17,261,500 | 17,261,500 | 17,261,500 | 17,261,500 | 17,261,500 | 17,261,500 | 2024-05-06 | 2024-05-18 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 55,500 | 0.32 % | |
199 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Menthobi Raya (Pembangunan Rg. BK, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17357012 | 51239712 | APBD | 23,625,300 | 23,625,300 | 23,554,200 | 23,554,200 | 23,554,200 | 23,554,200 | 23,554,200 | 23,554,200 | 2024-07-09 | 2024-07-17 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 71,100 | 0.3 % | |
200 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Kolam Renang Isen Mulang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15723012 | 50136970 | APBD | 30,000,000 | 29,820,150 | 29,598,150 | 29,598,150 | 29,598,150 | 29,598,150 | 29,598,150 | 29,598,150 | 2024-02-26 | 2024-03-18 | Roa Solution | 92.337.883.0-711.000 | 401,850 | 1.34 % | |
201 | 2024 | Badan Pendapatan Daerah | Pengawasan Pemasangan Paving Blok Area UPT Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17613012 | 52307669 | APBDP | 44,077,500 | 32,745,000 | 31,857,000 | 31,857,000 | 31,246,500 | 31,246,500 | 31,246,500 | 31,246,500 | 2024-08-23 | 2024-09-05 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 12,220,500 | 27.73 % | |
202 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Bimbingan Konseling SMAN 4 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17777012 | 52880730 | APBDP | 35,000,000 | 35,000,000 | 34,944,500 | 34,944,500 | 34,944,500 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 55,500 | 0.16 % | |
203 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Guru (1 Ruang) SMKN 1 Kuala Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16148012 | 51573334 | APBD | 20,000,000 | 20,000,000 | 19,935,000 | 19,935,000 | 19,935,000 | 19,935,000 | 19,935,000 | 19,935,000 | 2024-05-22 | 2024-06-02 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 65,000 | 0.33 % | |
204 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Kuala Kurun (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15771012 | 50387885 | APBD | 41,219,700 | 41,219,700 | 41,219,700 | 41,219,700 | 41,219,700 | 41,219,700 | 0 | 41,219,700 | 2024-03-15 | 2024-03-26 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 0 | 0 % | |
205 | 2024 | Biro Pengadaan Barang dan Jasa | Pengembangan Aplikasi dan Pemeliharaan SIAP BAJASA - Pengembangan SIM UKPBJ | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15734012 | 50300406 | APBD | 52,500,000 | 52,469,700 | 52,425,300 | 52,425,300 | 52,203,300 | 52,203,300 | 52,203,300 | 5,203,300 | 2024-03-01 | 2024-03-22 | 74,700 | 0.14 % | |||
206 | 2024 | Dinas Kehutanan | Belanja Jasa Konsultansi Pengawasan Arsitektur - Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor atau Bangunan Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16034012 | 49887465 | APBD | 49,539,000 | 49,500,000 | 49,317,300 | 49,317,300 | 48,595,800 | 48,595,800 | 48,595,800 | 48,595,800 | 2024-04-29 | 2024-05-10 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 221,700 | 0.45 % | |
207 | 2024 | Dinas Perkebunan | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor (DPPA-Oktober) | Pengadaan Langsung | Pekerjaan Konstruksi | 17902012 | 53346378 | APBDP | 170,679,200 | 169,578,640 | 169,286,833 | 169,164,604 | 169,164,604 | 0 | 0 | 0 | 2024-11-14 | 2024-11-25 | CV. Setia Bakti Group | 95.851.120.6-711.000 | 1,392,367 | 0.82 % | |
208 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN SIRING DAN PAGAR UPTPPD SERUYAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17598012 | 49721775 | APBD | 66,618,750 | 66,499,998 | 66,250,000 | 66,250,000 | 64,602,000 | 64,602,000 | 64,602,000 | 64,602,000 | 2024-08-14 | 2024-08-26 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 368,750 | 0.55 % | |
209 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17536012 | 51202371 | APBD | 33,020,000 | 33,020,000 | 32,967,000 | 32,967,000 | 32,967,000 | 32,967,000 | 32,967,000 | 32,967,000 | 2024-07-25 | 2024-08-02 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 53,000 | 0.16 % | |
210 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI GEDUNG KANTOR UPTPPD KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16021012 | 49824839 | APBD | 43,750,000 | 43,698,936 | 43,650,000 | 43,650,000 | 43,027,023 | 43,027,023 | 43,027,023 | 43,027,023 | 2024-05-01 | 2024-05-10 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 100,000 | 0.23 % | |
211 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Perencanaan Arsitektur - Penataan Halaman Pesanggrahan Tjilik Riwut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17813012 | 53104149 | APBD | 100,000,000 | 100,000,000 | 99,611,400 | 99,611,400 | 99,050,850 | 99,050,850 | 0 | 99,050,850 | 2024-10-29 | 2024-11-22 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 388,600 | 0.39 % | |
212 | 2024 | KPHL GERBANG BARITO | Beban Jasa Konsultansi Pengawasan Arsitektur - Pengawas Kandang Sapi - Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011357000 | 49971026 | APBD | 20,140,000 | 20,140,000 | 19,980,000 | 19,980,000 | 19,591,500 | 19,591,500 | 19,591,500 | 19,591,500 | 2024-11-21 | 2024-11-29 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 160,000 | 0.79 % | |
213 | 2024 | Badan Pendapatan Daerah | Belanja Modal Bangunan Gedung Kantor ( Perencanaan Penataan Halaman Kantor UPTPPD Sampit ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17428012 | 51957360 | APBDP | 74,250,000 | 74,162,985 | 73,829,985 | 73,829,985 | 72,880,935 | 72,880,935 | 72,880,935 | 72,880,935 | 2024-07-03 | 2024-07-17 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 420,015 | 0.57 % | |
214 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan Halaman Sekolah dan Rehab Ruang Kelas (4 Ruang) SMKN 5 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16173012 | 51424387 | APBD | 77,200,000 | 77,200,000 | 77,066,800 | 77,066,800 | 77,066,800 | 77,066,800 | 77,066,800 | 77,066,800 | 2024-05-22 | 2024-06-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 133,200 | 0.17 % | |
215 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 2 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17530012 | 51213384 | APBD | 28,090,000 | 28,090,000 | 27,868,000 | 27,868,000 | 27,868,000 | 27,868,000 | 27,868,000 | 27,868,000 | 2024-07-25 | 2024-08-02 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 222,000 | 0.79 % | |
216 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer,Bahasa SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16074012 | 50546851 | APBD | 41,850,000 | 41,850,000 | 41,794,500 | 41,794,500 | 41,794,500 | 41,794,500 | 41,794,500 | 41,794,500 | 2024-05-06 | 2024-05-18 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 55,500 | 0.13 % | |
217 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (PERENCANAAN REHAB LOBI GEDUNG KANTOR) | Pengadaan Langsung | Jasa Lainnya | 10031088000 | 53444696 | APBD;APBDP | 202,500,000 | 49,330,000 | 49,128,600 | 49,128,600 | 49,000,000 | 0 | 0 | 0 | 2024-12-17 | 2024-12-20 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 153,371,400 | 75.74 % | |
218 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17214012 | 51239502 | APBD | 48,776,500 | 48,776,500 | 48,726,000 | 48,726,000 | 48,726,000 | 48,726,000 | 0 | 48,726,000 | 2024-05-28 | 2024-06-05 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 50,500 | 0.1 % | |
219 | 2024 | Badan Pendapatan Daerah | Pengawasan Pembangunan Ruang Loket UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17745012 | 52649838 | APBD | 25,000,000 | 24,919,500 | 24,864,000 | 24,864,000 | 24,575,400 | 0 | 0 | 0 | 2024-10-16 | 2024-10-29 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 136,000 | 0.54 % | |
220 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS Kristen Palangka Raya (Pembangunan Rg. Lab. Kimia) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17361012 | 51240503 | APBD | 30,927,300 | 30,927,300 | 30,883,000 | 30,883,000 | 30,883,000 | 30,883,000 | 30,883,000 | 30,883,000 | 2024-07-09 | 2024-07-15 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 44,300 | 0.14 % | |
221 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17552012 | 49721332 | APBD | 26,000,000 | 25,974,000 | 25,308,000 | 25,308,000 | 24,769,650 | 24,769,650 | 24,769,650 | 24,769,650 | 2024-07-31 | 2024-08-14 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 692,000 | 2.66 % | |
222 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Aula SMAN 1 Tanah Siang Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17387012 | 51399046 | APBD | 55,000,000 | 55,000,000 | 54,822,400 | 54,822,400 | 54,822,400 | 54,822,400 | 54,822,400 | 54,822,400 | 2024-08-06 | 2024-08-13 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 177,600 | 0.32 % | |
223 | 2024 | Dinas Perhubungan | Pengawasan Pemeliharaan/Penataan ATCS Simpang Mahir Mahar-Jl. Trans Kalimantan (Arah Banjarmasin) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10004427000 | 53411285 | APBDP | 25,000,000 | 24,952,800 | 24,725,250 | 24,725,250 | 24,725,250 | 0 | 0 | 0 | 2024-11-12 | 2024-11-20 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 274,750 | 1.1 % | |
224 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Tower Air UPT. KPHL Gerbang Barito, Bangunan Rumah Genset dan Tower Air UPT. KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17679012 | 52599544 | APBDP | 24,068,000 | 24,067,900 | 23,932,155 | 23,932,155 | 23,671,305 | 0 | 0 | 0 | 2024-10-02 | 2024-10-11 | 135,845 | 0.56 % | |||
225 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Pagar UPT.KPHL Kapuas Kahayan - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17725012 | 52730217 | APBDP | 77,200,000 | 77,197,200 | 77,032,460 | 77,032,460 | 76,310,960 | 0 | 0 | 0 | 2024-10-11 | 2024-10-18 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 167,540 | 0.22 % | |
226 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Babi, Pakan dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10021409000 | 53545275 | APBD | 20,826,500 | 20,826,500 | 20,793,200 | 20,793,200 | 20,747,898 | 0 | 0 | 0 | 2024-11-30 | 2024-12-06 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 33,300 | 0.16 % | |
227 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pengecoran Jalan Menuju Sekolah SMAN 1 Tamban Catur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16090012 | 51398711 | APBD | 72,000,000 | 72,000,000 | 71,844,600 | 71,844,600 | 71,844,600 | 71,844,600 | 71,844,600 | 71,844,600 | 2024-05-08 | 2024-05-20 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 155,400 | 0.22 % | |
228 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Beban Jasa Konsultansi Pengawasan Pembangunan Pagar UPT BPSBTPH Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17618012 | 49429034 | APBD | 30,906,000 | 30,906,000 | 30,889,350 | 30,889,350 | 30,887,082 | 30,887,082 | 30,887,082 | 30,887,082 | 2024-08-26 | 2024-09-06 | 16,650 | 0.05 % | |||
229 | 2024 | Badan Keuangan dan Aset Daerah | Rehab Teras Aula | Pengadaan Langsung | Pekerjaan Konstruksi | 17886012 | 53327713 | APBD | 150,000,000 | 150,000,000 | 149,968,000 | 149,968,000 | 149,968,000 | 149,968,000 | 149,968,000 | 149,968,000 | 2024-11-08 | 2024-11-27 | KARYA UTAMA KAHAYAN | 86.020.287.8-711.000 | 32,000 | 0.02 % | |
230 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer,Laboratorium Bahasa SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17483012 | 51358813 | APBD | 42,420,000 | 42,420,000 | 42,357,600 | 42,357,600 | 42,357,600 | 42,357,600 | 42,357,600 | 42,357,600 | 2024-07-15 | 2024-07-19 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 62,400 | 0.15 % | |
231 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (1 Ruang) SMKN 3 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16184012 | 51423718 | APBD | 19,000,000 | 19,000,000 | 18,961,150 | 18,961,150 | 18,961,150 | 18,961,150 | 18,961,150 | 18,961,150 | 2024-05-22 | 2024-06-02 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 38,850 | 0.2 % | |
232 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Bimbingan Konseling (BK) SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17486012 | 51229891 | APBD | 10,530,000 | 10,530,000 | 10,503,360 | 10,503,360 | 10,503,360 | 10,503,360 | 10,503,360 | 10,503,360 | 2024-07-15 | 2024-07-19 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 26,640 | 0.25 % | |
233 | 2024 | Badan Pendapatan Daerah | Perencanaan Pembangunan Ruang Loket UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17546012 | 52151643 | APBDP | 42,500,000 | 42,499,999 | 42,424,200 | 42,424,200 | 42,191,100 | 42,191,100 | 42,191,100 | 42,191,100 | 2024-07-26 | 2024-08-10 | ROTASI DESIGN CONSULTANT | 90.011.802.7-711.000 | 75,800 | 0.18 % | |
234 | 2024 | Dinas Pendidikan | Jasa Konsunltasi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang SLBN 1 Kasongan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17345012 | 51911794 | APBD | 16,979,000 | 16,977,450 | 16,927,500 | 16,927,500 | 16,927,500 | 16,927,500 | 16,927,500 | 16,927,500 | 2024-08-12 | 2024-08-19 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 51,500 | 0.3 % | |
235 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor dan Bangunan Lainnya -Pengecoran Jalan Lingkungan | Pengadaan Langsung | Pekerjaan Konstruksi | 17906012 | 53345378 | APBDP | 190,000,000 | 190,000,000 | 189,722,500 | 189,722,500 | 189,500,000 | 0 | 0 | 0 | 2024-11-08 | 2024-11-15 | CV. CAHAYA MASSA | 01.505.868.8-714.000 | 277,500 | 0.15 % | |
236 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Pembangunan Rumah Genset dan Tower Air UPT.KPHP Kahayan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17667012 | 52595930 | APBDP | 16,884,000 | 16,883,600 | 16,852,575 | 16,852,575 | 16,738,800 | 16,738,800 | 16,738,800 | 16,738,800 | 2024-09-27 | 2024-10-09 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 31,425 | 0.19 % | |
237 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SERUYAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15795012 | 49207360 | APBD | 13,582,500 | 13,505,000 | 13,503,150 | 13,503,150 | 13,286,700 | 13,286,700 | 13,286,700 | 13,286,700 | 2024-03-15 | 2024-03-25 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 79,350 | 0.58 % | |
238 | 2024 | Dinas Komunikasi, Informatika, Persandian dan Statistik | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15856012 | 51029086 | APBD | 72,856,000 | 72,856,000 | 71,916,900 | 71,916,900 | 71,916,900 | 71,916,900 | 71,916,900 | 71,916,900 | 2024-03-27 | 2024-04-03 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 939,100 | 1.29 % | |
239 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAN 1 Tanah Siang Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17388012 | 51399067 | APBD | 58,000,000 | 58,000,000 | 57,800,200 | 57,800,200 | 57,800,200 | 57,800,200 | 57,800,200 | 57,800,200 | 2024-08-06 | 2024-08-13 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 199,800 | 0.34 % | |
240 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pemasangan Paving Halaman Kantor SMAN 1 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17823012 | 52898293 | APBDP | 35,000,000 | 35,000,000 | 34,889,000 | 34,889,000 | 34,889,000 | 34,889,000 | 34,889,000 | 34,889,000 | 2024-10-28 | 2024-11-05 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 111,000 | 0.32 % | |
241 | 2024 | Dinas Kebudayaan dan Pariwisata | Perencanaan Renovasi Ruang Pamer dan Pagar Belakang Museum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17798012 | 53018238 | APBDP | 97,818,000 | 97,818,000 | 97,596,000 | 97,596,000 | 97,041,000 | 0 | 0 | 0 | 2024-10-23 | 2024-11-28 | CV. BUKIT RAYA ENGINEERING | 02.618.720.3-711.000 | 222,000 | 0.23 % | |
242 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Mess UPT.KPHP Katingan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17601012 | 52224948 | APBDP | 44,147,000 | 44,146,000 | 44,086,425 | 44,086,425 | 43,711,800 | 43,711,800 | 43,711,800 | 43,711,800 | 2024-08-15 | 2024-08-23 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 60,575 | 0.14 % | |
243 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Lanjutan pembuatan pagar dan penataan halaman sekolah SMAN 1 Arut Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15911012 | 50729294 | APBD | 35,000,000 | 35,000,000 | 34,976,100 | 34,976,100 | 34,976,100 | 34,976,100 | 0 | 34,976,100 | 2024-03-28 | 2024-04-08 | Roa Solution | 92.337.883.0-711.000 | 23,900 | 0.07 % | |
244 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Rehabilitasi Gedung Juang Jl. Seth Adji | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15892012 | 51180723 | APBD | 30,000,000 | 30,000,000 | 29,881,200 | 29,881,200 | 29,881,200 | 29,881,200 | 29,881,200 | 29,881,200 | 2024-04-02 | 2024-04-19 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 118,800 | 0.4 % | |
245 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16099012 | 51588150 | APBD | 21,754,000 | 21,754,000 | 21,700,500 | 21,700,500 | 21,700,500 | 21,700,500 | 21,700,500 | 21,700,500 | 2024-05-09 | 2024-05-18 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 53,500 | 0.25 % | |
246 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan dan Penataan Halaman SMKN 3 Kuala Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16160012 | 51427594 | APBD | 27,000,000 | 27,000,000 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 2024-05-22 | 2024-06-02 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 49,200 | 0.18 % | |
247 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Perencanaan Pembangunan Parkir Mobil Operasional PUSDALOP-PB) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17884012 | 51467121 | APBD | 125,000,000 | 9,999,900 | 9,944,379 | 9,944,379 | 9,855,024 | 0 | 0 | 0 | 2024-11-11 | 2024-11-15 | 115,055,621 | 92.04 % | |||
248 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17280012 | 51240282 | APBD | 30,927,300 | 30,927,300 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 2024-06-12 | 2024-06-24 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 133,200 | 0.43 % | |
249 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet(Jamban) 1 Ruang SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15815012 | 50548649 | APBD | 4,078,000 | 4,078,000 | 4,050,000 | 4,050,000 | 4,050,000 | 4,050,000 | 4,050,000 | 4,050,000 | 2024-03-19 | 2024-03-27 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 28,000 | 0.69 % | |
250 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Dusun Utara (Pembangunan Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15840012 | 50377199 | APBD | 72,598,700 | 72,598,700 | 72,076,851 | 72,076,851 | 72,076,851 | 72,076,851 | 0 | 72,076,851 | 2024-03-21 | 2024-04-08 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 521,849 | 0.72 % | |
251 | 2024 | Dinas Kelautan dan Perikanan | 3.25.03.1.06.0001.5.2.03.01.01.0018 Jasa Konsultansi Pengawasan Peningkatan Jalan Titian Pelabuhan Perikanan Kuala Jelai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17840012 | 53218750 | APBDP | 61,000,000 | 61,000,000 | 60,639,300 | 60,639,300 | 60,500,000 | 60,500,000 | 60,500,000 | 60,500,000 | 2024-10-30 | 2024-11-08 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 360,700 | 0.59 % | |
252 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Kantin, Ruang Kepala Sekolah, Ruang Pembelajaran Khusus, Ruang tata Usaha SLBN Puruk Cahu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17328012 | 51911728 | APBD | 40,436,933 | 40,431,750 | 40,426,200 | 40,426,200 | 40,426,200 | 40,426,200 | 0 | 40,426,200 | 2024-07-01 | 2024-07-05 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 10,733 | 0.03 % | |
253 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Rehabilitasi Ruang Kelas dengan tingkat kerusakan minimal sedang beserta perabotnya SLBN 1 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17693012 | 52094234 | APBD | 10,200,000 | 10,197,570 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 2024-09-30 | 2024-10-02 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 54,600 | 0.54 % | |
254 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS Muhammadiyah Kasongan (Rehabilitasi Rg. Kelas, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17356012 | 51239112 | APBD | 41,824,200 | 41,824,200 | 41,747,100 | 41,747,100 | 41,747,100 | 41,747,100 | 41,747,100 | 41,747,100 | 2024-07-10 | 2024-07-16 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 77,100 | 0.18 % | |
255 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Ruang Kelas Baru SLBN Puruk Cahu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17327012 | 51911756 | APBD | 73,795,500 | 73,787,250 | 73,753,950 | 73,753,950 | 73,753,950 | 73,753,950 | 0 | 73,753,950 | 2024-07-01 | 2024-07-05 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 41,550 | 0.06 % | |
256 | 2024 | Badan Pendapatan Daerah | Perencanaan Pembangunan Rumah Dinas UPTPPD Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17650012 | 52495090 | APBDP | 58,650,000 | 58,635,750 | 57,498,000 | 57,498,000 | 56,598,900 | 56,598,900 | 56,598,900 | 56,598,900 | 2024-09-13 | 2024-09-26 | 1,152,000 | 1.96 % | |||
257 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya -Perencanaan Pembangunan Konstruksi/ Pembangunan Gedung Water Tank (Raservoir) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16009012 | 51467121 | APBD | 125,000,000 | 99,900,000 | 99,089,700 | 99,089,700 | 99,089,700 | 99,089,700 | 0 | 99,089,700 | 2024-05-13 | 2024-05-22 | 25,910,300 | 20.73 % | |||
258 | 2024 | Dinas Perhubungan | Pengawasan Pemeliharaan Area Traffic Control System (ATCS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17620012 | 51282094 | APBD | 25,000,000 | 24,952,800 | 24,586,500 | 24,586,500 | 24,586,500 | 24,586,500 | 24,586,500 | 24,586,500 | 2024-08-29 | 2024-09-06 | Roa Solution | 92.337.883.0-711.000 | 413,500 | 1.65 % | |
259 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Bahaur II Kabupaten Pulang Pisau | Pengadaan Langsung | Pekerjaan Konstruksi | 15678012 | 46522762 | APBD | 170,000,000 | 170,000,000 | 169,835,326 | 169,835,326 | 169,747,893 | 169,000,000 | 0 | 169,000,000 | 2024-01-05 | 2024-01-29 | CV.ANUGRAH ALAM INDO RAYA (AIR) | 72.282.377.0-714.000 | 164,674 | 0.1 % | |
260 | 2024 | Dinas Energi dan Sumber Daya Mineral | Belanja Jasa Konsultansi Perencanaan Arsitektur - Jasa Arsitektur Lainnya Konsultansi Perencanaan Pemasangan BPBL | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17406012 | 51938202 | APBD | 80,000,000 | 79,920,000 | 79,698,000 | 79,698,000 | 79,698,000 | 79,698,000 | 79,698,000 | 79,698,000 | 2024-06-27 | 2024-07-03 | 302,000 | 0.38 % | |||
261 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Perpustakaan, Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15786012 | 50392449 | APBD | 64,277,800 | 64,277,800 | 64,210,800 | 64,210,800 | 64,210,800 | 64,210,800 | 0 | 64,210,800 | 2024-03-15 | 2024-03-26 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 67,000 | 0.1 % | |
262 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI GEDUNG UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15738012 | 49826772 | APBD | 36,220,000 | 36,198,039 | 35,464,500 | 35,464,500 | 35,064,900 | 35,064,900 | 35,064,900 | 35,064,900 | 2024-03-07 | 2024-03-20 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 755,500 | 2.09 % | |
263 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Lab. Komputer SMAN 4 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16195012 | 50726676 | APBD | 26,873,000 | 26,873,000 | 26,850,900 | 26,850,900 | 26,850,900 | 26,850,900 | 26,850,900 | 26,850,900 | 2024-05-28 | 2024-06-05 | CV. SEIPUTRA PERSADA | 02.539.098.0-711.000 | 22,100 | 0.08 % | |
264 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Balai Riam (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17359012 | 51239888 | APBD | 58,394,200 | 58,394,200 | 58,116,700 | 58,116,700 | 58,116,700 | 58,116,700 | 58,116,700 | 58,116,700 | 2024-07-02 | 2024-07-11 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 277,500 | 0.48 % | |
265 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Pagar SMAN 1 Dusun Tengah Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15796012 | 50726863 | APBD | 95,000,000 | 95,000,000 | 94,770,791 | 94,770,791 | 94,770,791 | 94,770,791 | 94,770,791 | 94,770,791 | 2024-03-15 | 2024-03-26 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 229,209 | 0.24 % | |
266 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Ruang Perpustakaan SMAS Muhammadiyah 2 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17308012 | 51399735 | APBD | 30,000,000 | 30,000,000 | 29,948,940 | 29,948,940 | 29,948,940 | 29,948,940 | 29,948,940 | 29,948,940 | 2024-06-12 | 2024-06-24 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 51,060 | 0.17 % | |
267 | 2024 | Sekretariat DPRD | Beban Jasa Konsultansi Pengawasan arsitektur rehab ruang paripurna Lt 3 bagian belakang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17227012 | 49289848 | APBD | 14,000,000 | 13,991,550 | 13,974,900 | 13,974,900 | 13,974,900 | 13,974,900 | 13,974,900 | 13,974,900 | 2024-05-30 | 2024-06-10 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 25,100 | 0.18 % | |
268 | 2024 | Dinas Pendidikan | Perencanaan REHAB ACP DEPAN DISDIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10029710000 | 53712812 | APBDP | 41,500,000 | 41,500,000 | 41,452,950 | 41,452,950 | 41,452,950 | 0 | 0 | 0 | 2024-12-13 | 2024-12-17 | 47,050 | 0.11 % | |||
269 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17321012 | 51238296 | APBD | 43,755,200 | 43,755,200 | 43,623,000 | 43,623,000 | 43,623,000 | 43,623,000 | 43,623,000 | 43,623,000 | 2024-06-14 | 2024-06-26 | 132,200 | 0.3 % | |||
270 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Guru SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15962012 | 50730570 | APBD | 60,900,000 | 60,900,000 | 60,000,000 | 60,000,000 | 60,000,000 | 60,000,000 | 0 | 60,000,000 | 2024-04-05 | 2024-04-24 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 900,000 | 1.48 % | |
271 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15845012 | 50538788 | APBD | 41,085,000 | 41,085,000 | 41,000,000 | 41,000,000 | 41,000,000 | 41,000,000 | 41,000,000 | 41,000,000 | 2024-03-25 | 2024-04-12 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 85,000 | 0.21 % | |
272 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS PGRI 2 Sampit (Pembangunan Rg. Guru, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16133012 | 51239677 | APBD | 44,806,700 | 44,806,700 | 44,582,040 | 44,582,040 | 44,582,040 | 44,582,040 | 0 | 44,582,040 | 2024-05-21 | 2024-05-31 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 224,660 | 0.5 % | |
273 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE, KANOPI PENYAMBUNG KANTOR-GUDANG ARSIP UPTPPD SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15748012 | 49189732 | APBD | 49,500,000 | 49,498,849 | 49,284,000 | 49,284,000 | 48,695,700 | 48,695,700 | 48,695,700 | 48,695,700 | 2024-03-07 | 2024-03-20 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 216,000 | 0.44 % | |
274 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Ruang Lab Komputer SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17391012 | 51399342 | APBD | 28,500,000 | 28,500,000 | 28,450,000 | 28,450,000 | 28,450,000 | 28,450,000 | 28,450,000 | 28,450,000 | 2024-07-18 | 2024-07-25 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 50,000 | 0.18 % | |
275 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Praktik Siswa(RPS) KK- Rekayasa Perangkat Lunak SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16066012 | 50544142 | APBD | 97,573,000 | 97,573,000 | 97,400,000 | 97,400,000 | 97,400,000 | 97,400,000 | 97,400,000 | 97,400,000 | 2024-05-06 | 2024-05-18 | Roa Solution | 92.337.883.0-711.000 | 173,000 | 0.18 % | |
276 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pembuatan pagar dan penataan halaman sekolah SMAN 1 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17385012 | 51398837 | APBD | 70,000,000 | 70,000,000 | 69,874,500 | 69,874,500 | 69,874,500 | 69,874,500 | 69,874,500 | 69,874,500 | 2024-07-02 | 2024-07-11 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 125,500 | 0.18 % | |
277 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15781012 | 50378806 | APBD | 56,928,700 | 56,928,700 | 56,928,570 | 56,928,570 | 56,928,570 | 56,928,570 | 0 | 56,800,000 | 2024-03-15 | 2024-03-26 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 130 | 0 % | |
278 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Perencanaaan Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah VII | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17762012 | 52940602 | APBDP | 100,000,000 | 99,999,900 | 99,850,050 | 99,850,000 | 99,628,000 | 0 | 0 | 0 | 2024-10-17 | 2024-11-04 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 149,950 | 0.15 % | |
279 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS,Ruang Bimbingan Konseling(BK),Toilet(Jamban)beserta sanitasinya SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17492012 | 51214220 | APBD | 26,970,000 | 26,970,000 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 2024-07-15 | 2024-07-19 | Roa Solution | 92.337.883.0-711.000 | 19,200 | 0.07 % | |
280 | 2024 | Biro Pengadaan Barang dan Jasa | Survey Kepuasan Masyarakat atas Layanan PBJ | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16138012 | 50870324 | APBD | 100,000,000 | 100,000,000 | 99,702,420 | 99,702,420 | 98,956,500 | 98,956,500 | 98,956,500 | 98,956,500 | 2024-05-21 | 2024-06-07 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 297,580 | 0.3 % | |
281 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAGAR LANJUTAN UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17398012 | 49716639 | APBD | 59,606,250 | 59,534,850 | 59,312,850 | 59,312,850 | 58,463,700 | 58,463,700 | 58,463,700 | 58,463,700 | 2024-06-28 | 2024-07-12 | 293,400 | 0.49 % | |||
282 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pembangunan Pagar SMAN 1 Gunung Bintang Awai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17829012 | 52897846 | APBDP | 55,000,000 | 55,000,000 | 54,800,000 | 54,800,000 | 54,800,000 | 54,800,000 | 54,800,000 | 54,800,000 | 2024-10-27 | 2024-11-05 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 200,000 | 0.36 % | |
283 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pemasangan Paving Halaman SMAN 1 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17836012 | 52899068 | APBDP | 30,000,000 | 30,000,000 | 29,720,250 | 29,720,250 | 29,720,250 | 29,720,250 | 29,720,250 | 29,720,250 | 2024-10-30 | 2024-11-06 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 279,750 | 0.93 % | |
284 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pagar dan Parkir SMAN 6 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16135012 | 51399706 | APBD | 60,000,000 | 60,000,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 2024-05-21 | 2024-05-31 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 60,000 | 0.1 % | |
285 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Rungan Barat (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15841012 | 50388240 | APBD | 41,184,700 | 41,184,700 | 41,000,000 | 41,000,000 | 41,000,000 | 41,000,000 | 0 | 41,000,000 | 2024-03-25 | 2024-04-05 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 184,700 | 0.45 % | |
286 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Tamiyang Layang (Rehabilitasi Rg. Lab. Kimia, Rehabilitasi Rg. Lab. Fisika, Pembangunan Toilet (Jamban) ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15941012 | 50384903 | APBD | 63,519,700 | 63,519,700 | 63,400,000 | 63,400,000 | 63,400,000 | 63,400,000 | 0 | 63,400,000 | 2024-04-01 | 2024-04-22 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 119,700 | 0.19 % | |
287 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Fisika SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16096012 | 51588045 | APBD | 32,570,000 | 32,570,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 2024-05-09 | 2024-05-18 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 47,000 | 0.14 % | |
288 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Ruang Guru SMAS Muhammadiyah Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17275012 | 51400358 | APBD | 40,000,000 | 40,000,000 | 39,860,100 | 39,860,100 | 39,860,100 | 39,860,100 | 39,860,100 | 39,860,100 | 2024-06-07 | 2024-06-19 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 139,900 | 0.35 % | |
289 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 2 Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17671012 | 52609993 | APBDP | 20,000,000 | 20,000,000 | 19,950,585 | 19,950,585 | 19,950,585 | 19,950,585 | 19,950,585 | 19,950,585 | 2024-09-26 | 2024-10-03 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 49,415 | 0.25 % | |
290 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan 1).Pembangunan Toilet Beserta Sanitasinya,Rehab Rumah Dinas SMKN 7 PALANGKA RAYA,2).Rehab Ruang Kelas SMKN 6 PALANGKA RAYA,3).Pembangunan Saluran Drainase SMKN 8 PALANGKA RAYA,4).Pembuatan Jembatan SMKN 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17807012 | 52612750 | APBDP | 73,509,000 | 73,509,000 | 73,398,000 | 73,398,000 | 73,398,000 | 0 | 0 | 0 | 2024-10-25 | 2024-10-31 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,000 | 0.15 % | |
291 | 2024 | Dinas Ketahanan Pangan | Jasa Konsultansi Pengawasan Rehab Gedung/Kantor Pasca Kebakaran | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17888012 | 52895850 | APBD | 15,000,000 | 15,000,000 | 14,153,001 | 14,153,000 | 14,150,000 | 14,150,000 | 14,150,000 | 14,150,000 | 2024-11-08 | 2024-12-06 | Roa Solution | 92.337.883.0-711.000 | 846,999 | 5.65 % | |
292 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17445012 | 51358571 | APBD | 23,220,000 | 23,220,000 | 23,167,275 | 23,167,275 | 23,167,275 | 23,167,275 | 23,167,275 | 23,167,275 | 2024-07-06 | 2024-07-09 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 52,725 | 0.23 % | |
293 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMKS PGRI SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16076012 | 50547249 | APBD | 20,925,000 | 20,925,000 | 20,869,500 | 20,869,500 | 20,869,500 | 20,869,500 | 20,869,500 | 20,869,500 | 2024-05-06 | 2024-05-18 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 55,500 | 0.27 % | |
294 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | ,Belanja Jasa Konsultansi Perencanaan Renovasi Aula Kantor DPMPTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16010012 | 51311646 | APBD | 120,213,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,844,500 | 99,844,500 | 0 | 99,844,500 | 2024-05-16 | 2024-05-22 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 20,313,000 | 16.9 % | |
295 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15925012 | 50548805 | APBD | 54,488,000 | 54,488,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 2024-04-01 | 2024-04-19 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 111,000 | 0.2 % | |
296 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Rehabilitasi Ruang Kelas (1 Ruang) SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17476012 | 51171057 | APBD | 9,570,000 | 9,570,000 | 9,520,050 | 9,520,050 | 9,520,050 | 9,520,050 | 9,520,050 | 9,520,050 | 2024-07-15 | 2024-07-19 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 49,950 | 0.52 % | |
297 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Rehabilitasi 4 Ruang Kelas SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17378012 | 51399383 | APBD | 42,000,000 | 42,000,000 | 41,930,000 | 41,930,000 | 41,930,000 | 41,930,000 | 41,930,000 | 41,930,000 | 2024-07-02 | 2024-07-11 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 70,000 | 0.17 % | |
298 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Lanjutan Pemasangan Plafon dan Keramik SMAN 3 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15826012 | 50724513 | APBD | 56,000,000 | 56,000,000 | 55,750,773 | 55,750,773 | 55,750,773 | 55,750,773 | 0 | 55,750,773 | 2024-03-21 | 2024-04-08 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 249,227 | 0.45 % | |
299 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Rehabilitasi 4 Ruang Kelas SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15896012 | 50766553 | APBD | 49,500,000 | 49,500,000 | 49,439,000 | 49,439,000 | 49,439,000 | 49,439,000 | 0 | 49,439,000 | 2024-03-28 | 2024-04-08 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 61,000 | 0.12 % | |
300 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Fisika, Pembangunan Rg BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15779012 | 50378369 | APBD | 56,122,700 | 56,122,700 | 56,122,700 | 56,122,700 | 56,122,700 | 56,122,700 | 0 | 56,122,700 | 2024-03-15 | 2024-03-26 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 0 | 0 % | |
301 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMA Garing Tarantang (Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17253012 | 51239232 | APBD | 43,873,000 | 43,837,000 | 43,369,365 | 43,369,365 | 43,369,365 | 43,369,365 | 0 | 43,369,365 | 2024-06-03 | 2024-06-12 | 503,635 | 1.15 % | |||
302 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Perencanaan Dapur Umum, Bengkel, Rumah Panen | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16035012 | 51493303 | APBD | 68,900,000 | 68,900,000 | 68,800,000 | 68,800,000 | 68,750,000 | 68,750,000 | 100 | 68,750,000 | 2024-04-29 | 2024-05-17 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 100,000 | 0.15 % | |
303 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Kelas Baru (3 Ruang)SMKN 1 Teluk Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15997012 | 50968459 | APBD | 65,000,000 | 64,879,500 | 64,768,500 | 64,768,500 | 64,768,500 | 64,768,500 | 64,768,500 | 64,768,500 | 2024-05-06 | 2024-05-18 | 231,500 | 0.36 % | |||
304 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS SMK NEGERI 1 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15914012 | 50539559 | APBD | 7,679,000 | 7,679,000 | 7,623,500 | 7,623,500 | 7,623,500 | 7,623,500 | 7,623,500 | 7,623,500 | 2024-04-01 | 2024-04-19 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 55,500 | 0.72 % | |
305 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor dan Bangunan Lainnya -Drainase | Pengadaan Langsung | Pekerjaan Konstruksi | 17907012 | 53345283 | APBDP | 200,000,000 | 200,000,000 | 199,321,000 | 199,321,000 | 198,500,190 | 0 | 0 | 0 | 2024-11-08 | 2024-11-15 | CV CIPTA KREASI MEMBANGUN | 86.329.963.2-711.000 | 679,000 | 0.34 % | |
306 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Kantor SMAN 1 Sebangau Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17825012 | 52898406 | APBDP | 20,000,000 | 20,000,000 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 2024-10-28 | 2024-11-05 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 77,700 | 0.39 % | |
307 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Pengawasan Pemeliharaan Penyekatan dan Pemasangan Interior Gedung IBS Lt. 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17585012 | 52174190 | APBD | 3,000,000 | 3,000,000 | 2,997,000 | 2,997,000 | 2,269,950 | 2,269,950 | 2,269,950 | 2,269,950 | 2024-08-16 | 2024-08-26 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 3,000 | 0.1 % | |
308 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Fisika,Laboratorium Biologi SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17548012 | 51198840 | APBD | 55,230,000 | 55,230,000 | 55,176,720 | 55,176,720 | 55,176,720 | 55,176,720 | 55,176,720 | 55,176,720 | 2024-07-25 | 2024-08-02 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 53,280 | 0.1 % | |
309 | 2024 | Dinas Pemberdayaan Perempuan,Perlindungan Anak, Pengendalian Penduduk dan Keluarga Berencana | Perencanaan pembangunan pagar samping kantor, pos jaga dan tempat parkir kendaraan roda 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15958012 | 51139932 | APBD | 16,460,000 | 16,460,000 | 16,404,500 | 16,400,000 | 16,300,360 | 16,300,360 | 16,300,360 | 16,300,360 | 2024-04-04 | 2024-04-29 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 55,500 | 0.34 % | 3 |
310 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Kotawaringin Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15981012 | 49437734 | APBD | 93,682,964 | 93,682,000 | 93,240,000 | 93,240,000 | 93,240,000 | 93,240,000 | 0 | 93,240,000 | 2024-04-20 | 2024-05-10 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 442,964 | 0.47 % | 3 |
311 | 2024 | Dinas Pemberdayaan Perempuan,Perlindungan Anak, Pengendalian Penduduk dan Keluarga Berencana | Rehabilitasi ruang pelayanan UPT PPA Prov. Kalteng | Pengadaan Langsung | Jasa Lainnya | 16129012 | 51677930 | APBD | 78,323,720 | 78,323,720 | 78,229,692 | 78,229,692 | 77,829,692 | 77,829,692 | 77,829,692 | 77,829,692 | 2024-05-21 | 2024-06-10 | CV. USAHA BANGUN SARANA | 02.978.028.5-711.000 | 94,028 | 0.12 % | 3 |
312 | 2024 | Dinas Pemberdayaan Perempuan,Perlindungan Anak, Pengendalian Penduduk dan Keluarga Berencana | Pembangunan pagar samping kantor, pos jaga dan tempat parkir kendaraan roda 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 16177012 | 51140621 | APBD | 200,000,000 | 200,000,000 | 199,722,500 | 199,722,500 | 199,000,450 | 199,000,450 | 199,000,450 | 199,000,450 | 2024-05-21 | 2024-06-10 | 277,500 | 0.14 % | 3 | ||
313 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Kantin, Ruang Kelas Baru, Ruang UKS, Selasar Penghubung SLBN 2 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17320012 | 51899924 | APBD | 91,093,550 | 91,093,550 | 91,092,150 | 91,092,150 | 91,092,150 | 91,092,150 | 0 | 91,092,150 | 2024-07-01 | 2024-07-10 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 1,400 | 0 % | 3 |
314 | 2024 | Dinas Sosial | Pengawasan Pembangunan Pembatas Antar Bangsal Klien UPT PSBL Pambelum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17462012 | 49443403 | APBD | 49,820,000 | 49,820,000 | 49,266,795 | 49,266,795 | 48,581,925 | 48,581,925 | 48,581,925 | 48,581,925 | 2024-07-10 | 2024-07-19 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 553,205 | 1.11 % | 3 |
315 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17730012 | 52869904 | APBDP | 98,958,000 | 98,958,000 | 98,790,000 | 98,790,000 | 98,790,000 | 98,790,000 | 0 | 98,790,000 | 2024-10-12 | 2024-11-01 | CV.ADIKON CITRABANGUN KONSULTAN | 02.618.694.0-711.000 | 168,000 | 0.17 % | 3 |
316 | 2024 | Badan Pendapatan Daerah | Pengawasan Pembangunan Rumah Dinas UPTPPD Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17844012 | 53193784 | APBDP | 34,500,000 | 34,382,250 | 34,132,500 | 34,132,500 | 33,466,500 | 0 | 0 | 0 | 2024-10-30 | 2024-11-14 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 367,500 | 1.07 % | |
317 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan Gedung/Rumah Pelindung Vertical Dryer Kab. Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17484012 | 49360183 | APBD | 105,000,000 | 100,000,000 | 99,877,106 | 99,877,106 | 99,200,700 | 99,200,700 | 99,200,700 | 99,200,700 | 2024-07-11 | 2024-07-19 | 5,122,894 | 4.88 % | |||
318 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Ruang Kelas Baru SLBN 3 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17338012 | 51911575 | APBD | 98,636,832 | 98,124,000 | 97,569,000 | 97,569,000 | 97,569,000 | 97,569,000 | 0 | 97,569,000 | 2024-07-01 | 2024-07-05 | 1,067,832 | 1.08 % | |||
319 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 4 Palangka Raya (Pembangunan Toilet (jamban) beserta sanitasinya, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17260012 | 51240126 | APBD | 39,257,500 | 39,257,500 | 38,683,500 | 38,683,500 | 38,683,500 | 38,683,500 | 0 | 38,683,500 | 2024-06-04 | 2024-06-14 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 574,000 | 1.46 % | |
320 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Lanjutan Pemasangan Plafon dan Keramik SMAN 3 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16192012 | 51398083 | APBD | 42,000,000 | 42,000,000 | 41,547,300 | 41,547,300 | 41,547,300 | 41,547,300 | 41,547,300 | 41,547,300 | 2024-05-28 | 2024-06-05 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 452,700 | 1.08 % | |
321 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17647012 | 49720767 | APBD | 7,942,500 | 7,941,499 | 7,925,400 | 7,925,400 | 7,481,400 | 7,481,400 | 7,481,400 | 7,481,400 | 2024-09-13 | 2024-09-26 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 17,100 | 0.22 % | |
322 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN GUDANG KANTOR BAPENDA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15728012 | 49258772 | APBD | 67,500,000 | 67,293,750 | 67,071,750 | 67,071,750 | 66,361,350 | 66,361,350 | 66,361,350 | 66,361,350 | 2024-03-15 | 2024-03-25 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 428,250 | 0.63 % | |
323 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Bintang Awai (Pembangunan Rg. Kelas Baru (RKB) Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15819012 | 50377305 | APBD | 55,453,700 | 55,453,700 | 55,435,558 | 55,435,558 | 55,435,558 | 55,435,558 | 0 | 55,435,558 | 2024-03-21 | 2024-04-08 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 18,142 | 0.03 % | |
324 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan/Rehabilitasi Ruang Laboratorium Benih, Ruang Pengawasan Pemasaran/Peredaran Benih, Ruang Penilaian Varietas, Ruang Penyimpanan Sampel Benih, Ruang Sertifikasi Benih | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17319012 | 49393247 | APBD | 100,000,000 | 99,920,000 | 99,794,273 | 99,794,273 | 99,394,950 | 99,394,950 | 99,394,950 | 99,394,950 | 2024-06-26 | 2024-07-03 | 205,728 | 0.21 % | |||
325 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 1 Gunung Timang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15707012 | 49713438 | APBD | 15,000,000 | 15,000,000 | 14,950,000 | 14,950,000 | 14,950,000 | 0 | 0 | 0 | 2024-02-23 | 2024-03-11 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 50,000 | 0.33 % | |
326 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Gunung Bintang Awai (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17283012 | 51154058 | APBD | 41,574,800 | 41,574,800 | 38,472,600 | 38,472,600 | 38,472,600 | 38,472,600 | 0 | 38,472,600 | 2024-06-07 | 2024-06-19 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 3,102,200 | 7.46 % | |
327 | 2024 | Badan Pendapatan Daerah | Pengawasan Pembangunan Selasar Penyambung Antar Bangunan Kantor UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17744012 | 52649203 | APBD | 15,000,000 | 14,985,000 | 14,974,001 | 14,974,001 | 14,518,800 | 0 | 0 | 0 | 2024-10-16 | 2024-10-29 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 25,999 | 0.17 % | |
328 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Apartemen Ayam Petelur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17593012 | 52123179 | APBD | 99,999,427 | 99,900,000 | 99,589,200 | 99,589,200 | 99,456,000 | 99,456,000 | 99,456,000 | 99,456,000 | 2024-08-13 | 2024-08-20 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 410,227 | 0.41 % | |
329 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Rehabilitasi Rumah Dinas Guru SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17377012 | 51399443 | APBD | 30,000,000 | 30,000,000 | 29,942,000 | 29,942,000 | 29,942,000 | 29,942,000 | 29,942,000 | 29,942,000 | 2024-06-26 | 2024-07-05 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 58,000 | 0.19 % | |
330 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer,Bahasa SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15928012 | 50545329 | APBD | 55,158,000 | 55,158,000 | 55,102,500 | 55,102,500 | 55,102,500 | 55,102,500 | 55,102,500 | 55,102,500 | 2024-04-01 | 2024-04-19 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 55,500 | 0.1 % | |
331 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17673012 | 52610463 | APBDP | 30,000,000 | 30,000,000 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 2024-09-26 | 2024-10-03 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 49,980 | 0.17 % | |
332 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Asrama | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17791012 | 52993020 | APBDP | 21,780,000 | 21,779,310 | 21,467,400 | 21,467,400 | 21,467,400 | 0 | 0 | 0 | 2024-10-18 | 2024-10-22 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 312,600 | 1.44 % | |
333 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Fisika,Kimia,Biologi SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16073012 | 50546630 | APBD | 94,005,000 | 94,005,000 | 93,838,500 | 93,838,500 | 93,838,500 | 93,838,500 | 93,838,500 | 93,838,500 | 2024-05-06 | 2024-05-18 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 166,500 | 0.18 % | |
334 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 4 Palangka Raya (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. Tata Usaha) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15798012 | 50408911 | APBD | 56,921,800 | 56,921,800 | 56,110,500 | 56,110,500 | 56,110,500 | 56,110,500 | 0 | 56,110,500 | 2024-03-15 | 2024-03-26 | 811,300 | 1.43 % | |||
335 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN TOILET WAJIB PAJAK UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15764012 | 49250209 | APBD | 17,204,500 | 17,105,100 | 16,994,100 | 16,994,100 | 16,572,300 | 16,572,300 | 16,572,300 | 16,572,300 | 2024-03-15 | 2024-03-25 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 210,400 | 1.22 % | |
336 | 2024 | Biro Pengadaan Barang dan Jasa | Pembuatan Aplikasi Pengukuran Kinerja (PMM) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15736012 | 50300490 | APBD | 52,500,000 | 52,247,700 | 52,247,700 | 52,247,700 | 52,247,700 | 52,247,700 | 100 | 52,247,700 | 2024-04-02 | 2024-04-30 | cv anugerah hebat jaya | 39.143.156.6-711.000 | 252,300 | 0.48 % | |
337 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer SMK NEGERI 1 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17408012 | 51197400 | APBD | 18,440,000 | 18,440,000 | 18,386,720 | 18,386,720 | 18,386,720 | 18,386,720 | 18,386,720 | 18,386,720 | 2024-06-27 | 2024-07-02 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 53,280 | 0.29 % | |
338 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI RUANGAN LANTAI 1 DAN RUANGAN SEKRETARIAT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15742012 | 49833275 | APBD | 88,424,000 | 88,402,758 | 88,236,259 | 88,236,259 | 87,470,359 | 87,470,359 | 87,470,359 | 87,470,359 | 2024-03-11 | 2024-03-20 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 187,741 | 0.21 % | |
339 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Jasa Konsultansi Pengawasan - Pengawasan Rehab Ruang Rapat Direksi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17704012 | 52174254 | APBD | 6,000,000 | 6,000,000 | 5,900,000 | 5,900,000 | 5,794,200 | 0 | 0 | 0 | 2024-10-18 | 2024-10-28 | 100,000 | 1.67 % | |||
340 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Rehab Aula SMAN 1 Kurun (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16178012 | 51458384 | APBD | 30,000,000 | 30,000,000 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 2024-05-22 | 2024-05-31 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 88,800 | 0.3 % | |
341 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Kolam Renang Isen Mulang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15682012 | 46855724 | APBD | 35,000,000 | 34,956,000 | 34,810,821 | 34,810,821 | 34,810,821 | 34,810,821 | 34,810,821 | 34,810,821 | 2024-01-11 | 2024-01-29 | CV. KRUF STUDIO ENGINEERING | 81.075.394.7-711.000 | 189,179 | 0.54 % | |
342 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Lab IPA SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15957012 | 50727320 | APBD | 45,500,000 | 45,500,000 | 45,432,000 | 45,432,000 | 45,432,000 | 45,432,000 | 0 | 45,432,000 | 2024-04-19 | 2024-04-29 | 68,000 | 0.15 % | |||
343 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15987012 | 51422947 | APBD | 70,678,000 | 70,678,000 | 69,796,800 | 69,796,800 | 69,796,800 | 69,796,800 | 68,796,800 | 69,796,800 | 2024-04-19 | 2024-05-13 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 881,200 | 1.25 % | |
344 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Implementasi Dokumen SSK 1 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15710012 | 47521033 | APBD | 80,000,000 | 80,000,000 | 79,997,700 | 79,997,700 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | 2024-03-15 | hanyang tiup | 79.562.938.5-711.000 | 2,300 | 0 % | |
345 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan Halaman Sekolah SMKN 2 Kasongan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16042012 | 51010394 | APBD | 34,500,000 | 34,500,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 2024-05-06 | 2024-05-18 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 111,000 | 0.32 % | |
346 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17232012 | 51737627 | APBD | 37,940,000 | 37,940,000 | 37,718,000 | 37,718,000 | 37,718,000 | 37,718,000 | 0 | 37,718,000 | 2024-05-30 | 2024-06-10 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 222,000 | 0.59 % | |
347 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya -Rehab Kantor Ruang Penyusunan Program | Pengadaan Langsung | Pekerjaan Konstruksi | 17901012 | 53355495 | APBDP | 199,000,000 | 199,000,000 | 198,861,287 | 198,861,287 | 197,802,000 | 0 | 0 | 0 | 2024-11-08 | 2024-11-15 | CV. Bersama | 86.206.156.1-711.000 | 138,713 | 0.07 % | |
348 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17480012 | 51851882 | APBD | 38,460,000 | 38,460,000 | 38,016,000 | 38,016,000 | 38,016,000 | 38,016,000 | 38,016,000 | 38,016,000 | 2024-07-15 | 2024-07-19 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 444,000 | 1.15 % | |
349 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Renovasi Screen House di UPT BPPBTPH Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17881012 | 52434073 | APBDP | 20,140,000 | 20,095,000 | 19,955,859 | 19,955,859 | 19,787,859 | 19,787,859 | 19,787,859 | 19,787,859 | 2024-11-06 | 2024-11-12 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 184,141 | 0.91 % | |
350 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Instalasi Air Bersih (Grenteng) Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16111012 | 50581302 | APBD | 29,881,500 | 29,881,500 | 29,770,200 | 29,770,200 | 29,625,900 | 29,625,900 | 29,625,900 | 29,625,900 | 2024-05-15 | 2024-05-21 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 111,300 | 0.37 % | |
351 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Modal Kursi Tunggu Pasien dan Lemari Besi Arsip Cabinet | Pengadaan Langsung | Pengadaan Barang | 15992012 | 49708318 | APBD | 141,046,830 | 140,000,000 | 111,000,000 | 111,000,000 | 89,500,000 | 89,500,000 | 89,500,000 | 89,500,000 | 2024-04-24 | 2024-05-06 | CV.KARYA DAJABA PUTRA | 02.978.026.9-711.000 | 30,046,830 | 21.3 % | |
352 | 2024 | Dinas Perhubungan | Rehabilitasi Dermaga Jabiren di Kabupaten Pulang Pisau | Pengadaan Langsung | Pekerjaan Konstruksi | 16124012 | 51275788 | APBD | 165,803,875 | 165,800,000 | 165,700,000 | 165,700,000 | 165,533,500 | 165,533,500 | 0 | 165,533,500 | 2024-05-17 | 2024-05-31 | CV. DALANJEMBAR KARYAMARGA | 96.735.790.6-711.000 | 103,875 | 0.06 % | |
353 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17534012 | 51852198 | APBD | 83,750,000 | 83,750,000 | 83,581,300 | 83,581,300 | 83,581,300 | 83,581,300 | 83,581,300 | 83,581,300 | 2024-07-25 | 2024-08-02 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 168,700 | 0.2 % | |
354 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pembangunan RSUD Kelas B di Wilayah Barat Provinsi Kalimantan Tengah (Lanjutan)(Tahap 3) | Penunjukan Langsung | Pekerjaan Konstruksi | 15999012 | 51116873 | APBD | 197,520,000,000 | 195,009,800,000 | 194,970,797,184 | 194,970,797,000 | 194,886,500,000 | 194,886,500,000 | 0 | 0 | 2024-04-26 | 2024-05-30 | 2,549,202,816 | 1.29 % | |||
355 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pembangunan RSUD Kelas B di Wilayah Barat Provinsi Kalimantan Tengah (Lanjutan)(Tahap 3) | Penunjukan Langsung | Pekerjaan Konstruksi | 15999012 | 51116873 | APBD | 197,520,000,000 | 195,009,800,000 | 194,970,797,184 | 194,970,797,000 | 194,886,500,000 | 194,886,500,000 | 155,909,200,000 | 194,886,500,000 | 2024-04-26 | 2024-05-30 | 2,549,202,816 | 1.29 % | |||
356 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Perencanaan Pembangunan Jaringan Instalasi Air Bersih | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16002012 | 51390485 | APBD | 50,000,000 | 49,900,000 | 49,206,300 | 49,206,300 | 44,599,800 | 44,599,800 | 44,599,800 | 44,599,800 | 2024-05-03 | 2024-05-16 | CV. Bukit Indah Konsultan | 12.843.721.7-711.000 | 793,700 | 1.59 % | |
357 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Penataan Halaman dan Paving SMAN 1 Kapuas Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15960012 | 50729105 | APBD | 100,000,000 | 99,570,000 | 99,300,000 | 99,300,000 | 99,300,000 | 99,300,000 | 0 | 99,300,000 | 2024-04-05 | 2024-04-24 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 700,000 | 0.7 % | |
358 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15753012 | 50372749 | APBD | 61,980,700 | 61,980,700 | 61,383,000 | 61,383,000 | 61,383,000 | 61,383,000 | 0 | 61,383,000 | 2024-03-13 | 2024-03-22 | 597,700 | 0.96 % | |||
359 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Lab. Komputer, Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15788012 | 50392659 | APBD | 54,735,800 | 54,735,800 | 54,700,800 | 54,700,800 | 54,700,800 | 54,700,800 | 0 | 54,700,800 | 2024-03-15 | 2024-03-26 | CV. PENDANG JAYA RAYA ENGINEERING | 01.662.432.2-711.000 | 35,000 | 0.06 % | |
360 | 2024 | Badan Pendapatan Daerah | Perencanaan Semenisasi Halaman Kantor UPTPPD Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17649012 | 52495135 | APBDP | 34,246,500 | 25,974,000 | 25,863,000 | 25,863,000 | 25,130,400 | 25,130,400 | 25,130,400 | 25,130,400 | 2024-09-13 | 2024-09-26 | 8,383,500 | 24.48 % | |||
361 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 6 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17289012 | 51240545 | APBD | 30,927,300 | 30,927,300 | 30,902,400 | 30,902,400 | 30,902,400 | 30,902,400 | 30,902,400 | 30,902,400 | 2024-06-10 | 2024-06-21 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 24,900 | 0.08 % | |
362 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Sarana dan Prasarana UPT. KPHP Barito Hulu dan UPT. KPHP Barito Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17720012 | 52840856 | APBDP | 65,861,000 | 65,860,900 | 65,590,899 | 65,590,899 | 64,838,630 | 0 | 0 | 0 | 2024-10-10 | 2024-10-18 | 270,101 | 0.41 % | |||
363 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Pembinaan dan Evaluasi Kinerja Infrastruktur Air Minum di Provinsi Kalimantan Tengah 2 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15713012 | 47521029 | APBD | 80,000,000 | 80,000,000 | 79,986,600 | 79,986,600 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | 2024-03-15 | Erinstia Gustanty | 90.746.165.1-711.000 | 13,400 | 0.02 % | |
364 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17350012 | 51238222 | APBD | 33,757,000 | 33,757,000 | 33,300,000 | 33,300,000 | 33,300,000 | 33,300,000 | 33,300,000 | 33,300,000 | 2024-06-26 | 2024-07-05 | 457,000 | 1.35 % | |||
365 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Rehabilitasi Pagar, WC dan Penataan Halaman di Graha Tani Serta Serana Pendukung Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17619012 | 52143328 | APBD | 8,000,000 | 8,000,000 | 7,925,400 | 7,925,400 | 7,636,800 | 7,636,800 | 7,636,800 | 7,636,800 | 2024-08-29 | 2024-09-05 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 74,600 | 0.93 % | |
366 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15765012 | 49208240 | APBD | 42,900,000 | 42,818,250 | 42,390,900 | 42,390,900 | 41,785,950 | 41,785,950 | 41,785,950 | 41,785,950 | 2024-03-28 | 2024-04-12 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 509,100 | 1.19 % | |
367 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Bimbingan Konseling(BK) SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17528012 | 51358678 | APBD | 12,080,000 | 12,080,000 | 12,030,000 | 12,030,000 | 12,030,000 | 12,030,000 | 12,030,000 | 12,030,000 | 2024-07-25 | 2024-08-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 50,000 | 0.41 % | |
368 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan Halaman Sekolah SMKN 1 Kapuas Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16162012 | 51427255 | APBD | 34,500,000 | 34,500,000 | 34,443,000 | 34,443,000 | 34,443,000 | 34,443,000 | 34,443,000 | 34,443,000 | 2024-05-22 | 2024-06-02 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 57,000 | 0.17 % | |
369 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Kandang Ayam Kalper Pada Kegiatan Pengembangan Ayam Kalimantan Super (Kalper) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17576012 | 52123240 | APBD | 19,856,250 | 19,856,250 | 19,602,600 | 19,602,600 | 19,175,250 | 19,175,250 | 19,175,250 | 19,175,250 | 2024-08-06 | 2024-08-14 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 253,650 | 1.28 % | |
370 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Bangunan Gedung - Rehab Ruang Rapat Direksi | Pengadaan Langsung | Pekerjaan Konstruksi | 17703012 | 52174260 | APBD | 100,000,000 | 100,000,000 | 99,950,000 | 99,950,000 | 98,500,000 | 0 | 0 | 0 | 2024-10-18 | 2024-10-28 | 50,000 | 0.05 % | |||
371 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Pemeliharaan berupa Pengecatan Bangunan Gedung Admin RSUD dr. Doris Sylvanus | Pengadaan Langsung | Pekerjaan Konstruksi | 17488012 | 51985664 | APBD | 200,000,000 | 199,966,700 | 199,578,250 | 199,578,250 | 199,284,000 | 199,284,000 | 199,284,000 | 199,284,000 | 2024-07-25 | 2024-08-05 | CV. GATRA MEGAH | 90.383.566.8-711.000 | 421,750 | 0.21 % | |
372 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Perencanaan Pabrik es | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16036012 | 51493310 | APBD | 139,920,000 | 99,992,600 | 99,678,000 | 99,678,000 | 99,600,000 | 99,600,000 | 100 | 99,600,000 | 2024-04-29 | 2024-05-17 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 40,242,000 | 28.76 % | |
373 | 2024 | Dinas Perhubungan | Pengawasan Penanganan Lokasi Rawan Kecelakaan (LRK) Ruas Jalan Provinsi Kalimantan Tengah di Kota Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17621012 | 51282246 | APBD | 35,000,000 | 35,000,000 | 34,984,980 | 34,984,980 | 34,984,980 | 34,984,980 | 34,984,980 | 34,984,980 | 2024-08-29 | 2024-09-06 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 15,020 | 0.04 % | |
374 | 2024 | Dinas Kehutanan | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15735012 | 49887470 | APBD | 45,275,000 | 45,275,000 | 45,177,000 | 45,177,000 | 44,899,500 | 44,899,500 | 44,899,500 | 44,899,500 | 2024-02-28 | 2024-03-11 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 98,000 | 0.22 % | |
375 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Jalan Produksi/Jalan Usaha Tani di IPB Basarang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17773012 | 52970977 | APBDP | 8,026,240 | 8,026,240 | 7,992,000 | 7,992,000 | 7,925,400 | 7,925,400 | 7,925,400 | 7,925,400 | 2024-10-17 | 2024-10-23 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 34,240 | 0.43 % | |
376 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Mushola Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17754012 | 52365991 | APBDP | 30,000,000 | 30,000,000 | 29,879,158 | 29,879,158 | 29,870,100 | 0 | 0 | 0 | 2024-10-23 | 2024-10-30 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 120,842 | 0.4 % | |
377 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor dan Bangunan Lainnya -Parkiran | Pengadaan Langsung | Pekerjaan Konstruksi | 17903012 | 53355960 | APBDP | 79,550,000 | 79,550,000 | 79,289,000 | 79,289,000 | 79,198,500 | 0 | 0 | 0 | 2024-11-08 | 2024-11-15 | CV CIPTA KREASI MEMBANGUN | 86.329.963.2-711.000 | 261,000 | 0.33 % | |
378 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Toilet (Jamban)6 Ruang beserta sanitasinya SMK NEGERI 2 PALANGKARAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17414012 | 51198661 | APBD | 24,800,000 | 24,800,000 | 24,746,720 | 24,746,720 | 24,746,720 | 24,746,720 | 24,746,720 | 24,746,720 | 2024-06-27 | 2024-07-02 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 53,280 | 0.21 % | |
379 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16085012 | 49488011 | APBD | 7,049,000 | 7,049,000 | 7,015,200 | 7,015,200 | 7,015,200 | 7,015,200 | 0 | 7,015,200 | 2024-05-07 | 2024-05-13 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 33,800 | 0.48 % | |
380 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Pembangunan Sarana dan Prasarana pada UPT. KPHP Mentaya Tengah Seruyan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17639012 | 52224975 | APBDP | 34,664,000 | 34,663,900 | 34,609,800 | 34,609,800 | 31,185,450 | 0 | 0 | 0 | 2024-09-10 | 2024-10-01 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 54,200 | 0.16 % | |
381 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 1 Sanaman Mantikei | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17669012 | 52610279 | APBDP | 20,000,000 | 20,000,000 | 19,957,800 | 19,957,800 | 19,957,800 | 19,957,800 | 19,957,800 | 19,957,800 | 2024-09-26 | 2024-10-03 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 42,200 | 0.21 % | |
382 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pekerjaan Peningkatan Jalan dan Drainase UPT BBPHMT Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17758012 | 52365959 | APBDP | 100,000,000 | 100,000,000 | 99,789,000 | 99,789,000 | 99,789,000 | 0 | 0 | 0 | 2024-10-21 | 2024-10-31 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 211,000 | 0.21 % | |
383 | 2024 | Dinas Kelautan dan Perikanan | 3.25.03.1.01.06. 5.2.03.01.01.0001 Redesain DED Pembangunan PP Kuala Jelai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15679012 | 46761398 | APBD | 100,000,000 | 96,043,960 | 94,611,960 | 94,611,960 | 94,000,000 | 94,000,000 | 100 | 94,000,000 | 2024-01-09 | 2024-02-09 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 5,388,040 | 5.39 % | |
384 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Tamiyang Layang (Rehabilitasi Rg. Kelas, Pembangunan Rg. BK ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15833012 | 50384620 | APBD | 86,224,700 | 86,224,700 | 86,199,048 | 86,199,048 | 86,199,048 | 86,199,048 | 0 | 86,199,048 | 2024-03-21 | 2024-04-08 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 25,652 | 0.03 % | |
385 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Fisika,Laboratorium Kimia,Laboratorium Biologi SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17527012 | 51358755 | APBD | 95,290,000 | 95,290,000 | 95,238,000 | 95,238,000 | 95,238,000 | 95,238,000 | 95,238,000 | 95,238,000 | 2024-07-25 | 2024-08-02 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 52,000 | 0.05 % | |
386 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehabilitasi Ruang Kelas (16 Ruang) dengan tingkat kerusakan minimal sedang SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15872012 | 50538093 | APBD | 100,000,000 | 99,900,000 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 2024-03-25 | 2024-04-05 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 200,000 | 0.2 % | |
387 | 2024 | Dinas Energi dan Sumber Daya Mineral | Pemeliharaan/Rehabilitasi Sarana dan Prasarana Gedung Kantor atau Bangunan Lainnya -Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16032012 | 48888460 | APBD | 100,700,000 | 95,000,000 | 94,550,000 | 94,550,000 | 94,078,050 | 94,078,050 | 94,078,050 | 94,078,050 | 2024-04-29 | 2024-05-08 | 6,150,000 | 6.11 % | |||
388 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet (Jamban) SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15926012 | 50394656 | APBD | 4,078,350 | 4,078,350 | 4,050,600 | 4,050,600 | 4,050,600 | 4,050,600 | 4,050,600 | 4,050,600 | 2024-04-01 | 2024-04-19 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 27,750 | 0.68 % | |
389 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Rehab/Rehabilitasi Bangunan Laboratorium UPT BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17422012 | 51460051 | APBD | 45,275,000 | 45,275,000 | 45,200,000 | 45,200,000 | 45,189,765 | 45,189,765 | 45,189,765 | 45,189,765 | 2024-06-29 | 2024-07-08 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 75,000 | 0.17 % | |
390 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Koridor Penghubung bangunan SMAN 2 Kasongan (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16136012 | 51398736 | APBD | 29,900,000 | 29,900,000 | 29,881,200 | 29,881,200 | 29,881,200 | 29,881,200 | 29,500,000 | 29,881,200 | 2024-05-22 | 2024-05-31 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 18,800 | 0.06 % | |
391 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana dan Prasarana UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16202012 | 51716219 | APBD;APBDP | 58,110,000 | 58,109,832 | 57,804,360 | 57,804,360 | 57,138,360 | 57,138,360 | 57,138,360 | 57,138,360 | 2024-06-04 | 2024-06-14 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 305,640 | 0.53 % | |
392 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya UPT Taman Budaya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17788012 | 52473132 | APBDP | 97,818,000 | 97,500,180 | 97,347,000 | 97,347,000 | 97,014,000 | 0 | 0 | 0 | 2024-10-21 | 2024-11-25 | GEO DINAMIKA UTAMA | 01.576.437.6-711.000 | 471,000 | 0.48 % | |
393 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Pagar UPT.KPHP Katingan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17607012 | 52224947 | APBDP | 73,962,000 | 73,961,900 | 73,818,330 | 73,818,330 | 71,819,664 | 71,819,664 | 71,819,664 | 71,819,664 | 2024-08-26 | 2024-09-19 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 143,670 | 0.19 % | |
394 | 2024 | KPHP MURUNG RAYA | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Kandang Sapi - Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17581012 | 49970562 | APBD | 28,620,000 | 28,544,400 | 28,489,000 | 28,489,000 | 28,194,000 | 28,194,000 | 28,194,000 | 28,194,000 | 2024-08-07 | 2024-08-16 | 131,000 | 0.46 % | |||
395 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Perencanaan Pagar Kantor UPT Lab. Bahan Konstruksi Palangka Raya dan Pagar Rujab DPUPR di Jl. Muhammad Wongso Kab. Kobar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15759012 | 49800590 | APBD | 65,048,000 | 65,048,000 | 64,500,000 | 64,500,000 | 64,500,000 | 0 | 0 | 0 | 2024-03-15 | 2024-04-08 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 548,000 | 0.84 % | |
396 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15763012 | 49205578 | APBD | 13,582,500 | 13,505,000 | 13,331,100 | 13,331,100 | 13,064,700 | 13,064,700 | 13,064,700 | 13,064,700 | 2024-03-22 | 2024-03-29 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 251,400 | 1.85 % | |
397 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Pembangunan Musola) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17257012 | 51467121 | APBD | 125,000,000 | 15,000,000 | 14,874,000 | 14,874,000 | 14,874,000 | 14,874,000 | 0 | 14,874,000 | 2024-06-11 | 2024-06-21 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 110,126,000 | 88.1 % | |
398 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Kuala Kurun (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16183012 | 51238721 | APBD | 38,197,800 | 38,197,800 | 38,197,000 | 38,197,000 | 38,197,000 | 38,197,000 | 0 | 38,197,000 | 2024-05-22 | 2024-05-31 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 800 | 0 % | |
399 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pagar SMAN 1 Dusun Tengah Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16014012 | 51398178 | APBD | 75,000,000 | 75,000,000 | 75,000,000 | 75,000,000 | 75,000,000 | 75,000,000 | 75,000,000 | 75,000,000 | 2024-04-25 | 2024-05-02 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 0 | 0 % | |
400 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN GEDUNG ARSIP UPTPPD PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17574012 | 49697035 | APBD | 49,578,312 | 49,428,300 | 49,417,200 | 49,417,200 | 49,189,650 | 49,189,650 | 49,189,650 | 49,189,650 | 2024-08-05 | 2024-08-20 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 161,112 | 0.32 % | |
401 | 2024 | Inspektorat | Belanja Paket Kegiatan Rapat Koordinasi Pelaksanaan Perluasan Percontohan Desa Antikorupsi 2024 | Pengadaan Langsung | Jasa Lainnya | 17741012 | 52874358 | APBDP | 159,944,000 | 157,252,000 | 156,390,000 | 156,390,000 | 154,240,000 | 0 | 0 | 0 | 2024-10-15 | 2024-10-23 | SANTINILUWANSA PROPERTI INDONESIA, PT | 02.882.048.8-711.001 | 3,554,000 | 2.22 % | |
402 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Modal Kursi Rapat, Kursi Lipat, Meja Konseling, Meja Pantry Instalasi Gizi dan Sofa | Pengadaan Langsung | Pengadaan Barang | 15993012 | 49708316 | APBD | 154,462,870 | 149,850,000 | 148,753,875 | 148,753,875 | 128,760,000 | 128,760,000 | 128,760,000 | 128,760,000 | 2024-04-22 | 2024-05-03 | 5,708,995 | 3.7 % | |||
403 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Dusun Utara (Pembangunan Ruang Kelas Baru (RKB) 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17266012 | 51153272 | APBD | 38,962,100 | 38,962,100 | 38,895,510 | 38,895,510 | 38,895,510 | 38,895,510 | 38,895,510 | 38,895,510 | 2024-06-05 | 2024-06-14 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 66,590 | 0.17 % | |
404 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pembangunan Pembangunan Ruang Kelas Baru SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17505012 | 52082476 | APBD | 59,036,400 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,000 | 59,024,250 | 2024-07-18 | 2024-07-26 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 12,150 | 0.02 % | |
405 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan WC 2 Unit SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15904012 | 50767507 | APBD | 26,000,000 | 26,000,000 | 25,900,000 | 25,900,000 | 25,900,000 | 25,900,000 | 0 | 25,900,000 | 2024-03-28 | 2024-04-08 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 100,000 | 0.38 % | |
406 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana Prasarana UPT. KPHP Kahayan Hilir, UPT.KPHP Barito Hulu dan UPT.KPHP Murung Raya - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17225012 | 51760481 | APBDP | 74,199,000 | 74,198,949 | 74,087,000 | 74,087,000 | 73,356,570 | 73,356,570 | 73,356,570 | 73,356,570 | 2024-06-04 | 2024-06-14 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 112,000 | 0.15 % | |
407 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI GEDUNG KANTOR LAMA UPTPPD KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16025012 | 49824737 | APBD | 64,925,000 | 64,924,973 | 64,800,000 | 64,800,000 | 64,265,485 | 64,265,485 | 64,265,485 | 64,265,485 | 2024-05-01 | 2024-05-10 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 125,000 | 0.19 % | |
408 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Rehab 4 Ruang kelas dan Kantor SMAN 1 Tumpung Laung (Montalat Barut) - SMAN 1 Montallat (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15880012 | 50726945 | APBD | 64,000,000 | 64,000,000 | 63,833,500 | 63,833,500 | 63,833,500 | 63,833,500 | 0 | 63,833,500 | 2024-04-03 | 2024-04-24 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 166,500 | 0.26 % | |
409 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Samuda Kecil Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15675012 | 46521768 | APBD | 160,000,000 | 160,000,000 | 159,898,545 | 159,898,545 | 159,808,721 | 159,800,000 | 0 | 159,800,000 | 2024-01-05 | 2024-01-29 | CV. HALAJUR BATUAH | 95.382.560.1-711.000 | 101,455 | 0.06 % | |
410 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet (Jamban) dan Rehab Ruang Kelas (4 Ruang)SMKN 1 Banama Tingang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16172012 | 51424256 | APBD | 70,400,000 | 70,400,000 | 70,222,400 | 70,222,400 | 70,222,400 | 70,222,400 | 70,222,400 | 70,222,400 | 2024-05-22 | 2024-06-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 177,600 | 0.25 % | |
411 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17795012 | 52993381 | APBDP | 21,725,000 | 21,724,920 | 21,528,450 | 21,528,450 | 21,528,450 | 0 | 0 | 0 | 2024-10-18 | 2024-10-22 | 196,550 | 0.9 % | |||
412 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Rungan Barat (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16179012 | 51238795 | APBD | 29,042,000 | 29,042,000 | 28,860,000 | 28,860,000 | 28,860,000 | 28,860,000 | 0 | 28,860,000 | 2024-05-22 | 2024-05-31 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 182,000 | 0.63 % | |
413 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Aula SMAN 1 Tanah Siang Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15964012 | 50730047 | APBD | 63,000,000 | 63,000,000 | 62,500,000 | 62,500,000 | 62,500,000 | 62,500,000 | 0 | 62,500,000 | 2024-04-05 | 2024-04-24 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 500,000 | 0.79 % | |
414 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Jaringan Listrik - Belanja Instalasi Listrik Lab Kultur, UPS Linae dan OK IBS Kamar 1 | Pengadaan Langsung | Jasa Lainnya | 17471012 | 51999713 | APBD | 120,000,000 | 119,449,500 | 118,392,933 | 118,392,933 | 118,298,250 | 118,298,250 | 118,298,250 | 118,298,250 | 2024-08-15 | 2024-08-28 | CV.ANAIS TEKNIK | 02.292.605.9-711.000 | 1,607,067 | 1.34 % | |
415 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Pagar dan Penataan Halaman Sekolah SMK NEGERI 2 KUMAI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16164012 | 51425463 | APBD | 34,500,000 | 34,500,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 2024-05-22 | 2024-06-02 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.32 % | |
416 | 2024 | Dinas Komunikasi, Informatika, Persandian dan Statistik | Beban Jasa Iklan/Reklame, Film, dan Pemotretan | Pengadaan Langsung | Jasa Lainnya | 17303012 | 51843674 | APBD | 200,000,000 | 195,000,000 | 194,871,546 | 194,871,546 | 194,161,200 | 194,161,200 | 194,161,200 | 194,161,200 | 2024-06-19 | 2024-06-25 | Maeztro Production | 80.107.943.5-711.000 | 5,128,454 | 2.56 % | |
417 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Rehabilitasi Pagar Gedung Juang Jl. Seth Adji | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17468012 | 52043965 | APBD | 25,000,000 | 24,979,423 | 24,784,080 | 24,784,080 | 24,513,795 | 24,513,795 | 24,513,795 | 24,513,795 | 2024-07-11 | 2024-07-30 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 215,920 | 0.86 % | |
418 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Redesain Pengurukan Shrimp Estate | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17892012 | 53271079 | APBDP | 100,000,000 | 100,000,000 | 99,400,500 | 99,400,500 | 98,000,000 | 98,000,000 | 98,000,000 | 98,000,000 | 2024-11-07 | 2024-11-15 | 599,500 | 0.6 % | |||
419 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Kotawaringin Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15988012 | 51422982 | APBD | 69,267,000 | 69,267,000 | 68,378,220 | 68,378,220 | 68,376,000 | 68,376,000 | 68,376,000 | 68,376,000 | 2024-04-19 | 2024-05-13 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 888,780 | 1.28 % | |
420 | 2024 | Dinas Pendidikan | JASA KONSULTANSI PERENCANAAN PERBAIKAN PAGAR, LANTAI, DAN PENGECATAN PADA GEDUNG HUMA BERKAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17583012 | 52203886 | APBD | 45,000,000 | 45,000,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 2024-08-09 | 2024-08-15 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 50,000 | 0.11 % | |
421 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 3 Ruang SMAS Muhammadiyah Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15809012 | 50773982 | APBD | 85,000,000 | 85,000,000 | 84,693,000 | 84,693,000 | 84,693,000 | 84,693,000 | 0 | 84,693,000 | 2024-03-21 | 2024-04-08 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 307,000 | 0.36 % | |
422 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pos jaga SMAN 6 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16128012 | 51458621 | APBD | 6,000,000 | 6,000,000 | 5,955,000 | 5,955,000 | 5,955,000 | 5,955,000 | 5,955,000 | 5,955,000 | 2024-05-16 | 2024-05-22 | 45,000 | 0.75 % | |||
423 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Rehabilitasi Rumah Dinas Guru SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15898012 | 50767109 | APBD | 35,000,000 | 35,000,000 | 34,942,800 | 34,942,800 | 34,942,800 | 34,942,800 | 0 | 34,942,800 | 2024-03-28 | 2024-04-08 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 57,200 | 0.16 % | |
424 | 2024 | Dinas Sosial | Perencanaan Rehabilitasi Gedung Kantor Dinas Sosial Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15766012 | 49514044 | APBD | 68,900,000 | 68,890,000 | 68,300,206 | 68,300,206 | 68,055,781 | 68,055,781 | 68,055,781 | 68,055,781 | 2024-04-17 | 2024-05-02 | CV. DAKSA RESWARA PRAKASA | 65.529.585.5-711.000 | 599,794 | 0.87 % | |
425 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembuatan pagar dan penataan halaman sekolah SMAN 1 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15882012 | 50729322 | APBD | 77,000,000 | 77,000,000 | 76,956,300 | 76,956,300 | 76,956,300 | 76,956,300 | 0 | 76,956,300 | 2024-03-28 | 2024-04-08 | Roa Solution | 92.337.883.0-711.000 | 43,700 | 0.06 % | |
426 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawas Pembangunan Gedung Laboratorium Pada Kegiatan Pembangunan Pabrik Pakan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17677012 | 52276297 | APBD | 17,738,250 | 17,692,567 | 17,635,958 | 17,635,958 | 17,623,470 | 17,623,470 | 17,623,470 | 17,623,470 | 2024-10-04 | 2024-10-10 | 102,293 | 0.58 % | |||
427 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17573012 | 49720303 | APBD | 7,942,500 | 7,941,499 | 7,850,000 | 7,850,000 | 7,425,900 | 7,425,900 | 7,425,900 | 7,425,900 | 2024-08-05 | 2024-08-20 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 92,500 | 1.16 % | |
428 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Mess UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16201012 | 51460907 | APBDP | 81,213,000 | 81,212,928 | 80,766,930 | 80,766,930 | 79,268,430 | 79,268,430 | 79,268,430 | 79,268,430 | 2024-06-04 | 2024-06-14 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 446,070 | 0.55 % | |
429 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Penataan Halaman dan Pagar SMAN 1 Kahayan Kuala (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15837012 | 50773215 | APBD | 79,000,000 | 79,000,000 | 78,839,193 | 78,839,193 | 78,839,193 | 78,839,193 | 0 | 78,839,193 | 2024-03-21 | 2024-04-08 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 160,807 | 0.2 % | |
430 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Kantin, Ruang Pembelajaran Khusus, Ruang Guru, Ruang Kepala Sekolah SLBN 1 Kuala Pembuang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17340012 | 51911549 | APBD | 39,061,030 | 39,061,030 | 38,988,750 | 38,988,750 | 38,988,750 | 38,988,750 | 0 | 38,988,750 | 2024-07-01 | 2024-07-05 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 72,280 | 0.19 % | |
431 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0018 Pengawasan Rehab Dinding Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17842012 | 53100034 | APBDP | 27,950,000 | 27,950,000 | 27,897,000 | 27,897,000 | 27,500,000 | 27,500,000 | 27,500,000 | 27,500,000 | 2024-10-30 | 2024-11-08 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 53,000 | 0.19 % | |
432 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Jembatan di Lokasi RTR & RMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17295012 | 49360210 | APBD | 25,000,000 | 24,990,000 | 24,934,763 | 24,934,763 | 24,767,430 | 24,767,430 | 24,767,430 | 24,767,430 | 2024-06-12 | 2024-06-21 | 65,238 | 0.26 % | |||
433 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PENATAAN HALAMAN BELAKANG UPTPPD MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17599012 | 49722722 | APBD | 36,000,000 | 35,853,000 | 35,520,000 | 35,520,000 | 34,698,600 | 34,698,600 | 34,698,600 | 34,698,600 | 2024-08-14 | 2024-08-26 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 480,000 | 1.33 % | |
434 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Supervisi Rehabilitasi Jaringan Irigasi D.I.R. Maliku Baru Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15694012 | 46342586 | APBD | 100,000,000 | 100,000,000 | 99,822,300 | 99,822,300 | 99,783,450 | 99,783,450 | 0 | 99,783,450 | 2024-02-07 | 2024-02-29 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 177,700 | 0.18 % | |
435 | 2024 | Dinas Kesehatan | Pemeliharaan Gedung Bapelkes | Pengadaan Langsung | Pekerjaan Konstruksi | 16048012 | 51483550 | APBD | 50,000,000 | 49,999,623 | 49,758,187 | 49,629,210 | 49,629,210 | 49,629,210 | 49,629,210 | 49,629,210 | 2024-05-03 | 2024-05-10 | CV. SAMA SAMA SATIA | 66.550.544.2-711.000 | 241,813 | 0.48 % | |
436 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pagar dan Penataan Halaman SMAN 1 Sepang (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15831012 | 50727206 | APBD | 79,000,000 | 79,000,000 | 78,865,500 | 78,865,500 | 78,865,500 | 78,865,500 | 0 | 78,865,500 | 2024-03-21 | 2024-04-08 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 134,500 | 0.17 % | |
437 | 2024 | Badan Keuangan dan Aset Daerah | Penyusunan Standar Satuan Harga Tahun 2025 (Murni) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16119012 | 51645264 | APBD | 100,000,000 | 100,000,000 | 99,933,400 | 99,933,400 | 99,666,900 | 99,666,900 | 99,666,900 | 99,666,900 | 2024-05-21 | 2024-06-07 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 66,600 | 0.07 % | |
438 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN BAK SAMPAH DAN SEPTICTANK UPTPPD PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17523012 | 49189038 | APBD | 7,537,500 | 7,536,345 | 7,477,515 | 7,477,515 | 7,113,657 | 7,113,657 | 7,113,657 | 7,113,657 | 2024-07-22 | 2024-08-06 | ROTASI DESIGN CONSULTANT | 90.011.802.7-711.000 | 59,985 | 0.8 % | |
439 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pembuatan Master Plan Kawasan Rumah Sakit Provinsi Kalimantan Tengah | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011329000 | 52656421 | APBDP | 1,678,709,000 | 1,303,147,000 | 1,300,015,350 | 1,300,015,350 | 1,296,685,350 | 0 | 0 | 0 | 2024-11-19 | 2024-12-02 | 378,693,650 | 22.56 % | |||
440 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Dusun Utara (Pembangunan Ruang Kelas Baru (RKB) 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15838012 | 50376938 | APBD | 55,268,700 | 55,268,700 | 54,898,269 | 54,898,269 | 54,898,269 | 54,898,269 | 0 | 54,898,269 | 2024-03-21 | 2024-04-08 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 370,431 | 0.67 % | |
441 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Jasa Konsultansi Pengawasan Renovasi Aula Kantor Dinas Penanaman Modal dan PTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17514012 | 52090410 | APBD | 74,699,000 | 74,592,000 | 74,370,000 | 74,370,000 | 72,138,900 | 72,138,900 | 0 | 72,138,900 | 2024-07-23 | 2024-09-06 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 329,000 | 0.44 % | |
442 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS PGRI 2 Sampit (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17325012 | 51239650 | APBD | 40,702,300 | 40,701,480 | 40,645,980 | 40,645,980 | 40,645,980 | 40,645,980 | 40,645,980 | 40,645,980 | 2024-06-19 | 2024-06-28 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 56,320 | 0.14 % | |
443 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Unit Tahai Kabupaten Pulang Pisau | Pengadaan Langsung | Pekerjaan Konstruksi | 15684012 | 46525184 | APBD | 170,000,000 | 170,000,000 | 169,870,963 | 169,870,963 | 169,770,294 | 169,770,000 | 0 | 169,770,000 | 2024-01-18 | 2024-01-31 | Anugrah Karya Perkasa | 80.202.544.5-711.000 | 129,038 | 0.08 % | |
444 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Peningkatan Jalan Gang Veteran dan Sekitarnya, Desa Cempaka Mulia Barat, Kecamatan Cempaga, Kabupaten Kotawaringin Timur, Provinsi Kalimantan Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 16114012 | 49607540 | APBD | 186,400,000 | 186,399,000 | 186,098,424 | 186,098,424 | 185,916,000 | 185,916,000 | 100 | 185,916,000 | 2024-05-20 | 2024-06-05 | CV GATRA MEGA | 02.676.179.1-711.000 | 301,576 | 0.16 % | |
445 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Tewah (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16087012 | 51238943 | APBD | 42,205,600 | 42,205,600 | 42,000,000 | 42,000,000 | 42,000,000 | 42,000,000 | 0 | 42,000,000 | 2024-05-07 | 2024-05-15 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 205,600 | 0.49 % | |
446 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (PERENCANAAN PENGASPALAN JALAN LINGKUNGAN KANTOR BPB-PK) | Pengadaan Langsung | Jasa Lainnya | 10026922000 | 53444696 | APBD;APBDP | 202,500,000 | 99,064,725 | 98,124,000 | 98,124,000 | 97,236,000 | 0 | 0 | 0 | 2024-12-16 | 2024-12-19 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 104,376,000 | 51.54 % | |
447 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan WC SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17691012 | 52093722 | APBD | 10,000,000 | 9,333,435 | 9,333,435 | 9,333,435 | 9,333,435 | 9,333,435 | 9,333,435 | 9,333,435 | 2024-10-01 | 2024-10-03 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 666,565 | 6.67 % | |
448 | 2024 | Dinas Ketahanan Pangan | Rehab Ringan Bangunan Gedung Kantor Pasca Kebakaran | Pengadaan Langsung | Pekerjaan Konstruksi | 17889012 | 53208927 | APBD | 166,320,000 | 166,319,000 | 165,322,941 | 165,320,000 | 162,960,000 | 162,960,000 | 162,960,000 | 162,960,000 | 2024-11-08 | 2024-12-06 | CV. TRIPLE ANTANG PERKASA | 39.271.587.6-711.000 | 997,059 | 0.6 % | |
449 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS SMK NEGERI 1 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17409012 | 51197813 | APBD | 7,780,000 | 7,780,000 | 7,735,600 | 7,735,600 | 7,735,600 | 7,735,600 | 7,735,600 | 7,735,600 | 2024-06-27 | 2024-07-02 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 44,400 | 0.57 % | |
450 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17489012 | 51213926 | APBD | 25,670,000 | 25,670,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 2024-07-15 | 2024-07-19 | Roa Solution | 92.337.883.0-711.000 | 29,000 | 0.11 % | |
451 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Fisika SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17314012 | 51588012 | APBD | 33,027,000 | 33,027,000 | 32,950,000 | 32,950,000 | 32,950,000 | 32,950,000 | 32,950,000 | 32,950,000 | 2024-06-13 | 2024-06-17 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 77,000 | 0.23 % | |
452 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17868012 | 53276934 | APBDP | 5,523,000 | 5,523,000 | 5,494,500 | 5,494,500 | 5,494,500 | 0 | 0 | 0 | 2024-11-04 | 2024-11-12 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 28,500 | 0.52 % | |
453 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Pembangunan Hutan Kota Barito Timur - Pembangunan Hutan Kota di Luar Kawasan Hutan Negara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15720012 | 50109531 | APBD | 139,920,000 | 99,985,470 | 99,850,000 | 99,850,000 | 99,238,995 | 99,238,995 | 99,238,995 | 99,238,995 | 2024-02-26 | 2024-03-08 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 40,070,000 | 28.64 % | |
454 | 2024 | Biro Umum | Pengadaan Sofa Jati Ukir Istana Isen Mulang | Pengadaan Langsung | Pengadaan Barang | 17801012 | 53055414 | APBDP | 159,840,000 | 145,454,400 | 145,188,000 | 145,188,000 | 144,189,000 | 0 | 0 | 0 | 2024-10-28 | 2024-11-11 | CV. GEMILANG BESARI | 60.473.968.0-711.000 | 14,652,000 | 9.17 % | |
455 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Tewah (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15778012 | 50388665 | APBD | 59,899,700 | 59,899,700 | 59,899,700 | 59,899,700 | 59,899,700 | 59,899,700 | 0 | 59,899,700 | 2024-03-15 | 2024-03-26 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 0 | 0 % | |
456 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Renovasi Bangunan Screen House di IPBH Keruing | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17748012 | 52433544 | APBDP | 68,900,000 | 68,700,000 | 68,514,750 | 68,514,750 | 55,496,670 | 55,496,670 | 55,496,670 | 55,496,670 | 2024-10-16 | 2024-10-22 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 385,250 | 0.56 % | |
457 | 2024 | Dinas Komunikasi, Informatika, Persandian dan Statistik | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17302012 | 49232632 | APBD | 44,147,000 | 44,147,000 | 43,556,400 | 43,556,400 | 43,556,400 | 43,556,400 | 43,556,400 | 43,556,400 | 2024-06-11 | 2024-06-21 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 590,600 | 1.34 % | |
458 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultan Pengawasan- Penataan Jaringan Listrik Kantor Disnakertrans Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10004679000 | 53409287 | APBDP | 14,850,000 | 14,000,000 | 13,891,650 | 13,891,650 | 13,875,000 | 0 | 0 | 0 | 2024-11-12 | 2024-11-20 | 958,350 | 6.45 % | |||
459 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Rehab Teras Aula | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17885012 | 53327551 | APBD | 10,000,000 | 9,972,795 | 9,873,228 | 9,873,228 | 9,873,228 | 0 | 0 | 0 | 2024-11-08 | 2024-11-27 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 126,772 | 1.27 % | |
460 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan Halaman Sekolah SMKN 1 Kapuas Murung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16161012 | 51427520 | APBD | 34,500,000 | 34,500,000 | 34,432,000 | 34,432,000 | 34,432,000 | 34,432,000 | 34,432,000 | 34,432,000 | 2024-05-22 | 2024-06-02 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 68,000 | 0.2 % | |
461 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Fisika,Biologi SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15916012 | 50548043 | APBD | 54,488,000 | 54,488,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 2024-04-01 | 2024-04-19 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 111,000 | 0.2 % | |
462 | 2024 | Badan Pendapatan Daerah | PEKERJAAAN PERENCANAAN PEMBANGUNAN PAGAR LANJUTAN UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16024012 | 49187791 | APBD | 101,681,250 | 98,790,000 | 98,457,000 | 98,457,000 | 97,563,450 | 97,563,450 | 97,563,450 | 97,563,450 | 2024-04-29 | 2024-05-13 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 3,224,250 | 3.17 % | |
463 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Implementasi Dokumen SSK 2 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15711012 | 47521028 | APBD | 80,000,000 | 80,000,000 | 79,975,500 | 79,975,500 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | 2024-03-15 | MARDINO RUKITA | 16.699.748.6-711.000 | 24,500 | 0.03 % | |
464 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan Halaman Sekolah SMKN 1 Katingan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16047012 | 50968973 | APBD | 34,500,000 | 34,500,000 | 34,278,000 | 34,278,000 | 34,278,000 | 34,278,000 | 34,278,000 | 34,278,000 | 2024-05-07 | 2024-05-18 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 222,000 | 0.64 % | |
465 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Koridor Penghubung bangunan SMAN 2 Kasongan (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15966012 | 50729151 | APBD | 38,500,000 | 38,500,000 | 38,389,000 | 38,389,000 | 38,389,000 | 38,389,000 | 0 | 38,389,000 | 2024-04-06 | 2024-04-25 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 111,000 | 0.29 % | |
466 | 2024 | Dinas Pemuda dan Olahraga | Beban Jasa Konsultansi Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17697012 | 52689998 | APBD | 109,550,000 | 99,722,400 | 99,444,900 | 99,444,900 | 99,111,900 | 0 | 0 | 0 | 2024-09-30 | 2024-10-11 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 10,105,100 | 9.22 % | |
467 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Jasa Konsultansi Pengawasan Pembuatan Ruang PPID Kantor Dinas Penanaman Modal dan PTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17516012 | 52090376 | APBD | 30,906,000 | 30,906,000 | 30,724,800 | 30,724,800 | 29,803,056 | 29,803,056 | 0 | 29,803,056 | 2024-07-23 | 2024-09-06 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 181,200 | 0.59 % | |
468 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Kantin, Ruang Kelas Baru, Ruang UKS, Selasar Penghubung SLBN 2 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17499012 | 52082303 | APBD | 72,874,840 | 72,871,500 | 72,871,500 | 72,871,500 | 72,871,500 | 72,871,500 | 72,871,000 | 72,871,500 | 2024-07-18 | 2024-07-26 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 3,340 | 0 % | |
469 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Muara Teweh (Rehabilitasi Rg. Lab. Biologi, Rehabilitasi Toilet (Jamban) beserta sanitasinya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17310012 | 51238365 | APBD | 21,528,800 | 21,528,800 | 21,367,500 | 21,367,500 | 21,367,500 | 21,367,500 | 21,367,500 | 21,367,500 | 2024-06-13 | 2024-06-26 | 161,300 | 0.75 % | |||
470 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Jaringan Listrik - Pemeliharaan Jaringan Listrik Ruang Anggrek | Pengadaan Langsung | Jasa Lainnya | 17272012 | 51686768 | APBD | 65,000,000 | 64,088,500 | 63,221,000 | 63,221,000 | 62,999,000 | 62,999,000 | 62,999,000 | 62,999,000 | 2024-06-10 | 2024-06-21 | CV Berkat Sekumpul | 94.152.629.5-711.000 | 1,779,000 | 2.74 % | |
471 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Penataan Halaman SMAN 1 Kasongan (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15807012 | 50729180 | APBD | 79,000,000 | 79,000,000 | 78,887,700 | 78,887,700 | 78,887,700 | 78,887,700 | 78,887,700 | 78,887,700 | 2024-03-15 | 2024-03-26 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 112,300 | 0.14 % | |
472 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PENATAAN HALAMAN AULA UTAMA BAPENDA TAHAP 4 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17645012 | 49722644 | APBD | 48,000,000 | 47,896,500 | 47,397,000 | 47,397,000 | 46,664,400 | 46,664,400 | 46,664,400 | 46,664,400 | 2024-09-13 | 2024-09-26 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 603,000 | 1.26 % | |
473 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMKN 1 Muara Teweh | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17674012 | 52610179 | APBDP | 25,000,000 | 25,000,000 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 2024-09-26 | 2024-10-03 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 46,090 | 0.18 % | |
474 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pekerjaan Lanjutan Pembangunan Ruang Praktik Siswa(RPS) SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17367012 | 51422460 | APBD | 85,000,000 | 85,000,000 | 84,911,781 | 84,911,781 | 84,911,781 | 84,911,781 | 84,911,781 | 84,911,781 | 2024-06-24 | 2024-07-01 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 88,219 | 0.1 % | |
475 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Perpustakaan SMAS Muhammadiyah 2 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15906012 | 50771077 | APBD | 35,000,000 | 35,000,000 | 34,944,500 | 34,944,500 | 34,944,500 | 34,944,500 | 0 | 34,944,500 | 2024-04-02 | 2024-04-24 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 55,500 | 0.16 % | |
476 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16033012 | 51467427 | APBD | 90,000,000 | 90,000,000 | 89,466,000 | 89,466,000 | 89,077,500 | 89,077,500 | 89,077,500 | 89,077,500 | 2024-04-30 | 2024-05-14 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 534,000 | 0.59 % | |
477 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Rungan Barat (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17222012 | 51238887 | APBD | 29,081,500 | 29,081,500 | 29,037,600 | 29,037,600 | 29,037,600 | 29,037,600 | 0 | 29,037,600 | 2024-05-29 | 2024-06-06 | 43,900 | 0.15 % | |||
478 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Bintang Awai (Pembangunan Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15820012 | 50377525 | APBD | 57,734,700 | 57,734,700 | 57,663,144 | 57,663,144 | 57,663,144 | 57,663,144 | 0 | 57,663,144 | 2024-03-21 | 2024-04-08 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 71,556 | 0.12 % | |
479 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pembuatan Gapura Pintu Gerbang SMAN 1 Pulau Malan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17764012 | 52880594 | APBDP | 30,000,000 | 30,000,000 | 29,748,000 | 29,748,000 | 29,748,000 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 252,000 | 0.84 % | |
480 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI RUANG PAJAK KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15743012 | 49834659 | APBD | 76,616,400 | 76,582,553 | 76,471,554 | 76,471,554 | 75,528,062 | 75,528,062 | 75,528,062 | 75,528,062 | 2024-03-11 | 2024-03-20 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 144,846 | 0.19 % | |
481 | 2024 | Dinas Perhubungan | Rehabilitasi Terminal Sanggu Kabupaten Barito Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 17664012 | 51282247 | APBD | 164,141,000 | 164,141,000 | 163,904,224 | 163,904,224 | 163,899,136 | 163,899,136 | 163,899,136 | 163,899,136 | 2024-09-23 | 2024-09-30 | CV. ARTHA CAPRICORNUS | 01.922.068.0-711.000 | 236,776 | 0.14 % | |
482 | 2024 | Dinas Perhubungan | Pemeliharaan/Perbaikan Instalasi Lalu Lintas (Traffic Light, Warning Light) | Pengadaan Langsung | Jasa Lainnya | 15973012 | 51269547 | APBD | 185,765,000 | 185,765,000 | 185,481,000 | 185,481,000 | 185,481,000 | 185,481,000 | 185,481,000 | 185,481,000 | 2024-04-26 | 2024-05-01 | CV. PROGRESIF | 01.489.497.6-711.000 | 284,000 | 0.15 % | |
483 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN TOILET WAJIB PAJAK UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17551012 | 49722538 | APBD | 10,060,500 | 10,056,600 | 9,945,600 | 9,945,600 | 9,729,150 | 9,729,150 | 9,729,150 | 9,729,150 | 2024-07-31 | 2024-08-14 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 114,900 | 1.14 % | |
484 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Mess UPT.KPHP Katingan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16100012 | 51460909 | APBDP | 72,856,000 | 72,855,960 | 72,751,620 | 72,751,620 | 71,830,320 | 71,830,320 | 71,830,320 | 71,830,320 | 2024-05-28 | 2024-06-07 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 104,380 | 0.14 % | |
485 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Awang Lapai (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16084012 | 51155760 | APBD | 35,684,500 | 35,684,500 | 35,600,000 | 35,600,000 | 35,600,000 | 35,600,000 | 0 | 35,600,000 | 2024-05-06 | 2024-05-15 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 84,500 | 0.24 % | |
486 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika,Biologi SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15850012 | 50466996 | APBD | 97,747,700 | 97,747,700 | 97,646,700 | 97,646,700 | 97,646,700 | 97,646,700 | 97,646,700 | 97,646,700 | 2024-03-25 | 2024-04-12 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 101,000 | 0.1 % | |
487 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan Kandang Rusa UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17424012 | 51460050 | APBD | 26,475,000 | 26,475,000 | 26,000,001 | 26,000,001 | 25,618,800 | 25,618,800 | 25,618,800 | 25,618,800 | 2024-06-29 | 2024-07-05 | 474,999 | 1.79 % | |||
488 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Jasa Konsultansi Pengawasan - Pengawasan Rehab Loket Ruang Kamboja | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17584012 | 52174218 | APBD | 3,000,000 | 3,000,000 | 2,997,000 | 2,997,000 | 2,442,000 | 2,442,000 | 2,442,000 | 2,442,000 | 2024-08-21 | 2024-08-30 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 3,000 | 0.1 % | |
489 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pemasangan Paving Halaman Kantor SMAN 1 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17772012 | 52878799 | APBDP | 60,000,000 | 60,000,000 | 59,800,200 | 59,800,200 | 59,800,200 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 199,800 | 0.33 % | |
490 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Laboratorium Komputer SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17834012 | 52898577 | APBDP | 20,000,000 | 20,000,000 | 19,828,500 | 19,828,500 | 19,828,500 | 19,828,500 | 19,828,500 | 19,828,500 | 2024-10-28 | 2024-11-05 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 171,500 | 0.86 % | |
491 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Parkir) | Pengadaan Langsung | Jasa Lainnya | 17590012 | 52036015 | APBD;APBDP | 65,000,000 | 17,454,750 | 17,177,250 | 17,177,250 | 17,177,250 | 17,177,250 | 17,177,250 | 17,177,250 | 2024-08-09 | 2024-08-15 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 47,822,750 | 73.57 % | |
492 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Rehabilitasi Ruang Kelas dengan tingkat kerusakan minimal sedang beserta perabotnya SLBN 2 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17694012 | 52094333 | APBD | 10,200,000 | 10,197,570 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 2024-10-08 | 2024-10-11 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 54,600 | 0.54 % | |
493 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Pembangunan Rumah Genset dan Tower Air UPT.KPHP Kahayan Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17665012 | 52595923 | APBDP | 16,198,000 | 16,197,675 | 16,169,925 | 16,169,925 | 16,095,000 | 0 | 0 | 0 | 2024-09-27 | 2024-10-09 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 28,075 | 0.17 % | |
494 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 4 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16140012 | 51418356 | APBD | 25,000,000 | 25,000,000 | 24,900,100 | 24,900,100 | 24,900,100 | 24,900,100 | 24,900,100 | 24,900,100 | 2024-05-22 | 2024-06-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 99,900 | 0.4 % | |
495 | 2024 | Dinas Pemberdayaan Masyarakat dan Desa | Pengawasan Bangunan Mushola DPMD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17438012 | 52025972 | APBD | 42,000,000 | 42,000,000 | 41,950,000 | 41,950,000 | 41,625,000 | 41,625,000 | 41,625,000 | 41,625,000 | 2024-07-10 | 2024-07-26 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 50,000 | 0.12 % | |
496 | 2024 | Dinas Pendidikan | Pengawasan Rehab Pagar Gedung Dinas Pendidikan Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17449012 | 49797910 | APBD | 45,000,000 | 45,000,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 2024-07-13 | 2024-07-17 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 50,000 | 0.11 % | |
497 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa,Laboratorium Komputer SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17537012 | 51199416 | APBD | 36,890,000 | 36,890,000 | 36,823,400 | 36,823,400 | 36,823,400 | 36,823,400 | 36,823,400 | 36,823,400 | 2024-07-25 | 2024-08-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 66,600 | 0.18 % | |
498 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultansi Pengawasan Pagar Kantor UPT Lab. Bahan Konstruksi Palangka Raya dan Pagar Rujab DPUPR di Jl. Muhammad Wongso Kab. Kobar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16095012 | 49800589 | APBD | 38,904,000 | 38,904,000 | 38,561,067 | 38,561,067 | 38,500,000 | 0 | 0 | 0 | 2024-05-08 | 2024-05-31 | 342,933 | 0.88 % | |||
499 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Kelas SMAN 1 Sebangau Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17824012 | 52898364 | APBDP | 25,000,000 | 25,000,000 | 24,889,000 | 24,889,000 | 24,889,000 | 24,889,000 | 24,889,000 | 24,889,000 | 2024-10-28 | 2024-11-05 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 111,000 | 0.44 % | |
500 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Gedung/Rumah Pelindung Vertical Dryer Kab. Pulang Pisau | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17218012 | 49360182 | APBD | 147,000,000 | 146,976,000 | 146,565,510 | 146,565,510 | 145,466,610 | 145,466,610 | 0 | 0 | 2024-05-30 | 2024-06-21 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 434,490 | 0.3 % | |
501 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Gedung/Rumah Pelindung Vertical Dryer Kab. Pulang Pisau | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17218012 | 49360182 | APBD | 147,000,000 | 146,976,000 | 146,565,510 | 146,565,510 | 145,466,610 | 145,466,610 | 145,466,610 | 145,466,610 | 2024-05-30 | 2024-06-21 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 434,490 | 0.3 % | |
502 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Kantor SMAN 10 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17761012 | 52878507 | APBDP | 50,000,000 | 50,000,000 | 49,890,000 | 49,890,000 | 49,890,000 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | 110,000 | 0.22 % | |||
503 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Balai Riam (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15874012 | 50408755 | APBD | 82,872,800 | 82,872,800 | 82,706,300 | 82,706,300 | 82,706,300 | 82,706,300 | 0 | 82,706,300 | 2024-04-02 | 2024-04-24 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 166,500 | 0.2 % | |
504 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Pengawasan Rehab Ruang Direktur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17712012 | 52763643 | APBDP | 12,000,000 | 12,000,000 | 11,900,033 | 11,900,033 | 11,766,000 | 0 | 0 | 0 | 2024-10-16 | 2024-10-25 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 99,968 | 0.83 % | |
505 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0018 Pengawasan Rehab Bangunan dan Kolam Bioflok dan Peralatannya (1 Paket) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17859012 | 53220959 | APBD | 12,500,000 | 12,432,000 | 12,198,900 | 12,198,900 | 12,000,000 | 12,000,000 | 12,000,000 | 12,000,000 | 2024-11-01 | 2024-11-08 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 301,100 | 2.41 % | |
506 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS Muhammadiyah Kuala Kapuas (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS, Pembangunan Rg. BK ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15938012 | 50388772 | APBD | 77,160,700 | 77,160,700 | 76,407,858 | 76,407,858 | 76,407,858 | 76,407,858 | 0 | 76,407,858 | 2024-04-01 | 2024-04-22 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 752,842 | 0.98 % | |
507 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI MUSOLAH DAN AULA KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17806012 | 49955029 | APBD | 25,000,000 | 24,999,999 | 24,850,000 | 24,850,000 | 24,685,013 | 0 | 0 | 0 | 2024-10-30 | 2024-11-14 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 150,000 | 0.6 % | |
508 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Pagar UPT.KPHP Katingan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17268012 | 51802828 | APBDP | 116,226,000 | 99,999,345 | 99,894,728 | 99,894,728 | 99,067,778 | 99,067,778 | 99,067,778 | 99,067,778 | 2024-06-11 | 2024-06-21 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 16,331,273 | 14.05 % | |
509 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Guru SMAS Muhammadiyah Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15810012 | 50774184 | APBD | 45,500,000 | 45,500,000 | 45,288,000 | 45,288,000 | 45,288,000 | 45,288,000 | 0 | 45,288,000 | 2024-03-21 | 2024-04-08 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 212,000 | 0.47 % | |
510 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Pintu Gerbang dan Jembatan SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16159012 | 51645022 | APBD | 18,000,000 | 18,000,000 | 17,950,000 | 17,950,000 | 17,950,000 | 17,950,000 | 17,950,000 | 17,950,000 | 2024-05-22 | 2024-06-02 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 50,000 | 0.28 % | |
511 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehabilitasi Ruang Laboratorium Komputer,Rehabilitasi Ruang Multimedia,Rehabilitasi Toilet(Jamban) dengan tingkat kerusakan minimal sedang SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15844012 | 50538387 | APBD | 27,175,000 | 27,175,000 | 27,100,000 | 27,100,000 | 27,100,000 | 27,100,000 | 27,100,000 | 27,100,000 | 2024-03-25 | 2024-04-05 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 75,000 | 0.28 % | |
512 | 2024 | Dinas Pendidikan | Jasa Konsultasi Pengawasan Pembangunan Kantin, Ruang Pembelajaran Khusus, Ruang Guru, Ruang Kepala Sekolah SLBN 1 Kuala Pembuang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17508012 | 52082569 | APBD | 31,248,824 | 31,248,720 | 31,182,000 | 31,182,000 | 31,182,000 | 31,182,000 | 31,182,000 | 31,182,000 | 2024-07-18 | 2024-07-26 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 66,824 | 0.21 % | |
513 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Pengawasan Rehab/Rehabilitasi Rumah Jabatan Kepala UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17425012 | 51460061 | APBD | 10,309,530 | 10,309,530 | 10,256,400 | 10,256,400 | 10,189,800 | 10,189,800 | 10,189,800 | 10,189,800 | 2024-06-29 | 2024-07-05 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 53,130 | 0.52 % | |
514 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (2 Ruang) SMKN 1 Pangkalan Lada | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16150012 | 51423885 | APBD | 25,000,000 | 25,000,000 | 24,975,000 | 24,975,000 | 24,975,000 | 24,975,000 | 24,975,000 | 24,975,000 | 2024-05-22 | 2024-06-02 | Roa Solution | 92.337.883.0-711.000 | 25,000 | 0.1 % | |
515 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Rumah Dinas dan Pagar Sekolah SLBN 1 Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17616012 | 51911538 | APBD | 35,000,000 | 34,999,999 | 34,898,360 | 34,898,360 | 34,898,360 | 34,898,360 | 0 | 34,898,360 | 2024-08-26 | 2024-09-03 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 101,640 | 0.29 % | |
516 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS Kristen Palangka Raya (Pembangunan Rg. Lab. Kimia) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15805012 | 50410043 | APBD | 43,927,800 | 43,927,800 | 43,822,800 | 43,822,800 | 43,822,800 | 43,822,800 | 43,822,800 | 43,822,800 | 2024-03-15 | 2024-03-26 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 105,000 | 0.24 % | |
517 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Penataan Halaman SMAN 1 Kasongan (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16107012 | 51398796 | APBD | 60,000,000 | 60,000,000 | 59,889,000 | 59,889,000 | 59,889,000 | 59,889,000 | 59,889,000 | 59,889,000 | 2024-05-13 | 2024-05-22 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 111,000 | 0.19 % | |
518 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17417012 | 51211088 | APBD | 22,050,000 | 22,050,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 2024-06-27 | 2024-07-02 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 72,000 | 0.33 % | |
519 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Rumah Dinas Jl. RTA. Milono Km. 6,5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16039012 | 51445982 | APBD | 25,000,000 | 25,000,000 | 24,946,500 | 24,946,500 | 24,809,610 | 24,809,610 | 24,809,610 | 24,809,610 | 2024-05-07 | 2024-05-28 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 53,500 | 0.21 % | |
520 | 2024 | Inspektorat | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor-Pemasangan Interior Aula Inspektorat | Pengadaan Langsung | Pengadaan Barang | 17251012 | 49894891 | APBD | 206,252,000 | 200,000,000 | 199,511,400 | 199,511,400 | 199,258,320 | 199,258,320 | 199,258,320 | 199,258,320 | 2024-05-31 | 2024-06-11 | CV.EL BARRA | 20.634.253.7-711.000 | 6,740,600 | 3.27 % | |
521 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17447012 | 51358179 | APBD | 21,330,000 | 21,330,000 | 21,276,720 | 21,276,720 | 21,276,720 | 21,276,720 | 21,276,720 | 21,276,720 | 2024-07-06 | 2024-07-09 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 53,280 | 0.25 % | |
522 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Rumah Jaga Kebun Jabiren | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17896012 | 53083730 | APBD | 28,620,000 | 28,620,000 | 28,335,303 | 28,335,303 | 28,329,420 | 28,329,420 | 28,329,420 | 28,329,420 | 2024-11-07 | 2024-11-15 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 284,697 | 0.99 % | |
523 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15762012 | 49206089 | APBD | 13,582,500 | 13,505,000 | 13,364,400 | 13,364,400 | 13,075,800 | 13,075,800 | 13,075,800 | 13,075,800 | 2024-03-11 | 2024-03-20 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 218,100 | 1.61 % | |
524 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang OSIS SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16053012 | 50547833 | APBD | 13,609,000 | 13,609,000 | 13,563,000 | 13,563,000 | 13,563,000 | 13,563,000 | 13,563,000 | 13,563,000 | 2024-05-06 | 2024-05-18 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 46,000 | 0.34 % | |
525 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Awang Lapai (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17270012 | 51154245 | APBD | 37,095,800 | 37,095,800 | 37,095,000 | 37,095,000 | 37,095,000 | 37,095,000 | 0 | 37,095,000 | 2024-06-05 | 2024-06-14 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 800 | 0 % | |
526 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Pagar Sekolah dan Penataan Halaman SMKN 1 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16170012 | 51425119 | APBD | 68,200,000 | 68,200,000 | 68,077,900 | 68,077,900 | 68,077,900 | 68,077,900 | 68,077,900 | 68,077,900 | 2024-05-22 | 2024-06-02 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 122,100 | 0.18 % | |
527 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Supervisi Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah XII | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17767012 | 52940881 | APBDP | 100,000,000 | 99,999,900 | 99,789,000 | 99,789,000 | 99,400,000 | 0 | 0 | 0 | 2024-10-17 | 2024-11-04 | TRIAS POINTER | 02.538.776.2-711.000 | 211,000 | 0.21 % | |
528 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Rumah Dinas G. Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15721012 | 50137065 | APBD | 8,000,000 | 7,766,941 | 7,525,800 | 7,525,800 | 7,525,800 | 7,525,800 | 7,525,800 | 7,525,800 | 2024-03-19 | 2024-04-05 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 474,200 | 5.93 % | |
529 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi WC SMAN 3 Maliku 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17821012 | 52898139 | APBDP | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 2024-10-28 | 2024-11-05 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 55,500 | 0.28 % | |
530 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Perencanaan Pembangunan Sarana Prasarana Jaringan Air Limbah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16001012 | 51389703 | APBD | 50,000,000 | 49,900,000 | 48,307,200 | 48,307,200 | 44,422,200 | 44,422,200 | 44,422,200 | 44,422,200 | 2024-05-04 | 2024-05-17 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 1,692,800 | 3.39 % | |
531 | 2024 | Badan Pendapatan Daerah | Pengawasan Semenisasi Halaman Kantor UPTPPD Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17846012 | 53193661 | APBDP | 20,145,000 | 15,429,000 | 15,318,000 | 15,318,000 | 14,674,200 | 0 | 0 | 0 | 2024-11-01 | 2024-11-15 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 4,827,000 | 23.96 % | |
532 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Palangka Raya (Pembangunan Toilet (Jamban), Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17278012 | 51240438 | APBD | 30,478,300 | 30,478,300 | 30,425,000 | 30,425,000 | 30,425,000 | 30,425,000 | 30,425,000 | 30,425,000 | 2024-06-12 | 2024-06-24 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 53,300 | 0.17 % | |
533 | 2024 | Biro Pengadaan Barang dan Jasa | Pemeliharaan Aplikasi SI Monev | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16131012 | 50296829 | APBD | 52,500,000 | 52,247,700 | 52,247,700 | 52,247,700 | 51,803,700 | 51,803,700 | 51,803,700 | 51,803,700 | 2024-05-20 | 2024-06-07 | CV. PRIMA JAYA | 93.948.911.8-711.000 | 252,300 | 0.48 % | |
534 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Toilet(Jamban) 1 Ruang SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16026012 | 51170849 | APBD | 4,130,000 | 4,130,000 | 4,127,979 | 4,127,979 | 4,127,979 | 4,127,979 | 4,127,979 | 4,127,979 | 2024-05-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 2,021 | 0.05 % | ||
535 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Jasa Konsultansi Pengawasan Renovasi Parkir, Pagar, Kantin, Rumah Penjaga dan Gudang Kantor Dinas Penanaman Modal dan PTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17515012 | 52090398 | APBD | 51,379,000 | 51,337,500 | 51,171,000 | 51,171,000 | 49,635,870 | 49,635,870 | 0 | 49,635,870 | 2024-07-23 | 2024-09-06 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 208,000 | 0.4 % | |
536 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Biologi SMK NEGERI 1 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17538012 | 51212831 | APBD | 56,180,000 | 56,180,000 | 55,691,600 | 55,691,600 | 55,691,600 | 55,691,600 | 55,691,600 | 55,691,600 | 2024-07-25 | 2024-08-02 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 488,400 | 0.87 % | |
537 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Jasa Konsultansi Perencanaan Pembuatan Ruang PPID Kantor DPMPTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16011012 | 51311810 | APBD | 52,482,000 | 52,458,600 | 52,400,000 | 52,400,000 | 52,314,300 | 52,314,300 | 0 | 52,314,300 | 2024-05-16 | 2024-05-22 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 82,000 | 0.16 % | |
538 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN TOILET UMUM AULA UTAMA BAPENDA PROV.KAL-TENG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15731012 | 49248464 | APBD | 48,000,000 | 47,913,150 | 47,619,000 | 47,619,000 | 46,964,100 | 46,964,100 | 46,964,100 | 46,964,100 | 2024-03-11 | 2024-03-20 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 381,000 | 0.79 % | |
539 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Paju Epat (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15940012 | 50387283 | APBD | 64,762,700 | 64,762,700 | 64,700,000 | 64,700,000 | 64,700,000 | 64,700,000 | 0 | 64,700,000 | 2024-04-01 | 2024-04-22 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 62,700 | 0.1 % | |
540 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Pondasi Silo Pada Kegiatan Pembangunan Pabrik Pakan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17575012 | 52123197 | APBD | 99,999,990 | 99,960,000 | 99,822,855 | 99,822,855 | 99,400,500 | 99,400,500 | 99,400,500 | 98,500,000 | 2024-08-06 | 2024-08-14 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 177,135 | 0.18 % | |
541 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15751012 | 50372003 | APBD | 47,759,700 | 47,759,700 | 47,341,500 | 47,341,500 | 47,341,500 | 47,341,500 | 0 | 47,341,500 | 2024-03-13 | 2024-03-22 | 418,200 | 0.88 % | |||
542 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Tempat Parkir Kantor UPT BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16200012 | 51460045 | APBD | 10,588,165 | 10,588,165 | 10,466,065 | 10,466,065 | 10,436,775 | 10,436,775 | 10,436,775 | 10,436,775 | 2024-05-29 | 2024-06-05 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 122,100 | 1.15 % | |
543 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Pengawasan Arsitektur UPT Taman Budaya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10014748000 | 52473320 | APBDP | 67,819,000 | 67,800,465 | 67,488,000 | 67,488,000 | 67,032,900 | 0 | 0 | 0 | 2024-11-28 | 2024-12-17 | Roa Solution | 92.337.883.0-711.000 | 331,000 | 0.49 % | |
544 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Pemeliharaan Penyekatan dan Pemasangan Interior Gedung IBS Lt. 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16176012 | 51500498 | APBD | 5,000,000 | 4,999,000 | 4,995,000 | 4,995,000 | 4,073,700 | 4,073,700 | 4,073,700 | 4,073,700 | 2024-06-03 | 2024-06-12 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 5,000 | 0.1 % | |
545 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang kelas SMAN 2 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17769012 | 52877541 | APBDP | 40,000,000 | 40,000,000 | 39,676,950 | 39,676,950 | 39,676,950 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 323,050 | 0.81 % | |
546 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Muara Teweh (Rehabilitasi Rg. Kelas) 10 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17354012 | 51238352 | APBD | 95,972,700 | 95,972,700 | 95,770,800 | 95,770,800 | 95,770,800 | 95,770,800 | 95,770,800 | 95,770,800 | 2024-08-12 | 2024-08-16 | 201,900 | 0.21 % | |||
547 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS Muhammadiyah Katingan Tengah (Rehabilitasi Rg. Kelas, Rehabilitasi Toilet (Jamban) Beserta Sanitasinya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17265012 | 51239132 | APBD | 25,533,600 | 25,533,600 | 25,467,000 | 25,467,000 | 25,467,000 | 25,467,000 | 0 | 25,467,000 | 2024-06-05 | 2024-06-14 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 66,600 | 0.26 % | |
548 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI GARASI RUMAH DINAS ESSELON UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17683012 | 49835671 | APBD | 6,354,000 | 6,353,990 | 6,304,043 | 6,304,043 | 6,181,943 | 6,181,943 | 6,181,943 | 6,181,943 | 2024-09-27 | 2024-10-11 | 49,957 | 0.79 % | |||
549 | 2024 | KPHP SUKAMARA LAMANDAU | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17653012 | 52516230 | APBDP | 28,620,000 | 28,449,300 | 28,305,000 | 28,305,000 | 27,095,100 | 27,095,100 | 27,095,100 | 27,095,100 | 2024-09-18 | 2024-09-27 | 315,000 | 1.1 % | |||
550 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 1 Sematu Jaya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16155012 | 51423831 | APBD | 19,000,000 | 19,000,000 | 18,969,900 | 18,969,900 | 18,969,900 | 18,969,900 | 18,969,900 | 18,969,900 | 2024-05-22 | 2024-06-02 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 30,100 | 0.16 % | |
551 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 1 Mantangai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16154012 | 51423559 | APBD | 19,000,000 | 19,000,000 | 18,950,000 | 18,950,000 | 18,950,000 | 18,950,000 | 18,950,000 | 18,950,000 | 2024-05-22 | 2024-06-02 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 50,000 | 0.26 % | |
552 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer,Laboratorium Bahasa SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17444012 | 51358525 | APBD | 55,910,000 | 55,910,000 | 55,787,900 | 55,787,900 | 55,787,900 | 55,787,900 | 55,787,900 | 55,787,900 | 2024-07-06 | 2024-07-09 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 122,100 | 0.22 % | |
553 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Rehab Plafon, Pemasangan Interior dan Ornamen Lobby Admin Lt. 1 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16054012 | 51068929 | APBD | 20,000,000 | 19,980,000 | 19,700,280 | 19,700,280 | 15,739,800 | 15,739,800 | 15,739,800 | 15,739,800 | 2024-05-28 | 2024-06-10 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 299,720 | 1.5 % | |
554 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Ruang Guru, Ruang Kepala Sekolah, Ruang keterampilan, Ruang Pembelajaran Khusus, Ruang Perpustakaan, Ruang Tata Usaha SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17507012 | 52082489 | APBD | 48,934,480 | 48,923,250 | 48,923,250 | 48,923,250 | 48,923,250 | 48,923,250 | 48,923,000 | 48,923,250 | 2024-07-18 | 2024-07-26 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 11,230 | 0.02 % | |
555 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15927012 | 50549027 | APBD | 18,198,000 | 18,198,000 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 2024-04-01 | 2024-04-19 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 55,500 | 0.3 % | |
556 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15878012 | 50409821 | APBD | 43,927,800 | 43,927,800 | 43,872,300 | 43,872,300 | 43,872,300 | 43,872,300 | 0 | 43,872,300 | 2024-04-02 | 2024-04-24 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 55,500 | 0.13 % | |
557 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Bangsal dan Finishing Green House Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17756012 | 52365980 | APBDP | 56,000,000 | 56,000,000 | 55,458,375 | 55,458,375 | 55,458,375 | 0 | 0 | 0 | 2024-10-21 | 2024-10-31 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 541,625 | 0.97 % | |
558 | 2024 | Sekretariat DPRD | Beban Jasa Konsultansi Perencanaan arsitektur rehab bangunan induk lantai 1 Sekretariat DPRD Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Perorangan Konstruksi | 17503012 | 52010361 | APBD | 100,000,000 | 99,947,175 | 99,600,300 | 99,600,300 | 98,407,050 | 98,407,050 | 0 | 98,407,050 | 2024-07-16 | 2024-07-25 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 399,700 | 0.4 % | |
559 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KURUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006794000 | 49718725 | APBD | 9,001,500 | 8,999,999 | 8,991,000 | 8,991,000 | 8,591,400 | 0 | 0 | 0 | 2024-11-15 | 2024-11-29 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 10,500 | 0.12 % | |
560 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Beban Jasa Konsultansi Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17262012 | 49429033 | APBD | 52,482,000 | 51,000,000 | 50,889,000 | 50,889,000 | 50,888,838 | 50,888,838 | 50,888,838 | 50,888,838 | 2024-06-04 | 2024-06-11 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 1,593,000 | 3.04 % | |
561 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Toilet (Jamban)1 Ruang beserta sanitasinya SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17416012 | 51171719 | APBD | 4,880,000 | 4,880,000 | 4,844,000 | 4,844,000 | 4,844,000 | 4,844,000 | 4,844,000 | 4,844,000 | 2024-06-27 | 2024-07-02 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 36,000 | 0.74 % | |
562 | 2024 | Dinas Pendidikan | Jasa Konsunltasi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang SLBN 2 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17344012 | 51911805 | APBD | 12,750,000 | 12,748,350 | 12,705,000 | 12,705,000 | 12,705,000 | 12,705,000 | 12,705,000 | 12,705,000 | 2024-08-12 | 2024-08-19 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 45,000 | 0.35 % | |
563 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN TANDON AIR UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17434012 | 49722036 | APBD | 7,500,000 | 7,464,974 | 7,369,832 | 7,369,832 | 7,086,782 | 7,086,782 | 7,086,782 | 7,086,782 | 2024-07-03 | 2024-07-17 | 130,168 | 1.74 % | |||
564 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya -Rehab Asrama | Pengadaan Langsung | Pekerjaan Konstruksi | 17899012 | 53355214 | APBDP | 198,000,000 | 198,000,000 | 197,494,958 | 197,494,958 | 196,000,353 | 0 | 0 | 0 | 2024-11-08 | 2024-11-15 | CV. MULTI TATA KARYA | 71.905.824.0-711.000 | 505,042 | 0.26 % | |
565 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.07.0010.5.1.02.02.08.0018 Pengawasan Instalasi Listrik Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17861012 | 53183931 | APBD | 12,000,000 | 12,000,000 | 11,950,000 | 11,950,000 | 11,800,000 | 11,800,000 | 11,800,000 | 11,800,000 | 2024-11-01 | 2024-11-08 | CV.ADIKON CITRABANGUN KONSULTAN | 02.618.694.0-711.000 | 50,000 | 0.42 % | |
566 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika,Laboratorium Biologi SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17420012 | 51200460 | APBD | 82,850,000 | 82,850,000 | 82,619,120 | 82,619,120 | 82,619,120 | 82,619,120 | 82,619,120 | 82,619,120 | 2024-06-28 | 2024-07-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 230,880 | 0.28 % | |
567 | 2024 | Badan Pendapatan Daerah | Pengawasan Renovasi Ruang Kantor UPTPPD Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17845012 | 53155890 | APBDP | 27,000,000 | 20,035,500 | 19,924,500 | 19,924,500 | 19,341,750 | 0 | 0 | 0 | 2024-10-30 | 2024-11-14 | 7,075,500 | 26.21 % | |||
568 | 2024 | Dinas Perdagangan dan Perindustrian | Pengadaan Jasa Konsultansi Perencanaan Rehabilitasi Bangunan Rumah Kemasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17247012 | 51216832 | APBD | 67,017,915 | 67,017,915 | 66,975,180 | 66,975,000 | 66,420,180 | 66,400,000 | 66,400,000 | 66,400,000 | 2024-06-11 | 2024-06-21 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 42,735 | 0.06 % | |
569 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Ayam Buras, Pakan dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10021415000 | 53545249 | APBD | 11,771,500 | 11,771,500 | 11,527,300 | 11,527,300 | 11,524,908 | 0 | 0 | 0 | 2024-11-30 | 2024-12-06 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 244,200 | 2.07 % | |
570 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 2 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16145012 | 51421923 | APBD | 20,000,000 | 20,000,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 2024-05-22 | 2024-06-02 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.56 % | |
571 | 2024 | Dinas Pendidikan | Paket Pekerjaan PerencanaanPenataan Halaman dan Paving SMAN 2 Pulang Pisau (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15813012 | 50773725 | APBD | 38,500,000 | 38,500,000 | 38,450,000 | 38,450,000 | 38,450,000 | 38,450,000 | 38,450,000 | 38,450,000 | 2024-03-18 | 2024-03-28 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 50,000 | 0.13 % | |
572 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI GEDUNG UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17435012 | 49953444 | APBD | 21,180,000 | 21,172,082 | 20,978,369 | 20,978,369 | 20,118,119 | 20,118,119 | 20,118,119 | 20,118,119 | 2024-07-03 | 2024-07-17 | 201,631 | 0.95 % | |||
573 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Lanjutan pemasangan plafon dan keramik ruang kelas SMAN 1 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15881012 | 50729240 | APBD | 40,000,000 | 40,000,000 | 39,982,200 | 39,982,200 | 39,982,200 | 39,982,200 | 0 | 39,982,200 | 2024-03-28 | 2024-04-08 | Roa Solution | 92.337.883.0-711.000 | 17,800 | 0.04 % | |
574 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih ( SMAN 1 Katingan Kuala, SMAN 2 Katingan Kuala)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15705012 | 49713447 | APBD | 40,000,000 | 40,000,000 | 39,950,000 | 39,950,000 | 39,950,000 | 0 | 0 | 0 | 2024-02-23 | 2024-03-11 | CV. PENDANG JAYA RAYA ENGINEERING | 01.662.432.2-711.000 | 50,000 | 0.13 % | |
575 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Paju Epat (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17273012 | 51184289 | APBD | 49,202,700 | 49,202,700 | 49,173,000 | 49,173,000 | 49,173,000 | 49,173,000 | 0 | 49,173,000 | 2024-06-06 | 2024-06-14 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 29,700 | 0.06 % | |
576 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Penataan halaman SMAN 10 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17828012 | 52897755 | APBDP | 65,000,000 | 65,000,000 | 64,900,000 | 64,900,000 | 64,900,000 | 64,900,000 | 64,900,000 | 64,900,000 | 2024-10-26 | 2024-11-04 | CV. BATUAH RAYA KONSULTAN | 19.890.506.9-711.000 | 100,000 | 0.15 % | |
577 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Jaringan Listrik - Pekerjaan Instalasi Listrik AC (Air Conditioner) Gedung IKR | Pengadaan Langsung | Jasa Lainnya | 10011278000 | 52983251 | APBDP | 189,000,000 | 188,878,190 | 188,500,000 | 188,500,000 | 187,584,450 | 0 | 0 | 0 | 2024-11-20 | 2024-11-29 | CV.SINAR TERANG | 02.292.356.9-711.000 | 500,000 | 0.26 % | |
578 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS Muhammadiyah Kuala Kapuas (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS, Pembangunan Rg. BK ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17322012 | 51238986 | APBD | 54,359,200 | 54,359,200 | 54,359,200 | 54,359,200 | 54,359,200 | 54,359,200 | 54,359,200 | 54,359,200 | 2024-06-14 | 2024-06-26 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 0 | 0 % | |
579 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE, KANOPI PENYAMBUNG KANTOR-GUDANG ARSIP UPTPPD SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17219012 | 49687870 | APBD | 30,000,000 | 29,900,094 | 29,750,255 | 29,750,255 | 29,100,794 | 29,100,794 | 29,100,794 | 29,100,794 | 2024-05-29 | 2024-06-13 | 249,745 | 0.83 % | |||
580 | 2024 | Dinas Perpustakaan dan Arsip | Jasa Konsultansi Perencanaan Renovasi Gedung Fasilitas Layanan Perpustakaan Umum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16051012 | 51257316 | APBD | 97,818,000 | 97,818,000 | 97,300,047 | 97,300,000 | 97,200,000 | 97,200,000 | 97,200,000 | 97,200,000 | 2024-05-06 | 2024-05-31 | CV. MENTENG BATARUNG KONSULTINDO | 50.221.960.3-711.000 | 517,953 | 0.53 % | |
581 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 10 Palangka Raya (Pembangunan Rg. UKS, Pembangunan Rg. BK, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15861012 | 50408820 | APBD | 42,622,800 | 42,622,800 | 42,565,281 | 42,565,281 | 42,565,281 | 42,565,281 | 0 | 42,565,281 | 2024-03-22 | 2024-04-03 | 57,519 | 0.13 % | |||
582 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMA Garing Tarantang (Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15776012 | 50392180 | APBD | 62,209,700 | 62,154,450 | 62,098,950 | 62,098,950 | 62,098,950 | 62,098,950 | 62,098,950 | 62,098,950 | 2024-03-18 | 2024-03-28 | 110,750 | 0.18 % | |||
583 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang OSIS SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15924012 | 50541005 | APBD | 19,066,000 | 19,066,000 | 19,010,500 | 19,010,500 | 19,010,500 | 19,010,500 | 19,010,500 | 19,010,500 | 2024-04-01 | 2024-04-19 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 55,500 | 0.29 % | |
584 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Kambing Untuk Kabupaten Kotawaringin Timur Wilayah I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10026898000 | 52123183 | APBD | 8,472,000 | 8,436,000 | 8,380,500 | 8,380,500 | 8,380,500 | 0 | 0 | 0 | 2024-12-07 | 2024-12-13 | 91,500 | 1.08 % | |||
585 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Mushola Komp. Pemda G. Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17738012 | 52888477 | APBD | 14,992,770 | 14,992,770 | 14,397,255 | 14,397,255 | 14,397,255 | 0 | 0 | 0 | 2024-10-14 | 2024-11-01 | CV. LIANDRA BORU BERSAUDARA | 39.525.241.4-711.000 | 595,515 | 3.97 % | |
586 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Asrama Banjarbaru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15724012 | 50137001 | APBD | 40,000,000 | 39,964,062 | 39,072,000 | 39,072,000 | 39,072,000 | 39,072,000 | 39,072,000 | 39,072,000 | 2024-02-26 | 2024-03-18 | Roa Solution | 92.337.883.0-711.000 | 928,000 | 2.32 % | |
587 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Kantin, Ruang Kepala Sekolah, Ruang Pembelajaran Khusus, Ruang tata Usaha SLBN Puruk Cahu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17504012 | 52082461 | APBD | 32,349,546 | 32,347,620 | 32,347,620 | 32,347,620 | 32,347,620 | 32,347,620 | 3,234,700 | 32,347,620 | 2024-07-18 | 2024-07-26 | CV. SEIPUTRA PERSADA | 02.539.098.0-711.000 | 1,926 | 0.01 % | |
588 | 2024 | Badan Keuangan dan Aset Daerah | Pemeliharaan Rumah Dinas G. Obos | Pengadaan Langsung | Pekerjaan Konstruksi | 10008123000 | 53470377 | APBD | 475,000,000 | 200,000,000 | 199,737,592 | 199,737,592 | 199,737,592 | 0 | 0 | 0 | 2024-11-20 | 2024-12-09 | Archero | 92.264.805.0-711.000 | 275,262,408 | 57.95 % | |
589 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE KANTOR UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17256012 | 49693368 | APBD | 16,944,000 | 16,927,500 | 16,872,000 | 16,872,000 | 16,272,600 | 16,272,600 | 16,272,600 | 16,272,600 | 2024-06-03 | 2024-06-18 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 72,000 | 0.42 % | |
590 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Penataan Halaman dan Paving SMAN 2 Pulang Pisau (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17396012 | 51400295 | APBD | 29,900,000 | 29,900,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 2024-08-13 | 2024-08-21 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 100,000 | 0.33 % | |
591 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17238012 | 51738332 | APBD | 37,940,000 | 37,940,000 | 37,884,300 | 37,884,300 | 37,884,300 | 37,884,300 | 0 | 37,884,300 | 2024-05-30 | 2024-06-10 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 55,700 | 0.15 % | |
592 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Tamiyang Layang (Rehabilitasi Rg. Lab. Kimia, Rehabilitasi Rg. Lab. Fisika, Pembangunan Toilet (Jamban) ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17494012 | 51184005 | APBD | 44,772,300 | 44,772,300 | 44,733,000 | 44,733,000 | 44,733,000 | 44,733,000 | 44,733,000 | 44,733,000 | 2024-07-15 | 2024-07-19 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 39,300 | 0.09 % | |
593 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BUNTOK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16030012 | 49200311 | APBD | 13,582,500 | 13,504,992 | 13,500,000 | 13,500,000 | 13,231,200 | 13,231,200 | 13,231,200 | 13,231,200 | 2024-05-01 | 2024-05-10 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 82,500 | 0.61 % | |
594 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Kalibrasi Alat laboratorium | Pengadaan Langsung | Jasa Lainnya | 17718012 | 50510065 | APBD | 117,925,000 | 113,775,000 | 113,553,000 | 113,553,000 | 111,222,000 | 0 | 0 | 0 | 2024-10-16 | 2024-10-28 | 4,372,000 | 3.71 % | |||
595 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0002.5.1.02.02.08.0018 Pengawasan Pembuatan Kolam Ikan Lengkap Dengan Perlengkapannya di Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17890012 | 52993250 | APBD | 17,763,480 | 17,740,575 | 17,696,175 | 17,696,175 | 17,100,000 | 17,100,000 | 17,100,000 | 17,100,000 | 2024-11-07 | 2024-11-15 | CV. ANTANG SAKTI | 02.618.398.8-711.000 | 67,305 | 0.38 % | |
596 | 2024 | Dinas Kebudayaan dan Pariwisata | Perencanaan Penataan Halaman, Area Bermain dan Pembangunan Tempat Parkir Museum Balanga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17781012 | 52972220 | APBDP | 97,818,000 | 97,818,000 | 97,707,000 | 97,707,000 | 97,430,250 | 0 | 0 | 0 | 2024-10-21 | 2024-11-20 | CV. BATUAH RAYA KONSULTAN | 19.890.506.9-711.000 | 111,000 | 0.11 % | |
597 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Ruang Kelas Bertingkat Yayasan Pendidikan ANNUR Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16204012 | 49721527 | APBD | 100,000,000 | 99,900,000 | 99,850,000 | 99,850,000 | 99,850,000 | 99,850,000 | 99,850,000 | 99,850,000 | 2024-05-25 | 2024-05-27 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 150,000 | 0.15 % | |
598 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Penyediaan dan Pemeliharaan Sarana Prasarana UPT.KPHP Kotawaringin Barat - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17470012 | 52003425 | APBDP | 37,878,000 | 37,877,973 | 37,826,000 | 37,826,000 | 37,656,750 | 37,656,750 | 37,656,750 | 37,656,750 | 2024-07-17 | 2024-08-06 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 52,000 | 0.14 % | |
599 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17279012 | 51240370 | APBD | 30,927,300 | 30,927,300 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 2024-06-12 | 2024-06-24 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 133,200 | 0.43 % | |
600 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Kantor SMAN 1 Sebangau Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17776012 | 52880317 | APBDP | 30,000,000 | 30,000,000 | 29,922,300 | 29,922,300 | 29,922,300 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 77,700 | 0.26 % | |
601 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 6 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15863012 | 50410131 | APBD | 43,927,800 | 43,927,800 | 43,925,031 | 43,925,031 | 43,925,031 | 43,925,031 | 0 | 43,925,031 | 2024-03-25 | 2024-04-05 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 2,769 | 0.01 % | |
602 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMASANGAN PAVING BLOK HALAMAN AULA UTAMA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17600012 | 49686564 | APBD | 23,750,000 | 23,587,500 | 23,365,500 | 23,365,500 | 22,677,300 | 22,677,300 | 22,677,300 | 22,677,300 | 2024-08-14 | 2024-08-26 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 384,500 | 1.62 % | |
603 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17220012 | 49721716 | APBD | 32,000,000 | 31,900,092 | 31,842,494 | 31,842,494 | 31,365,194 | 31,365,194 | 31,365,194 | 31,365,194 | 2024-05-29 | 2024-06-13 | 157,506 | 0.49 % | |||
604 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0005 Perencanaan Lanjutan Rehab Garansi, Rehab Atap aula Kantor, Rehab Atap Sayap kanan- kiri kantor, Rehab Halaman dan jalan kantor, Rehab Halaman dan jalan kantor, Rehab Plafond Luar Ruang Bidang (1 Paket) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15959012 | 48161440 | APBD | 100,000,000 | 99,889,000 | 99,600,300 | 99,600,300 | 98,900,000 | 98,900,000 | 100 | 98,900,000 | 2024-04-24 | 2024-05-10 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 399,700 | 0.4 % | |
605 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pemeliharaan Jaringan Listrik Baru Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16126012 | 51644144 | APBDP | 30,000,000 | 30,000,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 2024-05-24 | 2024-05-31 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 50,000 | 0.17 % | |
606 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE UPTPPD KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17426012 | 49694303 | APBD | 16,944,000 | 16,943,999 | 16,900,000 | 16,900,000 | 16,594,500 | 16,594,500 | 16,594,500 | 16,594,500 | 2024-07-03 | 2024-07-17 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 44,000 | 0.26 % | |
607 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Rumah Dinas RTA Milono KM. 5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15722012 | 50136949 | APBD | 40,000,000 | 39,698,068 | 39,305,100 | 39,305,100 | 39,305,100 | 39,305,100 | 39,305,100 | 39,305,100 | 2024-02-26 | 2024-03-18 | Roa Solution | 92.337.883.0-711.000 | 694,900 | 1.74 % | |
608 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Peningkatan Drainase Jalan Brokoli V dan Sekitarnya, Kota Palangka Raya, Provinsi Kalimantan Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 17604012 | 52260770 | APBD | 186,400,000 | 186,400,000 | 185,907,784 | 185,907,784 | 185,500,000 | 185,500,000 | 185,500,000 | 185,500,000 | 2024-08-19 | 2024-09-06 | CV. RINDANG BUMI UTAMA | 93.938.888.0-711.000 | 492,216 | 0.26 % | |
609 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Rumah Dinas G. Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17841012 | 53220823 | APBD | 47,500,000 | 20,705,940 | 20,316,996 | 20,316,996 | 20,316,996 | 0 | 0 | 0 | 2024-11-01 | 2024-11-20 | CV. FELI TIRTHA MANDIRI | 39.579.843.2-711.000 | 27,183,004 | 57.23 % | |
610 | 2024 | Dinas Pendidikan | Jasa Konsultrasi Perencanaan Penimbunan Halaman Sekolah SLBN 1 Kuala Kapuas, Pembangunan Pagar sekolah SLBN 1 Palangka Raya, Pembangunan Paping SLBN 1 Sampit, Rehabilitasi Pagar Sekolah SLBN 1 Sampit dan Penimbunan Halaman Sekolah SLBN 2 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17860012 | 53268136 | APBD | 42,500,000 | 42,496,350 | 42,496,350 | 42,496,350 | 42,496,350 | 0 | 0 | 0 | 2024-11-02 | 2024-11-05 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 3,650 | 0.01 % | |
611 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Perencanaan Arsitektur - Rehab Pagar Pesanggrahan Tjilik Riwut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17814012 | 53104346 | APBD | 68,900,000 | 68,900,000 | 68,772,492 | 68,772,492 | 68,217,492 | 68,217,492 | 0 | 68,217,492 | 2024-10-29 | 2024-11-22 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 127,508 | 0.19 % | |
612 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Babi, Pakan dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10026897000 | 52123226 | APBD | 18,532,500 | 18,532,500 | 18,033,000 | 18,033,000 | 18,020,850 | 0 | 0 | 0 | 2024-12-07 | 2024-12-13 | 499,500 | 2.7 % | |||
613 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan WC 2 Unit SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15890012 | 50730701 | APBD | 27,000,000 | 27,000,000 | 26,800,000 | 26,800,000 | 26,800,000 | 26,800,000 | 0 | 26,800,000 | 2024-03-28 | 2024-04-08 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 200,000 | 0.74 % | |
614 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 10 Palangka Raya (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15860012 | 50408797 | APBD | 78,824,800 | 78,824,800 | 78,641,724 | 78,641,724 | 78,641,724 | 78,641,724 | 0 | 78,641,724 | 2024-03-22 | 2024-04-03 | 183,076 | 0.23 % | |||
615 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15851012 | 50467270 | APBD | 21,757,000 | 21,757,000 | 21,625,000 | 21,625,000 | 21,625,000 | 21,625,000 | 21,625,000 | 21,625,000 | 2024-03-25 | 2024-04-12 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 132,000 | 0.61 % | |
616 | 2024 | Dinas Perhubungan | Perencanaan Rehabilitasi Sedang/Berat Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15823012 | 50017129 | APBD | 89,813,000 | 89,813,000 | 89,688,000 | 89,688,000 | 89,688,000 | 89,688,000 | 89,688,000 | 89,688,000 | 2024-03-18 | 2024-04-02 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 125,000 | 0.14 % | 3 |
617 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15982012 | 49434241 | APBD | 99,980,000 | 99,980,000 | 99,872,250 | 99,872,250 | 99,870,000 | 99,870,000 | 0 | 99,870,000 | 2024-04-20 | 2024-05-10 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 107,750 | 0.11 % | 3 |
618 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15983012 | 49436702 | APBD | 98,935,553 | 98,935,000 | 98,828,850 | 98,828,850 | 98,828,000 | 98,828,000 | 0 | 98,828,000 | 2024-04-20 | 2024-05-10 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 106,703 | 0.11 % | 3 |
619 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Kantin, Ruang Guru, Ruang Kepala Sekolah, Ruang Keterampilan, Ruang Pembelajaran Khusus, Ruang Perpustakaan, Ruang Tata Usaha, Ruang UKS, Selasar Penghubung SLBN 3 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17337012 | 51911594 | APBD | 85,978,800 | 85,692,000 | 85,137,000 | 85,137,000 | 85,137,000 | 85,137,000 | 0 | 85,137,000 | 2024-07-01 | 2024-07-05 | 841,800 | 0.98 % | 3 | ||
620 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17430012 | 51930758 | APBD | 60,000,000 | 60,000,000 | 59,951,100 | 59,951,100 | 59,673,600 | 59,673,600 | 59,673,600 | 59,673,600 | 2024-07-01 | 2024-07-19 | CV. SEIPUTRA PERSADA | 02.539.098.0-711.000 | 48,900 | 0.08 % | 3 |
621 | 2024 | Dinas Sosial | Pengawasan Rehabilitasi Kantor Dinas Sosial Provinsi Kalimantan Tengah (Ruang Kadis dan Toilet Kantor) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17459012 | 49929417 | APBD | 49,820,000 | 49,820,000 | 49,804,035 | 49,804,035 | 48,893,280 | 48,893,280 | 48,893,280 | 48,893,280 | 2024-08-23 | 2024-09-12 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 15,965 | 0.03 % | 3 |
622 | 2024 | Dinas Sosial | Pengawasan Pembangunan Musholla UPT PSBL (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17461012 | 49455370 | APBD | 26,475,000 | 26,475,000 | 24,881,760 | 24,881,760 | 24,619,800 | 24,619,800 | 24,619,800 | 24,619,800 | 2024-07-10 | 2024-07-19 | CV. MULTI TEKNIKA | 01.489.648.4-711.000 | 1,593,240 | 6.02 % | 3 |
623 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17724012 | 52869548 | APBDP | 99,640,000 | 99,640,000 | 99,345,000 | 99,345,000 | 99,345,000 | 99,345,000 | 0 | 99,345,000 | 2024-10-12 | 2024-11-01 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 295,000 | 0.3 % | 3 |
624 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Kotawaringin Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17728012 | 52869819 | APBDP | 96,460,000 | 96,460,000 | 95,904,000 | 95,904,000 | 95,904,000 | 95,904,000 | 0 | 95,904,000 | 2024-10-12 | 2024-11-01 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 556,000 | 0.58 % | 3 |
625 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Penataan Halaman dan Paving SMAN 2 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17274012 | 51398894 | APBD | 83,998,000 | 83,998,000 | 83,139,000 | 83,139,000 | 83,139,000 | 83,139,000 | 83,139,000 | 83,139,000 | 2024-06-07 | 2024-06-19 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 859,000 | 1.02 % | |
626 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pembangunan Lanjutan Jalan Menuju Sekolah SMAN 1 Tamban Catur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17768012 | 52878588 | APBDP | 65,000,000 | 65,000,000 | 64,866,800 | 64,866,800 | 64,866,800 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 133,200 | 0.2 % | |
627 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15907012 | 49211291 | APBD | 52,800,000 | 52,700,036 | 51,953,550 | 51,953,550 | 51,629,430 | 51,629,430 | 51,629,430 | 51,629,430 | 2024-03-28 | 2024-04-12 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 846,450 | 1.6 % | |
628 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Drainase | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17793012 | 52775425 | APBDP | 22,000,000 | 21,997,980 | 21,986,880 | 21,986,880 | 21,986,880 | 0 | 0 | 0 | 2024-10-18 | 2024-10-22 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 13,120 | 0.06 % | |
629 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Asrama | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17864012 | 53269815 | APBDP | 17,820,000 | 17,820,000 | 17,765,550 | 17,765,550 | 17,765,550 | 0 | 0 | 0 | 2024-11-04 | 2024-11-12 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 54,450 | 0.31 % | |
630 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Bangunan Gedung - Rehab Ruang Direktur | Pengadaan Langsung | Pekerjaan Konstruksi | 17711012 | 52763600 | APBDP | 200,000,000 | 200,000,000 | 199,945,000 | 199,945,000 | 199,630,000 | 0 | 0 | 0 | 2024-10-16 | 2024-10-25 | CV. ASANA KARYA | 71.140.245.3-711.000 | 55,000 | 0.03 % | |
631 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Lanjutan pembuatan pagar dan penataan halaman sekolah SMAN 1 Arut Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17305012 | 51398865 | APBD | 32,400,000 | 32,400,000 | 32,289,900 | 32,289,900 | 32,289,900 | 32,289,900 | 32,289,900 | 32,289,900 | 2024-06-12 | 2024-06-24 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 110,100 | 0.34 % | |
632 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Arut Utara (Rehabilitasi Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15790012 | 50393059 | APBD | 45,515,100 | 45,515,100 | 45,177,000 | 45,177,000 | 45,177,000 | 45,177,000 | 0 | 45,177,000 | 2024-03-21 | 2024-04-08 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 338,100 | 0.74 % | |
633 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS Kristen Palangka Raya (Rehabilitasi Rg. Kelas) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16132012 | 51240474 | APBD | 67,792,500 | 67,792,500 | 67,738,000 | 67,738,000 | 67,738,000 | 67,738,000 | 0 | 67,738,000 | 2024-05-21 | 2024-05-31 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 54,500 | 0.08 % | |
634 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Gedung Laboratorium Pada Kegiatan Pembangunan Pabrik Pakan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17610012 | 50584261 | APBD | 17,204,500 | 17,116,000 | 17,061,394 | 17,061,394 | 17,038,500 | 17,038,500 | 17,038,500 | 17,038,500 | 2024-08-22 | 2024-08-30 | 143,106 | 0.83 % | |||
635 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17380012 | 51458609 | APBD | 45,000,000 | 45,000,000 | 44,833,500 | 44,833,500 | 44,833,500 | 44,833,500 | 44,833,500 | 44,833,500 | 2024-07-02 | 2024-07-11 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 166,500 | 0.37 % | |
636 | 2024 | Dinas Kesehatan | Konsultan Perencanaan Pembangunan RSUD Kelas B Di Wilayah Barat Provinsi Kalimantan Tengah - Tahapan Pengawasan Berkala Tahap III | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17565012 | 50987285 | APBD | 1,100,000,000 | 1,001,871,570 | 920,594,040 | 920,594,040 | 909,494,040 | 0 | 0 | 0 | 2024-08-05 | 2024-08-23 | 179,405,960 | 16.31 % | |||
637 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAS PGRI Pulau Hanaut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17244012 | 51398941 | APBD | 49,986,000 | 49,986,000 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 2024-05-30 | 2024-06-07 | 480,000 | 0.96 % | |||
638 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI PLAFON DAN TANGGA KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15744012 | 49831359 | APBD | 32,350,000 | 32,325,281 | 32,214,000 | 32,214,000 | 31,537,181 | 31,537,181 | 31,537,181 | 31,537,181 | 2024-03-07 | 2024-03-20 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 136,000 | 0.42 % | |
639 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultasi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (PERENCANAAN PEMBANGUNAN TOWER TRIANGLE PEMANCAR RADIO) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10031643000 | 53754396 | APBDP | 15,000,000 | 14,990,000 | 14,950,000 | 14,950,000 | 14,950,000 | 0 | 0 | 0 | 2024-12-18 | 2024-12-23 | 50,000 | 0.33 % | |||
640 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN RUANG TUNGGU CEK FISIK MOBIL | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16017012 | 49211993 | APBD | 32,832,000 | 32,648,929 | 32,458,250 | 32,458,250 | 32,230,756 | 32,230,756 | 32,230,756 | 32,230,756 | 2024-04-29 | 2024-05-13 | CV. DAKSA RESWARA PRAKASA | 65.529.585.5-711.000 | 373,750 | 1.14 % | |
641 | 2024 | Dinas Kelautan dan Perikanan | 3.25.03.1.06.0001.5.2.03.01.01.0018 Redesign Peningkatan Jalan Titian Pelabuhan Perikanan Kuala Jelai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17717012 | 52754950 | APBDP | 70,000,000 | 70,000,000 | 69,993,825 | 69,993,825 | 69,000,000 | 69,000,000 | 69,000,000 | 69,000,000 | 2024-10-07 | 2024-10-18 | CV. SEIPUTRA PERSADA | 02.539.098.0-711.000 | 6,175 | 0.01 % | |
642 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Dusun Utara (Pembangunan Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17433012 | 51153664 | APBD | 51,153,200 | 51,153,200 | 51,032,805 | 51,032,805 | 51,032,805 | 51,032,805 | 51,032,805 | 51,032,805 | 2024-07-03 | 2024-07-12 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 120,395 | 0.24 % | |
643 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Bimbingan Konseling SMAN 4 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17826012 | 52899120 | APBDP | 20,000,000 | 20,000,000 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 2024-10-28 | 2024-11-05 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 77,700 | 0.39 % | |
644 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17529012 | 51852251 | APBD | 41,850,000 | 41,850,000 | 41,800,000 | 41,800,000 | 41,800,000 | 41,800,000 | 41,800,000 | 41,800,000 | 2024-07-25 | 2024-08-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 50,000 | 0.12 % | |
645 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Laboratorium Komputer SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17786012 | 52880518 | APBDP | 30,000,000 | 30,000,000 | 29,780,412 | 29,780,412 | 29,780,412 | 0 | 0 | 0 | 2024-10-17 | 2024-10-23 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 219,588 | 0.73 % | |
646 | 2024 | Dinas Perhubungan | Rehabilitasi Terminal Natai Suka Kabupaten Kotawaringin Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 17571012 | 51282101 | APBD | 164,141,000 | 164,141,000 | 163,630,362 | 163,630,362 | 163,518,775 | 163,518,775 | 163,518,775 | 163,518,775 | 2024-08-05 | 2024-08-12 | CV. ARTHA CAPRICORNUS | 01.922.068.0-711.000 | 510,638 | 0.31 % | |
647 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pekerjaan Taman Smart Green House Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17757012 | 52365975 | APBDP | 40,000,000 | 40,000,000 | 39,849,000 | 39,849,000 | 39,849,000 | 0 | 0 | 0 | 2024-10-22 | 2024-10-31 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 151,000 | 0.38 % | |
648 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Kelas) 7 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16190012 | 51239274 | APBD | 65,551,400 | 65,551,400 | 65,490,000 | 65,490,000 | 65,490,000 | 65,490,000 | 0 | 65,490,000 | 2024-05-28 | 2024-06-05 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 61,400 | 0.09 % | |
649 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Kantor SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17785012 | 52880465 | APBDP | 40,000,000 | 40,000,000 | 39,710,028 | 39,710,028 | 39,710,028 | 0 | 0 | 0 | 2024-10-17 | 2024-10-23 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 289,972 | 0.72 % | |
650 | 2024 | Dinas Energi dan Sumber Daya Mineral | Penyediaan Peralatan dan Perlengkapan Kantor -Bahan Lainnya (Sekat Ruangan) | Pengadaan Langsung | Pengadaan Barang | 17715012 | 48640367 | APBD | 123,899,160 | 123,890,000 | 123,800,000 | 123,800,000 | 123,578,000 | 123,578,000 | 123,578,000 | 123,578,000 | 2024-10-07 | 2024-10-14 | 99,160 | 0.08 % | |||
651 | 2024 | Dinas Ketahanan Pangan | Jasa Konsultansi Perencanaan Rehab Gedung Kantor Pasca Kebakaran di Dinas Ketahanan Pangan Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17736012 | 52895855 | APBD | 18,000,000 | 18,000,000 | 17,982,000 | 17,982,000 | 17,460,300 | 17,460,300 | 17,460,300 | 17,460,300 | 2024-10-12 | 2024-10-30 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 18,000 | 0.1 % | |
652 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Jalan Produksi/Jalan Usaha Tani di IPBH Keruing | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17681012 | 52671062 | APBD | 28,091,840 | 28,091,840 | 28,050,000 | 28,050,000 | 27,930,930 | 27,930,930 | 27,930,930 | 27,930,930 | 2024-09-30 | 2024-10-24 | 41,840 | 0.15 % | |||
653 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI RUANGAN LANTAI 1 DAN RUANGAN SEKRETARIAT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17519012 | 49960506 | APBD | 50,528,000 | 50,505,000 | 50,449,500 | 50,449,500 | 49,683,600 | 49,683,600 | 49,683,600 | 49,683,600 | 2024-07-22 | 2024-08-06 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 78,500 | 0.16 % | |
654 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Penataan dan Penimbunan Halaman SMAN 2 Kahayan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17830012 | 52898328 | APBDP | 25,000,000 | 25,000,000 | 24,753,000 | 24,753,000 | 24,753,000 | 24,753,000 | 24,753,000 | 24,753,000 | 2024-10-26 | 2024-11-04 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 247,000 | 0.99 % | |
655 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Pengawasan Pemeliharaan berupa Pengecatan Bangunan Gedung Admin RSUD dr. Doris Sylvanus | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17487012 | 51985655 | APBD | 12,000,000 | 11,900,000 | 11,880,000 | 11,880,000 | 11,655,000 | 11,655,000 | 11,655,000 | 11,655,000 | 2024-07-25 | 2024-08-05 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 120,000 | 1 % | |
656 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Rehab Ruang Rapat Direksi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16058012 | 51500676 | APBD | 10,000,000 | 9,602,000 | 9,500,490 | 9,500,490 | 6,832,050 | 6,832,050 | 6,832,050 | 6,832,050 | 2024-05-28 | 2024-06-10 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 499,510 | 5 % | |
657 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN GEDUNG ARSIP UPTPPD PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16018012 | 49197483 | APBD | 86,761,976 | 81,813,632 | 81,400,879 | 81,400,879 | 81,173,273 | 81,173,273 | 81,173,273 | 81,173,273 | 2024-04-29 | 2024-05-13 | CV. DAKSA RESWARA PRAKASA | 65.529.585.5-711.000 | 5,361,097 | 6.18 % | |
658 | 2024 | Dinas Ketahanan Pangan | Jasa Konsultansi Pengawasan Teknis Pemeliharaan Kantor Rehab Sedang Dinas Ketahanan Pangan Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17848012 | 53208530 | APBD | 35,000,000 | 35,000,000 | 34,889,000 | 34,889,000 | 34,167,500 | 34,167,500 | 34,167,500 | 34,167,500 | 2024-11-04 | 2024-11-30 | Roa Solution | 92.337.883.0-711.000 | 111,000 | 0.32 % | |
659 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Pengecoran Jalan Lingkungan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17794012 | 52993498 | APBDP | 20,900,000 | 20,874,950 | 20,844,500 | 20,844,500 | 20,844,500 | 0 | 0 | 0 | 2024-10-18 | 2024-10-22 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 55,500 | 0.27 % | |
660 | 2024 | Inspektorat | Belanja Modal Pantry Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 17780012 | 52832408 | APBD | 100,000,000 | 100,000,000 | 99,917,760 | 99,917,760 | 99,751,260 | 0 | 0 | 0 | 2024-10-29 | CV.EL BARRA | 20.634.253.7-711.000 | 82,240 | 0.08 % | ||
661 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Modal Bangunan Parkir (PARKIR PUSDALOP-PB BPB-PK Prov. Kalteng) | Pengadaan Langsung | Pekerjaan Konstruksi | 10019443000 | 53559351 | APBDP | 180,000,000 | 180,000,000 | 179,717,413 | 179,717,413 | 179,700,000 | 0 | 0 | 0 | 2024-12-02 | 2024-12-05 | 282,587 | 0.16 % | |||
662 | 2024 | Dinas Kelautan dan Perikanan | 3.25.02.1.02.0003.5.1.02.02.08.0015 Belanja Jasa Konsultansi Perencanaan Penataan Ruang-Jasa Perencanaan Wilayah ( Jasa Konsultansi Pembuatan Peta KKPRL) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10009467000 | 52850933 | APBDP | 40,032,000 | 40,015,500 | 39,960,000 | 39,960,000 | 39,500,000 | 39,500,000 | 39,500,000 | 39,500,000 | 2024-11-19 | 2024-11-29 | CV. POLYGONS | 02.618.529.8-711.000 | 72,000 | 0.18 % | |
663 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Penataan Halaman dan Paving SMAN 1 Kapuas Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16137012 | 51398700 | APBD | 90,000,000 | 90,000,000 | 89,299,500 | 89,299,500 | 89,299,500 | 89,299,500 | 89,299,500 | 89,299,500 | 2024-05-22 | 2024-05-31 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 700,500 | 0.78 % | |
664 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Balai Riam (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17360012 | 51239859 | APBD | 43,863,300 | 43,863,300 | 43,730,100 | 43,730,100 | 43,730,100 | 43,730,100 | 43,730,100 | 43,730,100 | 2024-07-02 | 2024-07-11 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 133,200 | 0.3 % | |
665 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Lanjutan pemasangan plafon dan keramik ruang kelas SMAN 1 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17324012 | 51398820 | APBD | 30,000,000 | 30,000,000 | 29,914,500 | 29,914,500 | 29,914,500 | 29,914,500 | 29,914,500 | 29,914,500 | 2024-06-19 | 2024-06-28 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 85,500 | 0.29 % | |
666 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Lanjutan penataan Halaman SMAN 1 Kasongan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17760012 | 52877769 | APBDP | 100,000,000 | 98,956,500 | 98,423,700 | 98,423,700 | 98,423,700 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 1,576,300 | 1.58 % | |
667 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17482012 | 51852024 | APBD | 76,900,000 | 76,900,000 | 76,786,800 | 76,786,800 | 76,786,800 | 76,786,800 | 76,786,800 | 76,786,800 | 2024-07-15 | 2024-07-19 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 113,200 | 0.15 % | |
668 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang OSIS SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17315012 | 51212594 | APBD | 13,790,000 | 13,790,000 | 13,719,000 | 13,719,000 | 13,719,000 | 13,719,000 | 13,719,000 | 13,719,000 | 2024-06-13 | 2024-06-17 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 71,000 | 0.51 % | |
669 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 1 Gunung Bintang Awai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17668012 | 52609933 | APBDP | 25,000,000 | 25,000,000 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 2024-09-26 | 2024-10-03 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 46,090 | 0.18 % | |
670 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16007012 | 49488010 | APBD | 10,844,000 | 10,844,000 | 10,772,550 | 10,772,550 | 10,772,550 | 10,772,550 | 0 | 10,772,550 | 2024-04-24 | 2024-04-30 | 71,450 | 0.66 % | |||
671 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Renovasi Bangunan Screen House di IPBH Keruing | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17882012 | 52434029 | APBDP | 49,820,000 | 49,734,300 | 49,314,587 | 49,314,587 | 49,110,285 | 49,110,285 | 49,110,285 | 49,110,285 | 2024-11-06 | 2024-11-12 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 505,413 | 1.01 % | |
672 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Pagar UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17267012 | 51802827 | APBDP | 124,570,000 | 99,999,900 | 99,678,000 | 99,678,000 | 99,012,000 | 99,012,000 | 99,012,000 | 99,012,000 | 2024-06-11 | 2024-06-21 | GEO DINAMIKA UTAMA | 01.576.437.6-711.000 | 24,892,000 | 19.98 % | |
673 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 3 Ruang SMAN 1 Sampit (Sistem Suntik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17384012 | 51398975 | APBD | 90,000,000 | 90,000,000 | 89,826,750 | 89,826,750 | 89,826,750 | 89,826,750 | 89,826,750 | 89,826,750 | 2024-07-22 | 2024-07-26 | 173,250 | 0.19 % | |||
674 | 2024 | Dinas Pendidikan | Perencanaan Rehab Toilet Ruang Gedung Kantor Dinas Pendidikan Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17657012 | 52559536 | APBDP | 80,000,000 | 80,000,000 | 79,600,701 | 79,600,701 | 79,600,701 | 79,600,701 | 79,600,701 | 79,600,701 | 2024-09-23 | 2024-09-30 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 399,299 | 0.5 % | |
675 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 PALANGKARAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16078012 | 50540379 | APBD | 18,198,000 | 18,198,000 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 2024-05-06 | 2024-05-18 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 55,500 | 0.3 % | |
676 | 2024 | Badan Pendapatan Daerah | Perkerjaan Perencanaan Penataan Halaman Aula Utama Bapenda Tahap 4 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15905012 | 49114037 | APBD | 81,000,000 | 80,952,300 | 80,375,100 | 80,375,100 | 79,675,800 | 79,675,800 | 79,675,800 | 79,675,800 | 2024-03-28 | 2024-04-12 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 624,900 | 0.77 % | |
677 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Perencanaan Pembangunan Gudang Pakan Ternak UPT BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16199012 | 51460040 | APBD | 12,418,212 | 12,418,212 | 12,314,982 | 12,314,982 | 12,298,245 | 12,298,245 | 12,298,245 | 12,298,245 | 2024-05-29 | 2024-06-05 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 103,230 | 0.83 % | |
678 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAN 4 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17394012 | 51399841 | APBD | 30,000,000 | 30,000,000 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 2024-07-11 | 2024-07-18 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 88,800 | 0.3 % | |
679 | 2024 | Dinas Perhubungan | Pengawasan Rehabilitasi Dermaga Jabiren di Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16125012 | 51275198 | APBD | 10,070,000 | 10,070,000 | 10,050,001 | 10,050,001 | 10,016,701 | 10,016,701 | 0 | 10,016,701 | 2024-05-17 | 2024-05-31 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 19,999 | 0.2 % | |
680 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 2 Montallat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17670012 | 52610090 | APBDP | 25,000,000 | 25,000,000 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 2024-09-26 | 2024-10-03 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 46,090 | 0.18 % | |
681 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI KANTOR UPTPPD KUALA KURUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15732012 | 49828623 | APBD | 45,360,000 | 44,716,905 | 44,244,600 | 44,244,600 | 43,323,300 | 43,323,300 | 43,323,300 | 43,323,300 | 2024-03-07 | 2024-03-20 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 1,115,400 | 2.46 % | |
682 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika,Biologi SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15923012 | 50540728 | APBD | 81,732,000 | 81,732,000 | 81,621,000 | 81,621,000 | 81,621,000 | 81,621,000 | 81,621,000 | 81,621,000 | 2024-04-01 | 2024-04-19 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 111,000 | 0.14 % | |
683 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Asrama Banjarbaru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15681012 | 46855997 | APBD | 45,000,000 | 44,936,000 | 44,726,784 | 44,726,784 | 44,726,784 | 44,726,784 | 44,726,784 | 44,726,784 | 2024-01-11 | 2024-01-29 | CV. KRUF STUDIO ENGINEERING | 81.075.394.7-711.000 | 273,216 | 0.61 % | |
684 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Banama Tingang (Rehabilitasi Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15858012 | 50408682 | APBD | 58,462,800 | 58,462,800 | 58,341,600 | 58,341,600 | 58,341,600 | 58,341,600 | 0 | 58,341,600 | 2024-03-25 | 2024-04-12 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 121,200 | 0.21 % | |
685 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Jaringan Listrik - Belanja Perakitan Panel Pembagi Beban | Pengadaan Langsung | Jasa Lainnya | 17467012 | 51999729 | APBD | 198,000,000 | 197,753,000 | 197,576,781 | 197,576,781 | 197,298,060 | 197,298,060 | 197,298,060 | 197,298,060 | 2024-08-08 | 2024-08-19 | CV.ANAIS TEKNIK | 02.292.605.9-711.000 | 423,219 | 0.21 % | |
686 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Penataan Halaman dan Paving SMAN 2 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15808012 | 50729356 | APBD | 91,000,000 | 91,000,000 | 90,576,000 | 90,576,000 | 90,576,000 | 90,576,000 | 0 | 90,576,000 | 2024-03-21 | 2024-04-08 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 424,000 | 0.47 % | |
687 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Dusun Utara (Pembangunan Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15839012 | 50377032 | APBD | 46,177,000 | 46,177,000 | 45,829,569 | 45,829,569 | 45,829,569 | 45,829,569 | 0 | 45,829,569 | 2024-03-21 | 2024-04-08 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 347,431 | 0.75 % | |
688 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 6 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15862012 | 50410082 | APBD | 43,927,800 | 43,927,800 | 43,926,030 | 43,926,030 | 43,926,030 | 43,926,030 | 0 | 43,926,030 | 2024-03-25 | 2024-04-05 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 1,770 | 0 % | |
689 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Supervisi Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah VIII | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17362012 | 51942584 | APBD | 100,000,000 | 99,999,900 | 99,910,545 | 99,910,545 | 99,628,000 | 99,628,000 | 99,628,000 | 99,628,000 | 2024-08-19 | 2024-09-06 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 89,455 | 0.09 % | |
690 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Berupa Penyekatan dan Pemasangan Interior Gedung IBS Lt. 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 17596012 | 52174208 | APBD | 50,000,000 | 49,950,000 | 49,895,136 | 49,895,136 | 49,519,500 | 49,519,500 | 49,519,500 | 49,519,500 | 2024-08-16 | 2024-08-26 | CV.KARYA DAJABA PUTRA | 02.978.026.9-711.000 | 104,864 | 0.21 % | |
691 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembuatan Siring dan Drainase SMK NEGERI 2 KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16045012 | 51010552 | APBD | 84,000,000 | 84,000,000 | 83,445,000 | 83,445,000 | 83,445,000 | 83,445,000 | 83,445,000 | 83,445,000 | 2024-05-07 | 2024-05-18 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 555,000 | 0.66 % | |
692 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan 1).Rehab Ruang Kelas SMKN 1 PANDIH BATU,2).Pembangunan Toilet Beserta Sanitasinya SMKN 1 PULANG PISAU,3).Rehab Ruang Kepala Sekolah/Guru/TU SMKN 1 BANAMA TINGANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17808012 | 52613128 | APBDP | 73,532,000 | 73,532,000 | 73,400,851 | 73,400,851 | 73,400,851 | 0 | 0 | 0 | 2024-10-25 | 2024-10-31 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 131,149 | 0.18 % | |
693 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan WC 2 Unit SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17392012 | 51399360 | APBD | 25,000,000 | 25,000,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 2024-07-04 | 2024-07-12 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 50,000 | 0.2 % | |
694 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN GUDANG KANTOR BAPENDA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16182012 | 49701640 | APBD | 40,000,000 | 39,948,900 | 39,615,900 | 39,615,900 | 38,922,150 | 38,922,150 | 38,922,150 | 38,922,150 | 2024-05-29 | 2024-06-08 | 384,100 | 0.96 % | |||
695 | 2024 | Dinas Pendidikan | Perencanaan Pembangunan Ruang Kelas Bertingkat Yayasan Pendidikan ANNUR Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15895012 | 49721530 | APBD | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,900,000 | 99,900,000 | 99,900,000 | 99,900,000 | 2024-04-01 | 2024-04-16 | CV. PENDANG JAYA RAYA ENGINEERING | 01.662.432.2-711.000 | 100,000 | 0.1 % | |
696 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Instalasi Pembangkit Listrik Lainnya - Belanja Pemeliharaan Genset Doosan 650 kVa | Pengadaan Langsung | Jasa Lainnya | 17559012 | 52117607 | APBD | 200,000,000 | 199,515,000 | 198,201,600 | 198,201,600 | 196,825,200 | 196,825,200 | 196,825,200 | 196,825,200 | 2024-07-31 | 2024-08-12 | PT. DEKA MULTI ENGINEERING | 20.106.314.6-711.000 | 1,798,400 | 0.9 % | |
697 | 2024 | Dinas Komunikasi, Informatika, Persandian dan Statistik | Beban Jasa Iklan/Reklame, Film, dan Pemotretan 2 | Pengadaan Langsung | Jasa Lainnya | 17680012 | 51820586 | APBD | 200,000,000 | 200,000,000 | 199,134,000 | 199,134,000 | 198,024,000 | 198,024,000 | 198,024,000 | 198,024,000 | 2024-10-01 | 2024-10-03 | Maeztro Production | 80.107.943.5-711.000 | 866,000 | 0.43 % | |
698 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG KELAS SMAN 2 KATINGAN TENGAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17874012 | 53267745 | APBDP | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,900,000 | 0 | 0 | 0 | 2024-11-06 | 2024-11-14 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 100,000 | 0.1 % | |
699 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pemasangan Paving Halaman SMAN 1 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17778012 | 52880662 | APBDP | 50,000,000 | 50,000,000 | 49,778,000 | 49,778,000 | 49,778,000 | 0 | 0 | 0 | 2024-10-16 | 2024-10-23 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 222,000 | 0.44 % | |
700 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Penataan Halaman dan Pagar SMAN 1 Kahayan Kuala (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17597012 | 51399855 | APBD | 60,000,000 | 60,000,000 | 59,000,000 | 59,000,000 | 59,000,000 | 59,000,000 | 59,000,000 | 59,000,000 | 2024-08-13 | 2024-08-21 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 1,000,000 | 1.67 % | |
701 | 2024 | Dinas Sosial | Perencanaan Pembuatan Drainase UPT PSBL Pambelum (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15969012 | 49436019 | APBD | 68,900,000 | 68,860,800 | 68,201,730 | 68,201,730 | 67,862,070 | 67,862,070 | 67,862,070 | 67,862,070 | 2024-04-17 | 2024-05-03 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 698,270 | 1.01 % | |
702 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMA Garing Tarantang (Rehabilitasi Rg. Kelas, Rehabilitasi Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15773012 | 50391907 | APBD | 63,531,700 | 63,414,300 | 63,358,800 | 63,358,800 | 63,358,800 | 63,358,800 | 63,358,800 | 63,358,800 | 2024-03-18 | 2024-03-28 | 172,900 | 0.27 % | |||
703 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17389012 | 51399187 | APBD | 55,000,000 | 55,000,000 | 54,900,000 | 54,900,000 | 54,900,000 | 54,900,000 | 54,900,000 | 54,900,000 | 2024-07-02 | 2024-07-11 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 100,000 | 0.18 % | |
704 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Pengawasan Arsitektur (RESERVOIR) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17592012 | 52221339 | APBD | 70,000,000 | 70,000,000 | 69,541,500 | 69,541,500 | 69,486,000 | 69,486,000 | 69,486,000 | 69,486,000 | 2024-08-12 | 2024-08-16 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 458,500 | 0.66 % | |
705 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 1 Katingan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16153012 | 51423389 | APBD | 19,000,000 | 19,000,000 | 18,933,400 | 18,933,400 | 18,933,400 | 18,933,400 | 18,933,400 | 18,933,400 | 2024-05-22 | 2024-06-02 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 66,600 | 0.35 % | |
706 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Belanja Jasa Konsultansi Spesialis-Jasa Pengujian dan Analisa Sistem Mekanikal dan Elektrikal | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16102012 | 49409040 | APBD | 80,000,000 | 76,890,431 | 75,188,070 | 75,188,070 | 75,021,570 | 75,021,570 | 75,021,570 | 75,021,570 | 2024-05-14 | 2024-05-24 | Roa Solution | 92.337.883.0-711.000 | 4,811,930 | 6.01 % | |
707 | 2024 | Dinas Pendidikan | Pengawasan Rehab Toilet Kantor Dinas Pendidikan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17787012 | 53009033 | APBDP | 49,820,000 | 49,820,000 | 49,596,340 | 49,596,340 | 49,596,340 | 0 | 0 | 0 | 2024-10-18 | 2024-10-22 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 223,660 | 0.45 % | |
708 | 2024 | Badan Kesatuan Bangsa dan Politik | Jasa Konsultansi Pengawasan Peningkatan Jalan, Halaman dan Parit Keliling Kantor, Pengawasan Renovasi Pagar Kantor dan Pengawasan Renovasi Parkiran Motor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17629012 | 52364926 | APBD | 44,955,000 | 44,955,000 | 44,848,000 | 44,848,000 | 44,381,800 | 44,381,800 | 44,381,800 | 44,381,800 | 2024-09-04 | 2024-09-20 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 107,000 | 0.24 % | |
709 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Supervisi Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10003799000 | 53011833 | APBDP | 150,263,000 | 100,000,000 | 99,943,012 | 99,943,012 | 99,900,000 | 0 | 0 | 0 | 2024-11-11 | 2024-11-22 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 50,319,988 | 33.49 % | |
710 | 2024 | Dinas Perhubungan | Rehabilitasi Dermaga Kereng Bengkirai di Kota Palangka Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 17451012 | 51275605 | APBD | 165,803,875 | 165,800,000 | 165,773,000 | 165,773,000 | 165,641,593 | 165,641,593 | 165,641,593 | 165,641,593 | 2024-07-24 | 2024-08-09 | CV. ADI GRAHA | 02.437.661.8-711.000 | 30,875 | 0.02 % | |
711 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pekerjaan Pembangunan Jalan Menuju Embung dan Saluran Drainase Sekitarnya UPT BBPHMT Km. 38 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17747012 | 52433830 | APBDP | 30,000,000 | 30,000,000 | 29,947,800 | 29,947,800 | 29,503,800 | 29,503,800 | 29,503,800 | 29,503,800 | 2024-10-16 | 2024-10-25 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 52,200 | 0.17 % | |
712 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Pondasi Silo Pada Kegiatan Pembangunan Pabrik Pakan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16108012 | 50584522 | APBD | 99,999,063 | 99,999,000 | 99,700,200 | 99,700,200 | 98,867,700 | 98,867,700 | 98,867,700 | 98,867,700 | 2024-05-18 | 2024-05-22 | 298,863 | 0.3 % | |||
713 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 4 Palangka Raya (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. Tata Usaha) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17258012 | 51239977 | APBD | 40,115,400 | 40,115,400 | 39,238,500 | 39,238,500 | 39,238,500 | 39,238,500 | 0 | 39,238,500 | 2024-06-04 | 2024-06-14 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 876,900 | 2.19 % | |
714 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Kambing Untuk Kabupaten Kotawaringin Timur Wilayah I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10021955000 | 53545228 | APBD | 8,511,700 | 8,436,000 | 8,380,500 | 8,380,500 | 8,380,500 | 0 | 0 | 0 | 2024-11-30 | 2024-12-06 | 131,200 | 1.54 % | |||
715 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17611012 | 49719441 | APBD | 7,942,500 | 7,941,499 | 7,869,900 | 7,869,900 | 7,514,700 | 7,514,700 | 7,514,700 | 7,514,700 | 2024-08-23 | 2024-09-05 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 72,600 | 0.91 % | |
716 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15989012 | 51422962 | APBD | 72,054,000 | 72,000,000 | 71,700,450 | 71,700,450 | 71,700,000 | 71,700,000 | 71,700,000 | 71,700,000 | 2024-04-19 | 2024-05-13 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 353,550 | 0.49 % | |
717 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Pengadaan Paket Fullboard Dalam Rangka Pelatihan Juru Sembelih Halal | Pengadaan Langsung | Jasa Lainnya | 17276012 | 51845145 | APBD | 74,232,000 | 74,232,000 | 74,160,000 | 74,160,000 | 74,160,000 | 74,160,000 | 74,160,000 | 74,160,000 | 2024-06-08 | 2024-06-12 | PT. Wahana Abadi Regensi (Swiss-Belhotel Danum) | 02.618.611.4-711.000 | 72,000 | 0.1 % | |
718 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Kepala Sekolah SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15956012 | 50727452 | APBD | 33,250,000 | 33,250,000 | 33,183,000 | 33,183,000 | 33,183,000 | 33,183,000 | 0 | 33,183,000 | 2024-04-19 | 2024-04-29 | 67,000 | 0.2 % | |||
719 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAGAR DEPAN DAN SAMPING KANAN UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17221012 | 49714080 | APBD | 19,062,000 | 18,925,500 | 18,814,500 | 18,814,500 | 18,337,200 | 18,337,200 | 18,337,200 | 18,337,200 | 2024-05-29 | 2024-06-08 | 247,500 | 1.3 % | |||
720 | 2024 | Badan Keuangan dan Aset Daerah | Belanja Alat/ Bahan untuk Kegiatan Kantor-Alat/ Bahan untuk Kegiatan Kantor Lainnya | Pengadaan Langsung | Pengadaan Barang | 17632012 | 52412156 | APBD | 86,750,000 | 86,750,000 | 86,600,000 | 86,600,000 | 86,000,000 | 86,000,000 | 86,000,000 | 86,000,000 | 2024-09-17 | 2024-09-27 | ANUGRAH DUA PUTRA | 86.917.332.8-711.000 | 150,000 | 0.17 % | |
721 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN TOILET UMUM AULA UTAMA BAPENDA PROV.KAL-TENG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17553012 | 49722110 | APBD | 28,500,000 | 28,460,400 | 28,194,000 | 28,194,000 | 27,544,650 | 27,544,650 | 27,544,650 | 27,544,650 | 2024-07-31 | 2024-08-14 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 306,000 | 1.07 % | |
722 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BUNTOK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17815012 | 49717415 | APBD | 7,942,500 | 7,941,499 | 7,881,000 | 7,881,000 | 7,492,500 | 0 | 0 | 0 | 2024-11-01 | 2024-11-15 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 61,500 | 0.77 % | |
723 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Pagar dan Penataan Halaman Sekolah SMKN 1 SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15995012 | 51010594 | APBD | 28,620,000 | 26,584,500 | 26,495,700 | 26,495,700 | 26,495,700 | 26,495,700 | 26,495,700 | 26,495,700 | 2024-05-06 | 2024-05-18 | 2,124,300 | 7.42 % | |||
724 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Samuda Besar Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15674012 | 46521924 | APBD | 160,000,000 | 160,000,000 | 159,876,634 | 159,876,634 | 159,704,763 | 159,700,000 | 0 | 159,700,000 | 2024-01-05 | 2024-01-29 | CV. AGAPE KARYA | 01.576.239.6-711.000 | 123,366 | 0.08 % | |
725 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Rehab Loket Ruang Kamboja | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16050012 | 51500522 | APBD | 5,000,000 | 4,999,000 | 4,995,000 | 4,995,000 | 4,062,600 | 4,062,600 | 4,062,600 | 4,062,600 | 2024-05-22 | 2024-06-03 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 5,000 | 0.1 % | |
726 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Pembinaan dan Evaluasi Kinerja Infrastruktur Air Minum di Provinsi Kalimantan Tengah 1 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15712012 | 47521032 | APBD | 80,000,000 | 80,000,000 | 79,958,850 | 79,958,850 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | 2024-03-15 | Toman Ryan Wijaya Nababan | 84.644.933.8-952.000 | 41,150 | 0.05 % | |
727 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 10 Palangka Raya (Pembangunan Rg. UKS, Pembangunan Rg. BK, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16191012 | 51239949 | APBD | 30,080,500 | 30,080,500 | 30,000,000 | 30,000,000 | 30,000,000 | 30,000,000 | 0 | 30,000,000 | 2024-05-28 | 2024-06-05 | 80,500 | 0.27 % | |||
728 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana dan Prasarana UPT.KPHL Gerbang Barito - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16203012 | 51716254 | APBDP | 46,435,000 | 46,434,963 | 45,938,460 | 45,938,460 | 45,327,960 | 45,327,960 | 45,327,960 | 45,327,960 | 2024-06-04 | 2024-06-14 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 496,540 | 1.07 % | |
729 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN BAK SAMPAH DAN SEPTICTANK UPTPPD PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17765012 | 49686815 | APBD | 4,187,500 | 4,187,499 | 4,107,000 | 4,107,000 | 3,873,900 | 0 | 0 | 0 | 2024-10-16 | 2024-10-29 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 80,500 | 1.92 % | |
730 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Rehab 4 Ruang kelas dan Kantor SMAN 1 Tumpung Laung (Montalat Barut) - SMAN 1 Montallat (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17382012 | 51398275 | APBD | 48,000,000 | 48,000,000 | 47,866,800 | 47,866,800 | 47,866,800 | 47,866,800 | 47,866,800 | 47,866,800 | 2024-08-15 | 2024-08-21 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 133,200 | 0.28 % | |
731 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Perencanaan Peningkatan Jalan dan Drainase UPT BBPHMT Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17637012 | 52365846 | APBDP | 100,000,000 | 100,000,000 | 99,631,380 | 99,631,380 | 99,631,380 | 99,631,380 | 99,631,380 | 99,631,380 | 2024-09-06 | 2024-09-16 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 368,620 | 0.37 % | |
732 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Menthobi Raya (Rehabilitasi Rg. BK, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15864012 | 50408637 | APBD | 33,416,700 | 33,416,700 | 33,415,440 | 33,415,440 | 33,415,440 | 33,415,440 | 0 | 33,415,440 | 2024-03-25 | 2024-04-05 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 1,260 | 0 % | |
733 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Rungan Barat (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15842012 | 50388342 | APBD | 46,969,700 | 46,969,700 | 46,900,000 | 46,900,000 | 46,900,000 | 46,900,000 | 0 | 46,900,000 | 2024-03-25 | 2024-04-05 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 69,700 | 0.15 % | |
734 | 2024 | Dinas Pendidikan | Jasa Konsyltansi Pengawasan Penimbunan Halaman Sekolah SLBN 1 Kuala Kapuas, Pembangunan Pagar sekolah SLBN 1 Palangka Raya, Pembangunan Paping SLBN 1 Sampit, Rehabilitasi Pagar Sekolah SLBN 1 Sampit dan Penimbunan Halaman Sekolah SLBN 2 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008543000 | 53268177 | APBD | 34,000,000 | 33,999,300 | 33,993,750 | 33,993,750 | 33,993,750 | 0 | 0 | 0 | 2024-11-18 | 2024-11-20 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 6,250 | 0.02 % | |
735 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Kuala Kurun (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15772012 | 50388007 | APBD | 54,181,700 | 54,181,700 | 54,181,700 | 54,181,700 | 54,181,700 | 54,181,700 | 54,181,700 | 54,181,700 | 2024-03-15 | 2024-03-26 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 0 | 0 % | |
736 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 4 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15799012 | 50408955 | APBD | 43,927,800 | 43,927,800 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 2024-03-15 | 2024-03-26 | 693,300 | 1.58 % | |||
737 | 2024 | KPHL GERBANG BARITO | Beban Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Perencana Kandang Sapi - Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16121012 | 49971021 | APBD | 28,620,000 | 28,620,000 | 28,313,880 | 28,313,880 | 27,814,380 | 27,814,380 | 27,814,380 | 27,814,380 | 2024-06-25 | 2024-07-05 | GEO DINAMIKA UTAMA | 01.576.437.6-711.000 | 306,120 | 1.07 % | |
738 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Aksesibilitas SLBN 2 Pangkalan Bun. SLBN Kuala Kurun, SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10015223000 | 53031781 | APBD | 12,000,000 | 11,999,976 | 11,993,550 | 11,993,550 | 11,993,550 | 0 | 0 | 0 | 2024-11-22 | 2024-11-26 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 6,450 | 0.05 % | |
739 | 2024 | Dinas Sosial | Perencanaan Rehabilitasi Pagar Dinas Sosial Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15968012 | 49514901 | APBD | 68,900,000 | 68,890,000 | 68,300,206 | 68,300,206 | 68,055,781 | 68,055,781 | 68,055,781 | 68,055,781 | 2024-04-18 | 2024-05-03 | CV. DAKSA RESWARA PRAKASA | 65.529.585.5-711.000 | 599,794 | 0.87 % | |
740 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Bangunan Gedung Kantor - Pekerjaan Penambahan Main Distribution Panel (MDP) Gedung IKR | Pengadaan Langsung | Jasa Lainnya | 10004301000 | 52983404 | APBDP | 66,000,000 | 65,447,778 | 65,370,000 | 65,370,000 | 64,907,250 | 0 | 0 | 0 | 2024-11-13 | 2024-11-22 | CV.PATRIA TEHNIK | 03.134.923.6-711.000 | 630,000 | 0.95 % | |
741 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Pematang Karau (Rehabilitasi Rg. Kelas) 4 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15870012 | 50385130 | APBD | 49,390,700 | 49,390,700 | 49,335,049 | 49,335,049 | 49,335,049 | 49,335,049 | 0 | 49,335,049 | 2024-03-25 | 2024-04-05 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 55,651 | 0.11 % | |
742 | 2024 | Badan Pendapatan Daerah | Pengawasan Penataan Halaman ( Penimbunan ) Halaman Kantor UPTPPD Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17805012 | 53063514 | APBDP | 13,000,000 | 12,999,999 | 12,900,000 | 12,900,000 | 12,687,855 | 0 | 0 | 0 | 2024-10-30 | 2024-11-14 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 100,000 | 0.77 % | |
743 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 2 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15998012 | 50968174 | APBD | 19,000,000 | 18,925,500 | 18,870,000 | 18,870,000 | 18,870,000 | 18,870,000 | 18,870,000 | 18,870,000 | 2024-05-06 | 2024-05-21 | 130,000 | 0.68 % | |||
744 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Rumah Dinas G. Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008119000 | 53470322 | APBD | 33,250,000 | 15,270,825 | 15,088,230 | 15,088,230 | 15,088,230 | 0 | 0 | 0 | 2024-11-20 | 2024-12-09 | Roa Solution | 92.337.883.0-711.000 | 18,161,770 | 54.62 % | |
745 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Kotawaringin Lama (Rehabilitasi Rg. Lab. Kimia, Rehabilitasi Rg. Perpustakaan, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17252012 | 51239598 | APBD | 33,998,400 | 33,998,400 | 33,466,500 | 33,466,500 | 33,466,500 | 33,466,500 | 0 | 33,466,500 | 2024-06-03 | 2024-06-12 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 531,900 | 1.56 % | |
746 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Mandau Telawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16147012 | 51422978 | APBD | 25,000,000 | 25,000,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 2024-05-22 | 2024-06-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 50,000 | 0.2 % | |
747 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Bintang Awai (Pembangunan Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17284012 | 51153899 | APBD | 40,686,600 | 40,686,600 | 40,681,500 | 40,681,500 | 40,681,500 | 40,681,500 | 0 | 40,681,500 | 2024-06-07 | 2024-06-19 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 5,100 | 0.01 % | |
748 | 2024 | Badan Keuangan dan Aset Daerah | Pemeliharaan Mushola Komp. Pemda G. Obos | Pengadaan Langsung | Pekerjaan Konstruksi | 17872012 | 53293870 | APBD | 150,000,000 | 150,000,000 | 149,950,437 | 149,950,437 | 149,950,437 | 0 | 0 | 0 | 2024-11-07 | 2024-11-28 | CV. BANGUN TEHNIK BERSAMA | 39.560.168.5-711.000 | 49,563 | 0.03 % | |
749 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Rumah Dinas G.Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15953012 | 51374515 | APBD | 5,100,000 | 5,006,506 | 4,895,100 | 4,895,100 | 4,895,100 | 4,895,100 | 4,895,100 | 4,895,100 | 2024-04-03 | 2024-04-19 | Roa Solution | 92.337.883.0-711.000 | 204,900 | 4.02 % | |
750 | 2024 | Dinas Pemberdayaan Masyarakat dan Desa | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya | Pengadaan Langsung | Pekerjaan Konstruksi | 17518012 | 52116395 | APBD | 235,000,000 | 89,000,000 | 88,964,538 | 88,964,538 | 88,587,953 | 88,587,953 | 88,587,953 | 88,587,953 | 2024-07-22 | 2024-08-02 | CV. USAHA BANGUN SARANA | 02.978.028.5-711.000 | 146,035,462 | 62.14 % | |
751 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Jelai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16151012 | 51424149 | APBD | 20,000,000 | 20,000,000 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 2024-05-22 | 2024-06-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 77,700 | 0.39 % | |
752 | 2024 | Dinas Sosial | Pengawasan Pembuatan Drainase UPT PSBL Pambelum (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17464012 | 49441832 | APBD | 49,820,000 | 49,820,000 | 49,203,525 | 49,203,525 | 48,581,925 | 48,581,925 | 48,581,925 | 48,581,925 | 2024-07-10 | 2024-07-22 | PT. EDUKA REKAYASA KONSULTAN | 01.489.523.9-711.000 | 616,475 | 1.24 % | |
753 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | JAsa Konsultansi Pengawasan Pembangunan Green House Kota P. Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10005163000 | 53297906 | APBDP | 40,280,000 | 40,230,000 | 40,126,500 | 40,126,500 | 40,126,500 | 0 | 0 | 0 | 2024-11-13 | 2024-11-21 | 153,500 | 0.38 % | |||
754 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG KEPALA SEKOLAH/PIMPINAN DAN PEMBANGUNAN RUANG GURU SMAN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17880012 | 53267698 | APBDP | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,900,000 | 0 | 0 | 0 | 2024-11-06 | 2024-11-14 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 100,000 | 0.1 % | |
755 | 2024 | Badan Pendapatan Daerah | Belanja Modal Bangunan Kantor ( Perencanaan Pemasangan Paving Blok Area UPTPPD Palangka Raya ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17371012 | 51956964 | APBDP | 74,931,750 | 55,050,450 | 54,772,950 | 54,772,950 | 53,818,350 | 53,818,350 | 53,818,350 | 53,818,350 | 2024-06-26 | 2024-07-12 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 20,158,800 | 26.9 % | |
756 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAN 3 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17393012 | 51399809 | APBD | 30,000,000 | 30,000,000 | 29,924,520 | 29,924,520 | 29,924,520 | 29,924,520 | 29,924,520 | 29,924,520 | 2024-07-11 | 2024-07-18 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 75,480 | 0.25 % | |
757 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (1 Ruang) SMKN 1 SEBANGAU KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16167012 | 51573276 | APBD | 28,620,000 | 28,620,000 | 28,560,000 | 28,560,000 | 28,560,000 | 28,560,000 | 28,560,000 | 28,560,000 | 2024-05-22 | 2024-06-02 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 60,000 | 0.21 % | |
758 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Rehab Ruang Kelas SMKN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10004392000 | 53226721 | APBDP | 24,000,000 | 24,000,000 | 23,833,500 | 23,833,500 | 23,833,500 | 0 | 0 | 0 | 2024-11-12 | 2024-11-18 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 166,500 | 0.69 % | |
759 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan Jembatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17561012 | 52171665 | APBD | 20,275,000 | 20,230,000 | 19,905,075 | 19,905,075 | 19,655,325 | 19,655,325 | 19,655,325 | 19,655,325 | 2024-07-31 | 2024-08-07 | 369,925 | 1.82 % | |||
760 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Rehabilitasi Ruang Kelas dengan tingkat kerusakan minimal sedang beserta perabotnya SLBN 1 Kasongan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17695012 | 52094399 | APBD | 13,583,200 | 13,583,070 | 13,530,900 | 13,530,900 | 13,530,900 | 13,530,900 | 13,530,900 | 13,530,900 | 2024-09-30 | 2024-10-02 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 52,300 | 0.39 % | |
761 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15848012 | 50468012 | APBD | 32,578,000 | 32,578,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 2024-03-25 | 2024-04-12 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 55,000 | 0.17 % | |
762 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Asrama Kalteng Putra Putri Yogyakarta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15726012 | 49545210 | APBD | 20,000,000 | 20,000,000 | 19,785,750 | 19,785,750 | 19,785,750 | 19,785,750 | 19,785,750 | 19,785,750 | 2024-02-24 | 2024-03-12 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 214,250 | 1.07 % | |
763 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Supervisi Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah VI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16117012 | 50877402 | APBD | 100,000,000 | 99,999,900 | 99,900,000 | 99,900,000 | 99,678,000 | 99,678,000 | 99,678,000 | 99,678,000 | 2024-05-20 | 2024-06-05 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 100,000 | 0.1 % | |
764 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Lanjutan Pembangunan SMAN 2 Puruk Cahu (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17386012 | 51399019 | APBD | 30,000,000 | 30,000,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 2024-07-02 | 2024-07-11 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 50,000 | 0.17 % | |
765 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Rehabilitasi Ruang Kelas (3 Ruang ) SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17415012 | 51202065 | APBD | 44,970,000 | 44,970,000 | 44,899,000 | 44,899,000 | 44,899,000 | 44,899,000 | 44,899,000 | 44,899,000 | 2024-06-27 | 2024-07-02 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 71,000 | 0.16 % | |
766 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17407012 | 51201791 | APBD | 18,440,000 | 18,440,000 | 18,384,500 | 18,384,500 | 18,384,500 | 18,384,500 | 18,384,500 | 18,384,500 | 2024-06-27 | 2024-07-02 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 55,500 | 0.3 % | |
767 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17419012 | 51196980 | APBD | 41,650,000 | 41,650,000 | 41,570,080 | 41,570,080 | 41,570,080 | 41,570,080 | 41,570,080 | 41,570,080 | 2024-06-28 | 2024-07-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 79,920 | 0.19 % | |
768 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Lab Komputer SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15961012 | 50730622 | APBD | 31,500,000 | 31,500,000 | 31,000,000 | 31,000,000 | 31,000,000 | 31,000,000 | 0 | 31,000,000 | 2024-04-05 | 2024-04-24 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 500,000 | 1.59 % | |
769 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BARITO TIMUR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16028012 | 49199689 | APBD | 13,582,500 | 13,504,992 | 13,400,000 | 13,400,000 | 13,120,200 | 13,120,200 | 13,120,200 | 13,120,200 | 2024-05-01 | 2024-05-10 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 182,500 | 1.34 % | |
770 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan WC 2 Unit SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17381012 | 51399539 | APBD | 23,000,000 | 23,000,000 | 22,950,000 | 22,950,000 | 22,950,000 | 22,950,000 | 22,950,000 | 22,950,000 | 2024-07-02 | 2024-07-11 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 50,000 | 0.22 % | |
771 | 2024 | Badan Penghubung | Belanja Pemeliharaan Aset Tidak Berwujud-Software | Pengadaan Langsung | Jasa Lainnya | 16092012 | 51598332 | APBD | 100,000,000 | 98,000,000 | 97,957,500 | 97,957,500 | 97,957,500 | 0 | 0 | 0 | 2024-05-13 | 2024-05-21 | 2,042,500 | 2.04 % | |||
772 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15760012 | 49206656 | APBD | 13,582,500 | 13,538,300 | 13,530,900 | 13,530,900 | 13,109,100 | 13,109,100 | 13,109,100 | 13,109,100 | 2024-03-07 | 2024-03-20 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 51,600 | 0.38 % | |
773 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Pembangunan/Peningkatan Khatolic Center Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17603012 | 52260415 | APBD | 100,000,000 | 100,000,000 | 99,944,400 | 99,944,400 | 99,900,000 | 99,900,000 | 99,900,000 | 99,900,000 | 2024-08-16 | 2024-08-29 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 55,600 | 0.06 % | |
774 | 2024 | Dinas Kebudayaan dan Pariwisata | Beban Jasa Konsultansi Perencanaan Rehab berat rumah jaga dan WC gedung pameran pada UPT museum Balanga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16083012 | 51584889 | APBD | 65,000,000 | 65,000,000 | 64,850,000 | 64,850,000 | 64,602,000 | 64,602,000 | 64,602,000 | 64,602,000 | 2024-05-08 | 2024-05-31 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 150,000 | 0.23 % | |
775 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Pengawasan Pembangunan Pagar Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10004531000 | 52921903 | APBDP | 35,746,500 | 35,746,500 | 35,500,000 | 35,500,000 | 35,500,000 | 0 | 0 | 0 | 2024-11-12 | 2024-11-21 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 246,500 | 0.69 % | |
776 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Bangunan Gedung - Rehab Plafon, Pemasangan Interior dan Ornamen Lobby Admin Lt. 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 17701012 | 52174229 | APBD | 200,000,000 | 200,000,000 | 199,940,000 | 199,940,000 | 199,500,000 | 0 | 0 | 0 | 2024-10-18 | 2024-10-28 | 60,000 | 0.03 % | |||
777 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Pengawasan Rehabilitasi ICU RS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17568012 | 51839722 | APBD | 100,000,000 | 99,877,000 | 99,411,600 | 99,411,600 | 98,973,150 | 98,973,150 | 98,973,150 | 98,973,150 | 2024-08-08 | 2024-08-16 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 588,400 | 0.59 % | |
778 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pagar dan Penataan Halaman SMAN 10 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16127012 | 51399603 | APBD | 60,000,000 | 60,000,000 | 59,917,000 | 59,917,000 | 59,917,000 | 59,917,000 | 59,917,000 | 59,917,000 | 2024-05-16 | 2024-05-22 | 83,000 | 0.14 % | |||
779 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pagar & Penataan Halaman SMAN 2 Pandih Batu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16113012 | 51399767 | APBD | 56,000,000 | 56,000,000 | 55,944,000 | 55,944,000 | 55,944,000 | 55,944,000 | 55,944,000 | 55,944,000 | 2024-05-15 | 2024-05-27 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 56,000 | 0.1 % | |
780 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Perencanaan Penataan Halaman, Pembangunan Rumah Genset dan Penerangan Gedung Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17615012 | 52283730 | APBD | 68,735,952 | 68,733,000 | 68,409,522 | 68,409,522 | 68,259,006 | 68,259,006 | 68,259,006 | 68,259,006 | 2024-08-23 | 2024-08-29 | 326,430 | 0.47 % | |||
781 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Supervisi Rehabilitasi Jaringan Irigasi D.I.R. Kuala Jelai I Kabupaten Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15693012 | 46342654 | APBD | 100,000,000 | 100,000,000 | 99,888,900 | 99,888,900 | 99,844,500 | 99,844,500 | 0 | 99,844,500 | 2024-02-07 | 2024-02-29 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,100 | 0.11 % | |
782 | 2024 | Badan Keuangan dan Aset Daerah | Belanja Pakaian Dinas Lapangan | Pengadaan Langsung | Pengadaan Barang | 10013192000 | 53509847 | APBDP | 91,227,066 | 91,227,066 | 91,142,100 | 91,142,100 | 90,576,000 | 90,576,000 | 90,576,000 | 90,576,000 | 2024-11-25 | 2024-12-17 | CV.ANDA | 02.809.338.3-711.000 | 84,966 | 0.09 % | |
783 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Bagendang II Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15687012 | 46519828 | APBD | 160,000,000 | 160,000,000 | 159,759,518 | 159,759,518 | 159,637,621 | 159,637,000 | 0 | 159,637,000 | 2024-01-18 | 2024-01-31 | CV. MITRA GENERASI MANDIRI | 74.969.738.9-711.000 | 240,482 | 0.15 % | |
784 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pagar dan Penataan Halaman SMAN 10 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15830012 | 50767655 | APBD | 75,000,000 | 75,000,000 | 74,864,505 | 74,864,505 | 74,864,505 | 74,864,505 | 0 | 74,864,505 | 2024-03-21 | 2024-04-08 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 135,495 | 0.18 % | |
785 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Rehabilitasi Ruang Kelas dengan tingkat kerusakan minimal sedang beserta perabotnya SLBN 1 Kuala Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17692012 | 52094169 | APBD | 5,600,000 | 5,155,950 | 5,117,100 | 5,117,100 | 5,117,100 | 5,117,100 | 5,117,100 | 5,117,100 | 2024-09-30 | 2024-10-02 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 482,900 | 8.62 % | |
786 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Kelas) 7 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15785012 | 50392342 | APBD | 93,063,800 | 93,063,800 | 92,961,100 | 92,961,100 | 92,961,100 | 92,961,100 | 0 | 92,961,100 | 2024-03-15 | 2024-03-26 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 102,700 | 0.11 % | |
787 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Pengawasan Pembangunan Gudang Pakan Ternak UPT BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17605012 | 51460039 | APBD | 9,313,659 | 9,313,658 | 9,213,504 | 9,213,504 | 9,210,780 | 9,210,780 | 9,210,780 | 9,210,780 | 2024-08-16 | 2024-08-26 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 100,155 | 1.08 % | |
788 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pagar dan Penataan Halaman SMAN 1 Sepang (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16097012 | 51398569 | APBD | 60,000,000 | 60,000,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 2024-05-13 | 2024-05-22 | 60,000 | 0.1 % | |||
789 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI TOTAL RUMAH DINAS STAF UPTPPD BARITO SELATAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17402012 | 49961204 | APBD | 19,104,360 | 19,104,359 | 19,000,000 | 19,000,000 | 18,484,275 | 18,484,275 | 18,484,275 | 18,484,275 | 2024-07-03 | 2024-07-17 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 104,360 | 0.55 % | |
790 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17312012 | 51588413 | APBD | 22,050,000 | 22,050,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 2024-06-13 | 2024-06-17 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 72,000 | 0.33 % | |
791 | 2024 | Dinas Sosial | Perencanaan Peningkatan Jalan dan Halaman UPT PSBL Pambelum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15970012 | 49435669 | APBD | 97,944,000 | 97,943,500 | 96,615,510 | 96,615,510 | 96,220,350 | 96,220,350 | 96,220,350 | 96,220,350 | 2024-04-18 | 2024-05-03 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 1,328,490 | 1.36 % | |
792 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG PERPUSTAKAAN, RUANG UKS DAN RUANG BK SMAN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17877012 | 53267702 | APBDP | 75,000,000 | 75,000,000 | 74,925,000 | 74,925,000 | 74,925,000 | 0 | 0 | 0 | 2024-11-06 | 2024-11-14 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 75,000 | 0.1 % | |
793 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI TOTAL RUMAH DINAS STAF UPTPPD BARITO SELATAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16020012 | 49834785 | APBD | 32,670,440 | 32,670,439 | 32,600,000 | 32,600,000 | 31,968,000 | 31,968,000 | 31,968,000 | 31,968,000 | 2024-04-29 | 2024-05-13 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 70,440 | 0.22 % | |
794 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana dan Prasarana UPT.KPHP Barito Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17226012 | 51760498 | APBDP | 72,825,000 | 72,824,880 | 72,824,001 | 72,824,001 | 72,076,185 | 72,076,185 | 72,076,185 | 72,076,185 | 2024-06-04 | 2024-06-14 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 999 | 0 % | |
795 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS PGRI 2 Sampit (Pembangunan Rg. Guru, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15769012 | 50408617 | APBD | 63,561,800 | 63,561,800 | 63,231,150 | 63,231,150 | 63,231,150 | 63,231,150 | 63,231,150 | 63,231,150 | 2024-03-18 | 2024-03-28 | 330,650 | 0.52 % | |||
796 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Supervisi Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah XI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17766012 | 52940836 | APBDP | 100,000,000 | 99,999,900 | 99,900,000 | 99,900,000 | 99,500,000 | 0 | 0 | 0 | 2024-10-17 | 2024-11-04 | CV.BETANG AGUNG PERKASA CONSULTANT | 02.437.667.5-711.000 | 100,000 | 0.1 % | |
797 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16061012 | 50543436 | APBD | 75,883,000 | 75,883,000 | 75,800,000 | 75,800,000 | 75,800,000 | 75,800,000 | 75,800,000 | 75,800,000 | 2024-05-06 | 2024-05-18 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 83,000 | 0.11 % | |
798 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Pengawasan Pembangunan Jembatan Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17675012 | 52283862 | APBD | 23,925,960 | 23,924,940 | 23,865,000 | 23,865,000 | 23,865,000 | 23,865,000 | 23,865,000 | 23,865,000 | 2024-09-30 | 2024-10-08 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 60,960 | 0.25 % | |
799 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17816012 | 49718322 | APBD | 7,500,000 | 7,499,999 | 7,425,900 | 7,425,900 | 7,048,500 | 0 | 0 | 0 | 2024-11-01 | 2024-11-15 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 74,100 | 0.99 % | |
800 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16071012 | 50544880 | APBD | 31,136,000 | 31,136,000 | 31,080,500 | 31,080,500 | 31,080,500 | 31,080,500 | 31,080,500 | 31,080,500 | 2024-05-06 | 2024-05-18 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 55,500 | 0.18 % | |
801 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer,Laboratorium Bahasa SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17485012 | 51358098 | APBD | 51,360,000 | 51,360,000 | 51,297,840 | 51,297,840 | 51,297,840 | 51,297,840 | 51,297,840 | 51,297,840 | 2024-07-15 | 2024-07-19 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 62,160 | 0.12 % | |
802 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAS PGRI Pulau Hanaut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15866012 | 50729398 | APBD | 58,317,000 | 58,317,000 | 57,498,000 | 57,498,000 | 57,498,000 | 57,498,000 | 57,498,000 | 57,498,000 | 2024-03-25 | 2024-04-03 | 819,000 | 1.4 % | |||
803 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17317012 | 51358414 | APBD | 31,560,000 | 31,560,000 | 31,504,500 | 31,504,500 | 31,504,500 | 31,504,500 | 31,504,500 | 31,504,500 | 2024-06-13 | 2024-06-17 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 55,500 | 0.18 % | |
804 | 2024 | Badan Pendapatan Daerah | Perencanaan Pembangunan Ruang Pantry Kantor Samsat Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17524012 | 52118669 | APBDP | 14,450,000 | 14,339,091 | 14,257,395 | 14,257,395 | 13,697,400 | 13,697,400 | 13,697,400 | 13,697,400 | 2024-07-22 | 2024-08-06 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 192,605 | 1.33 % | |
805 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Jaringan Listrik - Belanja Jumper Genset Unit 2 1000kVA ke ATS Unit 1 650kVA | Pengadaan Langsung | Jasa Lainnya | 17472012 | 52019548 | APBD | 200,000,000 | 199,999,000 | 199,954,512 | 199,954,512 | 198,704,208 | 198,704,208 | 198,704,208 | 198,704,208 | 2024-07-23 | 2024-08-05 | CV.ANAIS TEKNIK | 02.292.605.9-711.000 | 45,488 | 0.02 % | |
806 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan,1).Pembangunan Siring SMKN 1 LAMANDAU,2).Lanjutan Pembangunan Ruang Laboratorium dan Penataan Halaman SMKN 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17811012 | 52613441 | APBDP | 61,670,000 | 61,670,000 | 61,521,750 | 61,521,750 | 61,521,750 | 0 | 0 | 0 | 2024-10-25 | 2024-10-31 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 148,250 | 0.24 % | |
807 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Palangka Raya (Pembangunan Toilet (Jamban), Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15879012 | 50409879 | APBD | 43,218,800 | 43,218,800 | 43,150,000 | 43,150,000 | 43,150,000 | 43,150,000 | 0 | 43,150,000 | 2024-04-02 | 2024-04-24 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 68,800 | 0.16 % | |
808 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Pematang Karau (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15871012 | 50387102 | APBD | 50,587,700 | 50,587,700 | 50,500,000 | 50,500,000 | 50,500,000 | 50,500,000 | 0 | 50,500,000 | 2024-03-25 | 2024-04-05 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 87,700 | 0.17 % | |
809 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17479012 | 51852081 | APBD | 76,900,000 | 76,900,000 | 38,406,720 | 38,406,720 | 38,406,720 | 38,406,720 | 38,406,720 | 38,406,720 | 2024-07-15 | 2024-07-19 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 38,493,280 | 50.06 % | |
810 | 2024 | KPHP SUKAMARA LAMANDAU | Belanja Jasa Konsultansi Pengawasan Arsitektur - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17716012 | 52516259 | APBDP | 20,140,000 | 19,883,025 | 19,801,290 | 19,801,290 | 19,608,150 | 0 | 0 | 0 | 2024-10-25 | 2024-11-08 | 338,710 | 1.68 % | |||
811 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 6 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17290012 | 51240595 | APBD | 30,927,300 | 30,927,300 | 30,858,000 | 30,858,000 | 30,858,000 | 30,858,000 | 30,858,000 | 30,858,000 | 2024-06-10 | 2024-06-21 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 69,300 | 0.22 % | |
812 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17441012 | 51852351 | APBD | 44,050,000 | 44,050,000 | 43,916,800 | 43,916,800 | 43,916,800 | 43,916,800 | 43,916,800 | 43,916,800 | 2024-07-06 | 2024-07-09 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 133,200 | 0.3 % | |
813 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Perencanaan pagar pengaman | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16037012 | 51493316 | APBD | 139,920,000 | 99,987,200 | 99,850,000 | 99,850,000 | 99,800,000 | 99,800,000 | 100 | 99,800,000 | 2024-04-29 | 2024-05-17 | Roa Solution | 92.337.883.0-711.000 | 40,070,000 | 28.64 % | |
814 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17413012 | 51201152 | APBD | 55,230,000 | 55,230,000 | 55,119,000 | 55,119,000 | 55,119,000 | 55,119,000 | 55,119,000 | 55,119,000 | 2024-06-27 | 2024-07-02 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.2 % | |
815 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pekerjaan Taman Smart Green House Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17636012 | 52365915 | APBDP | 78,000,000 | 78,000,000 | 77,631,180 | 77,631,180 | 77,631,180 | 77,631,180 | 77,631,180 | 77,631,180 | 2024-09-06 | 2024-09-16 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 368,820 | 0.47 % | |
816 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI GEDUNG KANTOR LAMA UPTPPD KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17427012 | 49932954 | APBD | 37,100,000 | 37,099,999 | 37,050,000 | 37,050,000 | 36,413,550 | 36,413,550 | 36,413,550 | 36,413,550 | 2024-07-03 | 2024-07-17 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 50,000 | 0.13 % | |
817 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG KEPALA SEKOLAH/PIMPINAN DAN PEMBANGUNAN RUANG GURU SMAN 2 KATINGAN TENGAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17879012 | 53267713 | APBDP | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,900,000 | 0 | 0 | 0 | 2024-11-06 | 2024-11-14 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 100,000 | 0.1 % | |
818 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Supervisi Rehabilitasi Jaringan Irigasi D.I.R. Unit Mentaren II Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15695012 | 46342386 | APBD | 100,000,000 | 100,000,000 | 99,822,300 | 99,822,300 | 99,783,450 | 99,783,450 | 0 | 99,783,450 | 2024-02-07 | 2024-02-29 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 177,700 | 0.18 % | |
819 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembuatan Pagar dan Penataan Halaman SMAN 4 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15865012 | 50729854 | APBD | 48,000,000 | 48,000,000 | 47,796,600 | 47,796,600 | 47,796,600 | 47,796,600 | 47,796,600 | 47,796,600 | 2024-03-22 | 2024-04-03 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 203,400 | 0.42 % | |
820 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana dan Prasarana UPT.KPHL Kapuas Kahayan dan RPH Anjir Kalampan - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17210012 | 51747920 | APBDP | 79,740,000 | 79,739,958 | 79,610,310 | 79,610,310 | 78,805,560 | 78,805,560 | 78,805,560 | 78,805,560 | 2024-06-04 | 2024-06-14 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 129,690 | 0.16 % | |
821 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAN 3 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15908012 | 50771836 | APBD | 35,000,000 | 35,000,000 | 34,944,500 | 34,944,500 | 34,944,500 | 34,944,500 | 0 | 34,944,500 | 2024-04-03 | 2024-04-24 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 55,500 | 0.16 % | |
822 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Kantin, Ruang Keterampilan, Ruang Pembelajaran KHusus, Ruang Tata Usaha, Ruang UKS, Selasar Penghubung SLB Negeri Kuala Kurun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17501012 | 52082362 | APBD | 50,390,280 | 50,366,250 | 50,366,250 | 50,366,250 | 50,366,250 | 50,366,250 | 50,366,000 | 50,366,250 | 2024-07-18 | 2024-07-26 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 24,030 | 0.05 % | |
823 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Peningkatan Jalan Teratai 5, Jalur 5 dan Sekitarnya, Kelurahan Ketapang, Kecamatan Mentawa Baru Ketapang, Kotawaringin Timur, Provinsi Kalimantan Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 16115012 | 49607729 | APBD | 186,400,000 | 186,397,000 | 185,726,219 | 185,726,219 | 185,585,000 | 185,585,000 | 100 | 185,585,000 | 2024-05-20 | 2024-06-05 | 673,781 | 0.36 % | |||
824 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15887012 | 50730498 | APBD | 65,000,000 | 65,000,000 | 64,500,000 | 64,500,000 | 64,500,000 | 64,500,000 | 0 | 64,500,000 | 2024-03-28 | 2024-04-08 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 500,000 | 0.77 % | |
825 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Kuin Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15676012 | 46521572 | APBD | 160,000,000 | 160,000,000 | 159,891,775 | 159,891,775 | 159,784,179 | 159,780,000 | 0 | 159,780,000 | 2024-01-05 | 2024-01-29 | 108,225 | 0.07 % | |||
826 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Study Kelayakan dan DED Pembangunan Rumah Sakit Provinsi di Kota Palangka Raya | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17397012 | 51972049 | APBD | 1,464,375,000 | 1,464,375,000 | 1,460,368,725 | 1,460,300,000 | 1,455,700,000 | 1,455,700,000 | 1,455,700,000 | 1,455,700,000 | 2024-06-28 | 2024-07-30 | 4,006,275 | 0.27 % | |||
827 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya -Rehab Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 17904012 | 53355646 | APBDP | 197,500,000 | 197,500,000 | 197,222,500 | 197,222,500 | 197,200,527 | 0 | 0 | 0 | 2024-11-08 | 2024-11-15 | CV.MAHAPUTRA BANGUN NUSANTARA | 03.271.635.9-711.000 | 277,500 | 0.14 % | |
828 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI GEDUNG ARSIP UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17742012 | 49932333 | APBD | 45,000,000 | 44,899,500 | 44,844,000 | 44,844,000 | 44,444,400 | 0 | 0 | 0 | 2024-10-16 | 2024-10-29 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 156,000 | 0.35 % | |
829 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 3 Ruang SMAN 4 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16193012 | 50726405 | APBD | 80,000,000 | 80,000,000 | 79,996,590 | 79,996,590 | 79,996,590 | 79,996,590 | 79,996,590 | 79,996,590 | 2024-05-28 | 2024-06-05 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 3,410 | 0 % | |
830 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Drainase) | Pengadaan Langsung | Jasa Lainnya | 17588012 | 52036015 | APBD;APBDP | 65,000,000 | 10,000,000 | 9,834,600 | 9,834,600 | 9,812,400 | 9,812,400 | 9,812,400 | 9,812,400 | 2024-08-15 | 2024-08-23 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 55,165,400 | 84.87 % | |
831 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI PARKIR KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17255012 | 49955641 | APBD | 11,110,000 | 11,100,000 | 10,933,500 | 10,933,500 | 10,589,400 | 10,589,400 | 10,589,400 | 10,589,400 | 2024-06-03 | 2024-06-18 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 176,500 | 1.59 % | |
832 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Parkiran | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17869012 | 53276985 | APBDP | 5,568,500 | 5,568,500 | 5,538,000 | 5,538,000 | 5,538,000 | 0 | 0 | 0 | 2024-11-04 | 2024-11-12 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 30,500 | 0.55 % | |
833 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pemeliharaan/Rehabilitasi Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17437012 | 49420051 | APBD | 70,407,000 | 70,400,000 | 70,096,500 | 70,096,500 | 68,986,500 | 68,986,500 | 68,986,500 | 68,986,500 | 2024-07-04 | 2024-07-11 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 310,500 | 0.44 % | |
834 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi WC SMAN 3 Maliku 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17770012 | 52877692 | APBDP | 30,000,000 | 30,000,000 | 29,889,000 | 29,889,000 | 29,889,000 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,000 | 0.37 % | |
835 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16068012 | 50526052 | APBD | 21,041,000 | 21,041,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 2024-05-06 | 2024-05-21 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 41,000 | 0.19 % | |
836 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Rungan Barat (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15843012 | 50388423 | APBD | 41,239,700 | 41,239,700 | 39,900,000 | 39,900,000 | 39,900,000 | 39,900,000 | 0 | 39,900,000 | 2024-03-25 | 2024-04-05 | 1,339,700 | 3.25 % | |||
837 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pembangunan Lanjutan Jalan Menuju Sekolah SMAN 1 Tamban Catur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17817012 | 52897813 | APBDP | 40,000,000 | 40,000,000 | 39,922,300 | 39,922,300 | 39,922,300 | 39,922,300 | 39,922,300 | 39,922,300 | 2024-10-28 | 2024-11-05 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 77,700 | 0.19 % | |
838 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Rumah Dinas RTA Milono KM. 5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15680012 | 46855535 | APBD | 45,000,000 | 44,906,000 | 44,640,315 | 44,640,315 | 44,640,315 | 44,640,315 | 44,640,315 | 44,640,315 | 2024-01-11 | 2024-01-29 | CV. KRUF STUDIO ENGINEERING | 81.075.394.7-711.000 | 359,685 | 0.8 % | |
839 | 2024 | Sekretariat DPRD | Jasa Konsultansi Perencanaan Spesifikasi: Bangunan Gedung Sederhana Renovasi Gedung Komisi DPRD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17819012 | 52978241 | APBDP | 100,000,000 | 99,999,999 | 95,682,000 | 95,682,000 | 94,572,000 | 0 | 0 | 0 | 2024-10-25 | 2024-11-05 | ROTASI DESIGN CONSULTANT | 90.011.802.7-711.000 | 4,318,000 | 4.32 % | |
840 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pembangunan RKB SMAN 3 Palangka Raya 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17752012 | 52880378 | APBDP | 90,000,000 | 90,000,000 | 89,993,250 | 89,993,250 | 89,993,250 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 6,750 | 0.01 % | |
841 | 2024 | Dinas Perkebunan | Pengadaan Karpet Ruang Kepala Dinas Perkebunan Provinsi Kalimantan Tengah (DPPA-Oktober) | Pengadaan Langsung | Pengadaan Barang | 17910012 | 53359794 | APBDP | 64,503,950 | 63,750,000 | 63,686,250 | 63,686,250 | 63,591,900 | 0 | 0 | 0 | 2024-11-08 | 2024-11-13 | Gunung Terang Abadi | 50.584.730.1-714.000 | 817,700 | 1.27 % | |
842 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Pengawasan Pembangunan Jaringan Instalasi Air Bersih | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17567012 | 51985613 | APBD | 35,000,000 | 34,900,000 | 34,503,240 | 34,503,240 | 34,443,300 | 34,443,300 | 34,443,300 | 34,443,300 | 2024-08-08 | 2024-08-19 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 496,760 | 1.42 % | |
843 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI PARKIR KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15733012 | 49831172 | APBD | 19,998,000 | 17,673,050 | 17,427,000 | 17,427,000 | 16,994,100 | 16,994,100 | 16,994,100 | 16,994,100 | 2024-03-07 | 2024-03-20 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 2,571,000 | 12.86 % | |
844 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Lab IPA SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17323012 | 51398623 | APBD | 39,000,000 | 39,000,000 | 38,940,000 | 38,940,000 | 38,940,000 | 38,940,000 | 38,940,000 | 38,940,000 | 2024-06-14 | 2024-06-26 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 60,000 | 0.15 % | |
845 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Pelabuhan Tambat/Sandar UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17678012 | 52528447 | APBDP | 21,406,000 | 21,405,700 | 21,277,590 | 21,277,590 | 21,066,690 | 0 | 0 | 0 | 2024-10-02 | 2024-10-11 | 128,410 | 0.6 % | |||
846 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KURUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16031012 | 49203740 | APBD | 15,393,500 | 15,315,491 | 15,300,000 | 15,300,000 | 15,040,500 | 15,040,500 | 15,040,500 | 15,040,500 | 2024-05-01 | 2024-05-10 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 93,500 | 0.61 % | |
847 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMKS PGRI SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17418012 | 51358944 | APBD | 21,260,000 | 21,210,000 | 21,147,840 | 21,147,840 | 21,147,840 | 21,147,840 | 21,147,840 | 21,147,840 | 2024-06-28 | 2024-07-02 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 112,160 | 0.53 % | |
848 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Biologi SMK NEGERI 1 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16055012 | 50541253 | APBD | 55,423,000 | 55,423,000 | 55,312,000 | 55,312,000 | 55,312,000 | 55,312,000 | 55,312,000 | 55,312,000 | 2024-05-06 | 2024-05-18 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.2 % | |
849 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Asrama Kalteng Putra Putri Yogyakarta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16086012 | 51587965 | APBD | 25,000,000 | 25,000,000 | 24,886,211 | 24,886,211 | 24,727,470 | 24,727,470 | 24,727,470 | 24,727,470 | 2024-05-20 | 2024-06-07 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 113,789 | 0.46 % | |
850 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Aksesibilitas SLBN 2 Pangkalan Bun. SLBN Kuala Kurun, SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17854012 | 53031749 | APBD | 15,000,000 | 14,990,550 | 14,990,550 | 14,990,550 | 14,990,550 | 0 | 0 | 0 | 2024-11-02 | 2024-11-05 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 9,450 | 0.06 % | |
851 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15929012 | 50545551 | APBD | 22,912,000 | 22,912,000 | 22,856,500 | 22,856,500 | 22,856,500 | 22,856,500 | 22,856,500 | 22,856,500 | 2024-04-01 | 2024-04-19 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 55,500 | 0.24 % | |
852 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Timang (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17313012 | 51238319 | APBD | 38,880,600 | 38,880,600 | 38,739,000 | 38,739,000 | 38,739,000 | 38,739,000 | 38,739,000 | 38,739,000 | 2024-06-13 | 2024-06-26 | 141,600 | 0.36 % | |||
853 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Gunung Bintang Awai (Pembangunan Rg. Lab. Kimia, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17233012 | 51153997 | APBD | 41,673,400 | 41,673,400 | 41,669,400 | 41,669,400 | 41,669,400 | 41,669,400 | 0 | 41,669,400 | 2024-05-30 | 2024-06-07 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 4,000 | 0.01 % | |
854 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16075012 | 50547129 | APBD | 17,367,000 | 17,367,000 | 17,311,500 | 17,311,500 | 17,311,500 | 17,311,500 | 17,311,500 | 17,311,500 | 2024-05-06 | 2024-05-18 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 55,500 | 0.32 % | |
855 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Palangka Raya (Pembangunan Rg. Baru (RKB), Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15875012 | 50409521 | APBD | 38,535,800 | 38,535,800 | 38,485,000 | 38,485,000 | 38,485,000 | 38,485,000 | 0 | 38,485,000 | 2024-04-02 | 2024-04-24 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 50,800 | 0.13 % | |
856 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Rumah Dinas Jl. RTA. Miono Km. 6,5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15725012 | 49544867 | APBD | 20,000,000 | 20,000,000 | 19,946,700 | 19,946,700 | 19,946,700 | 19,946,700 | 19,946,700 | 19,946,700 | 2024-02-24 | 2024-03-12 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 53,300 | 0.27 % | |
857 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas ( 3 Ruang ) SMKN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16197012 | 51738249 | APBD | 20,000,000 | 20,000,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 2024-05-24 | 2024-06-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 111,000 | 0.56 % | |
858 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Kimia) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17282012 | 51240210 | APBD | 30,927,300 | 30,927,300 | 30,771,900 | 30,771,900 | 30,771,900 | 30,771,900 | 30,771,900 | 30,771,900 | 2024-06-12 | 2024-06-24 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 155,400 | 0.5 % | |
859 | 2024 | Badan Pendapatan Daerah | Pengawasan Arsitektur Perkerjaan Pembangunan Ruang Pantry Kantor Induk UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17648012 | 52497977 | APBDP | 8,500,000 | 8,436,000 | 8,410,000 | 8,410,000 | 8,091,900 | 8,091,900 | 8,091,900 | 8,091,900 | 2024-09-13 | 2024-09-26 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 90,000 | 1.06 % | |
860 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI KANTOR UPTPPD KUALA KURUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17223012 | 49953914 | APBD | 25,920,000 | 25,918,500 | 25,752,000 | 25,752,000 | 25,219,200 | 25,219,200 | 25,219,200 | 25,219,200 | 2024-05-29 | 2024-06-08 | 168,000 | 0.65 % | |||
861 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pembangunan/Peningkatan Jalan Inspeksi D.I.R. Handil Sohor Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15688012 | 46519132 | APBD | 160,000,000 | 160,000,000 | 159,909,255 | 159,909,255 | 159,809,355 | 159,800,000 | 0 | 159,800,000 | 2024-01-18 | 2024-01-31 | 90,745 | 0.06 % | |||
862 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS,Ruang Bimbingan Konseling(BK),Toilet(Jamban)beserta sanitasinya SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16063012 | 50543972 | APBD | 26,605,000 | 26,605,000 | 26,506,800 | 26,506,800 | 26,506,800 | 26,506,800 | 26,506,800 | 26,506,800 | 2024-05-06 | 2024-05-18 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 98,200 | 0.37 % | |
863 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Ayam petelur dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10021413000 | 53545261 | APBD | 11,318,750 | 11,318,750 | 11,219,747 | 11,219,747 | 11,219,658 | 0 | 0 | 0 | 2024-11-30 | 2024-12-06 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 99,003 | 0.87 % | |
864 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer,Laboratorium Bahasa SMK NEGERI 1 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17531012 | 51213107 | APBD | 37,520,000 | 37,520,000 | 37,466,720 | 37,466,720 | 37,466,720 | 37,466,720 | 37,466,720 | 37,466,720 | 2024-07-25 | 2024-08-02 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 53,280 | 0.14 % | |
865 | 2024 | Sekretariat DPRD | jasa konsultasi perencanaan Pengaspalan Keliling Halaman Kantor Sekretariat DPRD Prov Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17660012 | 49289853 | APBD | 138,017,399 | 99,995,460 | 99,717,960 | 99,717,960 | 98,052,960 | 98,052,960 | 98,052,960 | 98,052,960 | 2024-09-20 | 2024-10-01 | CV. KRUF STUDIO ENGINEERING | 81.075.394.7-711.000 | 38,299,439 | 27.75 % | |
866 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Kantor SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17833012 | 52898548 | APBDP | 25,000,000 | 25,000,000 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 2024-10-28 | 2024-11-05 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 160,864 | 0.64 % | |
867 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Pematang Karau (Rehabilitasi Rg. Kelas) 4 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17228012 | 51183864 | APBD | 34,836,600 | 34,836,600 | 34,831,800 | 34,831,800 | 34,831,800 | 34,831,800 | 0 | 34,831,800 | 2024-05-31 | 2024-06-07 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 4,800 | 0.01 % | |
868 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Jalan Produksi/Jalan Usaha Tani di IPBH Keruing | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17774012 | 52970804 | APBDP | 16,052,480 | 16,052,480 | 15,995,100 | 15,995,100 | 15,873,000 | 0 | 0 | 0 | 2024-10-16 | 2024-10-24 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 57,380 | 0.36 % | |
869 | 2024 | Badan Pendapatan Daerah | Perencanaan Renovasi Ruang Kantor UPTPPD Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17370012 | 51957019 | APBDP | 45,900,000 | 33,522,000 | 33,300,000 | 33,300,000 | 32,656,200 | 32,656,200 | 32,656,200 | 32,656,200 | 2024-06-26 | 2024-07-12 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 12,600,000 | 27.45 % | |
870 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Ruang Guru, Ruang Kepala Sekolah, Ruang keterampilan, Ruang Pembelajaran Khusus, Ruang Perpustakaan, Ruang Tata Usaha SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17330012 | 51911713 | APBD | 61,168,100 | 61,161,000 | 61,149,900 | 61,149,900 | 61,149,900 | 61,149,900 | 0 | 61,149,900 | 2024-07-01 | 2024-07-05 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 18,200 | 0.03 % | |
871 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Biologi, Pembangunan Rg OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17352012 | 51154969 | APBD | 43,838,500 | 43,838,500 | 43,800,000 | 43,800,000 | 43,800,000 | 43,800,000 | 43,800,000 | 43,800,000 | 2024-07-15 | 2024-07-19 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 38,500 | 0.09 % | |
872 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Gunung Bintang Awai (Pembangunan Rg. Lab. Kimia, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15821012 | 50377691 | APBD | 59,117,700 | 59,117,700 | 59,090,544 | 59,090,544 | 59,090,544 | 59,090,544 | 0 | 59,090,544 | 2024-03-21 | 2024-04-08 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 27,156 | 0.05 % | |
873 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Gedung Hatchery Pada Kegiatan Pengembangan Ayam Kalimantan Super (Kalper) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17578012 | 52123235 | APBD | 15,885,000 | 15,885,000 | 15,562,200 | 15,562,200 | 15,429,000 | 15,429,000 | 15,429,000 | 15,429,000 | 2024-08-06 | 2024-08-14 | 322,800 | 2.03 % | |||
874 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 1 Belantika Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16152012 | 51423179 | APBD | 19,000,000 | 19,000,000 | 18,981,000 | 18,981,000 | 18,981,000 | 18,981,000 | 18,981,000 | 18,981,000 | 2024-05-22 | 2024-06-02 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 19,000 | 0.1 % | |
875 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Timpah (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17355012 | 51239090 | APBD | 45,729,400 | 45,729,400 | 45,698,700 | 45,698,700 | 45,698,700 | 45,698,700 | 45,698,700 | 45,698,700 | 2024-07-03 | 2024-07-12 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 30,700 | 0.07 % | |
876 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN TANDON AIR UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15902012 | 49246741 | APBD | 9,792,012 | 9,768,000 | 9,573,750 | 9,573,750 | 9,351,750 | 9,351,750 | 9,351,750 | 9,351,750 | 2024-03-28 | 2024-04-12 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 218,262 | 2.23 % | |
877 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Pembangunan Rumah Genset dan Tower Air UPT. KPHP Murung Raya - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17721012 | 52839871 | APBDP | 23,687,000 | 23,686,800 | 23,499,810 | 23,499,810 | 23,027,505 | 0 | 0 | 0 | 2024-10-10 | 2024-10-18 | 187,190 | 0.79 % | |||
878 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet (Jamban)6 Ruang beserta sanitasinya SMK NEGERI 2 PALANGKARAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15915012 | 50540151 | APBD | 24,470,000 | 24,470,000 | 24,414,500 | 24,414,500 | 24,414,500 | 24,414,500 | 24,414,500 | 24,414,500 | 2024-04-01 | 2024-04-19 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 55,500 | 0.23 % | |
879 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Bangunan Gedung - Rehab Loket Ruang Kamboja | Pengadaan Langsung | Pekerjaan Konstruksi | 17595012 | 52174219 | APBD | 50,000,000 | 50,000,000 | 49,832,937 | 49,832,937 | 49,494,950 | 49,494,950 | 49,494,950 | 49,494,950 | 2024-08-21 | 2024-08-30 | CV.KARYA DAJABA PUTRA | 02.978.026.9-711.000 | 167,063 | 0.33 % | |
880 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17866012 | 53276836 | APBDP | 17,775,000 | 17,775,000 | 17,715,600 | 17,715,600 | 17,715,600 | 0 | 0 | 0 | 2024-11-04 | 2024-11-12 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 59,400 | 0.33 % | |
881 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 10 Palangka Raya (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16134012 | 51239929 | APBD | 55,540,300 | 55,540,300 | 55,315,000 | 55,315,000 | 55,315,000 | 55,315,000 | 0 | 55,315,000 | 2024-05-21 | 2024-05-31 | 225,300 | 0.41 % | |||
882 | 2024 | Dinas Kesehatan | Pengadaan Jasa Konsultansi Pengawasan Rehab Rumah Dinas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17870012 | 51439879 | APBD | 24,000,000 | 24,000,000 | 23,995,000 | 23,995,000 | 23,976,000 | 23,976,000 | 23,976,000 | 23,976,000 | 2024-11-04 | 2024-11-06 | 5,000 | 0.02 % | |||
883 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (2 Ruang) SMKN 1 Pandih Batu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16149012 | 51573319 | APBD | 25,000,000 | 25,000,000 | 24,940,000 | 24,940,000 | 24,940,000 | 24,940,000 | 24,940,000 | 24,940,000 | 2024-05-22 | 2024-06-02 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 60,000 | 0.24 % | |
884 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pemeliharaan/Rehabilitasi Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17525012 | 49420052 | APBD | 40,724,000 | 40,724,000 | 40,650,000 | 40,650,000 | 40,165,350 | 40,165,350 | 40,165,350 | 40,165,350 | 2024-07-22 | 2024-07-31 | 74,000 | 0.18 % | |||
885 | 2024 | Badan Pendapatan Daerah | Perencanaan Pembangunan Selasar Penyambung antar Bangunan kantor UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17545012 | 52151620 | APBDP | 25,500,000 | 25,499,998 | 25,435,650 | 25,435,650 | 25,185,900 | 25,185,900 | 25,185,900 | 25,185,900 | 2024-07-26 | 2024-08-10 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 64,350 | 0.25 % | |
886 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Kuala Kurun (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17307012 | 51238707 | APBD | 29,081,400 | 29,081,400 | 29,000,000 | 29,000,000 | 29,000,000 | 29,000,000 | 29,000,000 | 29,000,000 | 2024-06-12 | 2024-06-24 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 81,400 | 0.28 % | |
887 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Jalan Produksi/Jalan Usaha Tani di IPB Basarang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17682012 | 52671203 | APBDP | 14,045,920 | 14,045,920 | 14,030,000 | 14,030,000 | 13,997,100 | 13,997,100 | 13,997,100 | 13,997,100 | 2024-09-30 | 2024-10-24 | 15,920 | 0.11 % | |||
888 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Lanjutan Pembangunan SMAN 2 Puruk Cahu (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15965012 | 50729901 | APBD | 40,000,000 | 40,000,000 | 39,500,000 | 39,500,000 | 39,500,000 | 39,500,000 | 0 | 39,500,000 | 2024-04-05 | 2024-04-24 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 500,000 | 1.25 % | |
889 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika,Laboratorium SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17481012 | 51851605 | APBD | 76,900,000 | 76,900,000 | 76,376,700 | 76,376,700 | 76,376,700 | 76,376,700 | 76,376,700 | 76,376,700 | 2024-07-15 | 2024-07-19 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 523,300 | 0.68 % | |
890 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Jasa Konsultansi Perencanaan Renovasi Parkir, Pagar, Kantin, Rumah Penjaga dan Gudang Kantor DPMPTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16006012 | 51312153 | APBD | 84,146,000 | 84,138,000 | 84,027,000 | 84,027,000 | 83,971,500 | 83,971,500 | 0 | 83,971,500 | 2024-05-16 | 2024-05-22 | Roa Solution | 92.337.883.0-711.000 | 119,000 | 0.14 % | |
891 | 2024 | Satuan Polisi Pamong Praja | Perencanaan Belanja Modal Bangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15952012 | 49577932 | APBD | 38,520,000 | 38,520,000 | 38,228,600 | 38,228,600 | 37,864,875 | 0 | 0 | 0 | 2024-04-03 | 2024-04-19 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 291,400 | 0.76 % | |
892 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Pagar UPT.KPHL Kapuas Kahayan - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17269012 | 51802829 | APBDP | 108,292,000 | 99,997,125 | 99,858,653 | 99,858,653 | 99,184,328 | 99,184,328 | 99,184,328 | 99,184,328 | 2024-06-11 | 2024-06-21 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 8,433,348 | 7.79 % | |
893 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Supervisi Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah VII | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16118012 | 50877462 | APBD | 100,000,000 | 99,999,900 | 99,833,400 | 99,833,400 | 99,567,000 | 99,567,000 | 99,567,000 | 99,567,000 | 2024-05-20 | 2024-06-05 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 166,600 | 0.17 % | |
894 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Tamiyang Layang (Rehabilitasi Rg. Kelas, Pembangunan Rg. BK ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17230012 | 51156087 | APBD | 60,739,800 | 60,739,800 | 60,739,200 | 60,739,200 | 60,739,200 | 60,739,200 | 0 | 60,739,200 | 2024-05-31 | 2024-06-07 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 600 | 0 % | |
895 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Paju Epat (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15836012 | 50387609 | APBD | 69,830,700 | 69,830,700 | 69,799,908 | 69,799,908 | 69,799,908 | 69,799,908 | 0 | 69,799,908 | 2024-03-21 | 2024-04-08 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 30,792 | 0.04 % | |
896 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0018 Pengawasan Dapur Umum, Bengkel, Rumah Panen | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17558012 | 47771153 | APBD | 49,820,000 | 49,740,000 | 49,550,400 | 49,550,400 | 49,000,000 | 49,000,000 | 49,000,000 | 49,000,000 | 2024-07-30 | 2024-08-09 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 269,600 | 0.54 % | |
897 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 4 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17261012 | 51240069 | APBD | 30,977,300 | 30,977,300 | 30,636,000 | 30,636,000 | 30,636,000 | 30,636,000 | 0 | 30,636,000 | 2024-06-04 | 2024-06-14 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 341,300 | 1.1 % | |
898 | 2024 | Dinas Kehutanan | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor atau Bangunan Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15806012 | 49887466 | APBD | 81,213,000 | 81,212,000 | 81,102,705 | 81,102,705 | 80,530,500 | 80,530,500 | 80,530,500 | 80,530,500 | 2024-03-18 | 2024-03-28 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 110,295 | 0.14 % | |
899 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15787012 | 50392548 | APBD | 69,211,800 | 69,211,800 | 69,139,900 | 69,139,900 | 69,139,900 | 69,139,900 | 0 | 69,139,900 | 2024-03-15 | 2024-03-26 | CV. PENDANG JAYA RAYA ENGINEERING | 01.662.432.2-711.000 | 71,900 | 0.1 % | |
900 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Pengawasan Rehab/Rehabilitasi Bangunan Laboratorium UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17608012 | 51460048 | APBD | 20,140,000 | 20,140,000 | 20,120,098 | 20,120,098 | 20,110,425 | 20,110,425 | 20,110,425 | 20,110,425 | 2024-08-19 | 2024-08-27 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 19,902 | 0.1 % | |
901 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Ruang Kepala Sekolah SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17248012 | 51398646 | APBD | 28,500,000 | 28,500,000 | 28,416,000 | 28,416,000 | 28,416,000 | 28,416,000 | 28,416,000 | 28,416,000 | 2024-05-31 | 2024-06-07 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 84,000 | 0.29 % | |
902 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15793012 | 49207879 | APBD | 13,582,500 | 13,538,300 | 13,475,400 | 13,475,400 | 13,220,100 | 13,220,100 | 13,220,100 | 13,220,100 | 2024-03-15 | 2024-03-25 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 107,100 | 0.79 % | |
903 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0008.5.1.02.02.08.0018 Pengawasan Revitalisasi tambak sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17609012 | 47773196 | APBD | 25,600,000 | 24,993,000 | 24,930,600 | 24,930,600 | 24,500,000 | 24,500,000 | 24,500,000 | 24,500,000 | 2024-08-21 | 2024-09-06 | CITRA MULTI CONSULTANT | 01.576.343.6-711.000 | 669,400 | 2.61 % | |
904 | 2024 | Dinas Pemuda dan Olahraga | Beban Jasa Konsultansi Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17698012 | 52690083 | APBD | 109,550,000 | 99,722,400 | 99,500,400 | 99,500,400 | 99,000,900 | 99,000,900 | 99,000,900 | 99,000,900 | 2024-09-30 | 2024-10-11 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 10,049,600 | 9.17 % | |
905 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Perencanaan Pembangunan Gudang Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17852012 | 52921898 | APBD | 27,962,100 | 27,962,000 | 27,800,000 | 27,800,000 | 27,799,506 | 27,799,506 | 27,799,506 | 27,799,506 | 2024-10-31 | 2024-11-08 | 162,100 | 0.58 % | |||
906 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Rumah Dinas SMKN 2 Bataguh | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16157012 | 51424995 | APBD | 25,000,000 | 25,000,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 2024-05-22 | 2024-06-02 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 50,000 | 0.2 % | |
907 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0018 Pengawasan Lanjutan Rehab Garansi, Rehab Atap aula Kantor, Rehab Atap Sayap kanan- kiri kantor, Rehab Halaman dan jalan kantor, Rehab Halaman dan jalan kantor, Rehab Plafond Luar Ruang Bidang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17473012 | 52047958 | APBD | 70,000,000 | 69,999,000 | 69,874,500 | 69,874,500 | 69,400,000 | 69,400,000 | 69,400,000 | 69,400,000 | 2024-07-11 | 2024-07-26 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 125,500 | 0.18 % | |
908 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Kelas Baru SMKS MIFTAHUSSALAM | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16181012 | 51427630 | APBD | 29,750,000 | 29,750,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 2024-05-22 | 2024-06-02 | Roa Solution | 92.337.883.0-711.000 | 2,000 | 0.01 % | |
909 | 2024 | Sekretariat DPRD | jasa konsultasi pengawasan Pengaspalan Keliling Halaman Kantor Sekretariat DPRD Prov Kalteng,Jasa Konsultansi Pengawasan Spesifikasi: Bangunan Gedung Sederhana Renovasi Gedung Komisi DPRD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17857012 | 49289856;52978553 | APBD;APBDP | 192,011,599 | 99,999,999 | 99,900,000 | 99,900,000 | 98,457,000 | 0 | 0 | 0 | 2024-11-01 | 2024-11-12 | Roa Solution | 92.337.883.0-711.000 | 92,111,599 | 47.97 % | |
910 | 2024 | Dinas Kesehatan | Pengadaan Jasa Konsultansi Perencanaan Rehab Rumah Dinas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15996012 | 51439825 | APBD | 36,000,000 | 36,000,000 | 35,742,000 | 35,742,000 | 35,631,000 | 35,631,000 | 0 | 35,631,000 | 2024-04-26 | 2024-04-30 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 258,000 | 0.72 % | |
911 | 2024 | Badan Pendapatan Daerah | Pengawasan Penataan Halaman Kantor UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17746012 | 52650120 | APBD | 27,000,000 | 26,973,000 | 26,917,500 | 26,917,500 | 26,451,300 | 0 | 0 | 0 | 2024-10-16 | 2024-10-29 | ROTASI DESIGN CONSULTANT | 90.011.802.7-711.000 | 82,500 | 0.31 % | |
912 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17477012 | 51358631 | APBD | 29,400,000 | 29,400,000 | 29,346,720 | 29,346,720 | 29,346,720 | 29,346,720 | 29,346,720 | 29,346,720 | 2024-07-15 | 2024-07-19 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 53,280 | 0.18 % | |
913 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Kantor Ruang Penyusunan Program | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17790012 | 52993236 | APBDP | 21,890,000 | 21,890,000 | 21,750,450 | 21,750,450 | 21,750,450 | 0 | 0 | 0 | 2024-10-18 | 2024-10-22 | 139,550 | 0.64 % | |||
914 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer,Laboratorium Bahasa SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17493012 | 51229367 | APBD | 51,350,000 | 51,350,000 | 51,326,400 | 51,326,400 | 51,326,400 | 51,326,400 | 51,326,400 | 51,326,400 | 2024-07-15 | 2024-07-19 | Roa Solution | 92.337.883.0-711.000 | 23,600 | 0.05 % | |
915 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PENATAAN HALAMAN BELAKANG UPTPPD MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16023012 | 49254192 | APBD | 63,000,000 | 48,118,500 | 48,074,100 | 48,074,100 | 47,175,000 | 47,175,000 | 47,175,000 | 47,175,000 | 2024-04-29 | 2024-05-13 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 14,925,900 | 23.69 % | |
916 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet (Jamban) SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15852012 | 50394249 | APBD | 4,819,767 | 4,819,767 | 4,784,100 | 4,784,100 | 4,784,100 | 4,784,100 | 4,784,100 | 4,784,100 | 2024-03-25 | 2024-04-12 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 35,667 | 0.74 % | |
917 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Zona Selamat Sekolah (ZOSS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17622012 | 51282398 | APBD | 25,000,000 | 25,000,000 | 24,978,330 | 24,978,330 | 24,978,330 | 24,978,330 | 24,978,330 | 24,978,330 | 2024-08-29 | 2024-09-06 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 21,670 | 0.09 % | |
918 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pembuatan Gapura Pintu Gerbang SMAN 1 Pulau Malan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17835012 | 52899026 | APBDP | 20,000,000 | 20,000,000 | 19,791,300 | 19,791,300 | 19,791,300 | 19,791,300 | 19,791,300 | 19,791,300 | 2024-10-26 | 2024-11-04 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 208,700 | 1.04 % | |
919 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Bintang Awai (Pembangunan Rg. Kelas Baru (RKB) Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17243012 | 51153815 | APBD | 39,089,600 | 39,089,600 | 39,016,500 | 39,016,500 | 39,016,500 | 39,016,500 | 0 | 39,016,500 | 2024-05-30 | 2024-06-07 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 73,100 | 0.19 % | |
920 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pembangunan Pagar SMAN 3 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17771012 | 52878740 | APBDP | 50,000,000 | 50,000,000 | 49,833,500 | 49,833,500 | 49,833,500 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 166,500 | 0.33 % | |
921 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Arut Utara (Rehabilitasi Rg. Kelas, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17285012 | 51239551 | APBD | 36,556,600 | 36,556,600 | 36,408,000 | 36,408,000 | 36,408,000 | 36,408,000 | 36,408,000 | 36,408,000 | 2024-06-07 | 2024-06-19 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 148,600 | 0.41 % | |
922 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Belanti I Kabupaten Pulang Pisau | Pengadaan Langsung | Pekerjaan Konstruksi | 15683012 | 46525062 | APBD | 170,000,000 | 170,000,000 | 169,890,225 | 169,890,225 | 169,790,592 | 169,790,000 | 0 | 169,790,000 | 2024-01-18 | 2024-01-31 | CV. ARTHA CAPRICORNUS | 01.922.068.0-711.000 | 109,775 | 0.06 % | |
923 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Toilet (Jamban)1 Ruang beserta sanitasinya SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17410012 | 51172055 | APBD | 4,130,000 | 4,130,000 | 4,107,800 | 4,107,800 | 4,107,800 | 4,107,800 | 4,107,800 | 4,107,800 | 2024-06-27 | 2024-07-02 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 22,200 | 0.54 % | |
924 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Rehab Aula SMAN 1 Kurun (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15910012 | 50729016 | APBD | 40,000,000 | 40,000,000 | 39,889,000 | 39,889,000 | 39,889,000 | 39,889,000 | 0 | 39,889,000 | 2024-04-03 | 2024-04-24 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,000 | 0.28 % | |
925 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Silo (Penyimpanan Bahan Pangan) Kapasitas 1.000 Ton (Kab. Pulpis dan Kotim) | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16016012 | 49360193 | APBD | 350,000,000 | 349,883,000 | 349,202,670 | 349,202,670 | 348,429,000 | 348,429,000 | 0 | 0 | 2024-04-25 | 2024-05-15 | 797,330 | 0.23 % | |||
926 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15984012 | 49438315 | APBD | 99,822,867 | 99,822,000 | 99,716,850 | 99,716,850 | 99,715,000 | 99,715,000 | 0 | 99,715,000 | 2024-04-20 | 2024-05-10 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 106,017 | 0.11 % | 3 |
927 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Katingan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17727012 | 52869776 | APBDP | 96,460,000 | 96,460,000 | 95,682,000 | 95,682,000 | 95,682,000 | 95,682,000 | 0 | 95,682,000 | 2024-10-12 | 2024-11-01 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 778,000 | 0.81 % | 3 |
928 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Silo (Penyimpanan Bahan Pangan) Kapasitas 1.000 Ton (Kab. Pulpis dan Kotim) | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16016012 | 49360193 | APBD | 350,000,000 | 349,883,000 | 349,202,670 | 349,202,670 | 348,429,000 | 348,429,000 | 348,429,000 | 348,429,000 | 2024-04-25 | 2024-05-15 | 797,330 | 0.23 % | |||
929 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan Green House Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17331012 | 49991946 | APBD | 80,000,000 | 80,000,000 | 79,591,995 | 79,591,995 | 79,342,800 | 79,342,800 | 79,342,800 | 79,342,800 | 2024-06-19 | 2024-06-26 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 408,005 | 0.51 % | |
930 | 2024 | Badan Pendapatan Daerah | Pengawasan Pelebaran Bangunan Ruang Cek Fisik UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17743012 | 52648279 | APBD | 10,500,000 | 10,478,400 | 10,450,650 | 10,450,650 | 10,178,700 | 0 | 0 | 0 | 2024-10-16 | 2024-10-29 | 49,350 | 0.47 % | |||
931 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa (Perhotelan) SMKN 3 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16139012 | 51418316 | APBD | 25,000,000 | 25,000,000 | 24,944,500 | 24,944,500 | 24,944,500 | 24,944,500 | 24,944,500 | 24,944,500 | 2024-05-22 | 2024-06-02 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 55,500 | 0.22 % | |
932 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Kotawaringin Lama (Rehabilitasi Rg. Lab. Biologi, Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17215012 | 51239616 | APBD | 32,810,000 | 32,810,000 | 32,578,500 | 32,578,500 | 32,578,500 | 32,578,500 | 0 | 32,578,500 | 2024-05-29 | 2024-06-06 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 231,500 | 0.71 % | |
933 | 2024 | Dinas Perdagangan dan Perindustrian | Pengadaan Jasa Konsultansi Pengawasan Rehabilitasi Bangunan Rumah Kemasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17594012 | 51216833 | APBD | 52,125,045 | 52,125,045 | 52,114,500 | 52,114,500 | 52,003,500 | 0 | 0 | 0 | 2024-08-13 | 2024-08-22 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 10,545 | 0.02 % | |
934 | 2024 | Dinas Kehutanan | Belanja Jasa Konsultansi Pengawasan Arsitektur - Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15901012 | 49887473 | APBD | 26,475,000 | 26,475,000 | 26,423,000 | 26,423,000 | 25,807,500 | 25,807,500 | 25,807,500 | 25,807,500 | 2024-03-28 | 2024-04-15 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 52,000 | 0.2 % | |
935 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Arut Utara (Rehabilitasi Rg. Kelas, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15789012 | 50392793 | APBD | 51,831,800 | 51,831,798 | 51,504,000 | 51,504,000 | 51,504,000 | 51,504,000 | 0 | 51,504,000 | 2024-03-21 | 2024-04-08 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 327,800 | 0.63 % | |
936 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17532012 | 51230168 | APBD | 25,670,000 | 25,670,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 2024-07-25 | 2024-08-02 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 29,000 | 0.11 % | |
937 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Pemutakhiran Dokumen SSK 1 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15708012 | 47521031 | APBD | 80,000,000 | 80,000,000 | 79,997,700 | 79,997,700 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | 2024-03-15 | Yoki Indra Kuncoro | 71.885.488.8-711.000 | 2,300 | 0 % | |
938 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan WC 2 Unit SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15955012 | 50727502 | APBD | 26,000,000 | 26,000,000 | 25,940,000 | 25,940,000 | 25,940,000 | 25,940,000 | 0 | 25,940,000 | 2024-04-19 | 2024-04-29 | 60,000 | 0.23 % | |||
939 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Bagendang IV Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15686012 | 46520306 | APBD | 160,000,000 | 160,000,000 | 159,901,621 | 159,901,621 | 159,800,850 | 159,800,000 | 0 | 159,800,000 | 2024-01-18 | 2024-01-31 | 98,379 | 0.06 % | |||
940 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Pembangunan Toilet(Jamban)beserta sanitasinya SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17411012 | 51202686 | APBD | 33,710,000 | 33,710,000 | 33,633,000 | 33,633,000 | 33,633,000 | 33,633,000 | 33,633,000 | 33,633,000 | 2024-06-27 | 2024-07-02 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 77,000 | 0.23 % | |
941 | 2024 | Sekretariat DPRD | jasa konsultasi pengawasan Pengaspalan Keliling Halaman Kantor Sekretariat DPRD Prov Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17688012 | 49289856 | APBD | 92,011,599 | 92,004,126 | 91,754,376 | 91,754,376 | 91,099,476 | 0 | 0 | 0 | 2024-10-03 | 2024-10-15 | 257,223 | 0.28 % | |||
942 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (8 Ruang) SMKN 4 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16174012 | 51424939 | APBD | 99,000,000 | 99,000,000 | 98,833,500 | 98,833,500 | 98,833,500 | 98,833,500 | 98,833,500 | 98,833,500 | 2024-05-22 | 2024-06-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 166,500 | 0.17 % | |
943 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan,1).Rehab Ruang Kelas SMKN 3 KUALA KAPUAS,2).Rehabilitasi Gudang Produksi SMKN 2 BATAGUH,3).Pembangunan Toilet Beserta Sanitasinya SMKS GKE MANDOMAI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17809012 | 52613300 | APBDP | 42,459,000 | 42,459,000 | 42,407,000 | 42,407,000 | 42,407,000 | 0 | 0 | 0 | 2024-10-25 | 2024-10-31 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 52,000 | 0.12 % | |
944 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SERUYAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17646012 | 49720900 | APBD | 7,942,500 | 7,941,499 | 7,869,900 | 7,869,900 | 7,425,900 | 7,425,900 | 7,425,900 | 7,425,900 | 2024-09-13 | 2024-09-26 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 72,600 | 0.91 % | |
945 | 2024 | Badan Pendapatan Daerah | .PEKERJAAN PENGAWASAN RENOVASI RUANG PAJAK KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17541012 | 49960741 | APBD | 43,780,000 | 43,756,200 | 43,711,800 | 43,711,800 | 43,312,200 | 43,312,200 | 43,312,200 | 43,312,200 | 2024-07-26 | 2024-08-10 | Roa Solution | 92.337.883.0-711.000 | 68,200 | 0.16 % | |
946 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI GARASI RUMAH DINAS ESSELON UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15740012 | 49824504 | APBD | 10,866,000 | 10,865,790 | 10,545,000 | 10,545,000 | 10,323,000 | 10,323,000 | 10,323,000 | 10,323,000 | 2024-03-11 | 2024-03-20 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 321,000 | 2.95 % | |
947 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16144012 | 51421805 | APBD | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 2024-05-22 | 2024-06-02 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 55,500 | 0.28 % | |
948 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer,Bahasa SMK NEGERI 1 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16056012 | 50541480 | APBD | 37,019,000 | 37,019,000 | 36,908,000 | 36,908,000 | 36,908,000 | 36,908,000 | 36,908,000 | 36,908,000 | 2024-05-06 | 2024-05-18 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,000 | 0.3 % | |
949 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Screen House | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16205012 | 51720530 | APBD | 57,240,000 | 57,240,000 | 57,129,000 | 57,129,000 | 57,054,000 | 57,054,000 | 57,054,000 | 57,054,000 | 2024-05-29 | 2024-06-05 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 111,000 | 0.19 % | |
950 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Kantin, Ruang Keterampilan, Ruang Pembelajaran KHusus, Ruang Tata Usaha, Ruang UKS, Selasar Penghubung SLB Negeri Kuala Kurun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17326012 | 51911767 | APBD | 62,987,850 | 62,981,400 | 62,925,900 | 62,925,900 | 62,925,900 | 62,925,900 | 0 | 62,925,900 | 2024-07-01 | 2024-07-05 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 61,950 | 0.1 % | |
951 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya -Rehab WC | Pengadaan Langsung | Pekerjaan Konstruksi | 17905012 | 53355830 | APBDP | 78,900,000 | 78,900,000 | 78,553,186 | 78,553,186 | 78,500,010 | 0 | 0 | 0 | 2024-11-08 | 2024-11-15 | CV. MULTI TATA KARYA | 71.905.824.0-711.000 | 346,814 | 0.44 % | |
952 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17239012 | 51735800 | APBD | 82,630,000 | 82,630,000 | 82,408,000 | 82,408,000 | 82,408,000 | 82,408,000 | 0 | 82,408,000 | 2024-05-30 | 2024-06-10 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 222,000 | 0.27 % | |
953 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE UPTPPD KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16019012 | 49196120 | APBD | 28,976,000 | 28,975,995 | 28,900,000 | 28,900,000 | 28,437,645 | 28,437,645 | 28,437,645 | 28,437,645 | 2024-04-29 | 2024-05-13 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 76,000 | 0.26 % | |
954 | 2024 | Dinas Sosial | Perencanaan Pembatas Antar Bangsal Klien UPT PSBL Pambelum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15971012 | 49435003 | APBD | 68,900,000 | 68,860,800 | 68,213,940 | 68,213,940 | 67,880,940 | 67,880,940 | 67,880,940 | 67,880,940 | 2024-04-17 | 2024-05-02 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 686,060 | 1 % | |
955 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMASANGAN PAVING BLOK HALAMAN AULA UTAMA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16188012 | 49188273 | APBD | 40,000,000 | 39,738,000 | 39,571,500 | 39,571,500 | 39,005,400 | 39,005,400 | 39,005,400 | 39,005,400 | 2024-05-22 | 2024-06-07 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 428,500 | 1.07 % | |
956 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17539012 | 51213613 | APBD | 76,920,000 | 76,920,000 | 76,823,100 | 76,823,100 | 76,823,100 | 76,823,100 | 76,823,100 | 76,823,100 | 2024-07-25 | 2024-08-02 | Roa Solution | 92.337.883.0-711.000 | 96,900 | 0.13 % | |
957 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Sanaman Mantikei (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17264012 | 51239529 | APBD | 38,595,300 | 38,595,300 | 38,540,000 | 38,540,000 | 38,540,000 | 38,540,000 | 0 | 38,540,000 | 2024-06-05 | 2024-06-14 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 55,300 | 0.14 % | |
958 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pembangunan Pagar SMAN 3 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17822012 | 52898255 | APBDP | 30,000,000 | 30,000,000 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 2024-10-28 | 2024-11-05 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 88,800 | 0.3 % | |
959 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Kuala Kurun (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16207012 | 51238686 | APBD | 39,609,200 | 39,609,200 | 39,609,000 | 39,609,000 | 39,609,000 | 39,609,000 | 0 | 39,609,000 | 2024-05-28 | 2024-06-05 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 200 | 0 % | |
960 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMA Garing Tarantang (Rehabilitasi Rg. Tata Usaha, Pembangunan Rg. Perpustakaan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17245012 | 51239190 | APBD | 37,287,000 | 37,287,000 | 36,737,670 | 36,737,670 | 36,737,670 | 36,737,670 | 0 | 36,737,670 | 2024-05-31 | 2024-06-07 | 549,330 | 1.47 % | |||
961 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pengecoran Jalan Menuju Sekolah SMAN 1 Tamban Catur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15812012 | 50729114 | APBD | 96,000,000 | 96,000,000 | 95,850,000 | 95,850,000 | 95,850,000 | 95,850,000 | 95,850,000 | 95,850,000 | 2024-03-18 | 2024-03-28 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 150,000 | 0.16 % | |
962 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehabilitasi Ruang Kelas (1 Ruang) dengan tingkat kerusakan minimal sedang SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15918012 | 50540553 | APBD | 9,443,000 | 9,443,000 | 9,409,700 | 9,409,700 | 9,409,700 | 9,409,700 | 9,409,700 | 9,409,700 | 2024-04-01 | 2024-04-19 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 33,300 | 0.35 % | |
963 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Peningkatan Jalan Damai dan Sekitarnya, Desa Cempaka Mulia Timur, Kecamatan Cempaga, Kabupaten Kotawaringin Timur, Provinsi Kalimantan Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 16116012 | 49565233 | APBD | 186,400,000 | 186,391,000 | 186,089,526 | 186,089,526 | 185,798,000 | 185,798,000 | 100 | 185,798,000 | 2024-05-20 | 2024-06-05 | CV GATRA MEGA | 02.676.179.1-711.000 | 310,474 | 0.17 % | |
964 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI GEDUNG KANTOR UPTPPD KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17399012 | 49934979 | APBD | 25,000,000 | 24,999,999 | 24,900,000 | 24,900,000 | 24,650,325 | 24,650,325 | 24,650,325 | 24,650,325 | 2024-07-03 | 2024-07-17 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 100,000 | 0.4 % | |
965 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan WC SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17332012 | 51911699 | APBD | 12,500,000 | 12,448,650 | 12,448,650 | 12,448,650 | 12,448,650 | 12,448,650 | 12,448,650 | 12,448,650 | 2024-08-14 | 2024-08-20 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 51,350 | 0.41 % | |
966 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG KELAS SMAN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17873012 | 53267712 | APBDP | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,900,000 | 0 | 0 | 0 | 2024-11-06 | 2024-11-14 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 100,000 | 0.1 % | |
967 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0018 Pengawasan Pagar Pengaman Keliling Tambak | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17555012 | 52151470 | APBD | 100,700,000 | 99,960,000 | 99,300,000 | 99,300,000 | 99,000,000 | 99,000,000 | 99,000,000 | 99,000,000 | 2024-07-26 | 2024-08-09 | PT. ANDAL CENDANAKA | 01.489.452.1-711.000 | 1,400,000 | 1.39 % | |
968 | 2024 | Badan Keuangan dan Aset Daerah | Belanja Modal Aset Tidak Berwujud - Sistem Aplikasi Penatausahaan BMD Prov. Kalteng (SiPeKa) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10011043000 | 53424637 | APBD | 99,850,000 | 99,844,500 | 99,789,000 | 99,789,000 | 99,289,500 | 99,289,500 | 99,289,500 | 99,289,500 | 2024-11-21 | 2024-11-29 | CV. Anugrah Teknik Raya | 99.127.164.4-711.000 | 61,000 | 0.06 % | |
969 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Penyediaan dan Pemeliharaan Sarana Prasarana pada UPT.KPHP Mentaya Hulu Seruyan Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17797012 | 52987927 | APBDP | 39,890,000 | 39,889,600 | 39,830,000 | 39,830,000 | 39,588,150 | 0 | 0 | 0 | 2024-10-22 | 2024-11-04 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 60,000 | 0.15 % | |
970 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pengadaan Bahan-Bahan Pelatihan DBH-DR Melalui Pelatihan Tata Boga, Anyaman Rotan, Pengolahan Ikan, Pengolahan Jamur Tiram dan Pengolahan Pakan Ternak | Pengadaan Langsung | Pengadaan Barang | 17909012 | 53371337 | APBD | 87,000,000 | 86,930,011 | 86,765,370 | 86,765,370 | 86,765,370 | 0 | 0 | 0 | 2024-11-08 | 2024-11-15 | CV. DEDIKASI KARYA DELANTARA | 90.527.413.0-711.000 | 234,630 | 0.27 % | |
971 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang SLB YPLB Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17333012 | 51911687 | APBD | 10,000,000 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 2024-08-14 | 2024-08-20 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 4,450 | 0.04 % | |
972 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Kotawaringin Lama (Rehabilitasi Rg. Lab. Kimia, Rehabilitasi Rg. Perpustakaan, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15791012 | 50393189 | APBD | 48,193,100 | 48,193,100 | 47,841,000 | 47,841,000 | 47,841,000 | 47,841,000 | 0 | 47,841,000 | 2024-03-21 | 2024-04-08 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 352,100 | 0.73 % | |
973 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16070012 | 50544714 | APBD | 21,041,000 | 21,041,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 2024-05-06 | 2024-05-18 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 41,000 | 0.19 % | |
974 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih ( SMKN 1 Kumai) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15715012 | 49713439 | APBD | 25,000,000 | 25,000,000 | 24,950,000 | 24,950,000 | 24,950,000 | 0 | 0 | 0 | 2024-02-23 | 2024-03-11 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 50,000 | 0.2 % | |
975 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE KANTOR UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16022012 | 49191281 | APBD | 28,976,000 | 28,715,700 | 28,493,700 | 28,493,700 | 27,616,800 | 27,616,800 | 27,616,800 | 27,616,800 | 2024-04-29 | 2024-05-13 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 482,300 | 1.66 % | |
976 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Rehabilitasi Laboratorium IPA 2 Ruang SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15897012 | 50766788 | APBD | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,900,000 | 29,900,000 | 0 | 29,900,000 | 2024-03-28 | 2024-04-08 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 100,000 | 0.33 % | |
977 | 2024 | Dinas Pemberdayaan Masyarakat dan Desa | Perencanaan Bangunan Mushola DPMD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15867012 | 51050071 | APBD | 72,000,000 | 72,000,000 | 71,817,000 | 71,817,000 | 71,484,000 | 71,484,000 | 0 | 71,484,000 | 2024-03-26 | 2024-04-08 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 183,000 | 0.25 % | |
978 | 2024 | KPHL GERBANG BARITO | Beban Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Perencana Kandang Kambing - Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16122012 | 49971020 | APBD | 28,620,000 | 28,620,000 | 28,313,880 | 28,313,880 | 27,814,380 | 27,814,380 | 27,814,380 | 27,814,380 | 2024-06-25 | 2024-07-05 | GEO DINAMIKA UTAMA | 01.576.437.6-711.000 | 306,120 | 1.07 % | |
979 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Perencanaan Pembangunan Green House Kota P. Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17895012 | 53297651 | APBDP | 57,240,000 | 57,240,000 | 57,109,500 | 57,109,500 | 57,109,500 | 57,109,500 | 57,109,500 | 57,109,500 | 2024-11-07 | 2024-11-15 | ROTASI DESIGN CONSULTANT | 90.011.802.7-711.000 | 130,500 | 0.23 % | |
980 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Perluasan SPAM Jaringan Perpipaan Kota Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15986012 | 51420541 | APBD | 35,049,000 | 35,000,000 | 34,176,900 | 34,176,900 | 34,176,900 | 34,176,900 | 34,176,900 | 34,176,900 | 2024-04-19 | 2024-05-13 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 872,100 | 2.49 % | |
981 | 2024 | Dinas Perpustakaan dan Arsip | Jasa Konsultansi Perencanaan Gedung Kafe Literasi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15991012 | 51257176 | APBD | 59,073,000 | 59,073,000 | 58,800,030 | 58,800,000 | 58,700,000 | 58,700,000 | 58,700,000 | 58,700,000 | 2024-05-06 | 2024-05-31 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 272,970 | 0.46 % | |
982 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Asrama Mahasiswa Kalteng di Jakarta Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15978012 | 51421909 | APBD | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,900,000 | 19,900,000 | 19,900,000 | 19,900,000 | 2024-04-20 | 2024-05-09 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 100,000 | 0.5 % | |
983 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Penataan dan Penimbunan Halaman SMAN 2 Kahayan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17763012 | 52879929 | APBDP | 40,000,000 | 40,000,000 | 39,760,200 | 39,760,200 | 39,760,200 | 0 | 0 | 0 | 2024-10-16 | 2024-10-22 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 239,800 | 0.6 % | |
984 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Rungan Barat (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17217012 | 51238823 | APBD | 33,118,600 | 33,118,600 | 33,100,200 | 33,100,200 | 33,100,200 | 33,100,200 | 0 | 33,100,200 | 2024-05-29 | 2024-06-06 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 18,400 | 0.06 % | |
985 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Pelabuhan Tambat/Sandar UPT.KPHL Gerbang Barito - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17700012 | 52528448 | APBDP | 21,406,000 | 21,405,700 | 21,350,000 | 21,350,000 | 20,959,298 | 0 | 0 | 0 | 2024-10-02 | 2024-10-11 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 56,000 | 0.26 % | |
986 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Sarana dan Prasarana UPT. KPHP Kapuas Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17714012 | 52528450 | APBDP | 25,128,000 | 25,127,900 | 25,106,258 | 25,106,258 | 24,828,758 | 0 | 0 | 0 | 2024-10-10 | 2024-10-18 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 21,743 | 0.09 % | |
987 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17440012 | 51851990 | APBD | 38,460,000 | 38,459,999 | 38,350,500 | 38,350,500 | 38,350,500 | 38,350,500 | 38,350,500 | 38,350,500 | 2024-07-06 | 2024-07-09 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 109,500 | 0.28 % | |
988 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16029012 | 49202880 | APBD | 13,500,000 | 13,423,496 | 13,400,000 | 13,400,000 | 13,120,200 | 13,120,200 | 13,120,200 | 13,120,200 | 2024-05-01 | 2024-05-10 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 100,000 | 0.74 % | |
989 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16146012 | 51422769 | APBD | 20,000,000 | 20,000,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 2024-05-22 | 2024-06-02 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.56 % | |
990 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Kandang Rusa UPT BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16040012 | 51460047 | APBD | 45,275,000 | 45,275,000 | 45,100,077 | 45,100,077 | 44,377,800 | 44,377,800 | 44,377,800 | 44,377,800 | 2024-04-30 | 2024-05-06 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 174,923 | 0.39 % | |
991 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih ( SMAN 1 Parenggean) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15714012 | 49713440 | APBD | 15,000,000 | 15,000,000 | 14,950,000 | 14,950,000 | 14,950,000 | 0 | 0 | 0 | 2024-02-23 | 2024-03-11 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 50,000 | 0.33 % | |
992 | 2024 | Dinas Energi dan Sumber Daya Mineral | Pemeliharaan/Rehabilitasi Sarana dan Prasarana Gedung Kantor atau Bangunan Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15692012 | 48888375 | APBD | 188,991,000 | 99,000,000 | 98,500,000 | 98,500,000 | 98,500,000 | 98,500,000 | 98,500,000 | 98,500,000 | 2024-02-15 | 2024-02-27 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 90,491,000 | 47.88 % | |
993 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Screen House | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17513012 | 51720770 | APBD | 40,280,000 | 40,279,999 | 40,096,227 | 40,096,227 | 39,960,000 | 39,960,000 | 39,960,000 | 39,960,000 | 2024-07-26 | 2024-08-05 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 183,773 | 0.46 % | |
994 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Kelas SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17784012 | 52880424 | APBDP | 40,000,000 | 40,000,000 | 39,715,467 | 39,715,467 | 39,715,467 | 0 | 0 | 0 | 2024-10-17 | 2024-10-23 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 284,533 | 0.71 % | |
995 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS,Ruang Bimbingan Konseling(BK) SMKS PGRI SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17412012 | 51358987 | APBD | 17,550,000 | 17,550,000 | 17,496,720 | 17,496,720 | 17,496,720 | 17,496,720 | 17,496,720 | 17,496,720 | 2024-06-27 | 2024-07-02 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 53,280 | 0.3 % | |
996 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang SLBN 1 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17343012 | 51911816 | APBD | 12,750,000 | 12,749,460 | 12,716,000 | 12,716,000 | 12,716,000 | 12,716,000 | 12,716,000 | 12,716,000 | 2024-08-12 | 2024-08-19 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 34,000 | 0.27 % | |
997 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI GEDUNG ARSIP UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17543012 | 52151560 | APBDP | 78,750,000 | 78,749,998 | 78,643,500 | 78,643,500 | 78,255,000 | 78,255,000 | 78,255,000 | 78,255,000 | 2024-07-26 | 2024-08-10 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 106,500 | 0.14 % | |
998 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0005 Perencanaan Pembuatan Sekat Ruang Podcast, Rehab Halaman dan jalan kantor, Rehab Jendela Kantor, Rehab Lantai Teras, Lantai Lobby dan Jalan Disabilitas, Rehab Pagar Kantor, Rehab Tiang Bendera (1 Paket) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16038012 | 51477528 | APBD | 100,000,000 | 99,889,000 | 99,800,000 | 99,800,000 | 99,100,000 | 99,100,000 | 100 | 99,100,000 | 2024-04-29 | 2024-05-17 | Roa Solution | 92.337.883.0-711.000 | 200,000 | 0.2 % | |
999 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Lanjutan penataan Halaman SMAN 1 Kasongan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17827012 | 52897728 | APBDP | 65,000,000 | 65,000,000 | 64,935,000 | 64,935,000 | 64,935,000 | 0 | 0 | 0 | 2024-10-27 | 2024-11-05 | CV. BATUAH RAYA KONSULTAN | 19.890.506.9-711.000 | 65,000 | 0.1 % | |
1000 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI PLAFON DAN TANGGA KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17818012 | 49957080 | APBD | 17,972,500 | 17,926,500 | 17,871,000 | 17,871,000 | 17,538,000 | 0 | 0 | 0 | 2024-10-30 | 2024-11-14 | 101,500 | 0.56 % | |||
1001 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 3 Puruk Cahu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17672012 | 52610382 | APBDP | 30,000,000 | 30,000,000 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 2024-09-26 | 2024-10-03 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 49,980 | 0.17 % | |
1002 | 2024 | Badan Pendapatan Daerah | Pengawasan Pembangunan Ruang Tunggu Cek Fisik Mobil | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17580012 | 52200424 | APBDP | 18,240,000 | 18,209,550 | 18,165,150 | 18,165,150 | 17,954,250 | 17,954,250 | 17,954,250 | 17,954,250 | 2024-08-06 | 2024-08-15 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 74,850 | 0.41 % | |
1003 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Dusun Utara (Pembangunan Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17309012 | 51153428 | APBD | 32,583,200 | 32,583,200 | 32,488,035 | 32,488,035 | 32,488,035 | 32,488,035 | 32,488,035 | 32,488,035 | 2024-06-13 | 2024-06-26 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 95,165 | 0.29 % | |
1004 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Pagar dan Parkir SMAN 6 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15829012 | 50770118 | APBD | 75,000,000 | 75,000,000 | 74,503,200 | 74,503,200 | 74,503,200 | 74,503,200 | 0 | 74,503,200 | 2024-03-21 | 2024-04-08 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 496,800 | 0.66 % | |
1005 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Ayam Buras, Pakan dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10026896000 | 52123216 | APBD | 11,649,000 | 11,649,000 | 11,638,350 | 11,638,350 | 11,638,350 | 0 | 0 | 0 | 2024-12-07 | 2024-12-13 | 10,650 | 0.09 % | |||
1006 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Rehabilitasi Ruang Laboratorium Komputer,Rehabilitasi Ruang Multimedia,Rehabilitasi Toilet(Jamban) SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17421012 | 51196816 | APBD | 27,790,000 | 27,780,000 | 27,713,400 | 27,713,400 | 27,713,400 | 27,713,400 | 27,713,400 | 27,713,400 | 2024-06-28 | 2024-07-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 76,600 | 0.28 % | |
1007 | 2024 | Dinas Sosial | Perencanaan Rehabilitasi Wisma DAMANG LEMAN dan H. IKAP Pada UPT. PSBR Majar Tabela | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17891012 | 53322197 | APBDP | 75,150,000 | 75,067,000 | 74,291,434 | 74,291,434 | 71,862,288 | 71,862,288 | 71,862,288 | 71,862,288 | 2024-11-13 | 2024-11-26 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 858,566 | 1.14 % | |
1008 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Perencanaan Parkir Kendaraan Bermotor Kantor) | Pengadaan Langsung | Jasa Lainnya | 10006250000 | 53444696 | APBD;APBDP | 202,500,000 | 24,952,800 | 24,464,400 | 24,464,400 | 24,087,000 | 0 | 0 | 0 | 2024-11-14 | 2024-11-19 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 178,035,600 | 87.92 % | |
1009 | 2024 | Badan Pendapatan Daerah | Perencanaan Pelebaran Bangunan Ruang Cek Fisik UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17544012 | 52151602 | APBDP | 17,850,000 | 17,849,999 | 17,782,200 | 17,782,200 | 17,526,900 | 17,526,900 | 17,526,900 | 17,526,900 | 2024-07-26 | 2024-08-10 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 67,800 | 0.38 % | |
1010 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pembangunan Pagar SMAN 1 Gunung Bintang Awai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17779012 | 52878667 | APBDP | 87,000,000 | 87,000,000 | 86,800,000 | 86,800,000 | 86,800,000 | 0 | 0 | 0 | 2024-10-17 | 2024-10-23 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 200,000 | 0.23 % | |
1011 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembuatan Rumah Genset SMKN 1 PANGKALAN LADA - SMKN 1 LAMANDAU - SMKN 1 SEBANGAU KUALA - SMKN 1 BANAMA TINGANG - SMKN 1 TIMPAH - SMKN 1 MANDAU TELAWANG - SMKN 2 BATAGUH - SMKN 1 MENTAYA HILIR SELATAN - SMKN 1 BUKIT SANTUAI - SMKN 1 GUNUNG PUREI - SMKN 1 KATINGAN KUALA - SMKN 1 DELANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17812012 | 52021306 | APBD | 19,920,000 | 19,920,000 | 19,869,000 | 19,869,000 | 19,869,000 | 0 | 0 | 0 | 2024-10-25 | 2024-10-31 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 51,000 | 0.26 % | |
1012 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet dan Rehab Ruang Praktik Siswa SMKN 1 Lamandau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16166012 | 51424298 | APBD | 46,500,000 | 46,500,000 | 46,442,400 | 46,442,400 | 46,442,400 | 46,442,400 | 46,442,400 | 46,442,400 | 2024-05-22 | 2024-06-02 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 57,600 | 0.12 % | |
1013 | 2024 | Badan Kepegawaian Daerah | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15912012 | 49241357 | APBD | 40,410,306 | 40,290,000 | 40,001,625 | 40,001,625 | 39,668,625 | 39,668,625 | 39,668,625 | 39,668,625 | 2024-03-28 | 2024-04-03 | 408,681 | 1.01 % | |||
1014 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Pengawasan Arsitektur (Pengawasan Bangunan Parkir Lingkungan Kantor) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17641012 | 52036017 | APBDP | 52,000,000 | 14,000,000 | 13,875,000 | 13,875,000 | 13,841,700 | 13,841,700 | 13,841,700 | 13,841,700 | 2024-09-10 | 2024-09-12 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 38,125,000 | 73.32 % | |
1015 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pembangunan RKB SMAN 3 Palangka Raya 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17831012 | 52898443 | APBDP | 75,000,000 | 75,000,000 | 74,980,500 | 74,980,500 | 74,980,500 | 0 | 0 | 0 | 2024-10-27 | 2024-11-05 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 19,500 | 0.03 % | |
1016 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Timang (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17349012 | 51184582 | APBD | 39,009,500 | 39,009,500 | 38,850,000 | 38,850,000 | 38,850,000 | 38,850,000 | 38,850,000 | 38,850,000 | 2024-06-26 | 2024-07-05 | 159,500 | 0.41 % | |||
1017 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0018 Pengawasan Interior Ruang Dinas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17843012 | 53100090 | APBDP | 46,000,000 | 46,000,000 | 45,954,000 | 45,954,000 | 45,600,000 | 45,600,000 | 45,600,000 | 45,600,000 | 2024-10-30 | 2024-11-08 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 46,000 | 0.1 % | |
1018 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Ruang Kelas Baru SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17329012 | 51911719 | APBD | 73,795,500 | 73,787,250 | 73,731,750 | 73,731,750 | 73,731,750 | 73,731,750 | 0 | 73,731,750 | 2024-07-01 | 2024-07-05 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 63,750 | 0.09 % | |
1019 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Kantor Ruang Penyusunan Program | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17865012 | 53269934 | APBDP | 17,910,000 | 17,910,000 | 17,893,200 | 17,893,200 | 17,859,900 | 0 | 0 | 0 | 2024-11-04 | 2024-11-12 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 16,800 | 0.09 % | |
1020 | 2024 | Badan Penghubung | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15994012 | 50432357 | APBD | 100,700,000 | 99,950,000 | 99,699,090 | 99,699,090 | 99,050,850 | 0 | 0 | 0 | 2024-04-19 | 2024-04-30 | CV. KRISOPRAS DESIGN KONSULTAN | 02.676.463.9-711.000 | 1,000,910 | 0.99 % | |
1021 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAN 1 Tanah Siang Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15963012 | 50730149 | APBD | 72,000,000 | 72,000,000 | 71,500,000 | 71,500,000 | 71,500,000 | 71,500,000 | 0 | 71,500,000 | 2024-04-05 | 2024-04-24 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 500,000 | 0.69 % | |
1022 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 1 Telawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16156012 | 51423894 | APBD | 19,000,000 | 19,000,000 | 18,922,300 | 18,922,300 | 18,922,300 | 18,922,300 | 18,922,300 | 18,922,300 | 2024-05-22 | 2024-06-02 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 77,700 | 0.41 % | |
1023 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Tewah (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16088012 | 51238916 | APBD | 39,746,300 | 39,746,300 | 39,700,000 | 39,700,000 | 39,700,000 | 39,700,000 | 0 | 39,700,000 | 2024-05-07 | 2024-05-15 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 46,300 | 0.12 % | |
1024 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAN 4 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15909012 | 50772040 | APBD | 35,000,000 | 35,000,000 | 34,933,400 | 34,933,400 | 34,933,400 | 34,933,400 | 0 | 34,933,400 | 2024-04-03 | 2024-04-24 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 66,600 | 0.19 % | |
1025 | 2024 | Dinas Pendidikan | Jasa Konsultasi Pengawasan Pembangunan Ruang Kelas Baru SLBN 3 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17511012 | 52082540 | APBD | 83,946,240 | 83,472,000 | 83,250,000 | 83,250,000 | 83,250,000 | 83,250,000 | 83,250,000 | 83,250,000 | 2024-07-18 | 2024-07-26 | 696,240 | 0.83 % | |||
1026 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Alat Kantor dan Rumah Tangga - Pemeliharaan Mesin Laundry Washer Extractor | Pengadaan Langsung | Jasa Lainnya | 17466012 | 51975355 | APBD | 104,000,000 | 103,950,000 | 103,896,000 | 103,896,000 | 103,785,000 | 103,785,000 | 103,785,000 | 103,785,000 | 2024-07-22 | 2024-08-01 | 104,000 | 0.1 % | |||
1027 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehabilitasi Ruang Kelas (3 Ruang ) SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15846012 | 50467738 | APBD | 44,361,000 | 44,361,000 | 44,289,000 | 44,289,000 | 44,289,000 | 44,289,000 | 44,289,000 | 44,289,000 | 2024-03-25 | 2024-04-12 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 72,000 | 0.16 % | |
1028 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Kandang Pada kegiatan Pengadaan Ternak Ayam petelur dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10026893000 | 52123218 | APBD | 10,060,500 | 10,060,500 | 10,059,930 | 10,059,930 | 10,056,600 | 0 | 0 | 0 | 2024-12-07 | 2024-12-13 | 570 | 0.01 % | |||
1029 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Katingan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16168012 | 51423665 | APBD | 25,000,000 | 25,000,000 | 24,905,650 | 24,905,650 | 24,905,650 | 24,905,650 | 24,905,650 | 24,905,650 | 2024-05-22 | 2024-06-02 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 94,350 | 0.38 % | |
1030 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Perencanaan Pembangunan Laboratorium | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17897012 | 53305583 | APBDP | 50,000,000 | 50,000,000 | 49,672,500 | 49,672,500 | 49,300,000 | 49,300,000 | 49,300,000 | 49,300,000 | 2024-11-07 | 2024-11-15 | 327,500 | 0.66 % | |||
1031 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17271012 | 51155168 | APBD | 40,137,100 | 40,137,100 | 40,137,000 | 40,137,000 | 40,137,000 | 40,137,000 | 0 | 40,137,000 | 2024-06-05 | 2024-06-14 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 100 | 0 % | |
1032 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Mushola Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17634012 | 52365937 | APBDP | 60,000,000 | 60,000,000 | 59,889,000 | 59,889,000 | 59,718,000 | 59,718,000 | 59,718,000 | 59,718,000 | 2024-09-17 | 2024-09-25 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 111,000 | 0.19 % | |
1033 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17241012 | 51735757 | APBD | 86,900,000 | 86,900,000 | 86,789,000 | 86,789,000 | 86,789,000 | 86,789,000 | 0 | 86,789,000 | 2024-05-30 | 2024-06-10 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 111,000 | 0.13 % | |
1034 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pembuatan Pagar dan Penataan Halaman SMAN 4 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17300012 | 51398991 | APBD | 36,000,000 | 36,000,000 | 35,819,700 | 35,819,700 | 35,819,700 | 35,819,700 | 35,819,700 | 35,819,700 | 2024-06-11 | 2024-06-24 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 180,300 | 0.5 % | |
1035 | 2024 | Dinas Pendidikan | Jasa Konsultasi Pengawasan Pembangunan Kantin, Ruang Guru, Ruang Kepsek, Ruang keterampilan, Ruang pembelajaran khusus, ruang perpustakaan ruang tata usaha, ruang UKS dan selasar penghubung SLBN 3 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17510012 | 52082529 | APBD | 68,783,040 | 68,514,750 | 68,292,750 | 68,292,750 | 68,292,750 | 68,292,750 | 68,292,000 | 68,292,750 | 2024-07-18 | 2024-07-26 | 490,290 | 0.71 % | |||
1036 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan WC 2 Unit SMAN 4 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16196012 | 50726813 | APBD | 24,325,000 | 24,325,000 | 24,320,100 | 24,320,100 | 24,320,100 | 24,320,100 | 24,320,100 | 24,320,100 | 2024-05-28 | 2024-06-05 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 4,900 | 0.02 % | |
1037 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Instalasi Air Bersih (Grenteng) Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17579012 | 52123230 | APBD | 21,180,000 | 21,180,000 | 21,069,000 | 21,069,000 | 20,979,000 | 20,979,000 | 20,979,000 | 20,979,000 | 2024-08-06 | 2024-08-14 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 111,000 | 0.52 % | |
1038 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Rehab Ruang Direktur dan Wadir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16060012 | 51500653 | APBD | 20,000,000 | 19,980,000 | 19,600,380 | 19,600,380 | 15,046,050 | 15,046,050 | 15,046,050 | 15,046,050 | 2024-05-28 | 2024-06-10 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 399,620 | 2 % | |
1039 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penataan Halaman dan Rehab Ruang Kelas (3 Ruang)SMKN 1 Gunung Purei | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16171012 | 51426936 | APBD | 69,200,000 | 69,200,000 | 69,055,700 | 69,055,700 | 69,055,700 | 69,055,700 | 69,055,700 | 69,055,700 | 2024-05-22 | 2024-06-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 144,300 | 0.21 % | |
1040 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Tempat Parkir Kantor UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17606012 | 51460043 | APBD | 7,562,975 | 7,562,975 | 7,449,109 | 7,449,109 | 7,446,990 | 7,446,990 | 7,446,990 | 7,446,990 | 2024-08-16 | 2024-08-26 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 113,866 | 1.51 % | |
1041 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Rambu Sungai di Sungai Samba dan Katingan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15976012 | 51271850 | APBD | 67,376,704 | 67,375,335 | 67,321,500 | 67,321,500 | 67,237,140 | 67,237,140 | 67,237,140 | 67,237,140 | 2024-06-27 | 2024-07-12 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 55,204 | 0.08 % | |
1042 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Pengawasan Pembangunan Sarana Prasarana Jaringan Air Limbah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17566012 | 51985822 | APBD | 35,000,000 | 34,900,000 | 34,305,660 | 34,305,660 | 34,254,600 | 34,254,600 | 34,254,600 | 34,254,600 | 2024-08-08 | 2024-08-19 | CV. Bukit Indah Konsultan | 12.843.721.7-711.000 | 694,340 | 1.98 % | |
1043 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pos jaga SMAN 6 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15828012 | 50770327 | APBD | 8,000,000 | 8,000,000 | 7,936,500 | 7,936,500 | 7,936,500 | 7,936,500 | 0 | 7,936,500 | 2024-03-21 | 2024-04-08 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 63,500 | 0.79 % | |
1044 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17533012 | 51358879 | APBD | 17,600,000 | 17,600,000 | 17,571,300 | 17,571,300 | 17,571,300 | 17,571,300 | 17,571,300 | 17,571,300 | 2024-07-25 | 2024-08-02 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 28,700 | 0.16 % | |
1045 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS Muhammadiyah Kasongan (Rehabilitasi Rg. Kelas, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15803012 | 50391507 | APBD | 59,337,700 | 59,337,700 | 59,229,600 | 59,229,600 | 59,229,600 | 59,229,600 | 59,229,600 | 59,229,600 | 2024-03-15 | 2024-03-26 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 108,100 | 0.18 % | |
1046 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0018 Pengawasan Pembuatan Sekat Ruang Podcast, Rehab Halaman dan jalan kantor, Rehab Jendela Kantor, Rehab Lantai Teras, Lantai Lobby dan Jalan Disabilitas, Rehab Pagar Kantor, Rehab Tiang Bendera (1 Paket) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17474012 | 52047972 | APBD | 70,000,000 | 69,999,000 | 69,874,500 | 69,874,500 | 69,500,000 | 69,500,000 | 69,500,000 | 69,500,000 | 2024-07-11 | 2024-07-26 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 125,500 | 0.18 % | |
1047 | 2024 | KPHL GERBANG BARITO | Beban Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - BUDIDAYA IKAN/AGROSILVOFISHERY- Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16120012 | 49971019 | APBD | 68,900,000 | 68,900,000 | 68,448,150 | 68,448,150 | 67,837,650 | 67,837,650 | 67,837,650 | 67,837,650 | 2024-06-25 | 2024-07-05 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 451,850 | 0.66 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | Tanggal Selesai Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2024 | Badan Penghubung | Belanja Pakaian Dinas dan Atribut Pimpinan dan Anggota DPRD | Pengadaan Langsung | Pengadaan Barang | 15758012 | 50432288 | 82,933,650 | 82,180,000 | 82,173,744 | 82,173,744 | 82,173,744 | 82,173,744 | 82,173,744 | 82,173,744 | 2024-03-13 | 759,906 | 0.92 % | 3 | ||
2 | 2024 | Badan Penghubung | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15784012 | 50432359 | 139,920,000 | 99,950,000 | 99,254,757 | 99,254,757 | 98,726,286 | 98,726,286 | 98,726,286 | 98,726,286 | 2024-03-15 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 40,665,243 | 29.06 % | 3 |
3 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Konsultan Perencanaan Konstruksi - Partisi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15847012 | 50964848 | 88,800,000 | 67,117,748 | 66,099,945 | 66,099,945 | 65,433,945 | 65,433,945 | 0 | 65,433,945 | 2024-03-20 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 22,700,055 | 25.56 % | 3 |
4 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Belanja Jasa Konsultansi Perencanaan Rekayasa-Jasa Desain Rekayasa untuk Pekerjaan Mekanikal dan Elektrikal dalam Bangunan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15894012 | 49409036 | 100,000,000 | 87,725,520 | 85,925,100 | 85,925,100 | 85,120,350 | 85,120,350 | 0 | 85,120,350 | 2024-03-27 | CV. KRUF STUDIO ENGINEERING | 81.075.394.7-711.000 | 14,074,900 | 14.07 % | 3 |
5 | 2024 | Dinas Pemberdayaan Perempuan,Perlindungan Anak, Pengendalian Penduduk dan Keluarga Berencana | Pengawasan pembangunan pagar samping kantor, pos jaga dan tempat parkir kendaraan roda 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15951012 | 51140509 | 10,700,000 | 10,700,000 | 10,644,500 | 10,644,500 | 10,545,000 | 10,545,000 | 10,545,000 | 10,545,000 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 55,500 | 0.52 % | 3 | |
6 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kota Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15975012 | 49433582 | 55,457,148 | 55,457,000 | 55,400,100 | 55,400,100 | 55,400,000 | 55,400,000 | 0 | 55,400,000 | 2024-04-20 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 57,048 | 0.1 % | 2.8 |
7 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Katingan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15980012 | 49437069 | 82,591,534 | 82,591,000 | 82,251,000 | 82,251,000 | 82,250,000 | 82,250,000 | 0 | 82,250,000 | 2024-04-20 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 340,534 | 0.41 % | 2.8 |
8 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Konsultan Pengawasan Konstruksi - Partisi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16101012 | 50965966 | 61,250,000 | 61,177,519 | 60,421,740 | 60,421,740 | 60,144,240 | 60,144,240 | 60,144,240 | 60,144,240 | 2024-05-14 | Roa Solution | 92.337.883.0-711.000 | 828,260 | 1.35 % | 3 |
9 | 2024 | Dinas Pemberdayaan Perempuan,Perlindungan Anak, Pengendalian Penduduk dan Keluarga Berencana | Rehabilitasi dinding koridor lantai1 DP3APPKB Prov. Kalteng | Pengadaan Langsung | Jasa Lainnya | 16130012 | 51678030 | 184,250,862 | 184,250,862 | 184,144,971 | 184,144,971 | 182,838,978 | 182,838,978 | 182,838,978 | 182,838,978 | 2024-05-21 | CV. USAHA BANGUN SARANA | 02.978.028.5-711.000 | 105,891 | 0.06 % | 3 |
10 | 2024 | Dinas Perhubungan | Pemeliharaan Gedung VIP Room Isen Mulang | Pengadaan Langsung | Jasa Lainnya | 16141012 | 50017133 | 197,625,869 | 197,625,000 | 197,300,000 | 197,300,000 | 197,300,000 | 197,300,000 | 197,300,000 | 197,300,000 | CV. KARYA SEPAKAT | 03.338.545.1-711.000 | 325,869 | 0.16 % | 3 | |
11 | 2024 | Dinas Sosial | Pengawasan Rehabilitasi Bangunan (Dapur dan Kantor) DiLingkungan UPT PSBR Majar Tabela | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17453012 | 49931138 | 49,820,000 | 49,820,000 | 49,203,525 | 49,203,525 | 48,581,925 | 48,581,925 | 48,581,925 | 48,581,925 | 2024-07-10 | PT. EDUKA REKAYASA KONSULTAN | 01.489.523.9-711.000 | 616,475 | 1.24 % | 3 |
12 | 2024 | Dinas Sosial | Pengawasan Rehabilitasi Pagar Dinas Sosial Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17458012 | 49930579 | 49,539,000 | 49,539,000 | 49,525,425 | 49,525,425 | 48,559,725 | 48,559,725 | 48,559,725 | 48,559,725 | 2024-08-08 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 13,575 | 0.03 % | 3 |
13 | 2024 | Dinas Sosial | Pengawasan Peningkatan Jalan dan Halaman UPT PSBL Pambelum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17463012 | 49439011 | 64,766,000 | 64,766,000 | 64,410,525 | 64,410,525 | 62,853,750 | 62,853,750 | 62,853,750 | 62,853,750 | 2024-07-10 | CV. MULTI TEKNIKA | 01.489.648.4-711.000 | 355,475 | 0.55 % | 3 |
14 | 2024 | Dinas Sosial | Pengawasan Rehabilitasi Bangunan di Lingkungan UPT. PSTW Sinta Rangkang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17465012 | 51172971 | 33,014,000 | 33,014,000 | 32,778,300 | 32,778,300 | 32,156,700 | 32,156,700 | 32,156,700 | 32,156,700 | 2024-07-10 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 235,700 | 0.71 % | 3 |
15 | 2024 | Badan Kesatuan Bangsa dan Politik | Jasa Konsultansi Perencanaan Peningkatan Jalan, Halaman dan Parit Keliling Motor, Perencanaan Renovasi Pagar Kantor, Perencanaan Renovasi Parkiran Motor, dan Perencanaan Renovasi Pos Jaga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17500012 | 52081754 | 69,329,000 | 69,329,000 | 69,197,400 | 69,197,400 | 68,886,600 | 68,886,600 | 0 | 68,886,600 | 2024-07-17 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 131,600 | 0.19 % | 3 |
16 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kota Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17723012 | 52869487 | 97,520,000 | 97,520,000 | 97,431,200 | 97,431,200 | 97,430,000 | 97,430,000 | 0 | 97,430,000 | 2024-10-12 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 88,800 | 0.09 % | 3 |
17 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17726012 | 52869695 | 99,640,000 | 99,640,000 | 99,418,000 | 99,418,000 | 99,418,000 | 99,418,000 | 0 | 99,418,000 | 2024-10-12 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 222,000 | 0.22 % | 3 |
18 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Kotawaringin Barat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17729012 | 52869860 | 99,640,000 | 99,640,000 | 99,567,000 | 99,567,000 | 99,567,000 | 99,567,000 | 0 | 99,567,000 | 2024-10-12 | CV.ADIKON CITRABANGUN KONSULTAN | 02.618.694.0-711.000 | 73,000 | 0.07 % | 3 |
19 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15877012 | 50409728 | 43,927,800 | 43,927,800 | 43,816,800 | 43,816,800 | 43,816,800 | 43,816,800 | 0 | 43,816,800 | 2024-04-02 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.25 % | |
20 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMA Garing Tarantang (Rehabilitasi Rg. Kelas, Rehabilitasi Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17246012 | 51239166 | 44,766,800 | 44,766,800 | 44,246,820 | 44,246,820 | 44,246,820 | 44,246,820 | 0 | 44,246,820 | 2024-05-31 | 519,980 | 1.16 % | |||
21 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Bangsal dan Finishing Green House Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17635012 | 52365926 | 100,000,000 | 100,000,000 | 99,589,200 | 99,589,200 | 99,589,200 | 99,589,200 | 99,589,200 | 99,589,200 | 2024-09-06 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 410,800 | 0.41 % | |
22 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Gudang Bahan Baku dan Vertical Dryer Pada Kegiatan Pembangunan Pabrik Pakan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17602012 | 52123193 | 99,999,998 | 99,977,700 | 99,922,200 | 99,922,200 | 99,922,200 | 99,922,200 | 99,922,200 | 99,922,200 | 2024-08-14 | 77,798 | 0.08 % | |||
23 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Pengecoran Jalan Lingkungan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17867012 | 53276889 | 17,100,000 | 17,100,000 | 16,905,300 | 16,905,300 | 16,849,800 | 0 | 0 | 0 | 2024-11-04 | 194,700 | 1.14 % | |||
24 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMA Garing Tarantang (Rehabilitasi Rg. Tata Usaha, Pembangunan Rg. Perpustakaan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15775012 | 50392033 | 52,895,700 | 52,866,525 | 52,811,025 | 52,811,025 | 52,811,025 | 52,811,025 | 0 | 52,811,025 | 2024-03-18 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 84,675 | 0.16 % | |
25 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer,Bahasa SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16069012 | 50544561 | 50,668,000 | 50,668,000 | 50,627,100 | 50,627,100 | 50,627,100 | 50,627,100 | 50,627,100 | 50,627,100 | 2024-05-06 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 40,900 | 0.08 % | |
26 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Banama Tingang (Pembangunan Rg. Lab. Fisika, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17249012 | 51239741 | 41,290,000 | 41,290,000 | 41,236,500 | 41,236,500 | 41,236,500 | 41,236,500 | 0 | 41,236,500 | 2024-05-31 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 53,500 | 0.13 % | |
27 | 2024 | Dinas Kehutanan | Belanja Jasa Konsultansi Pengawasan Arsitektur - Bangunan Rumah Genset dan Tower Air - RPH Anjir Kalampan - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17719012 | 52528455 | 25,128,000 | 25,127,900 | 25,106,258 | 25,106,258 | 24,551,258 | 0 | 0 | 0 | 2024-10-10 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 21,743 | 0.09 % | |
28 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 2 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16059012 | 50541749 | 27,711,000 | 27,711,000 | 27,600,000 | 27,600,000 | 27,600,000 | 27,600,000 | 27,600,000 | 27,600,000 | 2024-05-06 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.4 % | |
29 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16062012 | 50543691 | 25,329,000 | 25,329,000 | 25,230,300 | 25,230,300 | 25,230,300 | 25,230,300 | 25,230,300 | 25,230,300 | 2024-05-06 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 98,700 | 0.39 % | |
30 | 2024 | Dinas Pendidikan | Jasa Konsultasi Pengawasan Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang PKBM Tilung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17690012 | 52093881 | 8,000,000 | 7,333,215 | 7,333,215 | 7,333,215 | 7,333,215 | 7,333,215 | 7,333,215 | 7,333,215 | 2024-10-01 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 666,785 | 8.33 % | |
31 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Mess UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17699012 | 52528446 | 49,539,000 | 49,538,900 | 49,474,000 | 49,474,000 | 48,896,832 | 0 | 0 | 0 | 2024-10-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 65,000 | 0.13 % | |
32 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Bimbingan Konseling(BK) SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15931012 | 50546333 | 11,916,000 | 11,916,000 | 11,860,500 | 11,860,500 | 11,860,500 | 11,860,500 | 11,860,500 | 11,860,500 | 2024-04-01 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 55,500 | 0.47 % | |
33 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Asrama Mahasiswa Kalteng di Jakarta Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15727012 | 49546549 | 25,000,000 | 24,739,000 | 24,461,625 | 24,461,625 | 24,461,625 | 24,461,625 | 24,461,625 | 24,461,625 | 2024-02-24 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 538,375 | 2.15 % | |
34 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0018 Pengawasan Pembangunan Pabrik Es | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17554012 | 52151453 | 100,700,000 | 99,960,000 | 99,500,000 | 99,500,000 | 99,000,000 | 99,000,000 | 99,000,000 | 99,000,000 | 2024-07-26 | PT. ANDAL CENDANAKA | 01.489.452.1-711.000 | 1,200,000 | 1.19 % | |
35 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Rehabilitasi Laboratorium IPA 2 Ruang SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17379012 | 51399414 | 22,000,000 | 22,000,000 | 21,940,060 | 21,940,060 | 21,940,060 | 21,940,060 | 21,940,060 | 21,940,060 | 2024-07-02 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 59,940 | 0.27 % | |
36 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsuntansi Pengawasan Penataan Halaman, Pembangunan Rumah Genset dan Penerangan Gedung Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17676012 | 52283897 | 53,566,320 | 53,557,500 | 53,479,800 | 53,479,800 | 53,479,800 | 53,479,800 | 53,479,800 | 53,479,800 | 2024-09-30 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 86,520 | 0.16 % | |
37 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Pengawasan Arsitektur (Pengawasan Drainase Lingkungan Kantor) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17640012 | 52036017 | 52,000,000 | 8,000,000 | 7,925,400 | 7,925,400 | 7,858,800 | 7,858,800 | 7,858,800 | 7,858,800 | 2024-09-10 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 44,074,600 | 84.76 % | |
38 | 2024 | Sekretariat DPRD | jasa konsultasi pengawasan arsitektur rehab bangunan induk lantai 1 Sekretariat DPRD Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17556012 | 52010380 | 100,000,000 | 99,982,140 | 99,211,800 | 99,211,800 | 98,079,600 | 98,079,600 | 0 | 98,079,600 | 2024-07-29 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 788,200 | 0.79 % | |
39 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Jembatan Selasar SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17366012 | 51422583 | 43,000,000 | 43,000,000 | 42,910,935 | 42,910,935 | 42,910,935 | 42,910,935 | 42,910,935 | 42,910,935 | 2024-06-24 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 89,065 | 0.21 % | |
40 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Mushola Komp. Pemda G. Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17871012 | 53293805 | 10,000,000 | 9,972,795 | 9,773,550 | 9,773,550 | 9,773,550 | 0 | 0 | 0 | 2024-11-07 | Roa Solution | 92.337.883.0-711.000 | 226,450 | 2.26 % | |
41 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Gunung Bintang Awai (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15822012 | 50377997 | 58,977,700 | 58,977,700 | 58,968,002 | 58,968,002 | 58,968,002 | 58,968,002 | 0 | 58,968,002 | 2024-03-21 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 9,698 | 0.02 % | |
42 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pekerjaan Pembangunan Jalan Menuju Embung dan Saluran Drainase Sekitarnya UPT BBPHMT Km. 38 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17685012 | 52433418 | 20,000,000 | 20,000,000 | 19,795,740 | 19,795,740 | 19,103,100 | 19,103,100 | 19,103,100 | 19,103,100 | 2024-09-27 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 204,260 | 1.02 % | |
43 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Pembangunan Parkir Terbuka Permanen UPT.KPHL Kapuas Kahayan - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17658012 | 52528445 | 21,500,000 | 21,499,900 | 21,495,000 | 21,495,000 | 21,190,594 | 0 | 0 | 0 | 2024-09-24 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 5,000 | 0.02 % | |
44 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BARITO TIMUR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17802012 | 49717101 | 7,942,500 | 7,941,499 | 7,869,900 | 7,869,900 | 7,259,400 | 0 | 0 | 0 | 2024-11-01 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 72,600 | 0.91 % | |
45 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Bimbingan Konseling (BK) SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15854012 | 50525263 | 10,388,000 | 10,388,000 | 10,221,500 | 10,221,500 | 10,221,500 | 10,221,500 | 10,221,500 | 10,221,500 | 2024-03-25 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 166,500 | 1.6 % | |
46 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Pengawasan Pembangunan Kandang Bebek/Itik UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17684012 | 51460059 | 4,803,153 | 4,803,000 | 4,780,001 | 4,780,001 | 4,778,550 | 0 | 0 | 0 | 2024-10-18 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 23,152 | 0.48 % | |
47 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Kelas SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17832012 | 52898512 | 25,000,000 | 25,000,000 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 2024-10-28 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 160,864 | 0.64 % | |
48 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa konsultansi Perencanaan Rehabilitasi Pagar, WC dan Penataan Halaman di Graha Tani Serta Serana Pendukung Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17557012 | 52143274 | 14,000,000 | 14,000,000 | 13,974,900 | 13,974,900 | 13,786,200 | 13,786,200 | 13,786,200 | 13,786,200 | 2024-07-29 | 25,100 | 0.18 % | |||
49 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Perpustakaan SMKN 1 Katingan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16180012 | 51424548 | 25,000,000 | 25,000,000 | 24,966,100 | 24,966,100 | 24,966,100 | 24,966,100 | 24,966,100 | 24,966,100 | 2024-05-22 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 33,900 | 0.14 % | |
50 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Kelas SMAN 1 Sebangau Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17775012 | 52880011 | 40,000,000 | 40,000,000 | 39,889,000 | 39,889,000 | 39,889,000 | 0 | 0 | 0 | 2024-10-16 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 111,000 | 0.28 % | |
51 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN LABORATORIUM KOMPUTER DAN RUANG OSIS SMAN 2 KATINGAN TENGAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17876012 | 53267729 | 75,000,000 | 75,000,000 | 74,925,000 | 74,925,000 | 74,925,000 | 0 | 0 | 0 | 2024-11-06 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 75,000 | 0.1 % | |
52 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN LABORATORIUM KOMPUTER DAN RUANG OSIS SMAN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17875012 | 53267708 | 75,000,000 | 75,000,000 | 74,925,000 | 74,925,000 | 74,925,000 | 0 | 0 | 0 | 2024-11-06 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 75,000 | 0.1 % | |
53 | 2024 | Dinas Pemberdayaan Masyarakat dan Desa | Renovasi Panggung Gedung Aula Lewu Pancasila | Pengadaan Langsung | Pekerjaan Konstruksi | 17638012 | 52116395 | 235,000,000 | 85,000,000 | 84,947,301 | 84,947,301 | 84,237,900 | 0 | 0 | 0 | 2024-09-09 | CV. USAHA BANGUN SARANA | 02.978.028.5-711.000 | 150,052,699 | 63.85 % | |
54 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17311012 | 51238254 | 33,753,000 | 33,753,000 | 33,577,500 | 33,577,500 | 33,577,500 | 33,577,500 | 33,577,500 | 33,577,500 | 2024-06-13 | 175,500 | 0.52 % | |||
55 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Drainase | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17858012 | 53269288 | 18,000,000 | 18,000,000 | 17,704,500 | 17,704,500 | 17,621,250 | 0 | 0 | 0 | 2024-11-04 | 295,500 | 1.64 % | |||
56 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer SMK NEGERI 1 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15913012 | 50539334 | 18,198,000 | 18,198,000 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 2024-04-01 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 55,500 | 0.3 % | |
57 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Parkiran Kantor KM 7.5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17789012 | 52993782 | 7,159,500 | 7,147,500 | 7,104,000 | 7,104,000 | 7,104,000 | 0 | 0 | 0 | 2024-10-18 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 55,500 | 0.78 % | |
58 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pengadaan Bahan-Bahan Pelatihan DBH-DR Melalui Pelatihan Tata Boga, Pengolahan Madu, Pengolahan Ikan dan Anyaman Rotan | Pengadaan Langsung | Pengadaan Barang | 17663012 | 52589992 | 43,000,000 | 42,828,589 | 42,618,228 | 42,618,228 | 42,618,228 | 42,618,228 | 42,618,228 | 42,618,228 | 2024-09-22 | CV. DEDIKASI KARYA DELANTARA | 90.527.413.0-711.000 | 381,772 | 0.89 % | |
59 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS Kristen Palangka Raya (Rehabilitasi Rg. Kelas) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15804012 | 50409942 | 96,400,700 | 96,400,700 | 96,292,500 | 96,292,500 | 96,292,500 | 96,292,500 | 96,292,500 | 96,292,500 | 2024-03-15 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 108,200 | 0.11 % | |
60 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Jasa Konsultansi Perencanaan Guest House | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17898012 | 53305818 | 50,000,000 | 50,000,000 | 49,511,550 | 49,511,550 | 49,000,000 | 49,000,000 | 49,000,000 | 49,000,000 | 2024-11-07 | 488,450 | 0.98 % | |||
61 | 2024 | Badan Pendapatan Daerah | Pengawasan Penataan Halaman Kantor UPTPPD Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17706012 | 52644943 | 45,000,000 | 44,721,695 | 44,500,045 | 44,500,045 | 43,389,689 | 43,389,689 | 43,389,689 | 43,389,689 | 2024-10-02 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 499,955 | 1.11 % | |
62 | 2024 | Dinas Ketahanan Pangan | Jasa Konsultansi Perencanaan Rehab Sedang Kantor Dinas Ketahanan Pangan Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17737012 | 52888535 | 55,000,000 | 55,000,000 | 54,978,300 | 54,978,300 | 53,879,400 | 53,879,400 | 53,879,400 | 53,879,400 | 2024-10-12 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 21,700 | 0.04 % | |
63 | 2024 | Dinas Pendidikan | Perencanaan Rehab Aula Dan Ruang Kerja Kantor Dinas Pendidikan Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15757012 | 49797907 | 50,000,000 | 50,000,000 | 49,900,000 | 49,900,000 | 49,900,000 | 49,900,000 | 0 | 49,900,000 | 2024-03-13 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 100,000 | 0.2 % | |
64 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG PERPUSTAKAAN, RUANG UKS DAN RUANG BK SMAN 2 KATINGAN TENGAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17878012 | 53267718 | 75,000,000 | 75,000,000 | 74,925,000 | 74,925,000 | 74,925,000 | 0 | 0 | 0 | 2024-11-06 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 75,000 | 0.1 % | |
65 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Pengawasan Pembangunan Gudang Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10004515000 | 52921907 | 27,389,620 | 27,389,620 | 27,000,000 | 27,000,000 | 27,000,000 | 27,000,000 | 27,000,000 | 27,000,000 | 2024-11-12 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 389,620 | 1.42 % | |
66 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS PGRI 2 Sampit (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15768012 | 50408590 | 57,725,800 | 57,725,800 | 57,448,050 | 57,448,050 | 57,448,050 | 57,448,050 | 57,448,050 | 57,448,050 | 2024-03-18 | 277,750 | 0.48 % | |||
67 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Perencanaan Pembangunan Pagar Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17853012 | 52921895 | 36,135,330 | 30,259,900 | 30,100,000 | 30,100,000 | 30,036,156 | 30,036,156 | 30,036,156 | 30,036,156 | 2024-10-31 | 6,035,330 | 16.7 % | |||
68 | 2024 | Badan Keuangan dan Aset Daerah | Belanja Alat/ Bahan untuk Kegiatan Kantor-Alat Tulis Kantor, Belanja Alat/ Bahan untuk Kegiatan Kantor- Kertas dan Cover | Pengadaan Langsung | Pengadaan Barang | 10013694000 | 53370718 | 98,053,950 | 92,730,895 | 92,730,895 | 92,730,895 | 91,943,000 | 91,943,000 | 91,943,000 | 91,943,000 | 2024-11-25 | CV. Sinar Pratama Borneo | 65.376.111.4-711.000 | 5,323,055 | 5.43 % | |
69 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16027012 | 49204514 | 13,582,500 | 13,504,992 | 13,480,000 | 13,480,000 | 13,231,200 | 13,231,200 | 13,231,200 | 13,231,200 | 2024-05-01 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 102,500 | 0.75 % | |
70 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Banama Tingang (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17358012 | 51239837 | 41,193,400 | 41,193,400 | 41,125,500 | 41,125,500 | 41,125,500 | 41,125,500 | 41,125,500 | 41,125,500 | 2024-07-09 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 67,900 | 0.16 % | |
71 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Pagar UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17652012 | 52502761 | 87,343,000 | 87,342,900 | 86,974,050 | 86,974,050 | 86,362,218 | 0 | 0 | 0 | 2024-09-18 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 368,950 | 0.42 % | |
72 | 2024 | Satuan Polisi Pamong Praja | Pengawasan Belanja Modal Bangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17376012 | 49577185 | 22,480,000 | 22,480,000 | 22,466,400 | 22,466,400 | 22,288,800 | 0 | 0 | 0 | 2024-06-26 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 13,600 | 0.06 % | |
73 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17231012 | 51737546 | 75,880,000 | 75,880,000 | 75,658,000 | 75,658,000 | 75,658,000 | 75,658,000 | 0 | 75,658,000 | 2024-05-30 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 222,000 | 0.29 % | |
74 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17234012 | 51737679 | 75,880,000 | 75,880,000 | 75,824,100 | 75,824,100 | 75,824,100 | 75,824,100 | 0 | 75,824,100 | 2024-05-30 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 55,900 | 0.07 % | |
75 | 2024 | Badan Keuangan dan Aset Daerah | Papan Nama Pengamanan BMD | Pengadaan Langsung | Pengadaan Barang | 10013247000 | 53509946 | 155,500,000 | 153,942,200 | 153,928,000 | 153,928,000 | 152,650,000 | 152,650,000 | 152,650,000 | 152,650,000 | 2024-11-25 | ANUGRAH DUA PUTRA | 86.917.332.8-711.000 | 1,572,000 | 1.01 % | |
76 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Timang (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15750012 | 50371727 | 55,227,700 | 55,227,700 | 54,723,000 | 54,723,000 | 54,723,000 | 54,723,000 | 0 | 54,723,000 | 2024-03-13 | 504,700 | 0.91 % | |||
77 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15903012 | 50767349 | 52,000,000 | 52,000,000 | 51,900,000 | 51,900,000 | 51,900,000 | 51,900,000 | 0 | 51,900,000 | 2024-03-28 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 100,000 | 0.19 % | |
78 | 2024 | Dinas Kesehatan | Pengadaan Belanja Konsultansi Siteplan Bapelkes Provinsi Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17900012 | 53315196 | 50,000,000 | 49,967,000 | 49,412,000 | 49,412,000 | 49,195,500 | 49,195,500 | 49,195,500 | 49,195,500 | 2024-11-08 | Roa Solution | 92.337.883.0-711.000 | 588,000 | 1.18 % | |
79 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Pemeliharaan Pengecatan Bangunan Gedung Admin RSUD dr. Doris Sylvanus | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16057012 | 51069199 | 20,000,000 | 19,500,000 | 19,400,000 | 19,400,000 | 19,228,800 | 19,228,800 | 19,228,800 | 19,228,800 | 2024-05-21 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 600,000 | 3 % | |
80 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pemeliharan Jaringan Listrik Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17617012 | 51644088 | 25,000,000 | 25,000,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 2024-09-10 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 50,000 | 0.2 % | |
81 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Kimia) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15876012 | 50409580 | 43,927,800 | 43,927,800 | 43,839,000 | 43,839,000 | 43,839,000 | 43,839,000 | 0 | 43,839,000 | 2024-04-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 88,800 | 0.2 % | |
82 | 2024 | Inspektorat | Pemasangan Interior Gedung Kantor Inspektorat | Pengadaan Langsung | Pekerjaan Konstruksi | 17627012 | 49894996 | 200,000,000 | 200,000,000 | 199,885,470 | 199,885,470 | 199,829,970 | 199,829,970 | 199,829,970 | 199,829,970 | 2024-09-03 | CV.EL BARRA | 20.634.253.7-711.000 | 114,530 | 0.06 % | |
83 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembuatan Green House/Screen House dan Penyediaan Sarana Pengairan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17318012 | 51888534 | 43,529,000 | 43,510,000 | 43,456,500 | 43,456,500 | 43,147,920 | 43,147,920 | 43,147,920 | 43,147,920 | 2024-06-25 | 72,500 | 0.17 % | |||
84 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa,Komputer SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15917012 | 50548309 | 36,396,000 | 36,396,000 | 36,340,500 | 36,340,500 | 36,340,500 | 36,340,500 | 36,340,500 | 36,340,500 | 2024-04-01 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 55,500 | 0.15 % | |
85 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Perluasan SPAM Jaringan Perpipaan Kab. Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15985012 | 51420509 | 64,817,000 | 64,800,000 | 64,657,500 | 64,657,500 | 64,657,500 | 64,657,500 | 64,657,500 | 64,657,500 | 2024-04-19 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 159,500 | 0.25 % | |
86 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17316012 | 51358477 | 17,490,000 | 17,490,000 | 17,445,600 | 17,445,600 | 17,445,600 | 17,445,600 | 17,445,600 | 17,445,600 | 2024-06-13 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 44,400 | 0.25 % | |
87 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Jasa Konsultansi Pengawasan - Pengawasan Rehab Plafon, Pemasangan Interior dan Ornamen Lobby Admin Lt. 1 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17702012 | 52174226 | 12,000,000 | 12,000,000 | 11,950,260 | 11,950,260 | 11,710,500 | 0 | 0 | 0 | 2024-10-18 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 49,740 | 0.41 % | |
88 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih ( SMAN 1 Teweh Baru, SMAN 1 Kapuas Tengah, SLBN 1 Muara Teweh)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15706012 | 49713446 | 45,000,000 | 45,000,000 | 44,950,000 | 44,950,000 | 44,950,000 | 0 | 0 | 0 | 2024-02-23 | CV. PENDANG JAYA RAYA ENGINEERING | 01.662.432.2-711.000 | 50,000 | 0.11 % | |
89 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana dan Prasarana UPT.KPHP Kapuas Hulu dan UPT.KPHP Kapuas Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16189012 | 51728385 | 53,874,000 | 53,873,850 | 53,776,170 | 53,776,170 | 53,113,500 | 53,113,500 | 53,113,500 | 53,113,500 | 2024-06-05 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 97,830 | 0.18 % | |
90 | 2024 | Dinas Perhubungan | Pengawasan Rehabilitasi Sedang/Berat Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17564012 | 50017130 | 54,953,000 | 54,930,000 | 54,778,500 | 54,778,500 | 54,778,500 | 54,778,500 | 54,778,500 | 54,778,500 | 2024-08-02 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 174,500 | 0.32 % | |
91 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17236012 | 51738298 | 37,940,000 | 37,940,000 | 37,873,600 | 37,873,600 | 37,873,600 | 37,873,600 | 0 | 37,873,600 | 2024-05-30 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 66,400 | 0.18 % | |
92 | 2024 | Dinas Perpustakaan dan Arsip | Jasa Konsultansi Pengawasan Renovasi Gedung Fasilitas Layanan Perpustakaan Umum dan Gedung Kafe Literasi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17560012 | 52162091 | 93,060,000 | 93,006,900 | 92,840,400 | 92,800,000 | 92,400,000 | 92,400,000 | 92,400,000 | 92,400,000 | 2024-08-06 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 219,600 | 0.24 % | |
93 | 2024 | Dinas Kependudukan dan Catatan Sipil | Pembangunan Bangunan Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 17299012 | 51884976 | 44,000,000 | 44,000,000 | 43,900,000 | 43,900,000 | 43,789,000 | 0 | 0 | 0 | 2024-06-20 | 100,000 | 0.23 % | |||
94 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Pengawasan Arsitektur UPT Taman Budaya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17569012 | 49162747 | 115,520,000 | 99,950,000 | 99,678,000 | 99,678,000 | 98,124,000 | 98,124,000 | 98,124,000 | 98,124,000 | 2024-08-06 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 15,842,000 | 13.71 % | |
95 | 2024 | KPHL GERBANG BARITO | Beban Jasa Konsultansi Pengawasan Arsitektur - Pengawas Kandang Kambing - Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011349000 | 49971022 | 20,140,000 | 20,140,000 | 19,980,000 | 19,980,000 | 19,591,500 | 19,591,500 | 19,591,500 | 19,591,500 | 2024-11-21 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 160,000 | 0.79 % | |
96 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0005 Perencanaan Rehab Bangunan dan Kolam bioflok dan Peralatannya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17666012 | 48161437 | 17,500,000 | 17,500,000 | 17,349,300 | 17,349,300 | 17,000,000 | 17,000,000 | 17,000,000 | 17,000,000 | 2024-09-24 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 150,700 | 0.86 % | |
97 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pengadaan Bahan Pelatihan Peluasan Kesempatan Kerja (DBH DR) TA. 2024 | Pengadaan Langsung | Pengadaan Barang | 17363012 | 51952410 | 104,750,000 | 104,748,351 | 104,743,716 | 104,743,716 | 104,533,140 | 104,533,140 | 0 | 104,533,140 | 2024-06-24 | CV. DEDIKASI KARYA DELANTARA | 90.527.413.0-711.000 | 6,284 | 0.01 % | |
98 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang PKBM Tilung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17334012 | 51911612 | 10,000,000 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 2024-08-14 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 4,450 | 0.04 % | |
99 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Penataan halaman SMAN 10 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17753012 | 52878446 | 100,000,000 | 98,124,100 | 98,013,000 | 98,013,000 | 98,013,000 | 0 | 0 | 0 | 2024-10-16 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 1,987,000 | 1.99 % | |
100 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang kelas SMAN 2 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17820012 | 52897866 | 30,000,000 | 30,000,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 2024-10-28 | Roa Solution | 92.337.883.0-711.000 | 200,000 | 0.67 % | |
101 | 2024 | Badan Pendapatan Daerah | Perencanaan Penataan Halaman Kantor UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17547012 | 52151703 | 46,070,000 | 46,069,999 | 45,998,400 | 45,998,400 | 45,732,000 | 45,732,000 | 45,732,000 | 45,732,000 | 2024-07-26 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 71,600 | 0.16 % | |
102 | 2024 | Dinas Kebudayaan dan Pariwisata | Pengawasan Rehab berat rumah jaga dan WC gedung pameran pada UPT museum Balanga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17562012 | 51982072 | 35,049,000 | 35,000,000 | 34,854,000 | 34,854,000 | 34,299,000 | 34,299,000 | 34,299,000 | 34,299,000 | 2024-08-02 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 195,000 | 0.56 % | |
103 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16165012 | 51424796 | 34,500,000 | 34,500,000 | 34,400,000 | 34,400,000 | 34,400,000 | 34,400,000 | 34,400,000 | 34,400,000 | 2024-05-22 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 100,000 | 0.29 % | |
104 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17240012 | 51737424 | 41,315,000 | 41,315,000 | 41,148,500 | 41,148,500 | 41,148,500 | 41,148,500 | 0 | 41,148,500 | 2024-05-30 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 166,500 | 0.4 % | |
105 | 2024 | RSJ Kalawa Atei | Honor Tim Penilai dan Pengadaan Tanah dan Penambahan Lahan RSJ KA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17894012 | 53333825 | 60,000,000 | 59,562,600 | 53,660,005 | 53,660,005 | 53,581,920 | 0 | 0 | 0 | 2024-11-12 | 6,339,995 | 10.57 % | |||
106 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Pemutakhiran Dokumen SSK 2 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15709012 | 47521034 | 80,000,000 | 80,000,000 | 79,997,700 | 79,997,700 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | Gusti Iqbal | 92.227.204.2-711.000 | 2,300 | 0 % | |
107 | 2024 | Badan Pendapatan Daerah | Perencanaan Penataan Halaman ( Penimbunan ) Halaman Kantor UPTPPD Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17369012 | 51957090 | 23,543,000 | 23,542,998 | 23,450,000 | 23,450,000 | 23,026,395 | 23,026,395 | 23,026,395 | 23,026,395 | 2024-06-26 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 93,000 | 0.4 % | |
108 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penataan Halaman Jalan Sekolah SMKN 4 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16163012 | 51425505 | 34,500,000 | 34,500,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 2024-05-22 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,000 | 0.32 % | |
109 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16067012 | 50525715 | 25,329,000 | 25,329,000 | 25,280,250 | 25,280,250 | 25,280,250 | 25,280,250 | 25,280,250 | 25,280,250 | 2024-05-06 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 48,750 | 0.19 % | |
110 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Tewah (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15777012 | 50388517 | 56,393,700 | 56,393,700 | 56,393,700 | 56,393,700 | 56,393,700 | 56,393,700 | 0 | 56,393,700 | 2024-03-15 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 0 | 0 % | |
111 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS Muhammadiyah Katingan Tengah (Rehabilitasi Rg. Kelas, Rehabilitasi Toilet (Jamban) Beserta Sanitasinya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15802012 | 50391702 | 36,216,100 | 36,216,100 | 36,104,970 | 36,104,970 | 36,104,970 | 36,104,970 | 36,104,970 | 36,104,970 | 2024-03-15 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 111,130 | 0.31 % | |
112 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Redesain Pembangunan Pagar (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10014309000 | 53523680 | 50,000,000 | 50,000,000 | 49,472,700 | 49,472,700 | 49,000,000 | 49,000,000 | 49,000,000 | 49,000,000 | 2024-11-22 | 527,300 | 1.05 % | |||
113 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Kantor SMAN 10 Palangka Ray | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17799012 | 52897785 | 30,000,000 | 30,000,000 | 29,765,000 | 29,765,000 | 29,765,000 | 0 | 0 | 0 | 2024-10-26 | 235,000 | 0.78 % | |||
114 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Kuala Kurun (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15770012 | 50387750 | 56,188,700 | 56,188,700 | 56,188,700 | 56,188,700 | 56,188,700 | 56,188,700 | 0 | 56,188,700 | 2024-03-15 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 0 | 0 % | |
115 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16072012 | 50545076 | 17,256,000 | 17,256,000 | 17,200,500 | 17,200,500 | 17,200,500 | 17,200,500 | 17,200,500 | 17,200,500 | 2024-05-06 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 55,500 | 0.32 % | |
116 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 3 Ruang SMAS Muhammadiyah Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17277012 | 51400318 | 75,000,000 | 75,000,000 | 74,891,700 | 74,891,700 | 74,891,700 | 74,891,700 | 74,891,700 | 74,891,700 | 2024-06-07 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 108,300 | 0.14 % | |
117 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17242012 | 51735633 | 43,450,000 | 43,450,000 | 43,339,000 | 43,339,000 | 43,339,000 | 43,339,000 | 0 | 43,339,000 | 2024-05-30 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 111,000 | 0.26 % | |
118 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Perencanaan Rehab/Rehabilitasi Rumah Jabatan Kepala UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16198012 | 51460060 | 17,182,550 | 17,182,550 | 17,150,000 | 17,150,000 | 17,149,500 | 17,149,500 | 17,149,500 | 17,149,500 | 2024-05-29 | 32,550 | 0.19 % | |||
119 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa dan Rehab Ruang Kelas (2 Ruang)SMKN 1 Bulik Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16175012 | 51424566 | 53,500,000 | 53,500,000 | 53,389,000 | 53,389,000 | 53,389,000 | 53,389,000 | 53,389,000 | 53,389,000 | 2024-05-22 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 111,000 | 0.21 % | |
120 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas SMKN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17810012 | 52613554 | 28,000,000 | 28,000,000 | 27,944,500 | 27,944,500 | 27,944,500 | 0 | 0 | 0 | 2024-10-25 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 55,500 | 0.2 % | |
121 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Palangka Raya (Pembangunan Rg. Baru (RKB), Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17281012 | 51240182 | 27,184,900 | 27,184,900 | 27,117,000 | 27,117,000 | 27,117,000 | 27,117,000 | 27,117,000 | 27,117,000 | 2024-06-12 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 67,900 | 0.25 % | |
122 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Penataan Jaringan Listrik Kantor Disnakertrans Prov. Kalteng | Pengadaan Langsung | Pekerjaan Konstruksi | 10004680000 | 53409325 | 165,000,000 | 165,000,000 | 164,877,846 | 164,877,846 | 164,156,790 | 0 | 0 | 0 | 2024-11-12 | RIZKY PRATAMA JAYA BERSAUDARA | 76.683.857.7-711.000 | 122,154 | 0.07 % | |
123 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17439012 | 51230300 | 21,330,000 | 21,330,000 | 21,267,600 | 21,267,600 | 21,267,600 | 21,267,600 | 21,267,600 | 21,267,600 | 2024-07-06 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 62,400 | 0.29 % | |
124 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASANBPEMBANGUNAN PAPAN NAMA KANTOR UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006735000 | 49682748 | 7,942,500 | 7,941,499 | 7,869,900 | 7,869,900 | 7,514,700 | 0 | 0 | 0 | 2024-11-15 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 72,600 | 0.91 % | |
125 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika,Laboratorium Biologi SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17404012 | 51210835 | 99,090,000 | 99,090,000 | 98,989,000 | 98,989,000 | 98,989,000 | 98,989,000 | 98,989,000 | 98,989,000 | 2024-06-27 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 101,000 | 0.1 % | |
126 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Biologi, Pembangunan Rg OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15780012 | 50378568 | 62,191,700 | 62,191,700 | 62,191,700 | 62,191,700 | 62,191,700 | 62,191,700 | 0 | 62,100,000 | 2024-03-15 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 0 | 0 % | |
127 | 2024 | Dinas Kebudayaan dan Pariwisata | Konsultansi Perencanaan Interior Ruang Pamer Museum Balanga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17862012 | 53205444 | 97,818,000 | 77,265,000 | 77,160,000 | 77,160,000 | 76,605,000 | 0 | 0 | 0 | 2024-11-07 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 20,658,000 | 21.12 % | |
128 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Rehabilitasi Ruang Kelas (16 Ruang) SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17254012 | 51196683 | 100,000,000 | 100,000,000 | 99,766,900 | 99,766,900 | 99,766,900 | 99,766,900 | 0 | 99,766,900 | 2024-06-03 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 233,100 | 0.23 % | |
129 | 2024 | Dinas Perhubungan | Pengawasan Rehabilitasi Kereng Bengkirai Bengkel di Kota Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17452012 | 51274965 | 10,070,000 | 10,070,000 | 10,030,501 | 10,030,501 | 9,992,220 | 9,992,220 | 9,992,220 | 9,992,220 | 2024-07-24 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 39,499 | 0.39 % | |
130 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang SLBN 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17342012 | 51911520 | 7,000,000 | 6,999,660 | 6,972,000 | 6,972,000 | 6,972,000 | 6,972,000 | 6,972,000 | 6,972,000 | 2024-08-12 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 28,000 | 0.4 % | |
131 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika,Laboratorium SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17448012 | 51851935 | 76,900,000 | 76,900,000 | 76,834,200 | 76,834,200 | 76,834,200 | 76,834,200 | 76,834,200 | 76,834,200 | 2024-07-07 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 65,800 | 0.09 % | |
132 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Fisika, Pembangunan Rg BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16206012 | 51154406 | 39,570,100 | 39,570,100 | 39,570,000 | 39,570,000 | 39,570,000 | 39,570,000 | 0 | 39,570,000 | 2024-05-28 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 100 | 0 % | |
133 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Ruang Kelas Baru SLBN Puruk Cahu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17502012 | 52082436 | 59,036,400 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,000 | 59,024,250 | 2024-07-18 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 12,150 | 0.02 % | |
134 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penataan Halaman Sekolah SMK NEGERI 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16046012 | 50968770 | 34,500,000 | 34,500,000 | 34,167,000 | 34,167,000 | 34,167,000 | 34,167,000 | 34,167,000 | 34,167,000 | 2024-05-07 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 333,000 | 0.97 % | |
135 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAGAR DEPAN DAN SAMPING KANAN UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15730012 | 49198243 | 32,598,000 | 30,870,950 | 30,691,500 | 30,691,500 | 30,125,400 | 30,125,400 | 30,125,400 | 30,125,400 | 2024-03-11 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 1,906,500 | 5.85 % | |
136 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang OSIS SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17403012 | 51200734 | 19,320,000 | 19,320,000 | 19,266,720 | 19,266,720 | 19,266,720 | 19,266,720 | 19,266,720 | 19,266,720 | 2024-06-27 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 53,280 | 0.28 % | |
137 | 2024 | Dinas Pendidikan | jasa Konsultansi Pengawasan Rehabilitasi Ruang Kelas Dengan Tingkat Kerusakan Minimal Sedang SLB YPLB Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17689012 | 52553559 | 8,000,000 | 7,999,215 | 7,999,215 | 7,999,215 | 7,999,215 | 7,999,215 | 7,999,215 | 7,999,215 | 2024-10-01 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 785 | 0.01 % | |
138 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Balai Riam (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15873012 | 50408719 | 62,198,100 | 62,198,100 | 62,098,200 | 62,098,200 | 62,098,200 | 62,098,200 | 0 | 62,098,200 | 2024-04-02 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 99,900 | 0.16 % | |
139 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15930012 | 50546008 | 29,003,000 | 29,003,000 | 28,914,200 | 28,914,200 | 28,914,200 | 28,914,200 | 28,914,200 | 28,914,200 | 2024-04-01 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 88,800 | 0.31 % | |
140 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Muara Teweh (Rehabilitasi Rg. Lab. Biologi, Rehabilitasi Toilet (Jamban) beserta sanitasinya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15749012 | 50374075 | 30,478,700 | 30,478,700 | 30,247,500 | 30,247,500 | 30,247,500 | 30,247,500 | 0 | 30,247,500 | 2024-03-13 | 231,200 | 0.76 % | |||
141 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI MUSOLAH DAN AULA KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15745012 | 49830795 | 42,500,000 | 42,456,390 | 42,345,390 | 42,345,390 | 41,657,190 | 41,657,190 | 41,657,190 | 41,657,190 | 2024-03-07 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 154,610 | 0.36 % | |
142 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Pengawasan Arsitektur - Penataan Halaman Pesanggrahan Tjilik Riwut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10009924000 | 53104634 | 49,820,000 | 49,820,000 | 49,705,800 | 49,705,800 | 49,594,800 | 49,594,800 | 0 | 49,594,800 | 2024-11-20 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 114,200 | 0.23 % | |
143 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Timpah (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15855012 | 50388916 | 64,890,700 | 64,890,700 | 64,100,651 | 64,100,651 | 64,100,651 | 64,100,651 | 0 | 64,100,651 | 2024-03-21 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 790,049 | 1.22 % | |
144 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17405012 | 51649746 | 18,440,000 | 18,440,000 | 18,391,013 | 18,391,013 | 18,391,013 | 18,391,013 | 18,391,013 | 18,391,013 | 2024-06-28 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 48,987 | 0.27 % | |
145 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Renovasi Screen House di UPT BPPBTPH Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17749012 | 52433621 | 28,620,000 | 28,620,000 | 28,471,500 | 28,471,500 | 24,695,835 | 24,695,835 | 24,695,835 | 24,695,835 | 2024-10-16 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 148,500 | 0.52 % | |
146 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17792012 | 52993619 | 7,101,000 | 7,100,670 | 7,045,500 | 7,045,500 | 7,045,500 | 0 | 0 | 0 | 2024-10-18 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 55,500 | 0.78 % | |
147 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Guru SMAN 4 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16194012 | 50726568 | 50,000,000 | 50,000,000 | 49,913,370 | 49,913,370 | 49,913,370 | 49,913,370 | 49,913,370 | 49,913,370 | 2024-05-28 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 86,630 | 0.17 % | |
148 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17442012 | 51852315 | 88,100,000 | 88,100,000 | 87,944,600 | 87,944,600 | 87,944,600 | 87,944,600 | 87,944,600 | 87,944,600 | 2024-07-06 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 155,400 | 0.18 % | |
149 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Perpustakaan, Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17263012 | 51239442 | 45,306,200 | 45,306,200 | 45,255,000 | 45,255,000 | 45,255,000 | 45,255,000 | 0 | 45,255,000 | 2024-06-05 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 51,200 | 0.11 % | |
150 | 2024 | Dinas Kebudayaan dan Pariwisata | Perencanaan Rehab Aula Museum Balanga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17633012 | 49098175 | 75,150,000 | 75,150,000 | 75,000,000 | 75,000,000 | 74,665,805 | 0 | 0 | 0 | 2024-09-12 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 150,000 | 0.2 % | |
151 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Perencanaan Pembangunan Kandang Bebek/Itik UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17517012 | 51460058 | 6,421,894 | 6,421,894 | 6,405,894 | 6,405,894 | 6,371,400 | 6,371,400 | 6,371,400 | 6,371,400 | 2024-07-23 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 16,000 | 0.25 % | |
152 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Pematang Karau (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17229012 | 51184113 | 35,678,500 | 35,678,500 | 35,675,400 | 35,675,400 | 35,675,400 | 35,675,400 | 0 | 35,675,400 | 2024-05-31 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 3,100 | 0.01 % | |
153 | 2024 | Dinas Komunikasi, Informatika, Persandian dan Statistik | Video Produksi Iklan Layanan Masyarakat | Pengadaan Langsung | Jasa Lainnya | 17651012 | 50163783 | 100,000,000 | 100,000,000 | 99,888,900 | 99,888,900 | 99,789,000 | 99,789,000 | 99,789,000 | 99,789,000 | 2024-09-17 | Maeztro Production | 80.107.943.5-711.000 | 111,100 | 0.11 % | |
154 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Banama Tingang (Rehabilitasi Rg. Lab. Fisika, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15857012 | 50408668 | 58,602,800 | 58,602,800 | 58,447,050 | 58,447,050 | 58,447,050 | 58,447,050 | 0 | 58,447,050 | 2024-03-25 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 155,750 | 0.27 % | |
155 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Pagar & Penataan Halaman SMAN 2 Pandih Batu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15814012 | 50771469 | 78,000,000 | 78,000,000 | 77,850,000 | 77,850,000 | 77,850,000 | 77,850,000 | 77,850,000 | 77,850,000 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 150,000 | 0.19 % | ||
156 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan Rumah Jaga Kebun Jabiren | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10005166000 | 53084161 | 20,140,000 | 20,140,000 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 19,935,600 | 2024-11-13 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 204,400 | 1.01 % | |
157 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Ruang Guru SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17390012 | 51399306 | 52,200,000 | 52,200,000 | 52,000,000 | 52,000,000 | 52,000,000 | 52,000,000 | 52,000,000 | 52,000,000 | 2024-07-11 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 200,000 | 0.38 % | |
158 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan 1).Rehab Ruang Kelas SMKN 1 PANDIH BATU,2).Pembangunan Toilet Beserta Sanitasinya SMKN 1 PULANG PISAU,3).Rehab Ruang Laboratorium Dan Pembangunan Toilet Beserta Sanitasinya SMKN 1 BANAMA TINGANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10004375000 | 53226383 | 63,029,000 | 63,029,000 | 62,861,686 | 62,861,686 | 62,861,686 | 0 | 0 | 0 | 2024-11-12 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 167,314 | 0.27 % | |
159 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pekerjaan Penimbunan dan Pengecoran Halaman Sekolah SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17365012 | 51425179 | 60,000,000 | 60,000,000 | 59,940,555 | 59,940,555 | 59,940,555 | 59,940,555 | 59,940,555 | 59,940,555 | 2024-06-24 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 59,445 | 0.1 % | |
160 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Praktik Siswa(RPS) KK- Rekayasa Perangkat Lunak SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17540012 | 51214540 | 91,010,000 | 91,010,000 | 90,853,500 | 90,853,500 | 90,853,500 | 90,853,500 | 90,853,500 | 90,853,500 | 2024-07-25 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 156,500 | 0.17 % | |
161 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Kelas Baru (2 Ruang)dan Rehab Ruang Kelas (1 Ruang) SMKN 1 PERMATA KECUBUNG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16169012 | 51423982 | 60,000,000 | 60,000,000 | 59,866,800 | 59,866,800 | 59,866,800 | 59,866,800 | 59,866,800 | 59,866,800 | 2024-05-22 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 133,200 | 0.22 % | |
162 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 4 Palangka Raya (Pembangunan Toilet (jamban) beserta sanitasinya, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15801012 | 50409465 | 55,701,800 | 55,701,800 | 55,111,500 | 55,111,500 | 55,111,500 | 55,111,500 | 55,111,500 | 55,111,500 | 2024-03-15 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 590,300 | 1.06 % | |
163 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0002.5.1.02.02.08.0005 Perencanaan Pembuatan Kolam Ikan Lengkap Dengan Perlengkapannya Di Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17751012 | 52927462 | 30,337,200 | 30,247,500 | 30,197,550 | 30,197,550 | 30,000,000 | 30,000,000 | 30,000,000 | 30,000,000 | 2024-10-17 | CV. ENGGANG PRATAMA CONSULINDO | 01.700.139.7-711.000 | 139,650 | 0.46 % | |
164 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 4 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15800012 | 50408997 | 43,927,800 | 43,927,800 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 2024-03-15 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 693,300 | 1.58 % | |
165 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Gedung Hatchery Pada Kegiatan Pengembangan Ayam Kalimantan Super (Kalper) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16109012 | 50581654 | 27,165,000 | 20,992,800 | 20,773,650 | 20,773,650 | 20,579,400 | 20,579,400 | 20,579,400 | 20,579,400 | 2024-05-15 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 6,391,350 | 23.53 % | |
166 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Peningkatan Jalan Madiun Ngawi dan Sekitarnya, Kabupaten Kotawaringin Timur, Provinsi Kalimantan Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 16112012 | 49565586 | 186,400,000 | 186,397,000 | 185,726,219 | 185,726,219 | 185,596,000 | 185,596,000 | 185,596,000 | 185,596,000 | 2024-05-20 | 673,781 | 0.36 % | |||
167 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Awang Lapai (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15782012 | 50384485 | 50,597,700 | 50,597,700 | 50,547,584 | 50,547,584 | 50,547,584 | 50,547,584 | 0 | 50,547,584 | 2024-03-15 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 50,116 | 0.1 % | |
168 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 4 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17259012 | 51240011 | 30,977,300 | 30,977,300 | 30,636,000 | 30,636,000 | 30,636,000 | 30,636,000 | 0 | 30,636,000 | 2024-06-04 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 341,300 | 1.1 % | |
169 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kepala Sekolah/Guru Dan Rehab Ruang Kelas (3 Ruang) SMKN 6 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16142012 | 51421267 | 25,000,000 | 25,000,000 | 24,883,450 | 24,883,450 | 24,883,450 | 24,883,450 | 24,883,450 | 24,883,450 | 2024-05-22 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 116,550 | 0.47 % | |
170 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Pengawasan Arsitektur - Rehab Pagar Pesanggrahan Tjilik Riwut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10009883000 | 53104942 | 49,820,000 | 49,820,000 | 49,750,000 | 49,750,000 | 49,650,300 | 49,650,300 | 0 | 49,650,300 | 2024-11-20 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 70,000 | 0.14 % | |
171 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Konsultan Perencanaan Pembangunan Kandang Ayam Kalimantan Super (Kalper) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16110012 | 50581512 | 27,165,000 | 27,165,000 | 27,072,900 | 27,072,900 | 26,895,300 | 26,895,300 | 26,895,300 | 26,895,300 | 2024-05-15 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 92,100 | 0.34 % | |
172 | 2024 | Dinas Pendidikan | JASA KONSULTANSI PENGAWASAN PERBAIKAN PAGAR, LANTAI DAN PENGECATAN PADA GEDUNG HUMA BERKAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17750012 | 52940108 | 45,000,000 | 45,000,000 | 44,955,000 | 44,955,000 | 44,955,000 | 0 | 0 | 0 | 2024-10-15 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 45,000 | 0.1 % | |
173 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultansi Pengawasan Pemeliharaan Gedung Kantor DPUPR Pro. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16093012 | 49772646 | 85,000,000 | 85,000,000 | 84,800,000 | 84,800,000 | 84,800,000 | 0 | 0 | 0 | 2024-05-08 | 200,000 | 0.24 % | |||
174 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Paju Epat (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17304012 | 51184217 | 45,643,400 | 45,643,400 | 45,621,000 | 45,621,000 | 45,621,000 | 45,621,000 | 45,621,000 | 45,621,000 | 2024-06-11 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 22,400 | 0.05 % | |
175 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Arut Utara (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17286012 | 51602689 | 32,114,000 | 32,114,000 | 31,968,000 | 31,968,000 | 31,968,000 | 31,968,000 | 31,968,000 | 31,968,000 | 2024-06-07 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 146,000 | 0.45 % | |
176 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Teras Aula | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17739012 | 52888554 | 14,992,770 | 14,992,770 | 14,781,704 | 14,781,704 | 14,781,704 | 0 | 0 | 0 | 2024-10-14 | CV. FELI TIRTHA MANDIRI | 39.579.843.2-711.000 | 211,067 | 1.41 % | |
177 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Penataan Jaringan Listrik | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17796012 | 52994245 | 18,000,000 | 17,988,660 | 17,900,000 | 17,900,000 | 17,900,000 | 0 | 0 | 0 | 2024-10-18 | 100,000 | 0.56 % | |||
178 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.07.0010.5.1.02.02.08.0005 PERENCANAAN INSTALASI LISTRIK KANTOR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17643012 | 52466526 | 16,800,000 | 16,800,000 | 16,750,002 | 16,750,002 | 16,750,002 | 16,750,002 | 16,750,002 | 16,750,002 | 2024-09-10 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 49,998 | 0.3 % | |
179 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Perencanaan Pembangunan Jembatan Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17614012 | 52283657 | 30,259,965 | 30,259,900 | 30,192,000 | 30,192,000 | 30,192,000 | 30,192,000 | 30,192,000 | 30,192,000 | 2024-08-23 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 67,965 | 0.22 % | |
180 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Kotawaringin Lama (Rehabilitasi Rg. Lab. Biologi, Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15792012 | 50393286 | 46,504,100 | 46,504,098 | 46,176,000 | 46,176,000 | 46,176,000 | 46,176,000 | 0 | 46,176,000 | 2024-03-21 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 328,100 | 0.71 % | |
181 | 2024 | Dinas Perpustakaan dan Arsip | Pengadaan Buku Tercetak Perpustakaan | Pengadaan Langsung | Pengadaan Barang | 10009519000 | 53268668 | 116,842,629 | 116,840,000 | 116,600,100 | 116,600,100 | 116,568,000 | 116,568,000 | 116,568,000 | 116,568,000 | 2024-11-19 | CV.TRIO BARU INDAH | 75.522.314.6-711.000 | 242,529 | 0.21 % | |
182 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 3 Ruang SMAN 1 Sampit (Sistem Suntik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16043012 | 50729567 | 100,000,000 | 99,900,000 | 99,583,650 | 99,583,650 | 99,583,650 | 99,583,650 | 0 | 99,583,650 | 2024-05-03 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 416,350 | 0.42 % | |
183 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Pembangunan Toilet(Jamban)beserta sanitasinya SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15849012 | 50468167 | 33,258,000 | 33,258,000 | 33,166,000 | 33,166,000 | 33,166,000 | 33,166,000 | 33,166,000 | 33,166,000 | 2024-03-25 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 92,000 | 0.28 % | |
184 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Basawang Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15685012 | 46521079 | 160,000,000 | 160,000,000 | 159,760,303 | 159,760,303 | 159,621,938 | 159,620,000 | 0 | 159,620,000 | 2024-01-18 | CV. RIMA JAYA | 01.407.576.6-711.000 | 239,697 | 0.15 % | |
185 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN SIRING DAN PAGAR UPTPPD SERUYAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15746012 | 49212314 | 113,643,750 | 99,945,787 | 99,834,788 | 99,834,788 | 99,213,188 | 99,213,188 | 99,213,188 | 99,213,188 | 2024-03-15 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 13,808,963 | 12.15 % | |
186 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0008.5.1.02.02.08.0005 Perencanaan Revitalisasi tambak sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17469012 | 52046379 | 35,855,664 | 35,853,000 | 35,825,250 | 35,825,250 | 35,500,000 | 35,500,000 | 35,500,000 | 35,500,000 | 2024-07-09 | PT. ANDAL CENDANAKA | 01.489.452.1-711.000 | 30,414 | 0.08 % | |
187 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15752012 | 50372597 | 47,759,700 | 47,759,700 | 47,397,000 | 47,397,000 | 47,397,000 | 47,397,000 | 47,397,000 | 47,397,000 | 2024-03-13 | 362,700 | 0.76 % | |||
188 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17237012 | 51738316 | 75,880,000 | 75,880,000 | 75,824,100 | 75,824,100 | 75,824,100 | 75,824,100 | 0 | 75,824,100 | 2024-05-30 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 55,900 | 0.07 % | |
189 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Timang (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15754012 | 50372924 | 55,049,700 | 55,049,700 | 54,612,000 | 54,612,000 | 54,612,000 | 54,612,000 | 0 | 54,612,000 | 2024-03-13 | 437,700 | 0.8 % | |||
190 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Bahaur I Kabupaten Pulang Pisau | Pengadaan Langsung | Pekerjaan Konstruksi | 15677012 | 46522391 | 170,000,000 | 170,000,000 | 169,893,275 | 169,893,275 | 169,805,842 | 169,800,000 | 0 | 169,800,000 | 2024-01-05 | CV.MAULANA ABADI | 02.809.446.4-711.000 | 106,725 | 0.06 % | |
191 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Siring SMKN 2 Gunung Timang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16158012 | 51424194 | 27,500,000 | 27,500,000 | 27,400,100 | 27,400,100 | 27,400,100 | 27,400,100 | 27,400,100 | 27,400,100 | 2024-05-22 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 99,900 | 0.36 % | |
192 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembuatan Siring dan Drainase SMK NEGERI 1 KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16044012 | 51010446 | 51,000,000 | 51,000,000 | 50,778,000 | 50,778,000 | 50,778,000 | 50,778,000 | 50,778,000 | 50,778,000 | 2024-05-06 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 222,000 | 0.44 % | |
193 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer,Bahasa SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15853012 | 50525083 | 50,708,000 | 50,708,000 | 50,641,400 | 50,641,400 | 50,641,400 | 50,641,400 | 50,641,400 | 50,641,400 | 2024-03-25 | Roa Solution | 92.337.883.0-711.000 | 66,600 | 0.13 % | |
194 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Awang Lapai (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15783012 | 50378192 | 52,604,700 | 52,601,790 | 52,601,084 | 52,601,084 | 52,601,084 | 52,601,084 | 52,601,084 | 52,601,084 | 2024-03-15 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 3,616 | 0.01 % | |
195 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan WC 2 Unit SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17224012 | 51398659 | 22,000,000 | 22,000,000 | 21,944,500 | 21,944,500 | 21,944,500 | 21,944,500 | 21,944,500 | 21,944,500 | 2024-05-29 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 55,500 | 0.25 % | |
196 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS,Ruang Bimbingan Konseling(BK) SMKS PGRI SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16077012 | 50547386 | 17,317,000 | 17,317,000 | 17,261,500 | 17,261,500 | 17,261,500 | 17,261,500 | 17,261,500 | 17,261,500 | 2024-05-06 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 55,500 | 0.32 % | |
197 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Menthobi Raya (Pembangunan Rg. BK, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17357012 | 51239712 | 23,625,300 | 23,625,300 | 23,554,200 | 23,554,200 | 23,554,200 | 23,554,200 | 23,554,200 | 23,554,200 | 2024-07-09 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 71,100 | 0.3 % | |
198 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Kolam Renang Isen Mulang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15723012 | 50136970 | 30,000,000 | 29,820,150 | 29,598,150 | 29,598,150 | 29,598,150 | 29,598,150 | 29,598,150 | 29,598,150 | 2024-02-26 | Roa Solution | 92.337.883.0-711.000 | 401,850 | 1.34 % | |
199 | 2024 | Badan Pendapatan Daerah | Pengawasan Pemasangan Paving Blok Area UPT Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17613012 | 52307669 | 44,077,500 | 32,745,000 | 31,857,000 | 31,857,000 | 31,246,500 | 31,246,500 | 31,246,500 | 31,246,500 | 2024-08-23 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 12,220,500 | 27.73 % | |
200 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Bimbingan Konseling SMAN 4 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17777012 | 52880730 | 35,000,000 | 35,000,000 | 34,944,500 | 34,944,500 | 34,944,500 | 0 | 0 | 0 | 2024-10-16 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 55,500 | 0.16 % | |
201 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Guru (1 Ruang) SMKN 1 Kuala Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16148012 | 51573334 | 20,000,000 | 20,000,000 | 19,935,000 | 19,935,000 | 19,935,000 | 19,935,000 | 19,935,000 | 19,935,000 | 2024-05-22 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 65,000 | 0.33 % | |
202 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Kuala Kurun (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15771012 | 50387885 | 41,219,700 | 41,219,700 | 41,219,700 | 41,219,700 | 41,219,700 | 41,219,700 | 0 | 41,219,700 | 2024-03-15 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 0 | 0 % | |
203 | 2024 | Biro Pengadaan Barang dan Jasa | Pengembangan Aplikasi dan Pemeliharaan SIAP BAJASA - Pengembangan SIM UKPBJ | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15734012 | 50300406 | 52,500,000 | 52,469,700 | 52,425,300 | 52,425,300 | 52,203,300 | 52,203,300 | 52,203,300 | 5,203,300 | 2024-03-01 | 74,700 | 0.14 % | |||
204 | 2024 | Dinas Kehutanan | Belanja Jasa Konsultansi Pengawasan Arsitektur - Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor atau Bangunan Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16034012 | 49887465 | 49,539,000 | 49,500,000 | 49,317,300 | 49,317,300 | 48,595,800 | 48,595,800 | 48,595,800 | 48,595,800 | 2024-04-29 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 221,700 | 0.45 % | |
205 | 2024 | Dinas Perkebunan | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor (DPPA-Oktober) | Pengadaan Langsung | Pekerjaan Konstruksi | 17902012 | 53346378 | 170,679,200 | 169,578,640 | 169,286,833 | 169,164,604 | 169,164,604 | 0 | 0 | 0 | 2024-11-14 | CV. Setia Bakti Group | 95.851.120.6-711.000 | 1,392,367 | 0.82 % | |
206 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN SIRING DAN PAGAR UPTPPD SERUYAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17598012 | 49721775 | 66,618,750 | 66,499,998 | 66,250,000 | 66,250,000 | 64,602,000 | 64,602,000 | 64,602,000 | 64,602,000 | 2024-08-14 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 368,750 | 0.55 % | |
207 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17536012 | 51202371 | 33,020,000 | 33,020,000 | 32,967,000 | 32,967,000 | 32,967,000 | 32,967,000 | 32,967,000 | 32,967,000 | 2024-07-25 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 53,000 | 0.16 % | |
208 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI GEDUNG KANTOR UPTPPD KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16021012 | 49824839 | 43,750,000 | 43,698,936 | 43,650,000 | 43,650,000 | 43,027,023 | 43,027,023 | 43,027,023 | 43,027,023 | 2024-05-01 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 100,000 | 0.23 % | |
209 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Perencanaan Arsitektur - Penataan Halaman Pesanggrahan Tjilik Riwut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17813012 | 53104149 | 100,000,000 | 100,000,000 | 99,611,400 | 99,611,400 | 99,050,850 | 99,050,850 | 0 | 99,050,850 | 2024-10-29 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 388,600 | 0.39 % | |
210 | 2024 | KPHL GERBANG BARITO | Beban Jasa Konsultansi Pengawasan Arsitektur - Pengawas Kandang Sapi - Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011357000 | 49971026 | 20,140,000 | 20,140,000 | 19,980,000 | 19,980,000 | 19,591,500 | 19,591,500 | 19,591,500 | 19,591,500 | 2024-11-21 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 160,000 | 0.79 % | |
211 | 2024 | Badan Pendapatan Daerah | Belanja Modal Bangunan Gedung Kantor ( Perencanaan Penataan Halaman Kantor UPTPPD Sampit ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17428012 | 51957360 | 74,250,000 | 74,162,985 | 73,829,985 | 73,829,985 | 72,880,935 | 72,880,935 | 72,880,935 | 72,880,935 | 2024-07-03 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 420,015 | 0.57 % | |
212 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan Halaman Sekolah dan Rehab Ruang Kelas (4 Ruang) SMKN 5 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16173012 | 51424387 | 77,200,000 | 77,200,000 | 77,066,800 | 77,066,800 | 77,066,800 | 77,066,800 | 77,066,800 | 77,066,800 | 2024-05-22 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 133,200 | 0.17 % | |
213 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 2 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17530012 | 51213384 | 28,090,000 | 28,090,000 | 27,868,000 | 27,868,000 | 27,868,000 | 27,868,000 | 27,868,000 | 27,868,000 | 2024-07-25 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 222,000 | 0.79 % | |
214 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer,Bahasa SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16074012 | 50546851 | 41,850,000 | 41,850,000 | 41,794,500 | 41,794,500 | 41,794,500 | 41,794,500 | 41,794,500 | 41,794,500 | 2024-05-06 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 55,500 | 0.13 % | |
215 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (PERENCANAAN REHAB LOBI GEDUNG KANTOR) | Pengadaan Langsung | Jasa Lainnya | 10031088000 | 53444696 | 202,500,000 | 49,330,000 | 49,128,600 | 49,128,600 | 49,000,000 | 0 | 0 | 0 | 2024-12-17 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 153,371,400 | 75.74 % | |
216 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17214012 | 51239502 | 48,776,500 | 48,776,500 | 48,726,000 | 48,726,000 | 48,726,000 | 48,726,000 | 0 | 48,726,000 | 2024-05-28 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 50,500 | 0.1 % | |
217 | 2024 | Badan Pendapatan Daerah | Pengawasan Pembangunan Ruang Loket UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17745012 | 52649838 | 25,000,000 | 24,919,500 | 24,864,000 | 24,864,000 | 24,575,400 | 0 | 0 | 0 | 2024-10-16 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 136,000 | 0.54 % | |
218 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS Kristen Palangka Raya (Pembangunan Rg. Lab. Kimia) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17361012 | 51240503 | 30,927,300 | 30,927,300 | 30,883,000 | 30,883,000 | 30,883,000 | 30,883,000 | 30,883,000 | 30,883,000 | 2024-07-09 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 44,300 | 0.14 % | |
219 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17552012 | 49721332 | 26,000,000 | 25,974,000 | 25,308,000 | 25,308,000 | 24,769,650 | 24,769,650 | 24,769,650 | 24,769,650 | 2024-07-31 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 692,000 | 2.66 % | |
220 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Aula SMAN 1 Tanah Siang Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17387012 | 51399046 | 55,000,000 | 55,000,000 | 54,822,400 | 54,822,400 | 54,822,400 | 54,822,400 | 54,822,400 | 54,822,400 | 2024-08-06 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 177,600 | 0.32 % | |
221 | 2024 | Dinas Perhubungan | Pengawasan Pemeliharaan/Penataan ATCS Simpang Mahir Mahar-Jl. Trans Kalimantan (Arah Banjarmasin) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10004427000 | 53411285 | 25,000,000 | 24,952,800 | 24,725,250 | 24,725,250 | 24,725,250 | 0 | 0 | 0 | 2024-11-12 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 274,750 | 1.1 % | |
222 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Tower Air UPT. KPHL Gerbang Barito, Bangunan Rumah Genset dan Tower Air UPT. KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17679012 | 52599544 | 24,068,000 | 24,067,900 | 23,932,155 | 23,932,155 | 23,671,305 | 0 | 0 | 0 | 2024-10-02 | 135,845 | 0.56 % | |||
223 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Pagar UPT.KPHL Kapuas Kahayan - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17725012 | 52730217 | 77,200,000 | 77,197,200 | 77,032,460 | 77,032,460 | 76,310,960 | 0 | 0 | 0 | 2024-10-11 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 167,540 | 0.22 % | |
224 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Babi, Pakan dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10021409000 | 53545275 | 20,826,500 | 20,826,500 | 20,793,200 | 20,793,200 | 20,747,898 | 0 | 0 | 0 | 2024-11-30 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 33,300 | 0.16 % | |
225 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pengecoran Jalan Menuju Sekolah SMAN 1 Tamban Catur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16090012 | 51398711 | 72,000,000 | 72,000,000 | 71,844,600 | 71,844,600 | 71,844,600 | 71,844,600 | 71,844,600 | 71,844,600 | 2024-05-08 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 155,400 | 0.22 % | |
226 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Beban Jasa Konsultansi Pengawasan Pembangunan Pagar UPT BPSBTPH Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17618012 | 49429034 | 30,906,000 | 30,906,000 | 30,889,350 | 30,889,350 | 30,887,082 | 30,887,082 | 30,887,082 | 30,887,082 | 2024-08-26 | 16,650 | 0.05 % | |||
227 | 2024 | Badan Keuangan dan Aset Daerah | Rehab Teras Aula | Pengadaan Langsung | Pekerjaan Konstruksi | 17886012 | 53327713 | 150,000,000 | 150,000,000 | 149,968,000 | 149,968,000 | 149,968,000 | 149,968,000 | 149,968,000 | 149,968,000 | 2024-11-08 | KARYA UTAMA KAHAYAN | 86.020.287.8-711.000 | 32,000 | 0.02 % | |
228 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer,Laboratorium Bahasa SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17483012 | 51358813 | 42,420,000 | 42,420,000 | 42,357,600 | 42,357,600 | 42,357,600 | 42,357,600 | 42,357,600 | 42,357,600 | 2024-07-15 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 62,400 | 0.15 % | |
229 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (1 Ruang) SMKN 3 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16184012 | 51423718 | 19,000,000 | 19,000,000 | 18,961,150 | 18,961,150 | 18,961,150 | 18,961,150 | 18,961,150 | 18,961,150 | 2024-05-22 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 38,850 | 0.2 % | |
230 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Bimbingan Konseling (BK) SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17486012 | 51229891 | 10,530,000 | 10,530,000 | 10,503,360 | 10,503,360 | 10,503,360 | 10,503,360 | 10,503,360 | 10,503,360 | 2024-07-15 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 26,640 | 0.25 % | |
231 | 2024 | Badan Pendapatan Daerah | Perencanaan Pembangunan Ruang Loket UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17546012 | 52151643 | 42,500,000 | 42,499,999 | 42,424,200 | 42,424,200 | 42,191,100 | 42,191,100 | 42,191,100 | 42,191,100 | 2024-07-26 | ROTASI DESIGN CONSULTANT | 90.011.802.7-711.000 | 75,800 | 0.18 % | |
232 | 2024 | Dinas Pendidikan | Jasa Konsunltasi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang SLBN 1 Kasongan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17345012 | 51911794 | 16,979,000 | 16,977,450 | 16,927,500 | 16,927,500 | 16,927,500 | 16,927,500 | 16,927,500 | 16,927,500 | 2024-08-12 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 51,500 | 0.3 % | |
233 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor dan Bangunan Lainnya -Pengecoran Jalan Lingkungan | Pengadaan Langsung | Pekerjaan Konstruksi | 17906012 | 53345378 | 190,000,000 | 190,000,000 | 189,722,500 | 189,722,500 | 189,500,000 | 0 | 0 | 0 | 2024-11-08 | CV. CAHAYA MASSA | 01.505.868.8-714.000 | 277,500 | 0.15 % | |
234 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Pembangunan Rumah Genset dan Tower Air UPT.KPHP Kahayan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17667012 | 52595930 | 16,884,000 | 16,883,600 | 16,852,575 | 16,852,575 | 16,738,800 | 16,738,800 | 16,738,800 | 16,738,800 | 2024-09-27 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 31,425 | 0.19 % | |
235 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SERUYAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15795012 | 49207360 | 13,582,500 | 13,505,000 | 13,503,150 | 13,503,150 | 13,286,700 | 13,286,700 | 13,286,700 | 13,286,700 | 2024-03-15 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 79,350 | 0.58 % | |
236 | 2024 | Dinas Komunikasi, Informatika, Persandian dan Statistik | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15856012 | 51029086 | 72,856,000 | 72,856,000 | 71,916,900 | 71,916,900 | 71,916,900 | 71,916,900 | 71,916,900 | 71,916,900 | 2024-03-27 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 939,100 | 1.29 % | |
237 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAN 1 Tanah Siang Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17388012 | 51399067 | 58,000,000 | 58,000,000 | 57,800,200 | 57,800,200 | 57,800,200 | 57,800,200 | 57,800,200 | 57,800,200 | 2024-08-06 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 199,800 | 0.34 % | |
238 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pemasangan Paving Halaman Kantor SMAN 1 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17823012 | 52898293 | 35,000,000 | 35,000,000 | 34,889,000 | 34,889,000 | 34,889,000 | 34,889,000 | 34,889,000 | 34,889,000 | 2024-10-28 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 111,000 | 0.32 % | |
239 | 2024 | Dinas Kebudayaan dan Pariwisata | Perencanaan Renovasi Ruang Pamer dan Pagar Belakang Museum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17798012 | 53018238 | 97,818,000 | 97,818,000 | 97,596,000 | 97,596,000 | 97,041,000 | 0 | 0 | 0 | 2024-10-23 | CV. BUKIT RAYA ENGINEERING | 02.618.720.3-711.000 | 222,000 | 0.23 % | |
240 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Mess UPT.KPHP Katingan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17601012 | 52224948 | 44,147,000 | 44,146,000 | 44,086,425 | 44,086,425 | 43,711,800 | 43,711,800 | 43,711,800 | 43,711,800 | 2024-08-15 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 60,575 | 0.14 % | |
241 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Lanjutan pembuatan pagar dan penataan halaman sekolah SMAN 1 Arut Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15911012 | 50729294 | 35,000,000 | 35,000,000 | 34,976,100 | 34,976,100 | 34,976,100 | 34,976,100 | 0 | 34,976,100 | 2024-03-28 | Roa Solution | 92.337.883.0-711.000 | 23,900 | 0.07 % | |
242 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Rehabilitasi Gedung Juang Jl. Seth Adji | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15892012 | 51180723 | 30,000,000 | 30,000,000 | 29,881,200 | 29,881,200 | 29,881,200 | 29,881,200 | 29,881,200 | 29,881,200 | 2024-04-02 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 118,800 | 0.4 % | |
243 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16099012 | 51588150 | 21,754,000 | 21,754,000 | 21,700,500 | 21,700,500 | 21,700,500 | 21,700,500 | 21,700,500 | 21,700,500 | 2024-05-09 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 53,500 | 0.25 % | |
244 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan dan Penataan Halaman SMKN 3 Kuala Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16160012 | 51427594 | 27,000,000 | 27,000,000 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 2024-05-22 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 49,200 | 0.18 % | |
245 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Perencanaan Pembangunan Parkir Mobil Operasional PUSDALOP-PB) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17884012 | 51467121 | 125,000,000 | 9,999,900 | 9,944,379 | 9,944,379 | 9,855,024 | 0 | 0 | 0 | 2024-11-11 | 115,055,621 | 92.04 % | |||
246 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17280012 | 51240282 | 30,927,300 | 30,927,300 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 2024-06-12 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 133,200 | 0.43 % | |
247 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet(Jamban) 1 Ruang SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15815012 | 50548649 | 4,078,000 | 4,078,000 | 4,050,000 | 4,050,000 | 4,050,000 | 4,050,000 | 4,050,000 | 4,050,000 | 2024-03-19 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 28,000 | 0.69 % | |
248 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Dusun Utara (Pembangunan Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15840012 | 50377199 | 72,598,700 | 72,598,700 | 72,076,851 | 72,076,851 | 72,076,851 | 72,076,851 | 0 | 72,076,851 | 2024-03-21 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 521,849 | 0.72 % | |
249 | 2024 | Dinas Kelautan dan Perikanan | 3.25.03.1.06.0001.5.2.03.01.01.0018 Jasa Konsultansi Pengawasan Peningkatan Jalan Titian Pelabuhan Perikanan Kuala Jelai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17840012 | 53218750 | 61,000,000 | 61,000,000 | 60,639,300 | 60,639,300 | 60,500,000 | 60,500,000 | 60,500,000 | 60,500,000 | 2024-10-30 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 360,700 | 0.59 % | |
250 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Kantin, Ruang Kepala Sekolah, Ruang Pembelajaran Khusus, Ruang tata Usaha SLBN Puruk Cahu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17328012 | 51911728 | 40,436,933 | 40,431,750 | 40,426,200 | 40,426,200 | 40,426,200 | 40,426,200 | 0 | 40,426,200 | 2024-07-01 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 10,733 | 0.03 % | |
251 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Rehabilitasi Ruang Kelas dengan tingkat kerusakan minimal sedang beserta perabotnya SLBN 1 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17693012 | 52094234 | 10,200,000 | 10,197,570 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 2024-09-30 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 54,600 | 0.54 % | |
252 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS Muhammadiyah Kasongan (Rehabilitasi Rg. Kelas, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17356012 | 51239112 | 41,824,200 | 41,824,200 | 41,747,100 | 41,747,100 | 41,747,100 | 41,747,100 | 41,747,100 | 41,747,100 | 2024-07-10 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 77,100 | 0.18 % | |
253 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Ruang Kelas Baru SLBN Puruk Cahu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17327012 | 51911756 | 73,795,500 | 73,787,250 | 73,753,950 | 73,753,950 | 73,753,950 | 73,753,950 | 0 | 73,753,950 | 2024-07-01 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 41,550 | 0.06 % | |
254 | 2024 | Badan Pendapatan Daerah | Perencanaan Pembangunan Rumah Dinas UPTPPD Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17650012 | 52495090 | 58,650,000 | 58,635,750 | 57,498,000 | 57,498,000 | 56,598,900 | 56,598,900 | 56,598,900 | 56,598,900 | 2024-09-13 | 1,152,000 | 1.96 % | |||
255 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya -Perencanaan Pembangunan Konstruksi/ Pembangunan Gedung Water Tank (Raservoir) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16009012 | 51467121 | 125,000,000 | 99,900,000 | 99,089,700 | 99,089,700 | 99,089,700 | 99,089,700 | 0 | 99,089,700 | 2024-05-13 | 25,910,300 | 20.73 % | |||
256 | 2024 | Dinas Perhubungan | Pengawasan Pemeliharaan Area Traffic Control System (ATCS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17620012 | 51282094 | 25,000,000 | 24,952,800 | 24,586,500 | 24,586,500 | 24,586,500 | 24,586,500 | 24,586,500 | 24,586,500 | 2024-08-29 | Roa Solution | 92.337.883.0-711.000 | 413,500 | 1.65 % | |
257 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Bahaur II Kabupaten Pulang Pisau | Pengadaan Langsung | Pekerjaan Konstruksi | 15678012 | 46522762 | 170,000,000 | 170,000,000 | 169,835,326 | 169,835,326 | 169,747,893 | 169,000,000 | 0 | 169,000,000 | 2024-01-05 | CV.ANUGRAH ALAM INDO RAYA (AIR) | 72.282.377.0-714.000 | 164,674 | 0.1 % | |
258 | 2024 | Dinas Energi dan Sumber Daya Mineral | Belanja Jasa Konsultansi Perencanaan Arsitektur - Jasa Arsitektur Lainnya Konsultansi Perencanaan Pemasangan BPBL | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17406012 | 51938202 | 80,000,000 | 79,920,000 | 79,698,000 | 79,698,000 | 79,698,000 | 79,698,000 | 79,698,000 | 79,698,000 | 2024-06-27 | 302,000 | 0.38 % | |||
259 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Perpustakaan, Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15786012 | 50392449 | 64,277,800 | 64,277,800 | 64,210,800 | 64,210,800 | 64,210,800 | 64,210,800 | 0 | 64,210,800 | 2024-03-15 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 67,000 | 0.1 % | |
260 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI GEDUNG UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15738012 | 49826772 | 36,220,000 | 36,198,039 | 35,464,500 | 35,464,500 | 35,064,900 | 35,064,900 | 35,064,900 | 35,064,900 | 2024-03-07 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 755,500 | 2.09 % | |
261 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Lab. Komputer SMAN 4 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16195012 | 50726676 | 26,873,000 | 26,873,000 | 26,850,900 | 26,850,900 | 26,850,900 | 26,850,900 | 26,850,900 | 26,850,900 | 2024-05-28 | CV. SEIPUTRA PERSADA | 02.539.098.0-711.000 | 22,100 | 0.08 % | |
262 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Balai Riam (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17359012 | 51239888 | 58,394,200 | 58,394,200 | 58,116,700 | 58,116,700 | 58,116,700 | 58,116,700 | 58,116,700 | 58,116,700 | 2024-07-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 277,500 | 0.48 % | |
263 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Pagar SMAN 1 Dusun Tengah Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15796012 | 50726863 | 95,000,000 | 95,000,000 | 94,770,791 | 94,770,791 | 94,770,791 | 94,770,791 | 94,770,791 | 94,770,791 | 2024-03-15 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 229,209 | 0.24 % | |
264 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Ruang Perpustakaan SMAS Muhammadiyah 2 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17308012 | 51399735 | 30,000,000 | 30,000,000 | 29,948,940 | 29,948,940 | 29,948,940 | 29,948,940 | 29,948,940 | 29,948,940 | 2024-06-12 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 51,060 | 0.17 % | |
265 | 2024 | Sekretariat DPRD | Beban Jasa Konsultansi Pengawasan arsitektur rehab ruang paripurna Lt 3 bagian belakang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17227012 | 49289848 | 14,000,000 | 13,991,550 | 13,974,900 | 13,974,900 | 13,974,900 | 13,974,900 | 13,974,900 | 13,974,900 | 2024-05-30 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 25,100 | 0.18 % | |
266 | 2024 | Dinas Pendidikan | Perencanaan REHAB ACP DEPAN DISDIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10029710000 | 53712812 | 41,500,000 | 41,500,000 | 41,452,950 | 41,452,950 | 41,452,950 | 0 | 0 | 0 | 2024-12-13 | 47,050 | 0.11 % | |||
267 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17321012 | 51238296 | 43,755,200 | 43,755,200 | 43,623,000 | 43,623,000 | 43,623,000 | 43,623,000 | 43,623,000 | 43,623,000 | 2024-06-14 | 132,200 | 0.3 % | |||
268 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Guru SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15962012 | 50730570 | 60,900,000 | 60,900,000 | 60,000,000 | 60,000,000 | 60,000,000 | 60,000,000 | 0 | 60,000,000 | 2024-04-05 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 900,000 | 1.48 % | |
269 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15845012 | 50538788 | 41,085,000 | 41,085,000 | 41,000,000 | 41,000,000 | 41,000,000 | 41,000,000 | 41,000,000 | 41,000,000 | 2024-03-25 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 85,000 | 0.21 % | |
270 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS PGRI 2 Sampit (Pembangunan Rg. Guru, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16133012 | 51239677 | 44,806,700 | 44,806,700 | 44,582,040 | 44,582,040 | 44,582,040 | 44,582,040 | 0 | 44,582,040 | 2024-05-21 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 224,660 | 0.5 % | |
271 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE, KANOPI PENYAMBUNG KANTOR-GUDANG ARSIP UPTPPD SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15748012 | 49189732 | 49,500,000 | 49,498,849 | 49,284,000 | 49,284,000 | 48,695,700 | 48,695,700 | 48,695,700 | 48,695,700 | 2024-03-07 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 216,000 | 0.44 % | |
272 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Ruang Lab Komputer SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17391012 | 51399342 | 28,500,000 | 28,500,000 | 28,450,000 | 28,450,000 | 28,450,000 | 28,450,000 | 28,450,000 | 28,450,000 | 2024-07-18 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 50,000 | 0.18 % | |
273 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Praktik Siswa(RPS) KK- Rekayasa Perangkat Lunak SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16066012 | 50544142 | 97,573,000 | 97,573,000 | 97,400,000 | 97,400,000 | 97,400,000 | 97,400,000 | 97,400,000 | 97,400,000 | 2024-05-06 | Roa Solution | 92.337.883.0-711.000 | 173,000 | 0.18 % | |
274 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pembuatan pagar dan penataan halaman sekolah SMAN 1 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17385012 | 51398837 | 70,000,000 | 70,000,000 | 69,874,500 | 69,874,500 | 69,874,500 | 69,874,500 | 69,874,500 | 69,874,500 | 2024-07-02 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 125,500 | 0.18 % | |
275 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15781012 | 50378806 | 56,928,700 | 56,928,700 | 56,928,570 | 56,928,570 | 56,928,570 | 56,928,570 | 0 | 56,800,000 | 2024-03-15 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 130 | 0 % | |
276 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Perencanaaan Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah VII | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17762012 | 52940602 | 100,000,000 | 99,999,900 | 99,850,050 | 99,850,000 | 99,628,000 | 0 | 0 | 0 | 2024-10-17 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 149,950 | 0.15 % | |
277 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS,Ruang Bimbingan Konseling(BK),Toilet(Jamban)beserta sanitasinya SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17492012 | 51214220 | 26,970,000 | 26,970,000 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 26,950,800 | 2024-07-15 | Roa Solution | 92.337.883.0-711.000 | 19,200 | 0.07 % | |
278 | 2024 | Biro Pengadaan Barang dan Jasa | Survey Kepuasan Masyarakat atas Layanan PBJ | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16138012 | 50870324 | 100,000,000 | 100,000,000 | 99,702,420 | 99,702,420 | 98,956,500 | 98,956,500 | 98,956,500 | 98,956,500 | 2024-05-21 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 297,580 | 0.3 % | |
279 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAGAR LANJUTAN UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17398012 | 49716639 | 59,606,250 | 59,534,850 | 59,312,850 | 59,312,850 | 58,463,700 | 58,463,700 | 58,463,700 | 58,463,700 | 2024-06-28 | 293,400 | 0.49 % | |||
280 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pembangunan Pagar SMAN 1 Gunung Bintang Awai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17829012 | 52897846 | 55,000,000 | 55,000,000 | 54,800,000 | 54,800,000 | 54,800,000 | 54,800,000 | 54,800,000 | 54,800,000 | 2024-10-27 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 200,000 | 0.36 % | |
281 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pemasangan Paving Halaman SMAN 1 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17836012 | 52899068 | 30,000,000 | 30,000,000 | 29,720,250 | 29,720,250 | 29,720,250 | 29,720,250 | 29,720,250 | 29,720,250 | 2024-10-30 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 279,750 | 0.93 % | |
282 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pagar dan Parkir SMAN 6 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16135012 | 51399706 | 60,000,000 | 60,000,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 2024-05-21 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 60,000 | 0.1 % | |
283 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Rungan Barat (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15841012 | 50388240 | 41,184,700 | 41,184,700 | 41,000,000 | 41,000,000 | 41,000,000 | 41,000,000 | 0 | 41,000,000 | 2024-03-25 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 184,700 | 0.45 % | |
284 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Tamiyang Layang (Rehabilitasi Rg. Lab. Kimia, Rehabilitasi Rg. Lab. Fisika, Pembangunan Toilet (Jamban) ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15941012 | 50384903 | 63,519,700 | 63,519,700 | 63,400,000 | 63,400,000 | 63,400,000 | 63,400,000 | 0 | 63,400,000 | 2024-04-01 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 119,700 | 0.19 % | |
285 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Fisika SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16096012 | 51588045 | 32,570,000 | 32,570,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 2024-05-09 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 47,000 | 0.14 % | |
286 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Ruang Guru SMAS Muhammadiyah Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17275012 | 51400358 | 40,000,000 | 40,000,000 | 39,860,100 | 39,860,100 | 39,860,100 | 39,860,100 | 39,860,100 | 39,860,100 | 2024-06-07 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 139,900 | 0.35 % | |
287 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 2 Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17671012 | 52609993 | 20,000,000 | 20,000,000 | 19,950,585 | 19,950,585 | 19,950,585 | 19,950,585 | 19,950,585 | 19,950,585 | 2024-09-26 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 49,415 | 0.25 % | |
288 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan 1).Pembangunan Toilet Beserta Sanitasinya,Rehab Rumah Dinas SMKN 7 PALANGKA RAYA,2).Rehab Ruang Kelas SMKN 6 PALANGKA RAYA,3).Pembangunan Saluran Drainase SMKN 8 PALANGKA RAYA,4).Pembuatan Jembatan SMKN 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17807012 | 52612750 | 73,509,000 | 73,509,000 | 73,398,000 | 73,398,000 | 73,398,000 | 0 | 0 | 0 | 2024-10-25 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,000 | 0.15 % | |
289 | 2024 | Dinas Ketahanan Pangan | Jasa Konsultansi Pengawasan Rehab Gedung/Kantor Pasca Kebakaran | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17888012 | 52895850 | 15,000,000 | 15,000,000 | 14,153,001 | 14,153,000 | 14,150,000 | 14,150,000 | 14,150,000 | 14,150,000 | 2024-11-08 | Roa Solution | 92.337.883.0-711.000 | 846,999 | 5.65 % | |
290 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17445012 | 51358571 | 23,220,000 | 23,220,000 | 23,167,275 | 23,167,275 | 23,167,275 | 23,167,275 | 23,167,275 | 23,167,275 | 2024-07-06 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 52,725 | 0.23 % | |
291 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMKS PGRI SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16076012 | 50547249 | 20,925,000 | 20,925,000 | 20,869,500 | 20,869,500 | 20,869,500 | 20,869,500 | 20,869,500 | 20,869,500 | 2024-05-06 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 55,500 | 0.27 % | |
292 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | ,Belanja Jasa Konsultansi Perencanaan Renovasi Aula Kantor DPMPTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16010012 | 51311646 | 120,213,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,844,500 | 99,844,500 | 0 | 99,844,500 | 2024-05-16 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 20,313,000 | 16.9 % | |
293 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15925012 | 50548805 | 54,488,000 | 54,488,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 2024-04-01 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 111,000 | 0.2 % | |
294 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Rehabilitasi Ruang Kelas (1 Ruang) SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17476012 | 51171057 | 9,570,000 | 9,570,000 | 9,520,050 | 9,520,050 | 9,520,050 | 9,520,050 | 9,520,050 | 9,520,050 | 2024-07-15 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 49,950 | 0.52 % | |
295 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Rehabilitasi 4 Ruang Kelas SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17378012 | 51399383 | 42,000,000 | 42,000,000 | 41,930,000 | 41,930,000 | 41,930,000 | 41,930,000 | 41,930,000 | 41,930,000 | 2024-07-02 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 70,000 | 0.17 % | |
296 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Lanjutan Pemasangan Plafon dan Keramik SMAN 3 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15826012 | 50724513 | 56,000,000 | 56,000,000 | 55,750,773 | 55,750,773 | 55,750,773 | 55,750,773 | 0 | 55,750,773 | 2024-03-21 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 249,227 | 0.45 % | |
297 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Rehabilitasi 4 Ruang Kelas SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15896012 | 50766553 | 49,500,000 | 49,500,000 | 49,439,000 | 49,439,000 | 49,439,000 | 49,439,000 | 0 | 49,439,000 | 2024-03-28 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 61,000 | 0.12 % | |
298 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Fisika, Pembangunan Rg BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15779012 | 50378369 | 56,122,700 | 56,122,700 | 56,122,700 | 56,122,700 | 56,122,700 | 56,122,700 | 0 | 56,122,700 | 2024-03-15 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 0 | 0 % | |
299 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMA Garing Tarantang (Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17253012 | 51239232 | 43,873,000 | 43,837,000 | 43,369,365 | 43,369,365 | 43,369,365 | 43,369,365 | 0 | 43,369,365 | 2024-06-03 | 503,635 | 1.15 % | |||
300 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Perencanaan Dapur Umum, Bengkel, Rumah Panen | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16035012 | 51493303 | 68,900,000 | 68,900,000 | 68,800,000 | 68,800,000 | 68,750,000 | 68,750,000 | 100 | 68,750,000 | 2024-04-29 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 100,000 | 0.15 % | |
301 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Kelas Baru (3 Ruang)SMKN 1 Teluk Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15997012 | 50968459 | 65,000,000 | 64,879,500 | 64,768,500 | 64,768,500 | 64,768,500 | 64,768,500 | 64,768,500 | 64,768,500 | 2024-05-06 | 231,500 | 0.36 % | |||
302 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS SMK NEGERI 1 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15914012 | 50539559 | 7,679,000 | 7,679,000 | 7,623,500 | 7,623,500 | 7,623,500 | 7,623,500 | 7,623,500 | 7,623,500 | 2024-04-01 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 55,500 | 0.72 % | |
303 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor dan Bangunan Lainnya -Drainase | Pengadaan Langsung | Pekerjaan Konstruksi | 17907012 | 53345283 | 200,000,000 | 200,000,000 | 199,321,000 | 199,321,000 | 198,500,190 | 0 | 0 | 0 | 2024-11-08 | CV CIPTA KREASI MEMBANGUN | 86.329.963.2-711.000 | 679,000 | 0.34 % | |
304 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Kantor SMAN 1 Sebangau Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17825012 | 52898406 | 20,000,000 | 20,000,000 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 2024-10-28 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 77,700 | 0.39 % | |
305 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Pengawasan Pemeliharaan Penyekatan dan Pemasangan Interior Gedung IBS Lt. 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17585012 | 52174190 | 3,000,000 | 3,000,000 | 2,997,000 | 2,997,000 | 2,269,950 | 2,269,950 | 2,269,950 | 2,269,950 | 2024-08-16 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 3,000 | 0.1 % | |
306 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Fisika,Laboratorium Biologi SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17548012 | 51198840 | 55,230,000 | 55,230,000 | 55,176,720 | 55,176,720 | 55,176,720 | 55,176,720 | 55,176,720 | 55,176,720 | 2024-07-25 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 53,280 | 0.1 % | |
307 | 2024 | Dinas Pemberdayaan Perempuan,Perlindungan Anak, Pengendalian Penduduk dan Keluarga Berencana | Perencanaan pembangunan pagar samping kantor, pos jaga dan tempat parkir kendaraan roda 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15958012 | 51139932 | 16,460,000 | 16,460,000 | 16,404,500 | 16,400,000 | 16,300,360 | 16,300,360 | 16,300,360 | 16,300,360 | 2024-04-04 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 55,500 | 0.34 % | 3 |
308 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Kotawaringin Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15981012 | 49437734 | 93,682,964 | 93,682,000 | 93,240,000 | 93,240,000 | 93,240,000 | 93,240,000 | 0 | 93,240,000 | 2024-04-20 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 442,964 | 0.47 % | 3 |
309 | 2024 | Dinas Pemberdayaan Perempuan,Perlindungan Anak, Pengendalian Penduduk dan Keluarga Berencana | Rehabilitasi ruang pelayanan UPT PPA Prov. Kalteng | Pengadaan Langsung | Jasa Lainnya | 16129012 | 51677930 | 78,323,720 | 78,323,720 | 78,229,692 | 78,229,692 | 77,829,692 | 77,829,692 | 77,829,692 | 77,829,692 | 2024-05-21 | CV. USAHA BANGUN SARANA | 02.978.028.5-711.000 | 94,028 | 0.12 % | 3 |
310 | 2024 | Dinas Pemberdayaan Perempuan,Perlindungan Anak, Pengendalian Penduduk dan Keluarga Berencana | Pembangunan pagar samping kantor, pos jaga dan tempat parkir kendaraan roda 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 16177012 | 51140621 | 200,000,000 | 200,000,000 | 199,722,500 | 199,722,500 | 199,000,450 | 199,000,450 | 199,000,450 | 199,000,450 | 2024-05-21 | 277,500 | 0.14 % | 3 | ||
311 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Kantin, Ruang Kelas Baru, Ruang UKS, Selasar Penghubung SLBN 2 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17320012 | 51899924 | 91,093,550 | 91,093,550 | 91,092,150 | 91,092,150 | 91,092,150 | 91,092,150 | 0 | 91,092,150 | 2024-07-01 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 1,400 | 0 % | 3 |
312 | 2024 | Dinas Sosial | Pengawasan Pembangunan Pembatas Antar Bangsal Klien UPT PSBL Pambelum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17462012 | 49443403 | 49,820,000 | 49,820,000 | 49,266,795 | 49,266,795 | 48,581,925 | 48,581,925 | 48,581,925 | 48,581,925 | 2024-07-10 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 553,205 | 1.11 % | 3 |
313 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17730012 | 52869904 | 98,958,000 | 98,958,000 | 98,790,000 | 98,790,000 | 98,790,000 | 98,790,000 | 0 | 98,790,000 | 2024-10-12 | CV.ADIKON CITRABANGUN KONSULTAN | 02.618.694.0-711.000 | 168,000 | 0.17 % | 3 |
314 | 2024 | Badan Pendapatan Daerah | Pengawasan Pembangunan Rumah Dinas UPTPPD Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17844012 | 53193784 | 34,500,000 | 34,382,250 | 34,132,500 | 34,132,500 | 33,466,500 | 0 | 0 | 0 | 2024-10-30 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 367,500 | 1.07 % | |
315 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan Gedung/Rumah Pelindung Vertical Dryer Kab. Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17484012 | 49360183 | 105,000,000 | 100,000,000 | 99,877,106 | 99,877,106 | 99,200,700 | 99,200,700 | 99,200,700 | 99,200,700 | 2024-07-11 | 5,122,894 | 4.88 % | |||
316 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Ruang Kelas Baru SLBN 3 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17338012 | 51911575 | 98,636,832 | 98,124,000 | 97,569,000 | 97,569,000 | 97,569,000 | 97,569,000 | 0 | 97,569,000 | 2024-07-01 | 1,067,832 | 1.08 % | |||
317 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 4 Palangka Raya (Pembangunan Toilet (jamban) beserta sanitasinya, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17260012 | 51240126 | 39,257,500 | 39,257,500 | 38,683,500 | 38,683,500 | 38,683,500 | 38,683,500 | 0 | 38,683,500 | 2024-06-04 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 574,000 | 1.46 % | |
318 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Lanjutan Pemasangan Plafon dan Keramik SMAN 3 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16192012 | 51398083 | 42,000,000 | 42,000,000 | 41,547,300 | 41,547,300 | 41,547,300 | 41,547,300 | 41,547,300 | 41,547,300 | 2024-05-28 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 452,700 | 1.08 % | |
319 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17647012 | 49720767 | 7,942,500 | 7,941,499 | 7,925,400 | 7,925,400 | 7,481,400 | 7,481,400 | 7,481,400 | 7,481,400 | 2024-09-13 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 17,100 | 0.22 % | |
320 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN GUDANG KANTOR BAPENDA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15728012 | 49258772 | 67,500,000 | 67,293,750 | 67,071,750 | 67,071,750 | 66,361,350 | 66,361,350 | 66,361,350 | 66,361,350 | 2024-03-15 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 428,250 | 0.63 % | |
321 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Bintang Awai (Pembangunan Rg. Kelas Baru (RKB) Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15819012 | 50377305 | 55,453,700 | 55,453,700 | 55,435,558 | 55,435,558 | 55,435,558 | 55,435,558 | 0 | 55,435,558 | 2024-03-21 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 18,142 | 0.03 % | |
322 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan/Rehabilitasi Ruang Laboratorium Benih, Ruang Pengawasan Pemasaran/Peredaran Benih, Ruang Penilaian Varietas, Ruang Penyimpanan Sampel Benih, Ruang Sertifikasi Benih | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17319012 | 49393247 | 100,000,000 | 99,920,000 | 99,794,273 | 99,794,273 | 99,394,950 | 99,394,950 | 99,394,950 | 99,394,950 | 2024-06-26 | 205,728 | 0.21 % | |||
323 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 1 Gunung Timang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15707012 | 49713438 | 15,000,000 | 15,000,000 | 14,950,000 | 14,950,000 | 14,950,000 | 0 | 0 | 0 | 2024-02-23 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 50,000 | 0.33 % | |
324 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Gunung Bintang Awai (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17283012 | 51154058 | 41,574,800 | 41,574,800 | 38,472,600 | 38,472,600 | 38,472,600 | 38,472,600 | 0 | 38,472,600 | 2024-06-07 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 3,102,200 | 7.46 % | |
325 | 2024 | Badan Pendapatan Daerah | Pengawasan Pembangunan Selasar Penyambung Antar Bangunan Kantor UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17744012 | 52649203 | 15,000,000 | 14,985,000 | 14,974,001 | 14,974,001 | 14,518,800 | 0 | 0 | 0 | 2024-10-16 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 25,999 | 0.17 % | |
326 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Apartemen Ayam Petelur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17593012 | 52123179 | 99,999,427 | 99,900,000 | 99,589,200 | 99,589,200 | 99,456,000 | 99,456,000 | 99,456,000 | 99,456,000 | 2024-08-13 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 410,227 | 0.41 % | |
327 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Rehabilitasi Rumah Dinas Guru SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17377012 | 51399443 | 30,000,000 | 30,000,000 | 29,942,000 | 29,942,000 | 29,942,000 | 29,942,000 | 29,942,000 | 29,942,000 | 2024-06-26 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 58,000 | 0.19 % | |
328 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer,Bahasa SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15928012 | 50545329 | 55,158,000 | 55,158,000 | 55,102,500 | 55,102,500 | 55,102,500 | 55,102,500 | 55,102,500 | 55,102,500 | 2024-04-01 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 55,500 | 0.1 % | |
329 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17673012 | 52610463 | 30,000,000 | 30,000,000 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 2024-09-26 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 49,980 | 0.17 % | |
330 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Asrama | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17791012 | 52993020 | 21,780,000 | 21,779,310 | 21,467,400 | 21,467,400 | 21,467,400 | 0 | 0 | 0 | 2024-10-18 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 312,600 | 1.44 % | |
331 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Fisika,Kimia,Biologi SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16073012 | 50546630 | 94,005,000 | 94,005,000 | 93,838,500 | 93,838,500 | 93,838,500 | 93,838,500 | 93,838,500 | 93,838,500 | 2024-05-06 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 166,500 | 0.18 % | |
332 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 4 Palangka Raya (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. Tata Usaha) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15798012 | 50408911 | 56,921,800 | 56,921,800 | 56,110,500 | 56,110,500 | 56,110,500 | 56,110,500 | 0 | 56,110,500 | 2024-03-15 | 811,300 | 1.43 % | |||
333 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN TOILET WAJIB PAJAK UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15764012 | 49250209 | 17,204,500 | 17,105,100 | 16,994,100 | 16,994,100 | 16,572,300 | 16,572,300 | 16,572,300 | 16,572,300 | 2024-03-15 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 210,400 | 1.22 % | |
334 | 2024 | Biro Pengadaan Barang dan Jasa | Pembuatan Aplikasi Pengukuran Kinerja (PMM) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15736012 | 50300490 | 52,500,000 | 52,247,700 | 52,247,700 | 52,247,700 | 52,247,700 | 52,247,700 | 100 | 52,247,700 | 2024-04-02 | cv anugerah hebat jaya | 39.143.156.6-711.000 | 252,300 | 0.48 % | |
335 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer SMK NEGERI 1 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17408012 | 51197400 | 18,440,000 | 18,440,000 | 18,386,720 | 18,386,720 | 18,386,720 | 18,386,720 | 18,386,720 | 18,386,720 | 2024-06-27 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 53,280 | 0.29 % | |
336 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI RUANGAN LANTAI 1 DAN RUANGAN SEKRETARIAT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15742012 | 49833275 | 88,424,000 | 88,402,758 | 88,236,259 | 88,236,259 | 87,470,359 | 87,470,359 | 87,470,359 | 87,470,359 | 2024-03-11 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 187,741 | 0.21 % | |
337 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Jasa Konsultansi Pengawasan - Pengawasan Rehab Ruang Rapat Direksi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17704012 | 52174254 | 6,000,000 | 6,000,000 | 5,900,000 | 5,900,000 | 5,794,200 | 0 | 0 | 0 | 2024-10-18 | 100,000 | 1.67 % | |||
338 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Rehab Aula SMAN 1 Kurun (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16178012 | 51458384 | 30,000,000 | 30,000,000 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 2024-05-22 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 88,800 | 0.3 % | |
339 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Kolam Renang Isen Mulang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15682012 | 46855724 | 35,000,000 | 34,956,000 | 34,810,821 | 34,810,821 | 34,810,821 | 34,810,821 | 34,810,821 | 34,810,821 | 2024-01-11 | CV. KRUF STUDIO ENGINEERING | 81.075.394.7-711.000 | 189,179 | 0.54 % | |
340 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Lab IPA SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15957012 | 50727320 | 45,500,000 | 45,500,000 | 45,432,000 | 45,432,000 | 45,432,000 | 45,432,000 | 0 | 45,432,000 | 2024-04-19 | 68,000 | 0.15 % | |||
341 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15987012 | 51422947 | 70,678,000 | 70,678,000 | 69,796,800 | 69,796,800 | 69,796,800 | 69,796,800 | 68,796,800 | 69,796,800 | 2024-04-19 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 881,200 | 1.25 % | |
342 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Implementasi Dokumen SSK 1 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15710012 | 47521033 | 80,000,000 | 80,000,000 | 79,997,700 | 79,997,700 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | hanyang tiup | 79.562.938.5-711.000 | 2,300 | 0 % | |
343 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan Halaman Sekolah SMKN 2 Kasongan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16042012 | 51010394 | 34,500,000 | 34,500,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 2024-05-06 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 111,000 | 0.32 % | |
344 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17232012 | 51737627 | 37,940,000 | 37,940,000 | 37,718,000 | 37,718,000 | 37,718,000 | 37,718,000 | 0 | 37,718,000 | 2024-05-30 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 222,000 | 0.59 % | |
345 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya -Rehab Kantor Ruang Penyusunan Program | Pengadaan Langsung | Pekerjaan Konstruksi | 17901012 | 53355495 | 199,000,000 | 199,000,000 | 198,861,287 | 198,861,287 | 197,802,000 | 0 | 0 | 0 | 2024-11-08 | CV. Bersama | 86.206.156.1-711.000 | 138,713 | 0.07 % | |
346 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17480012 | 51851882 | 38,460,000 | 38,460,000 | 38,016,000 | 38,016,000 | 38,016,000 | 38,016,000 | 38,016,000 | 38,016,000 | 2024-07-15 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 444,000 | 1.15 % | |
347 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Renovasi Screen House di UPT BPPBTPH Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17881012 | 52434073 | 20,140,000 | 20,095,000 | 19,955,859 | 19,955,859 | 19,787,859 | 19,787,859 | 19,787,859 | 19,787,859 | 2024-11-06 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 184,141 | 0.91 % | |
348 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Instalasi Air Bersih (Grenteng) Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16111012 | 50581302 | 29,881,500 | 29,881,500 | 29,770,200 | 29,770,200 | 29,625,900 | 29,625,900 | 29,625,900 | 29,625,900 | 2024-05-15 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 111,300 | 0.37 % | |
349 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Modal Kursi Tunggu Pasien dan Lemari Besi Arsip Cabinet | Pengadaan Langsung | Pengadaan Barang | 15992012 | 49708318 | 141,046,830 | 140,000,000 | 111,000,000 | 111,000,000 | 89,500,000 | 89,500,000 | 89,500,000 | 89,500,000 | 2024-04-24 | CV.KARYA DAJABA PUTRA | 02.978.026.9-711.000 | 30,046,830 | 21.3 % | |
350 | 2024 | Dinas Perhubungan | Rehabilitasi Dermaga Jabiren di Kabupaten Pulang Pisau | Pengadaan Langsung | Pekerjaan Konstruksi | 16124012 | 51275788 | 165,803,875 | 165,800,000 | 165,700,000 | 165,700,000 | 165,533,500 | 165,533,500 | 0 | 165,533,500 | 2024-05-17 | CV. DALANJEMBAR KARYAMARGA | 96.735.790.6-711.000 | 103,875 | 0.06 % | |
351 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17534012 | 51852198 | 83,750,000 | 83,750,000 | 83,581,300 | 83,581,300 | 83,581,300 | 83,581,300 | 83,581,300 | 83,581,300 | 2024-07-25 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 168,700 | 0.2 % | |
352 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Perencanaan Pembangunan Jaringan Instalasi Air Bersih | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16002012 | 51390485 | 50,000,000 | 49,900,000 | 49,206,300 | 49,206,300 | 44,599,800 | 44,599,800 | 44,599,800 | 44,599,800 | 2024-05-03 | CV. Bukit Indah Konsultan | 12.843.721.7-711.000 | 793,700 | 1.59 % | |
353 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Penataan Halaman dan Paving SMAN 1 Kapuas Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15960012 | 50729105 | 100,000,000 | 99,570,000 | 99,300,000 | 99,300,000 | 99,300,000 | 99,300,000 | 0 | 99,300,000 | 2024-04-05 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 700,000 | 0.7 % | |
354 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15753012 | 50372749 | 61,980,700 | 61,980,700 | 61,383,000 | 61,383,000 | 61,383,000 | 61,383,000 | 0 | 61,383,000 | 2024-03-13 | 597,700 | 0.96 % | |||
355 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Lab. Komputer, Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15788012 | 50392659 | 54,735,800 | 54,735,800 | 54,700,800 | 54,700,800 | 54,700,800 | 54,700,800 | 0 | 54,700,800 | 2024-03-15 | CV. PENDANG JAYA RAYA ENGINEERING | 01.662.432.2-711.000 | 35,000 | 0.06 % | |
356 | 2024 | Badan Pendapatan Daerah | Perencanaan Semenisasi Halaman Kantor UPTPPD Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17649012 | 52495135 | 34,246,500 | 25,974,000 | 25,863,000 | 25,863,000 | 25,130,400 | 25,130,400 | 25,130,400 | 25,130,400 | 2024-09-13 | 8,383,500 | 24.48 % | |||
357 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 6 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17289012 | 51240545 | 30,927,300 | 30,927,300 | 30,902,400 | 30,902,400 | 30,902,400 | 30,902,400 | 30,902,400 | 30,902,400 | 2024-06-10 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 24,900 | 0.08 % | |
358 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Sarana dan Prasarana UPT. KPHP Barito Hulu dan UPT. KPHP Barito Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17720012 | 52840856 | 65,861,000 | 65,860,900 | 65,590,899 | 65,590,899 | 64,838,630 | 0 | 0 | 0 | 2024-10-10 | 270,101 | 0.41 % | |||
359 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Pembinaan dan Evaluasi Kinerja Infrastruktur Air Minum di Provinsi Kalimantan Tengah 2 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15713012 | 47521029 | 80,000,000 | 80,000,000 | 79,986,600 | 79,986,600 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | Erinstia Gustanty | 90.746.165.1-711.000 | 13,400 | 0.02 % | |
360 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17350012 | 51238222 | 33,757,000 | 33,757,000 | 33,300,000 | 33,300,000 | 33,300,000 | 33,300,000 | 33,300,000 | 33,300,000 | 2024-06-26 | 457,000 | 1.35 % | |||
361 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Rehabilitasi Pagar, WC dan Penataan Halaman di Graha Tani Serta Serana Pendukung Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17619012 | 52143328 | 8,000,000 | 8,000,000 | 7,925,400 | 7,925,400 | 7,636,800 | 7,636,800 | 7,636,800 | 7,636,800 | 2024-08-29 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 74,600 | 0.93 % | |
362 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15765012 | 49208240 | 42,900,000 | 42,818,250 | 42,390,900 | 42,390,900 | 41,785,950 | 41,785,950 | 41,785,950 | 41,785,950 | 2024-03-28 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 509,100 | 1.19 % | |
363 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Bimbingan Konseling(BK) SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17528012 | 51358678 | 12,080,000 | 12,080,000 | 12,030,000 | 12,030,000 | 12,030,000 | 12,030,000 | 12,030,000 | 12,030,000 | 2024-07-25 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 50,000 | 0.41 % | |
364 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan Halaman Sekolah SMKN 1 Kapuas Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16162012 | 51427255 | 34,500,000 | 34,500,000 | 34,443,000 | 34,443,000 | 34,443,000 | 34,443,000 | 34,443,000 | 34,443,000 | 2024-05-22 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 57,000 | 0.17 % | |
365 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Kandang Ayam Kalper Pada Kegiatan Pengembangan Ayam Kalimantan Super (Kalper) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17576012 | 52123240 | 19,856,250 | 19,856,250 | 19,602,600 | 19,602,600 | 19,175,250 | 19,175,250 | 19,175,250 | 19,175,250 | 2024-08-06 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 253,650 | 1.28 % | |
366 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Bangunan Gedung - Rehab Ruang Rapat Direksi | Pengadaan Langsung | Pekerjaan Konstruksi | 17703012 | 52174260 | 100,000,000 | 100,000,000 | 99,950,000 | 99,950,000 | 98,500,000 | 0 | 0 | 0 | 2024-10-18 | 50,000 | 0.05 % | |||
367 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Pemeliharaan berupa Pengecatan Bangunan Gedung Admin RSUD dr. Doris Sylvanus | Pengadaan Langsung | Pekerjaan Konstruksi | 17488012 | 51985664 | 200,000,000 | 199,966,700 | 199,578,250 | 199,578,250 | 199,284,000 | 199,284,000 | 199,284,000 | 199,284,000 | 2024-07-25 | CV. GATRA MEGAH | 90.383.566.8-711.000 | 421,750 | 0.21 % | |
368 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Perencanaan Pabrik es | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16036012 | 51493310 | 139,920,000 | 99,992,600 | 99,678,000 | 99,678,000 | 99,600,000 | 99,600,000 | 100 | 99,600,000 | 2024-04-29 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 40,242,000 | 28.76 % | |
369 | 2024 | Dinas Perhubungan | Pengawasan Penanganan Lokasi Rawan Kecelakaan (LRK) Ruas Jalan Provinsi Kalimantan Tengah di Kota Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17621012 | 51282246 | 35,000,000 | 35,000,000 | 34,984,980 | 34,984,980 | 34,984,980 | 34,984,980 | 34,984,980 | 34,984,980 | 2024-08-29 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 15,020 | 0.04 % | |
370 | 2024 | Dinas Kehutanan | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15735012 | 49887470 | 45,275,000 | 45,275,000 | 45,177,000 | 45,177,000 | 44,899,500 | 44,899,500 | 44,899,500 | 44,899,500 | 2024-02-28 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 98,000 | 0.22 % | |
371 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Jalan Produksi/Jalan Usaha Tani di IPB Basarang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17773012 | 52970977 | 8,026,240 | 8,026,240 | 7,992,000 | 7,992,000 | 7,925,400 | 7,925,400 | 7,925,400 | 7,925,400 | 2024-10-17 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 34,240 | 0.43 % | |
372 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Mushola Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17754012 | 52365991 | 30,000,000 | 30,000,000 | 29,879,158 | 29,879,158 | 29,870,100 | 0 | 0 | 0 | 2024-10-23 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 120,842 | 0.4 % | |
373 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor dan Bangunan Lainnya -Parkiran | Pengadaan Langsung | Pekerjaan Konstruksi | 17903012 | 53355960 | 79,550,000 | 79,550,000 | 79,289,000 | 79,289,000 | 79,198,500 | 0 | 0 | 0 | 2024-11-08 | CV CIPTA KREASI MEMBANGUN | 86.329.963.2-711.000 | 261,000 | 0.33 % | |
374 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Toilet (Jamban)6 Ruang beserta sanitasinya SMK NEGERI 2 PALANGKARAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17414012 | 51198661 | 24,800,000 | 24,800,000 | 24,746,720 | 24,746,720 | 24,746,720 | 24,746,720 | 24,746,720 | 24,746,720 | 2024-06-27 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 53,280 | 0.21 % | |
375 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16085012 | 49488011 | 7,049,000 | 7,049,000 | 7,015,200 | 7,015,200 | 7,015,200 | 7,015,200 | 0 | 7,015,200 | 2024-05-07 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 33,800 | 0.48 % | |
376 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Pembangunan Sarana dan Prasarana pada UPT. KPHP Mentaya Tengah Seruyan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17639012 | 52224975 | 34,664,000 | 34,663,900 | 34,609,800 | 34,609,800 | 31,185,450 | 0 | 0 | 0 | 2024-09-10 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 54,200 | 0.16 % | |
377 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 1 Sanaman Mantikei | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17669012 | 52610279 | 20,000,000 | 20,000,000 | 19,957,800 | 19,957,800 | 19,957,800 | 19,957,800 | 19,957,800 | 19,957,800 | 2024-09-26 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 42,200 | 0.21 % | |
378 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pekerjaan Peningkatan Jalan dan Drainase UPT BBPHMT Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17758012 | 52365959 | 100,000,000 | 100,000,000 | 99,789,000 | 99,789,000 | 99,789,000 | 0 | 0 | 0 | 2024-10-21 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 211,000 | 0.21 % | |
379 | 2024 | Dinas Kelautan dan Perikanan | 3.25.03.1.01.06. 5.2.03.01.01.0001 Redesain DED Pembangunan PP Kuala Jelai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15679012 | 46761398 | 100,000,000 | 96,043,960 | 94,611,960 | 94,611,960 | 94,000,000 | 94,000,000 | 100 | 94,000,000 | 2024-01-09 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 5,388,040 | 5.39 % | |
380 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Tamiyang Layang (Rehabilitasi Rg. Kelas, Pembangunan Rg. BK ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15833012 | 50384620 | 86,224,700 | 86,224,700 | 86,199,048 | 86,199,048 | 86,199,048 | 86,199,048 | 0 | 86,199,048 | 2024-03-21 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 25,652 | 0.03 % | |
381 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Fisika,Laboratorium Kimia,Laboratorium Biologi SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17527012 | 51358755 | 95,290,000 | 95,290,000 | 95,238,000 | 95,238,000 | 95,238,000 | 95,238,000 | 95,238,000 | 95,238,000 | 2024-07-25 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 52,000 | 0.05 % | |
382 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehabilitasi Ruang Kelas (16 Ruang) dengan tingkat kerusakan minimal sedang SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15872012 | 50538093 | 100,000,000 | 99,900,000 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 99,800,000 | 2024-03-25 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 200,000 | 0.2 % | |
383 | 2024 | Dinas Energi dan Sumber Daya Mineral | Pemeliharaan/Rehabilitasi Sarana dan Prasarana Gedung Kantor atau Bangunan Lainnya -Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16032012 | 48888460 | 100,700,000 | 95,000,000 | 94,550,000 | 94,550,000 | 94,078,050 | 94,078,050 | 94,078,050 | 94,078,050 | 2024-04-29 | 6,150,000 | 6.11 % | |||
384 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet (Jamban) SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15926012 | 50394656 | 4,078,350 | 4,078,350 | 4,050,600 | 4,050,600 | 4,050,600 | 4,050,600 | 4,050,600 | 4,050,600 | 2024-04-01 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 27,750 | 0.68 % | |
385 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Rehab/Rehabilitasi Bangunan Laboratorium UPT BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17422012 | 51460051 | 45,275,000 | 45,275,000 | 45,200,000 | 45,200,000 | 45,189,765 | 45,189,765 | 45,189,765 | 45,189,765 | 2024-06-29 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 75,000 | 0.17 % | |
386 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Koridor Penghubung bangunan SMAN 2 Kasongan (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16136012 | 51398736 | 29,900,000 | 29,900,000 | 29,881,200 | 29,881,200 | 29,881,200 | 29,881,200 | 29,500,000 | 29,881,200 | 2024-05-22 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 18,800 | 0.06 % | |
387 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana dan Prasarana UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16202012 | 51716219 | 58,110,000 | 58,109,832 | 57,804,360 | 57,804,360 | 57,138,360 | 57,138,360 | 57,138,360 | 57,138,360 | 2024-06-04 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 305,640 | 0.53 % | |
388 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya UPT Taman Budaya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17788012 | 52473132 | 97,818,000 | 97,500,180 | 97,347,000 | 97,347,000 | 97,014,000 | 0 | 0 | 0 | 2024-10-21 | GEO DINAMIKA UTAMA | 01.576.437.6-711.000 | 471,000 | 0.48 % | |
389 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Pagar UPT.KPHP Katingan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17607012 | 52224947 | 73,962,000 | 73,961,900 | 73,818,330 | 73,818,330 | 71,819,664 | 71,819,664 | 71,819,664 | 71,819,664 | 2024-08-26 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 143,670 | 0.19 % | |
390 | 2024 | KPHP MURUNG RAYA | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Kandang Sapi - Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17581012 | 49970562 | 28,620,000 | 28,544,400 | 28,489,000 | 28,489,000 | 28,194,000 | 28,194,000 | 28,194,000 | 28,194,000 | 2024-08-07 | 131,000 | 0.46 % | |||
391 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Perencanaan Pagar Kantor UPT Lab. Bahan Konstruksi Palangka Raya dan Pagar Rujab DPUPR di Jl. Muhammad Wongso Kab. Kobar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15759012 | 49800590 | 65,048,000 | 65,048,000 | 64,500,000 | 64,500,000 | 64,500,000 | 0 | 0 | 0 | 2024-03-15 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 548,000 | 0.84 % | |
392 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15763012 | 49205578 | 13,582,500 | 13,505,000 | 13,331,100 | 13,331,100 | 13,064,700 | 13,064,700 | 13,064,700 | 13,064,700 | 2024-03-22 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 251,400 | 1.85 % | |
393 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Pembangunan Musola) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17257012 | 51467121 | 125,000,000 | 15,000,000 | 14,874,000 | 14,874,000 | 14,874,000 | 14,874,000 | 0 | 14,874,000 | 2024-06-11 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 110,126,000 | 88.1 % | |
394 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Kuala Kurun (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16183012 | 51238721 | 38,197,800 | 38,197,800 | 38,197,000 | 38,197,000 | 38,197,000 | 38,197,000 | 0 | 38,197,000 | 2024-05-22 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 800 | 0 % | |
395 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pagar SMAN 1 Dusun Tengah Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16014012 | 51398178 | 75,000,000 | 75,000,000 | 75,000,000 | 75,000,000 | 75,000,000 | 75,000,000 | 75,000,000 | 75,000,000 | 2024-04-25 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 0 | 0 % | |
396 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN GEDUNG ARSIP UPTPPD PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17574012 | 49697035 | 49,578,312 | 49,428,300 | 49,417,200 | 49,417,200 | 49,189,650 | 49,189,650 | 49,189,650 | 49,189,650 | 2024-08-05 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 161,112 | 0.32 % | |
397 | 2024 | Inspektorat | Belanja Paket Kegiatan Rapat Koordinasi Pelaksanaan Perluasan Percontohan Desa Antikorupsi 2024 | Pengadaan Langsung | Jasa Lainnya | 17741012 | 52874358 | 159,944,000 | 157,252,000 | 156,390,000 | 156,390,000 | 154,240,000 | 0 | 0 | 0 | 2024-10-15 | SANTINILUWANSA PROPERTI INDONESIA, PT | 02.882.048.8-711.001 | 3,554,000 | 2.22 % | |
398 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Modal Kursi Rapat, Kursi Lipat, Meja Konseling, Meja Pantry Instalasi Gizi dan Sofa | Pengadaan Langsung | Pengadaan Barang | 15993012 | 49708316 | 154,462,870 | 149,850,000 | 148,753,875 | 148,753,875 | 128,760,000 | 128,760,000 | 128,760,000 | 128,760,000 | 2024-04-22 | 5,708,995 | 3.7 % | |||
399 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Dusun Utara (Pembangunan Ruang Kelas Baru (RKB) 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17266012 | 51153272 | 38,962,100 | 38,962,100 | 38,895,510 | 38,895,510 | 38,895,510 | 38,895,510 | 38,895,510 | 38,895,510 | 2024-06-05 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 66,590 | 0.17 % | |
400 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pembangunan Pembangunan Ruang Kelas Baru SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17505012 | 52082476 | 59,036,400 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,250 | 59,024,000 | 59,024,250 | 2024-07-18 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 12,150 | 0.02 % | |
401 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan WC 2 Unit SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15904012 | 50767507 | 26,000,000 | 26,000,000 | 25,900,000 | 25,900,000 | 25,900,000 | 25,900,000 | 0 | 25,900,000 | 2024-03-28 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 100,000 | 0.38 % | |
402 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana Prasarana UPT. KPHP Kahayan Hilir, UPT.KPHP Barito Hulu dan UPT.KPHP Murung Raya - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17225012 | 51760481 | 74,199,000 | 74,198,949 | 74,087,000 | 74,087,000 | 73,356,570 | 73,356,570 | 73,356,570 | 73,356,570 | 2024-06-04 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 112,000 | 0.15 % | |
403 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI GEDUNG KANTOR LAMA UPTPPD KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16025012 | 49824737 | 64,925,000 | 64,924,973 | 64,800,000 | 64,800,000 | 64,265,485 | 64,265,485 | 64,265,485 | 64,265,485 | 2024-05-01 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 125,000 | 0.19 % | |
404 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Rehab 4 Ruang kelas dan Kantor SMAN 1 Tumpung Laung (Montalat Barut) - SMAN 1 Montallat (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15880012 | 50726945 | 64,000,000 | 64,000,000 | 63,833,500 | 63,833,500 | 63,833,500 | 63,833,500 | 0 | 63,833,500 | 2024-04-03 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 166,500 | 0.26 % | |
405 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Samuda Kecil Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15675012 | 46521768 | 160,000,000 | 160,000,000 | 159,898,545 | 159,898,545 | 159,808,721 | 159,800,000 | 0 | 159,800,000 | 2024-01-05 | CV. HALAJUR BATUAH | 95.382.560.1-711.000 | 101,455 | 0.06 % | |
406 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet (Jamban) dan Rehab Ruang Kelas (4 Ruang)SMKN 1 Banama Tingang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16172012 | 51424256 | 70,400,000 | 70,400,000 | 70,222,400 | 70,222,400 | 70,222,400 | 70,222,400 | 70,222,400 | 70,222,400 | 2024-05-22 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 177,600 | 0.25 % | |
407 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17795012 | 52993381 | 21,725,000 | 21,724,920 | 21,528,450 | 21,528,450 | 21,528,450 | 0 | 0 | 0 | 2024-10-18 | 196,550 | 0.9 % | |||
408 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Rungan Barat (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16179012 | 51238795 | 29,042,000 | 29,042,000 | 28,860,000 | 28,860,000 | 28,860,000 | 28,860,000 | 0 | 28,860,000 | 2024-05-22 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 182,000 | 0.63 % | |
409 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Aula SMAN 1 Tanah Siang Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15964012 | 50730047 | 63,000,000 | 63,000,000 | 62,500,000 | 62,500,000 | 62,500,000 | 62,500,000 | 0 | 62,500,000 | 2024-04-05 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 500,000 | 0.79 % | |
410 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Jaringan Listrik - Belanja Instalasi Listrik Lab Kultur, UPS Linae dan OK IBS Kamar 1 | Pengadaan Langsung | Jasa Lainnya | 17471012 | 51999713 | 120,000,000 | 119,449,500 | 118,392,933 | 118,392,933 | 118,298,250 | 118,298,250 | 118,298,250 | 118,298,250 | 2024-08-15 | CV.ANAIS TEKNIK | 02.292.605.9-711.000 | 1,607,067 | 1.34 % | |
411 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Pagar dan Penataan Halaman Sekolah SMK NEGERI 2 KUMAI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16164012 | 51425463 | 34,500,000 | 34,500,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 34,389,000 | 2024-05-22 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.32 % | |
412 | 2024 | Dinas Komunikasi, Informatika, Persandian dan Statistik | Beban Jasa Iklan/Reklame, Film, dan Pemotretan | Pengadaan Langsung | Jasa Lainnya | 17303012 | 51843674 | 200,000,000 | 195,000,000 | 194,871,546 | 194,871,546 | 194,161,200 | 194,161,200 | 194,161,200 | 194,161,200 | 2024-06-19 | Maeztro Production | 80.107.943.5-711.000 | 5,128,454 | 2.56 % | |
413 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Rehabilitasi Pagar Gedung Juang Jl. Seth Adji | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17468012 | 52043965 | 25,000,000 | 24,979,423 | 24,784,080 | 24,784,080 | 24,513,795 | 24,513,795 | 24,513,795 | 24,513,795 | 2024-07-11 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 215,920 | 0.86 % | |
414 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Redesain Pengurukan Shrimp Estate | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17892012 | 53271079 | 100,000,000 | 100,000,000 | 99,400,500 | 99,400,500 | 98,000,000 | 98,000,000 | 98,000,000 | 98,000,000 | 2024-11-07 | 599,500 | 0.6 % | |||
415 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Kotawaringin Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15988012 | 51422982 | 69,267,000 | 69,267,000 | 68,378,220 | 68,378,220 | 68,376,000 | 68,376,000 | 68,376,000 | 68,376,000 | 2024-04-19 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 888,780 | 1.28 % | |
416 | 2024 | Dinas Pendidikan | JASA KONSULTANSI PERENCANAAN PERBAIKAN PAGAR, LANTAI, DAN PENGECATAN PADA GEDUNG HUMA BERKAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17583012 | 52203886 | 45,000,000 | 45,000,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 2024-08-09 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 50,000 | 0.11 % | |
417 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 3 Ruang SMAS Muhammadiyah Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15809012 | 50773982 | 85,000,000 | 85,000,000 | 84,693,000 | 84,693,000 | 84,693,000 | 84,693,000 | 0 | 84,693,000 | 2024-03-21 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 307,000 | 0.36 % | |
418 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pos jaga SMAN 6 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16128012 | 51458621 | 6,000,000 | 6,000,000 | 5,955,000 | 5,955,000 | 5,955,000 | 5,955,000 | 5,955,000 | 5,955,000 | 2024-05-16 | 45,000 | 0.75 % | |||
419 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Rehabilitasi Rumah Dinas Guru SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15898012 | 50767109 | 35,000,000 | 35,000,000 | 34,942,800 | 34,942,800 | 34,942,800 | 34,942,800 | 0 | 34,942,800 | 2024-03-28 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 57,200 | 0.16 % | |
420 | 2024 | Dinas Sosial | Perencanaan Rehabilitasi Gedung Kantor Dinas Sosial Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15766012 | 49514044 | 68,900,000 | 68,890,000 | 68,300,206 | 68,300,206 | 68,055,781 | 68,055,781 | 68,055,781 | 68,055,781 | 2024-04-17 | CV. DAKSA RESWARA PRAKASA | 65.529.585.5-711.000 | 599,794 | 0.87 % | |
421 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembuatan pagar dan penataan halaman sekolah SMAN 1 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15882012 | 50729322 | 77,000,000 | 77,000,000 | 76,956,300 | 76,956,300 | 76,956,300 | 76,956,300 | 0 | 76,956,300 | 2024-03-28 | Roa Solution | 92.337.883.0-711.000 | 43,700 | 0.06 % | |
422 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawas Pembangunan Gedung Laboratorium Pada Kegiatan Pembangunan Pabrik Pakan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17677012 | 52276297 | 17,738,250 | 17,692,567 | 17,635,958 | 17,635,958 | 17,623,470 | 17,623,470 | 17,623,470 | 17,623,470 | 2024-10-04 | 102,293 | 0.58 % | |||
423 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17573012 | 49720303 | 7,942,500 | 7,941,499 | 7,850,000 | 7,850,000 | 7,425,900 | 7,425,900 | 7,425,900 | 7,425,900 | 2024-08-05 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 92,500 | 1.16 % | |
424 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Mess UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16201012 | 51460907 | 81,213,000 | 81,212,928 | 80,766,930 | 80,766,930 | 79,268,430 | 79,268,430 | 79,268,430 | 79,268,430 | 2024-06-04 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 446,070 | 0.55 % | |
425 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Penataan Halaman dan Pagar SMAN 1 Kahayan Kuala (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15837012 | 50773215 | 79,000,000 | 79,000,000 | 78,839,193 | 78,839,193 | 78,839,193 | 78,839,193 | 0 | 78,839,193 | 2024-03-21 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 160,807 | 0.2 % | |
426 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Kantin, Ruang Pembelajaran Khusus, Ruang Guru, Ruang Kepala Sekolah SLBN 1 Kuala Pembuang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17340012 | 51911549 | 39,061,030 | 39,061,030 | 38,988,750 | 38,988,750 | 38,988,750 | 38,988,750 | 0 | 38,988,750 | 2024-07-01 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 72,280 | 0.19 % | |
427 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0018 Pengawasan Rehab Dinding Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17842012 | 53100034 | 27,950,000 | 27,950,000 | 27,897,000 | 27,897,000 | 27,500,000 | 27,500,000 | 27,500,000 | 27,500,000 | 2024-10-30 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 53,000 | 0.19 % | |
428 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Jembatan di Lokasi RTR & RMP | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17295012 | 49360210 | 25,000,000 | 24,990,000 | 24,934,763 | 24,934,763 | 24,767,430 | 24,767,430 | 24,767,430 | 24,767,430 | 2024-06-12 | 65,238 | 0.26 % | |||
429 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PENATAAN HALAMAN BELAKANG UPTPPD MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17599012 | 49722722 | 36,000,000 | 35,853,000 | 35,520,000 | 35,520,000 | 34,698,600 | 34,698,600 | 34,698,600 | 34,698,600 | 2024-08-14 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 480,000 | 1.33 % | |
430 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Supervisi Rehabilitasi Jaringan Irigasi D.I.R. Maliku Baru Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15694012 | 46342586 | 100,000,000 | 100,000,000 | 99,822,300 | 99,822,300 | 99,783,450 | 99,783,450 | 0 | 99,783,450 | 2024-02-07 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 177,700 | 0.18 % | |
431 | 2024 | Dinas Kesehatan | Pemeliharaan Gedung Bapelkes | Pengadaan Langsung | Pekerjaan Konstruksi | 16048012 | 51483550 | 50,000,000 | 49,999,623 | 49,758,187 | 49,629,210 | 49,629,210 | 49,629,210 | 49,629,210 | 49,629,210 | 2024-05-03 | CV. SAMA SAMA SATIA | 66.550.544.2-711.000 | 241,813 | 0.48 % | |
432 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pagar dan Penataan Halaman SMAN 1 Sepang (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15831012 | 50727206 | 79,000,000 | 79,000,000 | 78,865,500 | 78,865,500 | 78,865,500 | 78,865,500 | 0 | 78,865,500 | 2024-03-21 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 134,500 | 0.17 % | |
433 | 2024 | Badan Keuangan dan Aset Daerah | Penyusunan Standar Satuan Harga Tahun 2025 (Murni) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16119012 | 51645264 | 100,000,000 | 100,000,000 | 99,933,400 | 99,933,400 | 99,666,900 | 99,666,900 | 99,666,900 | 99,666,900 | 2024-05-21 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 66,600 | 0.07 % | |
434 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN BAK SAMPAH DAN SEPTICTANK UPTPPD PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17523012 | 49189038 | 7,537,500 | 7,536,345 | 7,477,515 | 7,477,515 | 7,113,657 | 7,113,657 | 7,113,657 | 7,113,657 | 2024-07-22 | ROTASI DESIGN CONSULTANT | 90.011.802.7-711.000 | 59,985 | 0.8 % | |
435 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Dusun Utara (Pembangunan Ruang Kelas Baru (RKB) 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15838012 | 50376938 | 55,268,700 | 55,268,700 | 54,898,269 | 54,898,269 | 54,898,269 | 54,898,269 | 0 | 54,898,269 | 2024-03-21 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 370,431 | 0.67 % | |
436 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Jasa Konsultansi Pengawasan Renovasi Aula Kantor Dinas Penanaman Modal dan PTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17514012 | 52090410 | 74,699,000 | 74,592,000 | 74,370,000 | 74,370,000 | 72,138,900 | 72,138,900 | 0 | 72,138,900 | 2024-07-23 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 329,000 | 0.44 % | |
437 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS PGRI 2 Sampit (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17325012 | 51239650 | 40,702,300 | 40,701,480 | 40,645,980 | 40,645,980 | 40,645,980 | 40,645,980 | 40,645,980 | 40,645,980 | 2024-06-19 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 56,320 | 0.14 % | |
438 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Unit Tahai Kabupaten Pulang Pisau | Pengadaan Langsung | Pekerjaan Konstruksi | 15684012 | 46525184 | 170,000,000 | 170,000,000 | 169,870,963 | 169,870,963 | 169,770,294 | 169,770,000 | 0 | 169,770,000 | 2024-01-18 | Anugrah Karya Perkasa | 80.202.544.5-711.000 | 129,038 | 0.08 % | |
439 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Peningkatan Jalan Gang Veteran dan Sekitarnya, Desa Cempaka Mulia Barat, Kecamatan Cempaga, Kabupaten Kotawaringin Timur, Provinsi Kalimantan Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 16114012 | 49607540 | 186,400,000 | 186,399,000 | 186,098,424 | 186,098,424 | 185,916,000 | 185,916,000 | 100 | 185,916,000 | 2024-05-20 | CV GATRA MEGA | 02.676.179.1-711.000 | 301,576 | 0.16 % | |
440 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Tewah (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16087012 | 51238943 | 42,205,600 | 42,205,600 | 42,000,000 | 42,000,000 | 42,000,000 | 42,000,000 | 0 | 42,000,000 | 2024-05-07 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 205,600 | 0.49 % | |
441 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (PERENCANAAN PENGASPALAN JALAN LINGKUNGAN KANTOR BPB-PK) | Pengadaan Langsung | Jasa Lainnya | 10026922000 | 53444696 | 202,500,000 | 99,064,725 | 98,124,000 | 98,124,000 | 97,236,000 | 0 | 0 | 0 | 2024-12-16 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 104,376,000 | 51.54 % | |
442 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan WC SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17691012 | 52093722 | 10,000,000 | 9,333,435 | 9,333,435 | 9,333,435 | 9,333,435 | 9,333,435 | 9,333,435 | 9,333,435 | 2024-10-01 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 666,565 | 6.67 % | |
443 | 2024 | Dinas Ketahanan Pangan | Rehab Ringan Bangunan Gedung Kantor Pasca Kebakaran | Pengadaan Langsung | Pekerjaan Konstruksi | 17889012 | 53208927 | 166,320,000 | 166,319,000 | 165,322,941 | 165,320,000 | 162,960,000 | 162,960,000 | 162,960,000 | 162,960,000 | 2024-11-08 | CV. TRIPLE ANTANG PERKASA | 39.271.587.6-711.000 | 997,059 | 0.6 % | |
444 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS SMK NEGERI 1 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17409012 | 51197813 | 7,780,000 | 7,780,000 | 7,735,600 | 7,735,600 | 7,735,600 | 7,735,600 | 7,735,600 | 7,735,600 | 2024-06-27 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 44,400 | 0.57 % | |
445 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17489012 | 51213926 | 25,670,000 | 25,670,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 2024-07-15 | Roa Solution | 92.337.883.0-711.000 | 29,000 | 0.11 % | |
446 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Fisika SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17314012 | 51588012 | 33,027,000 | 33,027,000 | 32,950,000 | 32,950,000 | 32,950,000 | 32,950,000 | 32,950,000 | 32,950,000 | 2024-06-13 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 77,000 | 0.23 % | |
447 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab WC | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17868012 | 53276934 | 5,523,000 | 5,523,000 | 5,494,500 | 5,494,500 | 5,494,500 | 0 | 0 | 0 | 2024-11-04 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 28,500 | 0.52 % | |
448 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Pembangunan Hutan Kota Barito Timur - Pembangunan Hutan Kota di Luar Kawasan Hutan Negara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15720012 | 50109531 | 139,920,000 | 99,985,470 | 99,850,000 | 99,850,000 | 99,238,995 | 99,238,995 | 99,238,995 | 99,238,995 | 2024-02-26 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 40,070,000 | 28.64 % | |
449 | 2024 | Biro Umum | Pengadaan Sofa Jati Ukir Istana Isen Mulang | Pengadaan Langsung | Pengadaan Barang | 17801012 | 53055414 | 159,840,000 | 145,454,400 | 145,188,000 | 145,188,000 | 144,189,000 | 0 | 0 | 0 | 2024-10-28 | CV. GEMILANG BESARI | 60.473.968.0-711.000 | 14,652,000 | 9.17 % | |
450 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Tewah (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15778012 | 50388665 | 59,899,700 | 59,899,700 | 59,899,700 | 59,899,700 | 59,899,700 | 59,899,700 | 0 | 59,899,700 | 2024-03-15 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 0 | 0 % | |
451 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Renovasi Bangunan Screen House di IPBH Keruing | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17748012 | 52433544 | 68,900,000 | 68,700,000 | 68,514,750 | 68,514,750 | 55,496,670 | 55,496,670 | 55,496,670 | 55,496,670 | 2024-10-16 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 385,250 | 0.56 % | |
452 | 2024 | Dinas Komunikasi, Informatika, Persandian dan Statistik | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17302012 | 49232632 | 44,147,000 | 44,147,000 | 43,556,400 | 43,556,400 | 43,556,400 | 43,556,400 | 43,556,400 | 43,556,400 | 2024-06-11 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 590,600 | 1.34 % | |
453 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultan Pengawasan- Penataan Jaringan Listrik Kantor Disnakertrans Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10004679000 | 53409287 | 14,850,000 | 14,000,000 | 13,891,650 | 13,891,650 | 13,875,000 | 0 | 0 | 0 | 2024-11-12 | 958,350 | 6.45 % | |||
454 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Rehab Teras Aula | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17885012 | 53327551 | 10,000,000 | 9,972,795 | 9,873,228 | 9,873,228 | 9,873,228 | 0 | 0 | 0 | 2024-11-08 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 126,772 | 1.27 % | |
455 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan Halaman Sekolah SMKN 1 Kapuas Murung | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16161012 | 51427520 | 34,500,000 | 34,500,000 | 34,432,000 | 34,432,000 | 34,432,000 | 34,432,000 | 34,432,000 | 34,432,000 | 2024-05-22 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 68,000 | 0.2 % | |
456 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Fisika,Biologi SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15916012 | 50548043 | 54,488,000 | 54,488,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 54,377,000 | 2024-04-01 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 111,000 | 0.2 % | |
457 | 2024 | Badan Pendapatan Daerah | PEKERJAAAN PERENCANAAN PEMBANGUNAN PAGAR LANJUTAN UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16024012 | 49187791 | 101,681,250 | 98,790,000 | 98,457,000 | 98,457,000 | 97,563,450 | 97,563,450 | 97,563,450 | 97,563,450 | 2024-04-29 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 3,224,250 | 3.17 % | |
458 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Implementasi Dokumen SSK 2 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15711012 | 47521028 | 80,000,000 | 80,000,000 | 79,975,500 | 79,975,500 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | MARDINO RUKITA | 16.699.748.6-711.000 | 24,500 | 0.03 % | |
459 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penimbunan Halaman Sekolah SMKN 1 Katingan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16047012 | 50968973 | 34,500,000 | 34,500,000 | 34,278,000 | 34,278,000 | 34,278,000 | 34,278,000 | 34,278,000 | 34,278,000 | 2024-05-07 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 222,000 | 0.64 % | |
460 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Koridor Penghubung bangunan SMAN 2 Kasongan (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15966012 | 50729151 | 38,500,000 | 38,500,000 | 38,389,000 | 38,389,000 | 38,389,000 | 38,389,000 | 0 | 38,389,000 | 2024-04-06 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 111,000 | 0.29 % | |
461 | 2024 | Dinas Pemuda dan Olahraga | Beban Jasa Konsultansi Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17697012 | 52689998 | 109,550,000 | 99,722,400 | 99,444,900 | 99,444,900 | 99,111,900 | 0 | 0 | 0 | 2024-09-30 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 10,105,100 | 9.22 % | |
462 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Jasa Konsultansi Pengawasan Pembuatan Ruang PPID Kantor Dinas Penanaman Modal dan PTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17516012 | 52090376 | 30,906,000 | 30,906,000 | 30,724,800 | 30,724,800 | 29,803,056 | 29,803,056 | 0 | 29,803,056 | 2024-07-23 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 181,200 | 0.59 % | |
463 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Kantin, Ruang Kelas Baru, Ruang UKS, Selasar Penghubung SLBN 2 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17499012 | 52082303 | 72,874,840 | 72,871,500 | 72,871,500 | 72,871,500 | 72,871,500 | 72,871,500 | 72,871,000 | 72,871,500 | 2024-07-18 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 3,340 | 0 % | |
464 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Muara Teweh (Rehabilitasi Rg. Lab. Biologi, Rehabilitasi Toilet (Jamban) beserta sanitasinya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17310012 | 51238365 | 21,528,800 | 21,528,800 | 21,367,500 | 21,367,500 | 21,367,500 | 21,367,500 | 21,367,500 | 21,367,500 | 2024-06-13 | 161,300 | 0.75 % | |||
465 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Jaringan Listrik - Pemeliharaan Jaringan Listrik Ruang Anggrek | Pengadaan Langsung | Jasa Lainnya | 17272012 | 51686768 | 65,000,000 | 64,088,500 | 63,221,000 | 63,221,000 | 62,999,000 | 62,999,000 | 62,999,000 | 62,999,000 | 2024-06-10 | CV Berkat Sekumpul | 94.152.629.5-711.000 | 1,779,000 | 2.74 % | |
466 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Penataan Halaman SMAN 1 Kasongan (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15807012 | 50729180 | 79,000,000 | 79,000,000 | 78,887,700 | 78,887,700 | 78,887,700 | 78,887,700 | 78,887,700 | 78,887,700 | 2024-03-15 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 112,300 | 0.14 % | |
467 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PENATAAN HALAMAN AULA UTAMA BAPENDA TAHAP 4 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17645012 | 49722644 | 48,000,000 | 47,896,500 | 47,397,000 | 47,397,000 | 46,664,400 | 46,664,400 | 46,664,400 | 46,664,400 | 2024-09-13 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 603,000 | 1.26 % | |
468 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMKN 1 Muara Teweh | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17674012 | 52610179 | 25,000,000 | 25,000,000 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 2024-09-26 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 46,090 | 0.18 % | |
469 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pekerjaan Lanjutan Pembangunan Ruang Praktik Siswa(RPS) SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17367012 | 51422460 | 85,000,000 | 85,000,000 | 84,911,781 | 84,911,781 | 84,911,781 | 84,911,781 | 84,911,781 | 84,911,781 | 2024-06-24 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 88,219 | 0.1 % | |
470 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Perpustakaan SMAS Muhammadiyah 2 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15906012 | 50771077 | 35,000,000 | 35,000,000 | 34,944,500 | 34,944,500 | 34,944,500 | 34,944,500 | 0 | 34,944,500 | 2024-04-02 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 55,500 | 0.16 % | |
471 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16033012 | 51467427 | 90,000,000 | 90,000,000 | 89,466,000 | 89,466,000 | 89,077,500 | 89,077,500 | 89,077,500 | 89,077,500 | 2024-04-30 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 534,000 | 0.59 % | |
472 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Rungan Barat (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17222012 | 51238887 | 29,081,500 | 29,081,500 | 29,037,600 | 29,037,600 | 29,037,600 | 29,037,600 | 0 | 29,037,600 | 2024-05-29 | 43,900 | 0.15 % | |||
473 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Bintang Awai (Pembangunan Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15820012 | 50377525 | 57,734,700 | 57,734,700 | 57,663,144 | 57,663,144 | 57,663,144 | 57,663,144 | 0 | 57,663,144 | 2024-03-21 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 71,556 | 0.12 % | |
474 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pembuatan Gapura Pintu Gerbang SMAN 1 Pulau Malan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17764012 | 52880594 | 30,000,000 | 30,000,000 | 29,748,000 | 29,748,000 | 29,748,000 | 0 | 0 | 0 | 2024-10-16 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 252,000 | 0.84 % | |
475 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI RUANG PAJAK KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15743012 | 49834659 | 76,616,400 | 76,582,553 | 76,471,554 | 76,471,554 | 75,528,062 | 75,528,062 | 75,528,062 | 75,528,062 | 2024-03-11 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 144,846 | 0.19 % | |
476 | 2024 | Dinas Perhubungan | Rehabilitasi Terminal Sanggu Kabupaten Barito Selatan | Pengadaan Langsung | Pekerjaan Konstruksi | 17664012 | 51282247 | 164,141,000 | 164,141,000 | 163,904,224 | 163,904,224 | 163,899,136 | 163,899,136 | 163,899,136 | 163,899,136 | 2024-09-23 | CV. ARTHA CAPRICORNUS | 01.922.068.0-711.000 | 236,776 | 0.14 % | |
477 | 2024 | Dinas Perhubungan | Pemeliharaan/Perbaikan Instalasi Lalu Lintas (Traffic Light, Warning Light) | Pengadaan Langsung | Jasa Lainnya | 15973012 | 51269547 | 185,765,000 | 185,765,000 | 185,481,000 | 185,481,000 | 185,481,000 | 185,481,000 | 185,481,000 | 185,481,000 | 2024-04-26 | CV. PROGRESIF | 01.489.497.6-711.000 | 284,000 | 0.15 % | |
478 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN TOILET WAJIB PAJAK UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17551012 | 49722538 | 10,060,500 | 10,056,600 | 9,945,600 | 9,945,600 | 9,729,150 | 9,729,150 | 9,729,150 | 9,729,150 | 2024-07-31 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 114,900 | 1.14 % | |
479 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Mess UPT.KPHP Katingan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16100012 | 51460909 | 72,856,000 | 72,855,960 | 72,751,620 | 72,751,620 | 71,830,320 | 71,830,320 | 71,830,320 | 71,830,320 | 2024-05-28 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 104,380 | 0.14 % | |
480 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Awang Lapai (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16084012 | 51155760 | 35,684,500 | 35,684,500 | 35,600,000 | 35,600,000 | 35,600,000 | 35,600,000 | 0 | 35,600,000 | 2024-05-06 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 84,500 | 0.24 % | |
481 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika,Biologi SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15850012 | 50466996 | 97,747,700 | 97,747,700 | 97,646,700 | 97,646,700 | 97,646,700 | 97,646,700 | 97,646,700 | 97,646,700 | 2024-03-25 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 101,000 | 0.1 % | |
482 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan Kandang Rusa UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17424012 | 51460050 | 26,475,000 | 26,475,000 | 26,000,001 | 26,000,001 | 25,618,800 | 25,618,800 | 25,618,800 | 25,618,800 | 2024-06-29 | 474,999 | 1.79 % | |||
483 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Jasa Konsultansi Pengawasan - Pengawasan Rehab Loket Ruang Kamboja | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17584012 | 52174218 | 3,000,000 | 3,000,000 | 2,997,000 | 2,997,000 | 2,442,000 | 2,442,000 | 2,442,000 | 2,442,000 | 2024-08-21 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 3,000 | 0.1 % | |
484 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pemasangan Paving Halaman Kantor SMAN 1 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17772012 | 52878799 | 60,000,000 | 60,000,000 | 59,800,200 | 59,800,200 | 59,800,200 | 0 | 0 | 0 | 2024-10-16 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 199,800 | 0.33 % | |
485 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Laboratorium Komputer SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17834012 | 52898577 | 20,000,000 | 20,000,000 | 19,828,500 | 19,828,500 | 19,828,500 | 19,828,500 | 19,828,500 | 19,828,500 | 2024-10-28 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 171,500 | 0.86 % | |
486 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Parkir) | Pengadaan Langsung | Jasa Lainnya | 17590012 | 52036015 | 65,000,000 | 17,454,750 | 17,177,250 | 17,177,250 | 17,177,250 | 17,177,250 | 17,177,250 | 17,177,250 | 2024-08-09 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 47,822,750 | 73.57 % | |
487 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Rehabilitasi Ruang Kelas dengan tingkat kerusakan minimal sedang beserta perabotnya SLBN 2 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17694012 | 52094333 | 10,200,000 | 10,197,570 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 10,145,400 | 2024-10-08 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 54,600 | 0.54 % | |
488 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Pembangunan Rumah Genset dan Tower Air UPT.KPHP Kahayan Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17665012 | 52595923 | 16,198,000 | 16,197,675 | 16,169,925 | 16,169,925 | 16,095,000 | 0 | 0 | 0 | 2024-09-27 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 28,075 | 0.17 % | |
489 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 4 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16140012 | 51418356 | 25,000,000 | 25,000,000 | 24,900,100 | 24,900,100 | 24,900,100 | 24,900,100 | 24,900,100 | 24,900,100 | 2024-05-22 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 99,900 | 0.4 % | |
490 | 2024 | Dinas Pemberdayaan Masyarakat dan Desa | Pengawasan Bangunan Mushola DPMD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17438012 | 52025972 | 42,000,000 | 42,000,000 | 41,950,000 | 41,950,000 | 41,625,000 | 41,625,000 | 41,625,000 | 41,625,000 | 2024-07-10 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 50,000 | 0.12 % | |
491 | 2024 | Dinas Pendidikan | Pengawasan Rehab Pagar Gedung Dinas Pendidikan Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17449012 | 49797910 | 45,000,000 | 45,000,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 44,950,000 | 2024-07-13 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 50,000 | 0.11 % | |
492 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa,Laboratorium Komputer SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17537012 | 51199416 | 36,890,000 | 36,890,000 | 36,823,400 | 36,823,400 | 36,823,400 | 36,823,400 | 36,823,400 | 36,823,400 | 2024-07-25 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 66,600 | 0.18 % | |
493 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultansi Pengawasan Pagar Kantor UPT Lab. Bahan Konstruksi Palangka Raya dan Pagar Rujab DPUPR di Jl. Muhammad Wongso Kab. Kobar | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16095012 | 49800589 | 38,904,000 | 38,904,000 | 38,561,067 | 38,561,067 | 38,500,000 | 0 | 0 | 0 | 2024-05-08 | 342,933 | 0.88 % | |||
494 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Kelas SMAN 1 Sebangau Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17824012 | 52898364 | 25,000,000 | 25,000,000 | 24,889,000 | 24,889,000 | 24,889,000 | 24,889,000 | 24,889,000 | 24,889,000 | 2024-10-28 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 111,000 | 0.44 % | |
495 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Kantor SMAN 10 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17761012 | 52878507 | 50,000,000 | 50,000,000 | 49,890,000 | 49,890,000 | 49,890,000 | 0 | 0 | 0 | 2024-10-16 | 110,000 | 0.22 % | |||
496 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Balai Riam (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15874012 | 50408755 | 82,872,800 | 82,872,800 | 82,706,300 | 82,706,300 | 82,706,300 | 82,706,300 | 0 | 82,706,300 | 2024-04-02 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 166,500 | 0.2 % | |
497 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Pengawasan Rehab Ruang Direktur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17712012 | 52763643 | 12,000,000 | 12,000,000 | 11,900,033 | 11,900,033 | 11,766,000 | 0 | 0 | 0 | 2024-10-16 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 99,968 | 0.83 % | |
498 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0018 Pengawasan Rehab Bangunan dan Kolam Bioflok dan Peralatannya (1 Paket) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17859012 | 53220959 | 12,500,000 | 12,432,000 | 12,198,900 | 12,198,900 | 12,000,000 | 12,000,000 | 12,000,000 | 12,000,000 | 2024-11-01 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 301,100 | 2.41 % | |
499 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS Muhammadiyah Kuala Kapuas (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS, Pembangunan Rg. BK ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15938012 | 50388772 | 77,160,700 | 77,160,700 | 76,407,858 | 76,407,858 | 76,407,858 | 76,407,858 | 0 | 76,407,858 | 2024-04-01 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 752,842 | 0.98 % | |
500 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI MUSOLAH DAN AULA KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17806012 | 49955029 | 25,000,000 | 24,999,999 | 24,850,000 | 24,850,000 | 24,685,013 | 0 | 0 | 0 | 2024-10-30 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 150,000 | 0.6 % | |
501 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Pagar UPT.KPHP Katingan Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17268012 | 51802828 | 116,226,000 | 99,999,345 | 99,894,728 | 99,894,728 | 99,067,778 | 99,067,778 | 99,067,778 | 99,067,778 | 2024-06-11 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 16,331,273 | 14.05 % | |
502 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Guru SMAS Muhammadiyah Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15810012 | 50774184 | 45,500,000 | 45,500,000 | 45,288,000 | 45,288,000 | 45,288,000 | 45,288,000 | 0 | 45,288,000 | 2024-03-21 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 212,000 | 0.47 % | |
503 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Pintu Gerbang dan Jembatan SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16159012 | 51645022 | 18,000,000 | 18,000,000 | 17,950,000 | 17,950,000 | 17,950,000 | 17,950,000 | 17,950,000 | 17,950,000 | 2024-05-22 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 50,000 | 0.28 % | |
504 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehabilitasi Ruang Laboratorium Komputer,Rehabilitasi Ruang Multimedia,Rehabilitasi Toilet(Jamban) dengan tingkat kerusakan minimal sedang SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15844012 | 50538387 | 27,175,000 | 27,175,000 | 27,100,000 | 27,100,000 | 27,100,000 | 27,100,000 | 27,100,000 | 27,100,000 | 2024-03-25 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 75,000 | 0.28 % | |
505 | 2024 | Dinas Pendidikan | Jasa Konsultasi Pengawasan Pembangunan Kantin, Ruang Pembelajaran Khusus, Ruang Guru, Ruang Kepala Sekolah SLBN 1 Kuala Pembuang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17508012 | 52082569 | 31,248,824 | 31,248,720 | 31,182,000 | 31,182,000 | 31,182,000 | 31,182,000 | 31,182,000 | 31,182,000 | 2024-07-18 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 66,824 | 0.21 % | |
506 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Pengawasan Rehab/Rehabilitasi Rumah Jabatan Kepala UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17425012 | 51460061 | 10,309,530 | 10,309,530 | 10,256,400 | 10,256,400 | 10,189,800 | 10,189,800 | 10,189,800 | 10,189,800 | 2024-06-29 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 53,130 | 0.52 % | |
507 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (2 Ruang) SMKN 1 Pangkalan Lada | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16150012 | 51423885 | 25,000,000 | 25,000,000 | 24,975,000 | 24,975,000 | 24,975,000 | 24,975,000 | 24,975,000 | 24,975,000 | 2024-05-22 | Roa Solution | 92.337.883.0-711.000 | 25,000 | 0.1 % | |
508 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Rumah Dinas dan Pagar Sekolah SLBN 1 Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17616012 | 51911538 | 35,000,000 | 34,999,999 | 34,898,360 | 34,898,360 | 34,898,360 | 34,898,360 | 0 | 34,898,360 | 2024-08-26 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 101,640 | 0.29 % | |
509 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS Kristen Palangka Raya (Pembangunan Rg. Lab. Kimia) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15805012 | 50410043 | 43,927,800 | 43,927,800 | 43,822,800 | 43,822,800 | 43,822,800 | 43,822,800 | 43,822,800 | 43,822,800 | 2024-03-15 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 105,000 | 0.24 % | |
510 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Penataan Halaman SMAN 1 Kasongan (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16107012 | 51398796 | 60,000,000 | 60,000,000 | 59,889,000 | 59,889,000 | 59,889,000 | 59,889,000 | 59,889,000 | 59,889,000 | 2024-05-13 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 111,000 | 0.19 % | |
511 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17417012 | 51211088 | 22,050,000 | 22,050,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 2024-06-27 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 72,000 | 0.33 % | |
512 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Rumah Dinas Jl. RTA. Milono Km. 6,5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16039012 | 51445982 | 25,000,000 | 25,000,000 | 24,946,500 | 24,946,500 | 24,809,610 | 24,809,610 | 24,809,610 | 24,809,610 | 2024-05-07 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 53,500 | 0.21 % | |
513 | 2024 | Inspektorat | Belanja Pemeliharaan Bangunan Gedung-Bangunan Gedung Tempat Kerja-Bangunan Gedung Kantor-Pemasangan Interior Aula Inspektorat | Pengadaan Langsung | Pengadaan Barang | 17251012 | 49894891 | 206,252,000 | 200,000,000 | 199,511,400 | 199,511,400 | 199,258,320 | 199,258,320 | 199,258,320 | 199,258,320 | 2024-05-31 | CV.EL BARRA | 20.634.253.7-711.000 | 6,740,600 | 3.27 % | |
514 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17447012 | 51358179 | 21,330,000 | 21,330,000 | 21,276,720 | 21,276,720 | 21,276,720 | 21,276,720 | 21,276,720 | 21,276,720 | 2024-07-06 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 53,280 | 0.25 % | |
515 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Rumah Jaga Kebun Jabiren | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17896012 | 53083730 | 28,620,000 | 28,620,000 | 28,335,303 | 28,335,303 | 28,329,420 | 28,329,420 | 28,329,420 | 28,329,420 | 2024-11-07 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 284,697 | 0.99 % | |
516 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15762012 | 49206089 | 13,582,500 | 13,505,000 | 13,364,400 | 13,364,400 | 13,075,800 | 13,075,800 | 13,075,800 | 13,075,800 | 2024-03-11 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 218,100 | 1.61 % | |
517 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang OSIS SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16053012 | 50547833 | 13,609,000 | 13,609,000 | 13,563,000 | 13,563,000 | 13,563,000 | 13,563,000 | 13,563,000 | 13,563,000 | 2024-05-06 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 46,000 | 0.34 % | |
518 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Awang Lapai (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17270012 | 51154245 | 37,095,800 | 37,095,800 | 37,095,000 | 37,095,000 | 37,095,000 | 37,095,000 | 0 | 37,095,000 | 2024-06-05 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 800 | 0 % | |
519 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Pagar Sekolah dan Penataan Halaman SMKN 1 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16170012 | 51425119 | 68,200,000 | 68,200,000 | 68,077,900 | 68,077,900 | 68,077,900 | 68,077,900 | 68,077,900 | 68,077,900 | 2024-05-22 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 122,100 | 0.18 % | |
520 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Supervisi Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah XII | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17767012 | 52940881 | 100,000,000 | 99,999,900 | 99,789,000 | 99,789,000 | 99,400,000 | 0 | 0 | 0 | 2024-10-17 | TRIAS POINTER | 02.538.776.2-711.000 | 211,000 | 0.21 % | |
521 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Rumah Dinas G. Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15721012 | 50137065 | 8,000,000 | 7,766,941 | 7,525,800 | 7,525,800 | 7,525,800 | 7,525,800 | 7,525,800 | 7,525,800 | 2024-03-19 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 474,200 | 5.93 % | |
522 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi WC SMAN 3 Maliku 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17821012 | 52898139 | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 2024-10-28 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 55,500 | 0.28 % | |
523 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Perencanaan Pembangunan Sarana Prasarana Jaringan Air Limbah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16001012 | 51389703 | 50,000,000 | 49,900,000 | 48,307,200 | 48,307,200 | 44,422,200 | 44,422,200 | 44,422,200 | 44,422,200 | 2024-05-04 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 1,692,800 | 3.39 % | |
524 | 2024 | Badan Pendapatan Daerah | Pengawasan Semenisasi Halaman Kantor UPTPPD Barito Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17846012 | 53193661 | 20,145,000 | 15,429,000 | 15,318,000 | 15,318,000 | 14,674,200 | 0 | 0 | 0 | 2024-11-01 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 4,827,000 | 23.96 % | |
525 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Palangka Raya (Pembangunan Toilet (Jamban), Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17278012 | 51240438 | 30,478,300 | 30,478,300 | 30,425,000 | 30,425,000 | 30,425,000 | 30,425,000 | 30,425,000 | 30,425,000 | 2024-06-12 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 53,300 | 0.17 % | |
526 | 2024 | Biro Pengadaan Barang dan Jasa | Pemeliharaan Aplikasi SI Monev | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16131012 | 50296829 | 52,500,000 | 52,247,700 | 52,247,700 | 52,247,700 | 51,803,700 | 51,803,700 | 51,803,700 | 51,803,700 | 2024-05-20 | CV. PRIMA JAYA | 93.948.911.8-711.000 | 252,300 | 0.48 % | |
527 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Toilet(Jamban) 1 Ruang SMK NEGERI 4 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16026012 | 51170849 | 4,130,000 | 4,130,000 | 4,127,979 | 4,127,979 | 4,127,979 | 4,127,979 | 4,127,979 | 4,127,979 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 2,021 | 0.05 % | ||
528 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Jasa Konsultansi Pengawasan Renovasi Parkir, Pagar, Kantin, Rumah Penjaga dan Gudang Kantor Dinas Penanaman Modal dan PTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17515012 | 52090398 | 51,379,000 | 51,337,500 | 51,171,000 | 51,171,000 | 49,635,870 | 49,635,870 | 0 | 49,635,870 | 2024-07-23 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 208,000 | 0.4 % | |
529 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Biologi SMK NEGERI 1 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17538012 | 51212831 | 56,180,000 | 56,180,000 | 55,691,600 | 55,691,600 | 55,691,600 | 55,691,600 | 55,691,600 | 55,691,600 | 2024-07-25 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 488,400 | 0.87 % | |
530 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Jasa Konsultansi Perencanaan Pembuatan Ruang PPID Kantor DPMPTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16011012 | 51311810 | 52,482,000 | 52,458,600 | 52,400,000 | 52,400,000 | 52,314,300 | 52,314,300 | 0 | 52,314,300 | 2024-05-16 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 82,000 | 0.16 % | |
531 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN TOILET UMUM AULA UTAMA BAPENDA PROV.KAL-TENG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15731012 | 49248464 | 48,000,000 | 47,913,150 | 47,619,000 | 47,619,000 | 46,964,100 | 46,964,100 | 46,964,100 | 46,964,100 | 2024-03-11 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 381,000 | 0.79 % | |
532 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Paju Epat (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15940012 | 50387283 | 64,762,700 | 64,762,700 | 64,700,000 | 64,700,000 | 64,700,000 | 64,700,000 | 0 | 64,700,000 | 2024-04-01 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 62,700 | 0.1 % | |
533 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Pondasi Silo Pada Kegiatan Pembangunan Pabrik Pakan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17575012 | 52123197 | 99,999,990 | 99,960,000 | 99,822,855 | 99,822,855 | 99,400,500 | 99,400,500 | 99,400,500 | 98,500,000 | 2024-08-06 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 177,135 | 0.18 % | |
534 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Gunung Timang (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15751012 | 50372003 | 47,759,700 | 47,759,700 | 47,341,500 | 47,341,500 | 47,341,500 | 47,341,500 | 0 | 47,341,500 | 2024-03-13 | 418,200 | 0.88 % | |||
535 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Tempat Parkir Kantor UPT BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16200012 | 51460045 | 10,588,165 | 10,588,165 | 10,466,065 | 10,466,065 | 10,436,775 | 10,436,775 | 10,436,775 | 10,436,775 | 2024-05-29 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 122,100 | 1.15 % | |
536 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Pengawasan Arsitektur UPT Taman Budaya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10014748000 | 52473320 | 67,819,000 | 67,800,465 | 67,488,000 | 67,488,000 | 67,032,900 | 0 | 0 | 0 | 2024-11-28 | Roa Solution | 92.337.883.0-711.000 | 331,000 | 0.49 % | |
537 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Pemeliharaan Penyekatan dan Pemasangan Interior Gedung IBS Lt. 2 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16176012 | 51500498 | 5,000,000 | 4,999,000 | 4,995,000 | 4,995,000 | 4,073,700 | 4,073,700 | 4,073,700 | 4,073,700 | 2024-06-03 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 5,000 | 0.1 % | |
538 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang kelas SMAN 2 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17769012 | 52877541 | 40,000,000 | 40,000,000 | 39,676,950 | 39,676,950 | 39,676,950 | 0 | 0 | 0 | 2024-10-16 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 323,050 | 0.81 % | |
539 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Muara Teweh (Rehabilitasi Rg. Kelas) 10 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17354012 | 51238352 | 95,972,700 | 95,972,700 | 95,770,800 | 95,770,800 | 95,770,800 | 95,770,800 | 95,770,800 | 95,770,800 | 2024-08-12 | 201,900 | 0.21 % | |||
540 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS Muhammadiyah Katingan Tengah (Rehabilitasi Rg. Kelas, Rehabilitasi Toilet (Jamban) Beserta Sanitasinya) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17265012 | 51239132 | 25,533,600 | 25,533,600 | 25,467,000 | 25,467,000 | 25,467,000 | 25,467,000 | 0 | 25,467,000 | 2024-06-05 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 66,600 | 0.26 % | |
541 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI GARASI RUMAH DINAS ESSELON UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17683012 | 49835671 | 6,354,000 | 6,353,990 | 6,304,043 | 6,304,043 | 6,181,943 | 6,181,943 | 6,181,943 | 6,181,943 | 2024-09-27 | 49,957 | 0.79 % | |||
542 | 2024 | KPHP SUKAMARA LAMANDAU | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17653012 | 52516230 | 28,620,000 | 28,449,300 | 28,305,000 | 28,305,000 | 27,095,100 | 27,095,100 | 27,095,100 | 27,095,100 | 2024-09-18 | 315,000 | 1.1 % | |||
543 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 1 Sematu Jaya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16155012 | 51423831 | 19,000,000 | 19,000,000 | 18,969,900 | 18,969,900 | 18,969,900 | 18,969,900 | 18,969,900 | 18,969,900 | 2024-05-22 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 30,100 | 0.16 % | |
544 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 1 Mantangai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16154012 | 51423559 | 19,000,000 | 19,000,000 | 18,950,000 | 18,950,000 | 18,950,000 | 18,950,000 | 18,950,000 | 18,950,000 | 2024-05-22 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 50,000 | 0.26 % | |
545 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer,Laboratorium Bahasa SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17444012 | 51358525 | 55,910,000 | 55,910,000 | 55,787,900 | 55,787,900 | 55,787,900 | 55,787,900 | 55,787,900 | 55,787,900 | 2024-07-06 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 122,100 | 0.22 % | |
546 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Rehab Plafon, Pemasangan Interior dan Ornamen Lobby Admin Lt. 1 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16054012 | 51068929 | 20,000,000 | 19,980,000 | 19,700,280 | 19,700,280 | 15,739,800 | 15,739,800 | 15,739,800 | 15,739,800 | 2024-05-28 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 299,720 | 1.5 % | |
547 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Ruang Guru, Ruang Kepala Sekolah, Ruang keterampilan, Ruang Pembelajaran Khusus, Ruang Perpustakaan, Ruang Tata Usaha SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17507012 | 52082489 | 48,934,480 | 48,923,250 | 48,923,250 | 48,923,250 | 48,923,250 | 48,923,250 | 48,923,000 | 48,923,250 | 2024-07-18 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 11,230 | 0.02 % | |
548 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15927012 | 50549027 | 18,198,000 | 18,198,000 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 2024-04-01 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 55,500 | 0.3 % | |
549 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15878012 | 50409821 | 43,927,800 | 43,927,800 | 43,872,300 | 43,872,300 | 43,872,300 | 43,872,300 | 0 | 43,872,300 | 2024-04-02 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 55,500 | 0.13 % | |
550 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Bangsal dan Finishing Green House Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17756012 | 52365980 | 56,000,000 | 56,000,000 | 55,458,375 | 55,458,375 | 55,458,375 | 0 | 0 | 0 | 2024-10-21 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 541,625 | 0.97 % | |
551 | 2024 | Sekretariat DPRD | Beban Jasa Konsultansi Perencanaan arsitektur rehab bangunan induk lantai 1 Sekretariat DPRD Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Perorangan Konstruksi | 17503012 | 52010361 | 100,000,000 | 99,947,175 | 99,600,300 | 99,600,300 | 98,407,050 | 98,407,050 | 0 | 98,407,050 | 2024-07-16 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 399,700 | 0.4 % | |
552 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KURUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10006794000 | 49718725 | 9,001,500 | 8,999,999 | 8,991,000 | 8,991,000 | 8,591,400 | 0 | 0 | 0 | 2024-11-15 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 10,500 | 0.12 % | |
553 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Beban Jasa Konsultansi Perencanaan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17262012 | 49429033 | 52,482,000 | 51,000,000 | 50,889,000 | 50,889,000 | 50,888,838 | 50,888,838 | 50,888,838 | 50,888,838 | 2024-06-04 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 1,593,000 | 3.04 % | |
554 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Toilet (Jamban)1 Ruang beserta sanitasinya SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17416012 | 51171719 | 4,880,000 | 4,880,000 | 4,844,000 | 4,844,000 | 4,844,000 | 4,844,000 | 4,844,000 | 4,844,000 | 2024-06-27 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 36,000 | 0.74 % | |
555 | 2024 | Dinas Pendidikan | Jasa Konsunltasi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang SLBN 2 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17344012 | 51911805 | 12,750,000 | 12,748,350 | 12,705,000 | 12,705,000 | 12,705,000 | 12,705,000 | 12,705,000 | 12,705,000 | 2024-08-12 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 45,000 | 0.35 % | |
556 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN TANDON AIR UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17434012 | 49722036 | 7,500,000 | 7,464,974 | 7,369,832 | 7,369,832 | 7,086,782 | 7,086,782 | 7,086,782 | 7,086,782 | 2024-07-03 | 130,168 | 1.74 % | |||
557 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya -Rehab Asrama | Pengadaan Langsung | Pekerjaan Konstruksi | 17899012 | 53355214 | 198,000,000 | 198,000,000 | 197,494,958 | 197,494,958 | 196,000,353 | 0 | 0 | 0 | 2024-11-08 | CV. MULTI TATA KARYA | 71.905.824.0-711.000 | 505,042 | 0.26 % | |
558 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.07.0010.5.1.02.02.08.0018 Pengawasan Instalasi Listrik Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17861012 | 53183931 | 12,000,000 | 12,000,000 | 11,950,000 | 11,950,000 | 11,800,000 | 11,800,000 | 11,800,000 | 11,800,000 | 2024-11-01 | CV.ADIKON CITRABANGUN KONSULTAN | 02.618.694.0-711.000 | 50,000 | 0.42 % | |
559 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika,Laboratorium Biologi SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17420012 | 51200460 | 82,850,000 | 82,850,000 | 82,619,120 | 82,619,120 | 82,619,120 | 82,619,120 | 82,619,120 | 82,619,120 | 2024-06-28 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 230,880 | 0.28 % | |
560 | 2024 | Badan Pendapatan Daerah | Pengawasan Renovasi Ruang Kantor UPTPPD Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17845012 | 53155890 | 27,000,000 | 20,035,500 | 19,924,500 | 19,924,500 | 19,341,750 | 0 | 0 | 0 | 2024-10-30 | 7,075,500 | 26.21 % | |||
561 | 2024 | Dinas Perdagangan dan Perindustrian | Pengadaan Jasa Konsultansi Perencanaan Rehabilitasi Bangunan Rumah Kemasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17247012 | 51216832 | 67,017,915 | 67,017,915 | 66,975,180 | 66,975,000 | 66,420,180 | 66,400,000 | 66,400,000 | 66,400,000 | 2024-06-11 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 42,735 | 0.06 % | |
562 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Ayam Buras, Pakan dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10021415000 | 53545249 | 11,771,500 | 11,771,500 | 11,527,300 | 11,527,300 | 11,524,908 | 0 | 0 | 0 | 2024-11-30 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 244,200 | 2.07 % | |
563 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 2 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16145012 | 51421923 | 20,000,000 | 20,000,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 2024-05-22 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.56 % | |
564 | 2024 | Dinas Pendidikan | Paket Pekerjaan PerencanaanPenataan Halaman dan Paving SMAN 2 Pulang Pisau (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15813012 | 50773725 | 38,500,000 | 38,500,000 | 38,450,000 | 38,450,000 | 38,450,000 | 38,450,000 | 38,450,000 | 38,450,000 | 2024-03-18 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 50,000 | 0.13 % | |
565 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI GEDUNG UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17435012 | 49953444 | 21,180,000 | 21,172,082 | 20,978,369 | 20,978,369 | 20,118,119 | 20,118,119 | 20,118,119 | 20,118,119 | 2024-07-03 | 201,631 | 0.95 % | |||
566 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Lanjutan pemasangan plafon dan keramik ruang kelas SMAN 1 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15881012 | 50729240 | 40,000,000 | 40,000,000 | 39,982,200 | 39,982,200 | 39,982,200 | 39,982,200 | 0 | 39,982,200 | 2024-03-28 | Roa Solution | 92.337.883.0-711.000 | 17,800 | 0.04 % | |
567 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih ( SMAN 1 Katingan Kuala, SMAN 2 Katingan Kuala)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15705012 | 49713447 | 40,000,000 | 40,000,000 | 39,950,000 | 39,950,000 | 39,950,000 | 0 | 0 | 0 | 2024-02-23 | CV. PENDANG JAYA RAYA ENGINEERING | 01.662.432.2-711.000 | 50,000 | 0.13 % | |
568 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Paju Epat (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17273012 | 51184289 | 49,202,700 | 49,202,700 | 49,173,000 | 49,173,000 | 49,173,000 | 49,173,000 | 0 | 49,173,000 | 2024-06-06 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 29,700 | 0.06 % | |
569 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Penataan halaman SMAN 10 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17828012 | 52897755 | 65,000,000 | 65,000,000 | 64,900,000 | 64,900,000 | 64,900,000 | 64,900,000 | 64,900,000 | 64,900,000 | 2024-10-26 | CV. BATUAH RAYA KONSULTAN | 19.890.506.9-711.000 | 100,000 | 0.15 % | |
570 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Jaringan Listrik - Pekerjaan Instalasi Listrik AC (Air Conditioner) Gedung IKR | Pengadaan Langsung | Jasa Lainnya | 10011278000 | 52983251 | 189,000,000 | 188,878,190 | 188,500,000 | 188,500,000 | 187,584,450 | 0 | 0 | 0 | 2024-11-20 | CV.SINAR TERANG | 02.292.356.9-711.000 | 500,000 | 0.26 % | |
571 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS Muhammadiyah Kuala Kapuas (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS, Pembangunan Rg. BK ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17322012 | 51238986 | 54,359,200 | 54,359,200 | 54,359,200 | 54,359,200 | 54,359,200 | 54,359,200 | 54,359,200 | 54,359,200 | 2024-06-14 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 0 | 0 % | |
572 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE, KANOPI PENYAMBUNG KANTOR-GUDANG ARSIP UPTPPD SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17219012 | 49687870 | 30,000,000 | 29,900,094 | 29,750,255 | 29,750,255 | 29,100,794 | 29,100,794 | 29,100,794 | 29,100,794 | 2024-05-29 | 249,745 | 0.83 % | |||
573 | 2024 | Dinas Perpustakaan dan Arsip | Jasa Konsultansi Perencanaan Renovasi Gedung Fasilitas Layanan Perpustakaan Umum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16051012 | 51257316 | 97,818,000 | 97,818,000 | 97,300,047 | 97,300,000 | 97,200,000 | 97,200,000 | 97,200,000 | 97,200,000 | 2024-05-06 | CV. MENTENG BATARUNG KONSULTINDO | 50.221.960.3-711.000 | 517,953 | 0.53 % | |
574 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 10 Palangka Raya (Pembangunan Rg. UKS, Pembangunan Rg. BK, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15861012 | 50408820 | 42,622,800 | 42,622,800 | 42,565,281 | 42,565,281 | 42,565,281 | 42,565,281 | 0 | 42,565,281 | 2024-03-22 | 57,519 | 0.13 % | |||
575 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMA Garing Tarantang (Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15776012 | 50392180 | 62,209,700 | 62,154,450 | 62,098,950 | 62,098,950 | 62,098,950 | 62,098,950 | 62,098,950 | 62,098,950 | 2024-03-18 | 110,750 | 0.18 % | |||
576 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang OSIS SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15924012 | 50541005 | 19,066,000 | 19,066,000 | 19,010,500 | 19,010,500 | 19,010,500 | 19,010,500 | 19,010,500 | 19,010,500 | 2024-04-01 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 55,500 | 0.29 % | |
577 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Kambing Untuk Kabupaten Kotawaringin Timur Wilayah I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10026898000 | 52123183 | 8,472,000 | 8,436,000 | 8,380,500 | 8,380,500 | 8,380,500 | 0 | 0 | 0 | 2024-12-07 | 91,500 | 1.08 % | |||
578 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Mushola Komp. Pemda G. Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17738012 | 52888477 | 14,992,770 | 14,992,770 | 14,397,255 | 14,397,255 | 14,397,255 | 0 | 0 | 0 | 2024-10-14 | CV. LIANDRA BORU BERSAUDARA | 39.525.241.4-711.000 | 595,515 | 3.97 % | |
579 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Asrama Banjarbaru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15724012 | 50137001 | 40,000,000 | 39,964,062 | 39,072,000 | 39,072,000 | 39,072,000 | 39,072,000 | 39,072,000 | 39,072,000 | 2024-02-26 | Roa Solution | 92.337.883.0-711.000 | 928,000 | 2.32 % | |
580 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Kantin, Ruang Kepala Sekolah, Ruang Pembelajaran Khusus, Ruang tata Usaha SLBN Puruk Cahu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17504012 | 52082461 | 32,349,546 | 32,347,620 | 32,347,620 | 32,347,620 | 32,347,620 | 32,347,620 | 3,234,700 | 32,347,620 | 2024-07-18 | CV. SEIPUTRA PERSADA | 02.539.098.0-711.000 | 1,926 | 0.01 % | |
581 | 2024 | Badan Keuangan dan Aset Daerah | Pemeliharaan Rumah Dinas G. Obos | Pengadaan Langsung | Pekerjaan Konstruksi | 10008123000 | 53470377 | 475,000,000 | 200,000,000 | 199,737,592 | 199,737,592 | 199,737,592 | 0 | 0 | 0 | 2024-11-20 | Archero | 92.264.805.0-711.000 | 275,262,408 | 57.95 % | |
582 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE KANTOR UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17256012 | 49693368 | 16,944,000 | 16,927,500 | 16,872,000 | 16,872,000 | 16,272,600 | 16,272,600 | 16,272,600 | 16,272,600 | 2024-06-03 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 72,000 | 0.42 % | |
583 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Penataan Halaman dan Paving SMAN 2 Pulang Pisau (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17396012 | 51400295 | 29,900,000 | 29,900,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 29,800,000 | 2024-08-13 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 100,000 | 0.33 % | |
584 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17238012 | 51738332 | 37,940,000 | 37,940,000 | 37,884,300 | 37,884,300 | 37,884,300 | 37,884,300 | 0 | 37,884,300 | 2024-05-30 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 55,700 | 0.15 % | |
585 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Tamiyang Layang (Rehabilitasi Rg. Lab. Kimia, Rehabilitasi Rg. Lab. Fisika, Pembangunan Toilet (Jamban) ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17494012 | 51184005 | 44,772,300 | 44,772,300 | 44,733,000 | 44,733,000 | 44,733,000 | 44,733,000 | 44,733,000 | 44,733,000 | 2024-07-15 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 39,300 | 0.09 % | |
586 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BUNTOK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16030012 | 49200311 | 13,582,500 | 13,504,992 | 13,500,000 | 13,500,000 | 13,231,200 | 13,231,200 | 13,231,200 | 13,231,200 | 2024-05-01 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 82,500 | 0.61 % | |
587 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Kalibrasi Alat laboratorium | Pengadaan Langsung | Jasa Lainnya | 17718012 | 50510065 | 117,925,000 | 113,775,000 | 113,553,000 | 113,553,000 | 111,222,000 | 0 | 0 | 0 | 2024-10-16 | 4,372,000 | 3.71 % | |||
588 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0002.5.1.02.02.08.0018 Pengawasan Pembuatan Kolam Ikan Lengkap Dengan Perlengkapannya di Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17890012 | 52993250 | 17,763,480 | 17,740,575 | 17,696,175 | 17,696,175 | 17,100,000 | 17,100,000 | 17,100,000 | 17,100,000 | 2024-11-07 | CV. ANTANG SAKTI | 02.618.398.8-711.000 | 67,305 | 0.38 % | |
589 | 2024 | Dinas Kebudayaan dan Pariwisata | Perencanaan Penataan Halaman, Area Bermain dan Pembangunan Tempat Parkir Museum Balanga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17781012 | 52972220 | 97,818,000 | 97,818,000 | 97,707,000 | 97,707,000 | 97,430,250 | 0 | 0 | 0 | 2024-10-21 | CV. BATUAH RAYA KONSULTAN | 19.890.506.9-711.000 | 111,000 | 0.11 % | |
590 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Ruang Kelas Bertingkat Yayasan Pendidikan ANNUR Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16204012 | 49721527 | 100,000,000 | 99,900,000 | 99,850,000 | 99,850,000 | 99,850,000 | 99,850,000 | 99,850,000 | 99,850,000 | 2024-05-25 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 150,000 | 0.15 % | |
591 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Penyediaan dan Pemeliharaan Sarana Prasarana UPT.KPHP Kotawaringin Barat - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17470012 | 52003425 | 37,878,000 | 37,877,973 | 37,826,000 | 37,826,000 | 37,656,750 | 37,656,750 | 37,656,750 | 37,656,750 | 2024-07-17 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 52,000 | 0.14 % | |
592 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17279012 | 51240370 | 30,927,300 | 30,927,300 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 30,794,100 | 2024-06-12 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 133,200 | 0.43 % | |
593 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Kantor SMAN 1 Sebangau Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17776012 | 52880317 | 30,000,000 | 30,000,000 | 29,922,300 | 29,922,300 | 29,922,300 | 0 | 0 | 0 | 2024-10-16 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 77,700 | 0.26 % | |
594 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 6 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15863012 | 50410131 | 43,927,800 | 43,927,800 | 43,925,031 | 43,925,031 | 43,925,031 | 43,925,031 | 0 | 43,925,031 | 2024-03-25 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 2,769 | 0.01 % | |
595 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMASANGAN PAVING BLOK HALAMAN AULA UTAMA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17600012 | 49686564 | 23,750,000 | 23,587,500 | 23,365,500 | 23,365,500 | 22,677,300 | 22,677,300 | 22,677,300 | 22,677,300 | 2024-08-14 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 384,500 | 1.62 % | |
596 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17220012 | 49721716 | 32,000,000 | 31,900,092 | 31,842,494 | 31,842,494 | 31,365,194 | 31,365,194 | 31,365,194 | 31,365,194 | 2024-05-29 | 157,506 | 0.49 % | |||
597 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0005 Perencanaan Lanjutan Rehab Garansi, Rehab Atap aula Kantor, Rehab Atap Sayap kanan- kiri kantor, Rehab Halaman dan jalan kantor, Rehab Halaman dan jalan kantor, Rehab Plafond Luar Ruang Bidang (1 Paket) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15959012 | 48161440 | 100,000,000 | 99,889,000 | 99,600,300 | 99,600,300 | 98,900,000 | 98,900,000 | 100 | 98,900,000 | 2024-04-24 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 399,700 | 0.4 % | |
598 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pemeliharaan Jaringan Listrik Baru Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16126012 | 51644144 | 30,000,000 | 30,000,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 2024-05-24 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 50,000 | 0.17 % | |
599 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE UPTPPD KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17426012 | 49694303 | 16,944,000 | 16,943,999 | 16,900,000 | 16,900,000 | 16,594,500 | 16,594,500 | 16,594,500 | 16,594,500 | 2024-07-03 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 44,000 | 0.26 % | |
600 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Rumah Dinas RTA Milono KM. 5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15722012 | 50136949 | 40,000,000 | 39,698,068 | 39,305,100 | 39,305,100 | 39,305,100 | 39,305,100 | 39,305,100 | 39,305,100 | 2024-02-26 | Roa Solution | 92.337.883.0-711.000 | 694,900 | 1.74 % | |
601 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Peningkatan Drainase Jalan Brokoli V dan Sekitarnya, Kota Palangka Raya, Provinsi Kalimantan Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 17604012 | 52260770 | 186,400,000 | 186,400,000 | 185,907,784 | 185,907,784 | 185,500,000 | 185,500,000 | 185,500,000 | 185,500,000 | 2024-08-19 | CV. RINDANG BUMI UTAMA | 93.938.888.0-711.000 | 492,216 | 0.26 % | |
602 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Rumah Dinas G. Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17841012 | 53220823 | 47,500,000 | 20,705,940 | 20,316,996 | 20,316,996 | 20,316,996 | 0 | 0 | 0 | 2024-11-01 | CV. FELI TIRTHA MANDIRI | 39.579.843.2-711.000 | 27,183,004 | 57.23 % | |
603 | 2024 | Dinas Pendidikan | Jasa Konsultrasi Perencanaan Penimbunan Halaman Sekolah SLBN 1 Kuala Kapuas, Pembangunan Pagar sekolah SLBN 1 Palangka Raya, Pembangunan Paping SLBN 1 Sampit, Rehabilitasi Pagar Sekolah SLBN 1 Sampit dan Penimbunan Halaman Sekolah SLBN 2 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17860012 | 53268136 | 42,500,000 | 42,496,350 | 42,496,350 | 42,496,350 | 42,496,350 | 0 | 0 | 0 | 2024-11-02 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 3,650 | 0.01 % | |
604 | 2024 | Dinas Kebudayaan dan Pariwisata | Belanja Jasa Konsultansi Perencanaan Arsitektur - Rehab Pagar Pesanggrahan Tjilik Riwut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17814012 | 53104346 | 68,900,000 | 68,900,000 | 68,772,492 | 68,772,492 | 68,217,492 | 68,217,492 | 0 | 68,217,492 | 2024-10-29 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 127,508 | 0.19 % | |
605 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Babi, Pakan dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10026897000 | 52123226 | 18,532,500 | 18,532,500 | 18,033,000 | 18,033,000 | 18,020,850 | 0 | 0 | 0 | 2024-12-07 | 499,500 | 2.7 % | |||
606 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan WC 2 Unit SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15890012 | 50730701 | 27,000,000 | 27,000,000 | 26,800,000 | 26,800,000 | 26,800,000 | 26,800,000 | 0 | 26,800,000 | 2024-03-28 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 200,000 | 0.74 % | |
607 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 10 Palangka Raya (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15860012 | 50408797 | 78,824,800 | 78,824,800 | 78,641,724 | 78,641,724 | 78,641,724 | 78,641,724 | 0 | 78,641,724 | 2024-03-22 | 183,076 | 0.23 % | |||
608 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15851012 | 50467270 | 21,757,000 | 21,757,000 | 21,625,000 | 21,625,000 | 21,625,000 | 21,625,000 | 21,625,000 | 21,625,000 | 2024-03-25 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 132,000 | 0.61 % | |
609 | 2024 | Dinas Perhubungan | Perencanaan Rehabilitasi Sedang/Berat Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15823012 | 50017129 | 89,813,000 | 89,813,000 | 89,688,000 | 89,688,000 | 89,688,000 | 89,688,000 | 89,688,000 | 89,688,000 | 2024-03-18 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 125,000 | 0.14 % | 3 |
610 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15982012 | 49434241 | 99,980,000 | 99,980,000 | 99,872,250 | 99,872,250 | 99,870,000 | 99,870,000 | 0 | 99,870,000 | 2024-04-20 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 107,750 | 0.11 % | 3 |
611 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15983012 | 49436702 | 98,935,553 | 98,935,000 | 98,828,850 | 98,828,850 | 98,828,000 | 98,828,000 | 0 | 98,828,000 | 2024-04-20 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 106,703 | 0.11 % | 3 |
612 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Kantin, Ruang Guru, Ruang Kepala Sekolah, Ruang Keterampilan, Ruang Pembelajaran Khusus, Ruang Perpustakaan, Ruang Tata Usaha, Ruang UKS, Selasar Penghubung SLBN 3 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17337012 | 51911594 | 85,978,800 | 85,692,000 | 85,137,000 | 85,137,000 | 85,137,000 | 85,137,000 | 0 | 85,137,000 | 2024-07-01 | 841,800 | 0.98 % | 3 | ||
613 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17430012 | 51930758 | 60,000,000 | 60,000,000 | 59,951,100 | 59,951,100 | 59,673,600 | 59,673,600 | 59,673,600 | 59,673,600 | 2024-07-01 | CV. SEIPUTRA PERSADA | 02.539.098.0-711.000 | 48,900 | 0.08 % | 3 |
614 | 2024 | Dinas Sosial | Pengawasan Rehabilitasi Kantor Dinas Sosial Provinsi Kalimantan Tengah (Ruang Kadis dan Toilet Kantor) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17459012 | 49929417 | 49,820,000 | 49,820,000 | 49,804,035 | 49,804,035 | 48,893,280 | 48,893,280 | 48,893,280 | 48,893,280 | 2024-08-23 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 15,965 | 0.03 % | 3 |
615 | 2024 | Dinas Sosial | Pengawasan Pembangunan Musholla UPT PSBL (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17461012 | 49455370 | 26,475,000 | 26,475,000 | 24,881,760 | 24,881,760 | 24,619,800 | 24,619,800 | 24,619,800 | 24,619,800 | 2024-07-10 | CV. MULTI TEKNIKA | 01.489.648.4-711.000 | 1,593,240 | 6.02 % | 3 |
616 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17724012 | 52869548 | 99,640,000 | 99,640,000 | 99,345,000 | 99,345,000 | 99,345,000 | 99,345,000 | 0 | 99,345,000 | 2024-10-12 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 295,000 | 0.3 % | 3 |
617 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Kotawaringin Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17728012 | 52869819 | 96,460,000 | 96,460,000 | 95,904,000 | 95,904,000 | 95,904,000 | 95,904,000 | 0 | 95,904,000 | 2024-10-12 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 556,000 | 0.58 % | 3 |
618 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Penataan Halaman dan Paving SMAN 2 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17274012 | 51398894 | 83,998,000 | 83,998,000 | 83,139,000 | 83,139,000 | 83,139,000 | 83,139,000 | 83,139,000 | 83,139,000 | 2024-06-07 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 859,000 | 1.02 % | |
619 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pembangunan Lanjutan Jalan Menuju Sekolah SMAN 1 Tamban Catur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17768012 | 52878588 | 65,000,000 | 65,000,000 | 64,866,800 | 64,866,800 | 64,866,800 | 0 | 0 | 0 | 2024-10-16 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 133,200 | 0.2 % | |
620 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15907012 | 49211291 | 52,800,000 | 52,700,036 | 51,953,550 | 51,953,550 | 51,629,430 | 51,629,430 | 51,629,430 | 51,629,430 | 2024-03-28 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 846,450 | 1.6 % | |
621 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Drainase | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17793012 | 52775425 | 22,000,000 | 21,997,980 | 21,986,880 | 21,986,880 | 21,986,880 | 0 | 0 | 0 | 2024-10-18 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 13,120 | 0.06 % | |
622 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Asrama | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17864012 | 53269815 | 17,820,000 | 17,820,000 | 17,765,550 | 17,765,550 | 17,765,550 | 0 | 0 | 0 | 2024-11-04 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 54,450 | 0.31 % | |
623 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Bangunan Gedung - Rehab Ruang Direktur | Pengadaan Langsung | Pekerjaan Konstruksi | 17711012 | 52763600 | 200,000,000 | 200,000,000 | 199,945,000 | 199,945,000 | 199,630,000 | 0 | 0 | 0 | 2024-10-16 | CV. ASANA KARYA | 71.140.245.3-711.000 | 55,000 | 0.03 % | |
624 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Lanjutan pembuatan pagar dan penataan halaman sekolah SMAN 1 Arut Utara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17305012 | 51398865 | 32,400,000 | 32,400,000 | 32,289,900 | 32,289,900 | 32,289,900 | 32,289,900 | 32,289,900 | 32,289,900 | 2024-06-12 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 110,100 | 0.34 % | |
625 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Arut Utara (Rehabilitasi Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15790012 | 50393059 | 45,515,100 | 45,515,100 | 45,177,000 | 45,177,000 | 45,177,000 | 45,177,000 | 0 | 45,177,000 | 2024-03-21 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 338,100 | 0.74 % | |
626 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAS Kristen Palangka Raya (Rehabilitasi Rg. Kelas) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16132012 | 51240474 | 67,792,500 | 67,792,500 | 67,738,000 | 67,738,000 | 67,738,000 | 67,738,000 | 0 | 67,738,000 | 2024-05-21 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 54,500 | 0.08 % | |
627 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Gedung Laboratorium Pada Kegiatan Pembangunan Pabrik Pakan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17610012 | 50584261 | 17,204,500 | 17,116,000 | 17,061,394 | 17,061,394 | 17,038,500 | 17,038,500 | 17,038,500 | 17,038,500 | 2024-08-22 | 143,106 | 0.83 % | |||
628 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17380012 | 51458609 | 45,000,000 | 45,000,000 | 44,833,500 | 44,833,500 | 44,833,500 | 44,833,500 | 44,833,500 | 44,833,500 | 2024-07-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 166,500 | 0.37 % | |
629 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAS PGRI Pulau Hanaut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17244012 | 51398941 | 49,986,000 | 49,986,000 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 49,506,000 | 2024-05-30 | 480,000 | 0.96 % | |||
630 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI PLAFON DAN TANGGA KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15744012 | 49831359 | 32,350,000 | 32,325,281 | 32,214,000 | 32,214,000 | 31,537,181 | 31,537,181 | 31,537,181 | 31,537,181 | 2024-03-07 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 136,000 | 0.42 % | |
631 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultasi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (PERENCANAAN PEMBANGUNAN TOWER TRIANGLE PEMANCAR RADIO) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10031643000 | 53754396 | 15,000,000 | 14,990,000 | 14,950,000 | 14,950,000 | 14,950,000 | 0 | 0 | 0 | 2024-12-18 | 50,000 | 0.33 % | |||
632 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN RUANG TUNGGU CEK FISIK MOBIL | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16017012 | 49211993 | 32,832,000 | 32,648,929 | 32,458,250 | 32,458,250 | 32,230,756 | 32,230,756 | 32,230,756 | 32,230,756 | 2024-04-29 | CV. DAKSA RESWARA PRAKASA | 65.529.585.5-711.000 | 373,750 | 1.14 % | |
633 | 2024 | Dinas Kelautan dan Perikanan | 3.25.03.1.06.0001.5.2.03.01.01.0018 Redesign Peningkatan Jalan Titian Pelabuhan Perikanan Kuala Jelai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17717012 | 52754950 | 70,000,000 | 70,000,000 | 69,993,825 | 69,993,825 | 69,000,000 | 69,000,000 | 69,000,000 | 69,000,000 | 2024-10-07 | CV. SEIPUTRA PERSADA | 02.539.098.0-711.000 | 6,175 | 0.01 % | |
634 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Dusun Utara (Pembangunan Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17433012 | 51153664 | 51,153,200 | 51,153,200 | 51,032,805 | 51,032,805 | 51,032,805 | 51,032,805 | 51,032,805 | 51,032,805 | 2024-07-03 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 120,395 | 0.24 % | |
635 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Bimbingan Konseling SMAN 4 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17826012 | 52899120 | 20,000,000 | 20,000,000 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 2024-10-28 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 77,700 | 0.39 % | |
636 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17529012 | 51852251 | 41,850,000 | 41,850,000 | 41,800,000 | 41,800,000 | 41,800,000 | 41,800,000 | 41,800,000 | 41,800,000 | 2024-07-25 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 50,000 | 0.12 % | |
637 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Laboratorium Komputer SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17786012 | 52880518 | 30,000,000 | 30,000,000 | 29,780,412 | 29,780,412 | 29,780,412 | 0 | 0 | 0 | 2024-10-17 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 219,588 | 0.73 % | |
638 | 2024 | Dinas Perhubungan | Rehabilitasi Terminal Natai Suka Kabupaten Kotawaringin Barat | Pengadaan Langsung | Pekerjaan Konstruksi | 17571012 | 51282101 | 164,141,000 | 164,141,000 | 163,630,362 | 163,630,362 | 163,518,775 | 163,518,775 | 163,518,775 | 163,518,775 | 2024-08-05 | CV. ARTHA CAPRICORNUS | 01.922.068.0-711.000 | 510,638 | 0.31 % | |
639 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pekerjaan Taman Smart Green House Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17757012 | 52365975 | 40,000,000 | 40,000,000 | 39,849,000 | 39,849,000 | 39,849,000 | 0 | 0 | 0 | 2024-10-22 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 151,000 | 0.38 % | |
640 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Kelas) 7 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16190012 | 51239274 | 65,551,400 | 65,551,400 | 65,490,000 | 65,490,000 | 65,490,000 | 65,490,000 | 0 | 65,490,000 | 2024-05-28 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 61,400 | 0.09 % | |
641 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Kantor SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17785012 | 52880465 | 40,000,000 | 40,000,000 | 39,710,028 | 39,710,028 | 39,710,028 | 0 | 0 | 0 | 2024-10-17 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 289,972 | 0.72 % | |
642 | 2024 | Dinas Energi dan Sumber Daya Mineral | Penyediaan Peralatan dan Perlengkapan Kantor -Bahan Lainnya (Sekat Ruangan) | Pengadaan Langsung | Pengadaan Barang | 17715012 | 48640367 | 123,899,160 | 123,890,000 | 123,800,000 | 123,800,000 | 123,578,000 | 123,578,000 | 123,578,000 | 123,578,000 | 2024-10-07 | 99,160 | 0.08 % | |||
643 | 2024 | Dinas Ketahanan Pangan | Jasa Konsultansi Perencanaan Rehab Gedung Kantor Pasca Kebakaran di Dinas Ketahanan Pangan Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17736012 | 52895855 | 18,000,000 | 18,000,000 | 17,982,000 | 17,982,000 | 17,460,300 | 17,460,300 | 17,460,300 | 17,460,300 | 2024-10-12 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 18,000 | 0.1 % | |
644 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Jalan Produksi/Jalan Usaha Tani di IPBH Keruing | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17681012 | 52671062 | 28,091,840 | 28,091,840 | 28,050,000 | 28,050,000 | 27,930,930 | 27,930,930 | 27,930,930 | 27,930,930 | 2024-09-30 | 41,840 | 0.15 % | |||
645 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI RUANGAN LANTAI 1 DAN RUANGAN SEKRETARIAT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17519012 | 49960506 | 50,528,000 | 50,505,000 | 50,449,500 | 50,449,500 | 49,683,600 | 49,683,600 | 49,683,600 | 49,683,600 | 2024-07-22 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 78,500 | 0.16 % | |
646 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Penataan dan Penimbunan Halaman SMAN 2 Kahayan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17830012 | 52898328 | 25,000,000 | 25,000,000 | 24,753,000 | 24,753,000 | 24,753,000 | 24,753,000 | 24,753,000 | 24,753,000 | 2024-10-26 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 247,000 | 0.99 % | |
647 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Pengawasan Pemeliharaan berupa Pengecatan Bangunan Gedung Admin RSUD dr. Doris Sylvanus | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17487012 | 51985655 | 12,000,000 | 11,900,000 | 11,880,000 | 11,880,000 | 11,655,000 | 11,655,000 | 11,655,000 | 11,655,000 | 2024-07-25 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 120,000 | 1 % | |
648 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Rehab Ruang Rapat Direksi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16058012 | 51500676 | 10,000,000 | 9,602,000 | 9,500,490 | 9,500,490 | 6,832,050 | 6,832,050 | 6,832,050 | 6,832,050 | 2024-05-28 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 499,510 | 5 % | |
649 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN GEDUNG ARSIP UPTPPD PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16018012 | 49197483 | 86,761,976 | 81,813,632 | 81,400,879 | 81,400,879 | 81,173,273 | 81,173,273 | 81,173,273 | 81,173,273 | 2024-04-29 | CV. DAKSA RESWARA PRAKASA | 65.529.585.5-711.000 | 5,361,097 | 6.18 % | |
650 | 2024 | Dinas Ketahanan Pangan | Jasa Konsultansi Pengawasan Teknis Pemeliharaan Kantor Rehab Sedang Dinas Ketahanan Pangan Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17848012 | 53208530 | 35,000,000 | 35,000,000 | 34,889,000 | 34,889,000 | 34,167,500 | 34,167,500 | 34,167,500 | 34,167,500 | 2024-11-04 | Roa Solution | 92.337.883.0-711.000 | 111,000 | 0.32 % | |
651 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Pengecoran Jalan Lingkungan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17794012 | 52993498 | 20,900,000 | 20,874,950 | 20,844,500 | 20,844,500 | 20,844,500 | 0 | 0 | 0 | 2024-10-18 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 55,500 | 0.27 % | |
652 | 2024 | Inspektorat | Belanja Modal Pantry Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 17780012 | 52832408 | 100,000,000 | 100,000,000 | 99,917,760 | 99,917,760 | 99,751,260 | 0 | 0 | 0 | CV.EL BARRA | 20.634.253.7-711.000 | 82,240 | 0.08 % | ||
653 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Modal Bangunan Parkir (PARKIR PUSDALOP-PB BPB-PK Prov. Kalteng) | Pengadaan Langsung | Pekerjaan Konstruksi | 10019443000 | 53559351 | 180,000,000 | 180,000,000 | 179,717,413 | 179,717,413 | 179,700,000 | 0 | 0 | 0 | 2024-12-02 | 282,587 | 0.16 % | |||
654 | 2024 | Dinas Kelautan dan Perikanan | 3.25.02.1.02.0003.5.1.02.02.08.0015 Belanja Jasa Konsultansi Perencanaan Penataan Ruang-Jasa Perencanaan Wilayah ( Jasa Konsultansi Pembuatan Peta KKPRL) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10009467000 | 52850933 | 40,032,000 | 40,015,500 | 39,960,000 | 39,960,000 | 39,500,000 | 39,500,000 | 39,500,000 | 39,500,000 | 2024-11-19 | CV. POLYGONS | 02.618.529.8-711.000 | 72,000 | 0.18 % | |
655 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Penataan Halaman dan Paving SMAN 1 Kapuas Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16137012 | 51398700 | 90,000,000 | 90,000,000 | 89,299,500 | 89,299,500 | 89,299,500 | 89,299,500 | 89,299,500 | 89,299,500 | 2024-05-22 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 700,500 | 0.78 % | |
656 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Balai Riam (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17360012 | 51239859 | 43,863,300 | 43,863,300 | 43,730,100 | 43,730,100 | 43,730,100 | 43,730,100 | 43,730,100 | 43,730,100 | 2024-07-02 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 133,200 | 0.3 % | |
657 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Lanjutan pemasangan plafon dan keramik ruang kelas SMAN 1 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17324012 | 51398820 | 30,000,000 | 30,000,000 | 29,914,500 | 29,914,500 | 29,914,500 | 29,914,500 | 29,914,500 | 29,914,500 | 2024-06-19 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 85,500 | 0.29 % | |
658 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Lanjutan penataan Halaman SMAN 1 Kasongan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17760012 | 52877769 | 100,000,000 | 98,956,500 | 98,423,700 | 98,423,700 | 98,423,700 | 0 | 0 | 0 | 2024-10-16 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 1,576,300 | 1.58 % | |
659 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17482012 | 51852024 | 76,900,000 | 76,900,000 | 76,786,800 | 76,786,800 | 76,786,800 | 76,786,800 | 76,786,800 | 76,786,800 | 2024-07-15 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 113,200 | 0.15 % | |
660 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang OSIS SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17315012 | 51212594 | 13,790,000 | 13,790,000 | 13,719,000 | 13,719,000 | 13,719,000 | 13,719,000 | 13,719,000 | 13,719,000 | 2024-06-13 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 71,000 | 0.51 % | |
661 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 1 Gunung Bintang Awai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17668012 | 52609933 | 25,000,000 | 25,000,000 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 2024-09-26 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 46,090 | 0.18 % | |
662 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16007012 | 49488010 | 10,844,000 | 10,844,000 | 10,772,550 | 10,772,550 | 10,772,550 | 10,772,550 | 0 | 10,772,550 | 2024-04-24 | 71,450 | 0.66 % | |||
663 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Renovasi Bangunan Screen House di IPBH Keruing | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17882012 | 52434029 | 49,820,000 | 49,734,300 | 49,314,587 | 49,314,587 | 49,110,285 | 49,110,285 | 49,110,285 | 49,110,285 | 2024-11-06 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 505,413 | 1.01 % | |
664 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Pagar UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17267012 | 51802827 | 124,570,000 | 99,999,900 | 99,678,000 | 99,678,000 | 99,012,000 | 99,012,000 | 99,012,000 | 99,012,000 | 2024-06-11 | GEO DINAMIKA UTAMA | 01.576.437.6-711.000 | 24,892,000 | 19.98 % | |
665 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 3 Ruang SMAN 1 Sampit (Sistem Suntik) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17384012 | 51398975 | 90,000,000 | 90,000,000 | 89,826,750 | 89,826,750 | 89,826,750 | 89,826,750 | 89,826,750 | 89,826,750 | 2024-07-22 | 173,250 | 0.19 % | |||
666 | 2024 | Dinas Pendidikan | Perencanaan Rehab Toilet Ruang Gedung Kantor Dinas Pendidikan Prov. Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17657012 | 52559536 | 80,000,000 | 80,000,000 | 79,600,701 | 79,600,701 | 79,600,701 | 79,600,701 | 79,600,701 | 79,600,701 | 2024-09-23 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 399,299 | 0.5 % | |
667 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 2 PALANGKARAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16078012 | 50540379 | 18,198,000 | 18,198,000 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 18,142,500 | 2024-05-06 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 55,500 | 0.3 % | |
668 | 2024 | Badan Pendapatan Daerah | Perkerjaan Perencanaan Penataan Halaman Aula Utama Bapenda Tahap 4 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15905012 | 49114037 | 81,000,000 | 80,952,300 | 80,375,100 | 80,375,100 | 79,675,800 | 79,675,800 | 79,675,800 | 79,675,800 | 2024-03-28 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 624,900 | 0.77 % | |
669 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Perencanaan Pembangunan Gudang Pakan Ternak UPT BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16199012 | 51460040 | 12,418,212 | 12,418,212 | 12,314,982 | 12,314,982 | 12,298,245 | 12,298,245 | 12,298,245 | 12,298,245 | 2024-05-29 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 103,230 | 0.83 % | |
670 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAN 4 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17394012 | 51399841 | 30,000,000 | 30,000,000 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 2024-07-11 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 88,800 | 0.3 % | |
671 | 2024 | Dinas Perhubungan | Pengawasan Rehabilitasi Dermaga Jabiren di Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16125012 | 51275198 | 10,070,000 | 10,070,000 | 10,050,001 | 10,050,001 | 10,016,701 | 10,016,701 | 0 | 10,016,701 | 2024-05-17 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 19,999 | 0.2 % | |
672 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 2 Montallat | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17670012 | 52610090 | 25,000,000 | 25,000,000 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 24,953,910 | 2024-09-26 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 46,090 | 0.18 % | |
673 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI KANTOR UPTPPD KUALA KURUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15732012 | 49828623 | 45,360,000 | 44,716,905 | 44,244,600 | 44,244,600 | 43,323,300 | 43,323,300 | 43,323,300 | 43,323,300 | 2024-03-07 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 1,115,400 | 2.46 % | |
674 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika,Biologi SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15923012 | 50540728 | 81,732,000 | 81,732,000 | 81,621,000 | 81,621,000 | 81,621,000 | 81,621,000 | 81,621,000 | 81,621,000 | 2024-04-01 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 111,000 | 0.14 % | |
675 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Asrama Banjarbaru | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15681012 | 46855997 | 45,000,000 | 44,936,000 | 44,726,784 | 44,726,784 | 44,726,784 | 44,726,784 | 44,726,784 | 44,726,784 | 2024-01-11 | CV. KRUF STUDIO ENGINEERING | 81.075.394.7-711.000 | 273,216 | 0.61 % | |
676 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Banama Tingang (Rehabilitasi Rg. Lab. Biologi, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15858012 | 50408682 | 58,462,800 | 58,462,800 | 58,341,600 | 58,341,600 | 58,341,600 | 58,341,600 | 0 | 58,341,600 | 2024-03-25 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 121,200 | 0.21 % | |
677 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Jaringan Listrik - Belanja Perakitan Panel Pembagi Beban | Pengadaan Langsung | Jasa Lainnya | 17467012 | 51999729 | 198,000,000 | 197,753,000 | 197,576,781 | 197,576,781 | 197,298,060 | 197,298,060 | 197,298,060 | 197,298,060 | 2024-08-08 | CV.ANAIS TEKNIK | 02.292.605.9-711.000 | 423,219 | 0.21 % | |
678 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Penataan Halaman dan Paving SMAN 2 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15808012 | 50729356 | 91,000,000 | 91,000,000 | 90,576,000 | 90,576,000 | 90,576,000 | 90,576,000 | 0 | 90,576,000 | 2024-03-21 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 424,000 | 0.47 % | |
679 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Dusun Utara (Pembangunan Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15839012 | 50377032 | 46,177,000 | 46,177,000 | 45,829,569 | 45,829,569 | 45,829,569 | 45,829,569 | 0 | 45,829,569 | 2024-03-21 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 347,431 | 0.75 % | |
680 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 6 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15862012 | 50410082 | 43,927,800 | 43,927,800 | 43,926,030 | 43,926,030 | 43,926,030 | 43,926,030 | 0 | 43,926,030 | 2024-03-25 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 1,770 | 0 % | |
681 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Supervisi Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah VIII | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17362012 | 51942584 | 100,000,000 | 99,999,900 | 99,910,545 | 99,910,545 | 99,628,000 | 99,628,000 | 99,628,000 | 99,628,000 | 2024-08-19 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 89,455 | 0.09 % | |
682 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Berupa Penyekatan dan Pemasangan Interior Gedung IBS Lt. 2 | Pengadaan Langsung | Pekerjaan Konstruksi | 17596012 | 52174208 | 50,000,000 | 49,950,000 | 49,895,136 | 49,895,136 | 49,519,500 | 49,519,500 | 49,519,500 | 49,519,500 | 2024-08-16 | CV.KARYA DAJABA PUTRA | 02.978.026.9-711.000 | 104,864 | 0.21 % | |
683 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembuatan Siring dan Drainase SMK NEGERI 2 KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16045012 | 51010552 | 84,000,000 | 84,000,000 | 83,445,000 | 83,445,000 | 83,445,000 | 83,445,000 | 83,445,000 | 83,445,000 | 2024-05-07 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 555,000 | 0.66 % | |
684 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan 1).Rehab Ruang Kelas SMKN 1 PANDIH BATU,2).Pembangunan Toilet Beserta Sanitasinya SMKN 1 PULANG PISAU,3).Rehab Ruang Kepala Sekolah/Guru/TU SMKN 1 BANAMA TINGANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17808012 | 52613128 | 73,532,000 | 73,532,000 | 73,400,851 | 73,400,851 | 73,400,851 | 0 | 0 | 0 | 2024-10-25 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 131,149 | 0.18 % | |
685 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan WC 2 Unit SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17392012 | 51399360 | 25,000,000 | 25,000,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 2024-07-04 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 50,000 | 0.2 % | |
686 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN GUDANG KANTOR BAPENDA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16182012 | 49701640 | 40,000,000 | 39,948,900 | 39,615,900 | 39,615,900 | 38,922,150 | 38,922,150 | 38,922,150 | 38,922,150 | 2024-05-29 | 384,100 | 0.96 % | |||
687 | 2024 | Dinas Pendidikan | Perencanaan Pembangunan Ruang Kelas Bertingkat Yayasan Pendidikan ANNUR Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15895012 | 49721530 | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,900,000 | 99,900,000 | 99,900,000 | 99,900,000 | 2024-04-01 | CV. PENDANG JAYA RAYA ENGINEERING | 01.662.432.2-711.000 | 100,000 | 0.1 % | |
688 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Instalasi Pembangkit Listrik Lainnya - Belanja Pemeliharaan Genset Doosan 650 kVa | Pengadaan Langsung | Jasa Lainnya | 17559012 | 52117607 | 200,000,000 | 199,515,000 | 198,201,600 | 198,201,600 | 196,825,200 | 196,825,200 | 196,825,200 | 196,825,200 | 2024-07-31 | PT. DEKA MULTI ENGINEERING | 20.106.314.6-711.000 | 1,798,400 | 0.9 % | |
689 | 2024 | Dinas Komunikasi, Informatika, Persandian dan Statistik | Beban Jasa Iklan/Reklame, Film, dan Pemotretan 2 | Pengadaan Langsung | Jasa Lainnya | 17680012 | 51820586 | 200,000,000 | 200,000,000 | 199,134,000 | 199,134,000 | 198,024,000 | 198,024,000 | 198,024,000 | 198,024,000 | 2024-10-01 | Maeztro Production | 80.107.943.5-711.000 | 866,000 | 0.43 % | |
690 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG KELAS SMAN 2 KATINGAN TENGAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17874012 | 53267745 | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,900,000 | 0 | 0 | 0 | 2024-11-06 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 100,000 | 0.1 % | |
691 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pemasangan Paving Halaman SMAN 1 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17778012 | 52880662 | 50,000,000 | 50,000,000 | 49,778,000 | 49,778,000 | 49,778,000 | 0 | 0 | 0 | 2024-10-16 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 222,000 | 0.44 % | |
692 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Penataan Halaman dan Pagar SMAN 1 Kahayan Kuala (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17597012 | 51399855 | 60,000,000 | 60,000,000 | 59,000,000 | 59,000,000 | 59,000,000 | 59,000,000 | 59,000,000 | 59,000,000 | 2024-08-13 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 1,000,000 | 1.67 % | |
693 | 2024 | Dinas Sosial | Perencanaan Pembuatan Drainase UPT PSBL Pambelum (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15969012 | 49436019 | 68,900,000 | 68,860,800 | 68,201,730 | 68,201,730 | 67,862,070 | 67,862,070 | 67,862,070 | 67,862,070 | 2024-04-17 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 698,270 | 1.01 % | |
694 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMA Garing Tarantang (Rehabilitasi Rg. Kelas, Rehabilitasi Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15773012 | 50391907 | 63,531,700 | 63,414,300 | 63,358,800 | 63,358,800 | 63,358,800 | 63,358,800 | 63,358,800 | 63,358,800 | 2024-03-18 | 172,900 | 0.27 % | |||
695 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17389012 | 51399187 | 55,000,000 | 55,000,000 | 54,900,000 | 54,900,000 | 54,900,000 | 54,900,000 | 54,900,000 | 54,900,000 | 2024-07-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 100,000 | 0.18 % | |
696 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Pengawasan Arsitektur (RESERVOIR) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17592012 | 52221339 | 70,000,000 | 70,000,000 | 69,541,500 | 69,541,500 | 69,486,000 | 69,486,000 | 69,486,000 | 69,486,000 | 2024-08-12 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 458,500 | 0.66 % | |
697 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 1 Katingan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16153012 | 51423389 | 19,000,000 | 19,000,000 | 18,933,400 | 18,933,400 | 18,933,400 | 18,933,400 | 18,933,400 | 18,933,400 | 2024-05-22 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 66,600 | 0.35 % | |
698 | 2024 | Badan Perencanaan Pembangunan Daerah, Penelitian dan Pengembangan | Belanja Jasa Konsultansi Spesialis-Jasa Pengujian dan Analisa Sistem Mekanikal dan Elektrikal | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16102012 | 49409040 | 80,000,000 | 76,890,431 | 75,188,070 | 75,188,070 | 75,021,570 | 75,021,570 | 75,021,570 | 75,021,570 | 2024-05-14 | Roa Solution | 92.337.883.0-711.000 | 4,811,930 | 6.01 % | |
699 | 2024 | Dinas Pendidikan | Pengawasan Rehab Toilet Kantor Dinas Pendidikan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17787012 | 53009033 | 49,820,000 | 49,820,000 | 49,596,340 | 49,596,340 | 49,596,340 | 0 | 0 | 0 | 2024-10-18 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 223,660 | 0.45 % | |
700 | 2024 | Badan Kesatuan Bangsa dan Politik | Jasa Konsultansi Pengawasan Peningkatan Jalan, Halaman dan Parit Keliling Kantor, Pengawasan Renovasi Pagar Kantor dan Pengawasan Renovasi Parkiran Motor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17629012 | 52364926 | 44,955,000 | 44,955,000 | 44,848,000 | 44,848,000 | 44,381,800 | 44,381,800 | 44,381,800 | 44,381,800 | 2024-09-04 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 107,000 | 0.24 % | |
701 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Supervisi Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10003799000 | 53011833 | 150,263,000 | 100,000,000 | 99,943,012 | 99,943,012 | 99,900,000 | 0 | 0 | 0 | 2024-11-11 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 50,319,988 | 33.49 % | |
702 | 2024 | Dinas Perhubungan | Rehabilitasi Dermaga Kereng Bengkirai di Kota Palangka Raya | Pengadaan Langsung | Pekerjaan Konstruksi | 17451012 | 51275605 | 165,803,875 | 165,800,000 | 165,773,000 | 165,773,000 | 165,641,593 | 165,641,593 | 165,641,593 | 165,641,593 | 2024-07-24 | CV. ADI GRAHA | 02.437.661.8-711.000 | 30,875 | 0.02 % | |
703 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pekerjaan Pembangunan Jalan Menuju Embung dan Saluran Drainase Sekitarnya UPT BBPHMT Km. 38 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17747012 | 52433830 | 30,000,000 | 30,000,000 | 29,947,800 | 29,947,800 | 29,503,800 | 29,503,800 | 29,503,800 | 29,503,800 | 2024-10-16 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 52,200 | 0.17 % | |
704 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Pondasi Silo Pada Kegiatan Pembangunan Pabrik Pakan Tahap II | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16108012 | 50584522 | 99,999,063 | 99,999,000 | 99,700,200 | 99,700,200 | 98,867,700 | 98,867,700 | 98,867,700 | 98,867,700 | 2024-05-18 | 298,863 | 0.3 % | |||
705 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 4 Palangka Raya (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. Tata Usaha) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17258012 | 51239977 | 40,115,400 | 40,115,400 | 39,238,500 | 39,238,500 | 39,238,500 | 39,238,500 | 0 | 39,238,500 | 2024-06-04 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 876,900 | 2.19 % | |
706 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Kambing Untuk Kabupaten Kotawaringin Timur Wilayah I | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10021955000 | 53545228 | 8,511,700 | 8,436,000 | 8,380,500 | 8,380,500 | 8,380,500 | 0 | 0 | 0 | 2024-11-30 | 131,200 | 1.54 % | |||
707 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17611012 | 49719441 | 7,942,500 | 7,941,499 | 7,869,900 | 7,869,900 | 7,514,700 | 7,514,700 | 7,514,700 | 7,514,700 | 2024-08-23 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 72,600 | 0.91 % | |
708 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15989012 | 51422962 | 72,054,000 | 72,000,000 | 71,700,450 | 71,700,450 | 71,700,000 | 71,700,000 | 71,700,000 | 71,700,000 | 2024-04-19 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 353,550 | 0.49 % | |
709 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Pengadaan Paket Fullboard Dalam Rangka Pelatihan Juru Sembelih Halal | Pengadaan Langsung | Jasa Lainnya | 17276012 | 51845145 | 74,232,000 | 74,232,000 | 74,160,000 | 74,160,000 | 74,160,000 | 74,160,000 | 74,160,000 | 74,160,000 | 2024-06-08 | PT. Wahana Abadi Regensi (Swiss-Belhotel Danum) | 02.618.611.4-711.000 | 72,000 | 0.1 % | |
710 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Kepala Sekolah SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15956012 | 50727452 | 33,250,000 | 33,250,000 | 33,183,000 | 33,183,000 | 33,183,000 | 33,183,000 | 0 | 33,183,000 | 2024-04-19 | 67,000 | 0.2 % | |||
711 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAGAR DEPAN DAN SAMPING KANAN UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17221012 | 49714080 | 19,062,000 | 18,925,500 | 18,814,500 | 18,814,500 | 18,337,200 | 18,337,200 | 18,337,200 | 18,337,200 | 2024-05-29 | 247,500 | 1.3 % | |||
712 | 2024 | Badan Keuangan dan Aset Daerah | Belanja Alat/ Bahan untuk Kegiatan Kantor-Alat/ Bahan untuk Kegiatan Kantor Lainnya | Pengadaan Langsung | Pengadaan Barang | 17632012 | 52412156 | 86,750,000 | 86,750,000 | 86,600,000 | 86,600,000 | 86,000,000 | 86,000,000 | 86,000,000 | 86,000,000 | 2024-09-17 | ANUGRAH DUA PUTRA | 86.917.332.8-711.000 | 150,000 | 0.17 % | |
713 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN TOILET UMUM AULA UTAMA BAPENDA PROV.KAL-TENG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17553012 | 49722110 | 28,500,000 | 28,460,400 | 28,194,000 | 28,194,000 | 27,544,650 | 27,544,650 | 27,544,650 | 27,544,650 | 2024-07-31 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 306,000 | 1.07 % | |
714 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BUNTOK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17815012 | 49717415 | 7,942,500 | 7,941,499 | 7,881,000 | 7,881,000 | 7,492,500 | 0 | 0 | 0 | 2024-11-01 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 61,500 | 0.77 % | |
715 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Pagar dan Penataan Halaman Sekolah SMKN 1 SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15995012 | 51010594 | 28,620,000 | 26,584,500 | 26,495,700 | 26,495,700 | 26,495,700 | 26,495,700 | 26,495,700 | 26,495,700 | 2024-05-06 | 2,124,300 | 7.42 % | |||
716 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Samuda Besar Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15674012 | 46521924 | 160,000,000 | 160,000,000 | 159,876,634 | 159,876,634 | 159,704,763 | 159,700,000 | 0 | 159,700,000 | 2024-01-05 | CV. AGAPE KARYA | 01.576.239.6-711.000 | 123,366 | 0.08 % | |
717 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Rehab Loket Ruang Kamboja | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16050012 | 51500522 | 5,000,000 | 4,999,000 | 4,995,000 | 4,995,000 | 4,062,600 | 4,062,600 | 4,062,600 | 4,062,600 | 2024-05-22 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 5,000 | 0.1 % | |
718 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Pembinaan dan Evaluasi Kinerja Infrastruktur Air Minum di Provinsi Kalimantan Tengah 1 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15712012 | 47521032 | 80,000,000 | 80,000,000 | 79,958,850 | 79,958,850 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | Toman Ryan Wijaya Nababan | 84.644.933.8-952.000 | 41,150 | 0.05 % | |
719 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 10 Palangka Raya (Pembangunan Rg. UKS, Pembangunan Rg. BK, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16191012 | 51239949 | 30,080,500 | 30,080,500 | 30,000,000 | 30,000,000 | 30,000,000 | 30,000,000 | 0 | 30,000,000 | 2024-05-28 | 80,500 | 0.27 % | |||
720 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana dan Prasarana UPT.KPHL Gerbang Barito - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16203012 | 51716254 | 46,435,000 | 46,434,963 | 45,938,460 | 45,938,460 | 45,327,960 | 45,327,960 | 45,327,960 | 45,327,960 | 2024-06-04 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 496,540 | 1.07 % | |
721 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN BAK SAMPAH DAN SEPTICTANK UPTPPD PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17765012 | 49686815 | 4,187,500 | 4,187,499 | 4,107,000 | 4,107,000 | 3,873,900 | 0 | 0 | 0 | 2024-10-16 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 80,500 | 1.92 % | |
722 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Rehab 4 Ruang kelas dan Kantor SMAN 1 Tumpung Laung (Montalat Barut) - SMAN 1 Montallat (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17382012 | 51398275 | 48,000,000 | 48,000,000 | 47,866,800 | 47,866,800 | 47,866,800 | 47,866,800 | 47,866,800 | 47,866,800 | 2024-08-15 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 133,200 | 0.28 % | |
723 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Perencanaan Peningkatan Jalan dan Drainase UPT BBPHMT Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17637012 | 52365846 | 100,000,000 | 100,000,000 | 99,631,380 | 99,631,380 | 99,631,380 | 99,631,380 | 99,631,380 | 99,631,380 | 2024-09-06 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 368,620 | 0.37 % | |
724 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Menthobi Raya (Rehabilitasi Rg. BK, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15864012 | 50408637 | 33,416,700 | 33,416,700 | 33,415,440 | 33,415,440 | 33,415,440 | 33,415,440 | 0 | 33,415,440 | 2024-03-25 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 1,260 | 0 % | |
725 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Rungan Barat (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15842012 | 50388342 | 46,969,700 | 46,969,700 | 46,900,000 | 46,900,000 | 46,900,000 | 46,900,000 | 0 | 46,900,000 | 2024-03-25 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 69,700 | 0.15 % | |
726 | 2024 | Dinas Pendidikan | Jasa Konsyltansi Pengawasan Penimbunan Halaman Sekolah SLBN 1 Kuala Kapuas, Pembangunan Pagar sekolah SLBN 1 Palangka Raya, Pembangunan Paping SLBN 1 Sampit, Rehabilitasi Pagar Sekolah SLBN 1 Sampit dan Penimbunan Halaman Sekolah SLBN 2 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008543000 | 53268177 | 34,000,000 | 33,999,300 | 33,993,750 | 33,993,750 | 33,993,750 | 0 | 0 | 0 | 2024-11-18 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 6,250 | 0.02 % | |
727 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Kuala Kurun (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15772012 | 50388007 | 54,181,700 | 54,181,700 | 54,181,700 | 54,181,700 | 54,181,700 | 54,181,700 | 54,181,700 | 54,181,700 | 2024-03-15 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 0 | 0 % | |
728 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 4 Palangka Raya (Pembangunan Rg. Lab. Fisika) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15799012 | 50408955 | 43,927,800 | 43,927,800 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 43,234,500 | 2024-03-15 | 693,300 | 1.58 % | |||
729 | 2024 | KPHL GERBANG BARITO | Beban Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Perencana Kandang Sapi - Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16121012 | 49971021 | 28,620,000 | 28,620,000 | 28,313,880 | 28,313,880 | 27,814,380 | 27,814,380 | 27,814,380 | 27,814,380 | 2024-06-25 | GEO DINAMIKA UTAMA | 01.576.437.6-711.000 | 306,120 | 1.07 % | |
730 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Aksesibilitas SLBN 2 Pangkalan Bun. SLBN Kuala Kurun, SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10015223000 | 53031781 | 12,000,000 | 11,999,976 | 11,993,550 | 11,993,550 | 11,993,550 | 0 | 0 | 0 | 2024-11-22 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 6,450 | 0.05 % | |
731 | 2024 | Dinas Sosial | Perencanaan Rehabilitasi Pagar Dinas Sosial Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15968012 | 49514901 | 68,900,000 | 68,890,000 | 68,300,206 | 68,300,206 | 68,055,781 | 68,055,781 | 68,055,781 | 68,055,781 | 2024-04-18 | CV. DAKSA RESWARA PRAKASA | 65.529.585.5-711.000 | 599,794 | 0.87 % | |
732 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Bangunan Gedung Kantor - Pekerjaan Penambahan Main Distribution Panel (MDP) Gedung IKR | Pengadaan Langsung | Jasa Lainnya | 10004301000 | 52983404 | 66,000,000 | 65,447,778 | 65,370,000 | 65,370,000 | 64,907,250 | 0 | 0 | 0 | 2024-11-13 | CV.PATRIA TEHNIK | 03.134.923.6-711.000 | 630,000 | 0.95 % | |
733 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Pematang Karau (Rehabilitasi Rg. Kelas) 4 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15870012 | 50385130 | 49,390,700 | 49,390,700 | 49,335,049 | 49,335,049 | 49,335,049 | 49,335,049 | 0 | 49,335,049 | 2024-03-25 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 55,651 | 0.11 % | |
734 | 2024 | Badan Pendapatan Daerah | Pengawasan Penataan Halaman ( Penimbunan ) Halaman Kantor UPTPPD Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17805012 | 53063514 | 13,000,000 | 12,999,999 | 12,900,000 | 12,900,000 | 12,687,855 | 0 | 0 | 0 | 2024-10-30 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 100,000 | 0.77 % | |
735 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 2 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15998012 | 50968174 | 19,000,000 | 18,925,500 | 18,870,000 | 18,870,000 | 18,870,000 | 18,870,000 | 18,870,000 | 18,870,000 | 2024-05-06 | 130,000 | 0.68 % | |||
736 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Rumah Dinas G. Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10008119000 | 53470322 | 33,250,000 | 15,270,825 | 15,088,230 | 15,088,230 | 15,088,230 | 0 | 0 | 0 | 2024-11-20 | Roa Solution | 92.337.883.0-711.000 | 18,161,770 | 54.62 % | |
737 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Kotawaringin Lama (Rehabilitasi Rg. Lab. Kimia, Rehabilitasi Rg. Perpustakaan, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17252012 | 51239598 | 33,998,400 | 33,998,400 | 33,466,500 | 33,466,500 | 33,466,500 | 33,466,500 | 0 | 33,466,500 | 2024-06-03 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 531,900 | 1.56 % | |
738 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Mandau Telawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16147012 | 51422978 | 25,000,000 | 25,000,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 2024-05-22 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 50,000 | 0.2 % | |
739 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Bintang Awai (Pembangunan Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17284012 | 51153899 | 40,686,600 | 40,686,600 | 40,681,500 | 40,681,500 | 40,681,500 | 40,681,500 | 0 | 40,681,500 | 2024-06-07 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 5,100 | 0.01 % | |
740 | 2024 | Badan Keuangan dan Aset Daerah | Pemeliharaan Mushola Komp. Pemda G. Obos | Pengadaan Langsung | Pekerjaan Konstruksi | 17872012 | 53293870 | 150,000,000 | 150,000,000 | 149,950,437 | 149,950,437 | 149,950,437 | 0 | 0 | 0 | 2024-11-07 | CV. BANGUN TEHNIK BERSAMA | 39.560.168.5-711.000 | 49,563 | 0.03 % | |
741 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Rumah Dinas G.Obos | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15953012 | 51374515 | 5,100,000 | 5,006,506 | 4,895,100 | 4,895,100 | 4,895,100 | 4,895,100 | 4,895,100 | 4,895,100 | 2024-04-03 | Roa Solution | 92.337.883.0-711.000 | 204,900 | 4.02 % | |
742 | 2024 | Dinas Pemberdayaan Masyarakat dan Desa | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya | Pengadaan Langsung | Pekerjaan Konstruksi | 17518012 | 52116395 | 235,000,000 | 89,000,000 | 88,964,538 | 88,964,538 | 88,587,953 | 88,587,953 | 88,587,953 | 88,587,953 | 2024-07-22 | CV. USAHA BANGUN SARANA | 02.978.028.5-711.000 | 146,035,462 | 62.14 % | |
743 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Jelai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16151012 | 51424149 | 20,000,000 | 20,000,000 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 19,922,300 | 2024-05-22 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 77,700 | 0.39 % | |
744 | 2024 | Dinas Sosial | Pengawasan Pembuatan Drainase UPT PSBL Pambelum (Lanjutan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17464012 | 49441832 | 49,820,000 | 49,820,000 | 49,203,525 | 49,203,525 | 48,581,925 | 48,581,925 | 48,581,925 | 48,581,925 | 2024-07-10 | PT. EDUKA REKAYASA KONSULTAN | 01.489.523.9-711.000 | 616,475 | 1.24 % | |
745 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | JAsa Konsultansi Pengawasan Pembangunan Green House Kota P. Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10005163000 | 53297906 | 40,280,000 | 40,230,000 | 40,126,500 | 40,126,500 | 40,126,500 | 0 | 0 | 0 | 2024-11-13 | 153,500 | 0.38 % | |||
746 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG KEPALA SEKOLAH/PIMPINAN DAN PEMBANGUNAN RUANG GURU SMAN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17880012 | 53267698 | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,900,000 | 0 | 0 | 0 | 2024-11-06 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 100,000 | 0.1 % | |
747 | 2024 | Badan Pendapatan Daerah | Belanja Modal Bangunan Kantor ( Perencanaan Pemasangan Paving Blok Area UPTPPD Palangka Raya ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17371012 | 51956964 | 74,931,750 | 55,050,450 | 54,772,950 | 54,772,950 | 53,818,350 | 53,818,350 | 53,818,350 | 53,818,350 | 2024-06-26 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 20,158,800 | 26.9 % | |
748 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan RKB 2 Ruang SMAN 3 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17393012 | 51399809 | 30,000,000 | 30,000,000 | 29,924,520 | 29,924,520 | 29,924,520 | 29,924,520 | 29,924,520 | 29,924,520 | 2024-07-11 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 75,480 | 0.25 % | |
749 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (1 Ruang) SMKN 1 SEBANGAU KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16167012 | 51573276 | 28,620,000 | 28,620,000 | 28,560,000 | 28,560,000 | 28,560,000 | 28,560,000 | 28,560,000 | 28,560,000 | 2024-05-22 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 60,000 | 0.21 % | |
750 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Rehab Ruang Kelas SMKN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10004392000 | 53226721 | 24,000,000 | 24,000,000 | 23,833,500 | 23,833,500 | 23,833,500 | 0 | 0 | 0 | 2024-11-12 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 166,500 | 0.69 % | |
751 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan Jembatan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17561012 | 52171665 | 20,275,000 | 20,230,000 | 19,905,075 | 19,905,075 | 19,655,325 | 19,655,325 | 19,655,325 | 19,655,325 | 2024-07-31 | 369,925 | 1.82 % | |||
752 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Rehabilitasi Ruang Kelas dengan tingkat kerusakan minimal sedang beserta perabotnya SLBN 1 Kasongan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17695012 | 52094399 | 13,583,200 | 13,583,070 | 13,530,900 | 13,530,900 | 13,530,900 | 13,530,900 | 13,530,900 | 13,530,900 | 2024-09-30 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 52,300 | 0.39 % | |
753 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15848012 | 50468012 | 32,578,000 | 32,578,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 32,523,000 | 2024-03-25 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 55,000 | 0.17 % | |
754 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Asrama Kalteng Putra Putri Yogyakarta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15726012 | 49545210 | 20,000,000 | 20,000,000 | 19,785,750 | 19,785,750 | 19,785,750 | 19,785,750 | 19,785,750 | 19,785,750 | 2024-02-24 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 214,250 | 1.07 % | |
755 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Supervisi Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah VI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16117012 | 50877402 | 100,000,000 | 99,999,900 | 99,900,000 | 99,900,000 | 99,678,000 | 99,678,000 | 99,678,000 | 99,678,000 | 2024-05-20 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 100,000 | 0.1 % | |
756 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Lanjutan Pembangunan SMAN 2 Puruk Cahu (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17386012 | 51399019 | 30,000,000 | 30,000,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 29,950,000 | 2024-07-02 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 50,000 | 0.17 % | |
757 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Rehabilitasi Ruang Kelas (3 Ruang ) SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17415012 | 51202065 | 44,970,000 | 44,970,000 | 44,899,000 | 44,899,000 | 44,899,000 | 44,899,000 | 44,899,000 | 44,899,000 | 2024-06-27 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 71,000 | 0.16 % | |
758 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17407012 | 51201791 | 18,440,000 | 18,440,000 | 18,384,500 | 18,384,500 | 18,384,500 | 18,384,500 | 18,384,500 | 18,384,500 | 2024-06-27 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 55,500 | 0.3 % | |
759 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17419012 | 51196980 | 41,650,000 | 41,650,000 | 41,570,080 | 41,570,080 | 41,570,080 | 41,570,080 | 41,570,080 | 41,570,080 | 2024-06-28 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 79,920 | 0.19 % | |
760 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Ruang Lab Komputer SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15961012 | 50730622 | 31,500,000 | 31,500,000 | 31,000,000 | 31,000,000 | 31,000,000 | 31,000,000 | 0 | 31,000,000 | 2024-04-05 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 500,000 | 1.59 % | |
761 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BARITO TIMUR | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16028012 | 49199689 | 13,582,500 | 13,504,992 | 13,400,000 | 13,400,000 | 13,120,200 | 13,120,200 | 13,120,200 | 13,120,200 | 2024-05-01 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 182,500 | 1.34 % | |
762 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan WC 2 Unit SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17381012 | 51399539 | 23,000,000 | 23,000,000 | 22,950,000 | 22,950,000 | 22,950,000 | 22,950,000 | 22,950,000 | 22,950,000 | 2024-07-02 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 50,000 | 0.22 % | |
763 | 2024 | Badan Penghubung | Belanja Pemeliharaan Aset Tidak Berwujud-Software | Pengadaan Langsung | Jasa Lainnya | 16092012 | 51598332 | 100,000,000 | 98,000,000 | 97,957,500 | 97,957,500 | 97,957,500 | 0 | 0 | 0 | 2024-05-13 | 2,042,500 | 2.04 % | |||
764 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15760012 | 49206656 | 13,582,500 | 13,538,300 | 13,530,900 | 13,530,900 | 13,109,100 | 13,109,100 | 13,109,100 | 13,109,100 | 2024-03-07 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 51,600 | 0.38 % | |
765 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Pembangunan/Peningkatan Khatolic Center Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17603012 | 52260415 | 100,000,000 | 100,000,000 | 99,944,400 | 99,944,400 | 99,900,000 | 99,900,000 | 99,900,000 | 99,900,000 | 2024-08-16 | CV. MAYANG ENGINEERING | 02.292.848.5-711.000 | 55,600 | 0.06 % | |
766 | 2024 | Dinas Kebudayaan dan Pariwisata | Beban Jasa Konsultansi Perencanaan Rehab berat rumah jaga dan WC gedung pameran pada UPT museum Balanga | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16083012 | 51584889 | 65,000,000 | 65,000,000 | 64,850,000 | 64,850,000 | 64,602,000 | 64,602,000 | 64,602,000 | 64,602,000 | 2024-05-08 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 150,000 | 0.23 % | |
767 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Pengawasan Pembangunan Pagar Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10004531000 | 52921903 | 35,746,500 | 35,746,500 | 35,500,000 | 35,500,000 | 35,500,000 | 0 | 0 | 0 | 2024-11-12 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 246,500 | 0.69 % | |
768 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Bangunan Gedung - Rehab Plafon, Pemasangan Interior dan Ornamen Lobby Admin Lt. 1 | Pengadaan Langsung | Pekerjaan Konstruksi | 17701012 | 52174229 | 200,000,000 | 200,000,000 | 199,940,000 | 199,940,000 | 199,500,000 | 0 | 0 | 0 | 2024-10-18 | 60,000 | 0.03 % | |||
769 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Pengawasan Rehabilitasi ICU RS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17568012 | 51839722 | 100,000,000 | 99,877,000 | 99,411,600 | 99,411,600 | 98,973,150 | 98,973,150 | 98,973,150 | 98,973,150 | 2024-08-08 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 588,400 | 0.59 % | |
770 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pagar dan Penataan Halaman SMAN 10 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16127012 | 51399603 | 60,000,000 | 60,000,000 | 59,917,000 | 59,917,000 | 59,917,000 | 59,917,000 | 59,917,000 | 59,917,000 | 2024-05-16 | 83,000 | 0.14 % | |||
771 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pagar & Penataan Halaman SMAN 2 Pandih Batu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16113012 | 51399767 | 56,000,000 | 56,000,000 | 55,944,000 | 55,944,000 | 55,944,000 | 55,944,000 | 55,944,000 | 55,944,000 | 2024-05-15 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 56,000 | 0.1 % | |
772 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Perencanaan Penataan Halaman, Pembangunan Rumah Genset dan Penerangan Gedung Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17615012 | 52283730 | 68,735,952 | 68,733,000 | 68,409,522 | 68,409,522 | 68,259,006 | 68,259,006 | 68,259,006 | 68,259,006 | 2024-08-23 | 326,430 | 0.47 % | |||
773 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Supervisi Rehabilitasi Jaringan Irigasi D.I.R. Kuala Jelai I Kabupaten Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15693012 | 46342654 | 100,000,000 | 100,000,000 | 99,888,900 | 99,888,900 | 99,844,500 | 99,844,500 | 0 | 99,844,500 | 2024-02-07 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,100 | 0.11 % | |
774 | 2024 | Badan Keuangan dan Aset Daerah | Belanja Pakaian Dinas Lapangan | Pengadaan Langsung | Pengadaan Barang | 10013192000 | 53509847 | 91,227,066 | 91,227,066 | 91,142,100 | 91,142,100 | 90,576,000 | 90,576,000 | 90,576,000 | 90,576,000 | 2024-11-25 | CV.ANDA | 02.809.338.3-711.000 | 84,966 | 0.09 % | |
775 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Bagendang II Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15687012 | 46519828 | 160,000,000 | 160,000,000 | 159,759,518 | 159,759,518 | 159,637,621 | 159,637,000 | 0 | 159,637,000 | 2024-01-18 | CV. MITRA GENERASI MANDIRI | 74.969.738.9-711.000 | 240,482 | 0.15 % | |
776 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pagar dan Penataan Halaman SMAN 10 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15830012 | 50767655 | 75,000,000 | 75,000,000 | 74,864,505 | 74,864,505 | 74,864,505 | 74,864,505 | 0 | 74,864,505 | 2024-03-21 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 135,495 | 0.18 % | |
777 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Rehabilitasi Ruang Kelas dengan tingkat kerusakan minimal sedang beserta perabotnya SLBN 1 Kuala Kapuas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17692012 | 52094169 | 5,600,000 | 5,155,950 | 5,117,100 | 5,117,100 | 5,117,100 | 5,117,100 | 5,117,100 | 5,117,100 | 2024-09-30 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 482,900 | 8.62 % | |
778 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Kelas) 7 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15785012 | 50392342 | 93,063,800 | 93,063,800 | 92,961,100 | 92,961,100 | 92,961,100 | 92,961,100 | 0 | 92,961,100 | 2024-03-15 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 102,700 | 0.11 % | |
779 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Pengawasan Pembangunan Gudang Pakan Ternak UPT BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17605012 | 51460039 | 9,313,659 | 9,313,658 | 9,213,504 | 9,213,504 | 9,210,780 | 9,210,780 | 9,210,780 | 9,210,780 | 2024-08-16 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 100,155 | 1.08 % | |
780 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pagar dan Penataan Halaman SMAN 1 Sepang (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16097012 | 51398569 | 60,000,000 | 60,000,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 59,940,000 | 2024-05-13 | 60,000 | 0.1 % | |||
781 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI TOTAL RUMAH DINAS STAF UPTPPD BARITO SELATAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17402012 | 49961204 | 19,104,360 | 19,104,359 | 19,000,000 | 19,000,000 | 18,484,275 | 18,484,275 | 18,484,275 | 18,484,275 | 2024-07-03 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 104,360 | 0.55 % | |
782 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMKS MAHARATI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17312012 | 51588413 | 22,050,000 | 22,050,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 21,978,000 | 2024-06-13 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 72,000 | 0.33 % | |
783 | 2024 | Dinas Sosial | Perencanaan Peningkatan Jalan dan Halaman UPT PSBL Pambelum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15970012 | 49435669 | 97,944,000 | 97,943,500 | 96,615,510 | 96,615,510 | 96,220,350 | 96,220,350 | 96,220,350 | 96,220,350 | 2024-04-18 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 1,328,490 | 1.36 % | |
784 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG PERPUSTAKAAN, RUANG UKS DAN RUANG BK SMAN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17877012 | 53267702 | 75,000,000 | 75,000,000 | 74,925,000 | 74,925,000 | 74,925,000 | 0 | 0 | 0 | 2024-11-06 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 75,000 | 0.1 % | |
785 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI TOTAL RUMAH DINAS STAF UPTPPD BARITO SELATAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16020012 | 49834785 | 32,670,440 | 32,670,439 | 32,600,000 | 32,600,000 | 31,968,000 | 31,968,000 | 31,968,000 | 31,968,000 | 2024-04-29 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 70,440 | 0.22 % | |
786 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana dan Prasarana UPT.KPHP Barito Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17226012 | 51760498 | 72,825,000 | 72,824,880 | 72,824,001 | 72,824,001 | 72,076,185 | 72,076,185 | 72,076,185 | 72,076,185 | 2024-06-04 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 999 | 0 % | |
787 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS PGRI 2 Sampit (Pembangunan Rg. Guru, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15769012 | 50408617 | 63,561,800 | 63,561,800 | 63,231,150 | 63,231,150 | 63,231,150 | 63,231,150 | 63,231,150 | 63,231,150 | 2024-03-18 | 330,650 | 0.52 % | |||
788 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Supervisi Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah XI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17766012 | 52940836 | 100,000,000 | 99,999,900 | 99,900,000 | 99,900,000 | 99,500,000 | 0 | 0 | 0 | 2024-10-17 | CV.BETANG AGUNG PERKASA CONSULTANT | 02.437.667.5-711.000 | 100,000 | 0.1 % | |
789 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16061012 | 50543436 | 75,883,000 | 75,883,000 | 75,800,000 | 75,800,000 | 75,800,000 | 75,800,000 | 75,800,000 | 75,800,000 | 2024-05-06 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 83,000 | 0.11 % | |
790 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Pengawasan Pembangunan Jembatan Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17675012 | 52283862 | 23,925,960 | 23,924,940 | 23,865,000 | 23,865,000 | 23,865,000 | 23,865,000 | 23,865,000 | 23,865,000 | 2024-09-30 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 60,960 | 0.25 % | |
791 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17816012 | 49718322 | 7,500,000 | 7,499,999 | 7,425,900 | 7,425,900 | 7,048,500 | 0 | 0 | 0 | 2024-11-01 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 74,100 | 0.99 % | |
792 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16071012 | 50544880 | 31,136,000 | 31,136,000 | 31,080,500 | 31,080,500 | 31,080,500 | 31,080,500 | 31,080,500 | 31,080,500 | 2024-05-06 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 55,500 | 0.18 % | |
793 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer,Laboratorium Bahasa SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17485012 | 51358098 | 51,360,000 | 51,360,000 | 51,297,840 | 51,297,840 | 51,297,840 | 51,297,840 | 51,297,840 | 51,297,840 | 2024-07-15 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 62,160 | 0.12 % | |
794 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAS PGRI Pulau Hanaut | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15866012 | 50729398 | 58,317,000 | 58,317,000 | 57,498,000 | 57,498,000 | 57,498,000 | 57,498,000 | 57,498,000 | 57,498,000 | 2024-03-25 | 819,000 | 1.4 % | |||
795 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia SMK NEGERI 1 SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17317012 | 51358414 | 31,560,000 | 31,560,000 | 31,504,500 | 31,504,500 | 31,504,500 | 31,504,500 | 31,504,500 | 31,504,500 | 2024-06-13 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 55,500 | 0.18 % | |
796 | 2024 | Badan Pendapatan Daerah | Perencanaan Pembangunan Ruang Pantry Kantor Samsat Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17524012 | 52118669 | 14,450,000 | 14,339,091 | 14,257,395 | 14,257,395 | 13,697,400 | 13,697,400 | 13,697,400 | 13,697,400 | 2024-07-22 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 192,605 | 1.33 % | |
797 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Jaringan Listrik - Belanja Jumper Genset Unit 2 1000kVA ke ATS Unit 1 650kVA | Pengadaan Langsung | Jasa Lainnya | 17472012 | 52019548 | 200,000,000 | 199,999,000 | 199,954,512 | 199,954,512 | 198,704,208 | 198,704,208 | 198,704,208 | 198,704,208 | 2024-07-23 | CV.ANAIS TEKNIK | 02.292.605.9-711.000 | 45,488 | 0.02 % | |
798 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan,1).Pembangunan Siring SMKN 1 LAMANDAU,2).Lanjutan Pembangunan Ruang Laboratorium dan Penataan Halaman SMKN 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17811012 | 52613441 | 61,670,000 | 61,670,000 | 61,521,750 | 61,521,750 | 61,521,750 | 0 | 0 | 0 | 2024-10-25 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 148,250 | 0.24 % | |
799 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Palangka Raya (Pembangunan Toilet (Jamban), Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15879012 | 50409879 | 43,218,800 | 43,218,800 | 43,150,000 | 43,150,000 | 43,150,000 | 43,150,000 | 0 | 43,150,000 | 2024-04-02 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 68,800 | 0.16 % | |
800 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Pematang Karau (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15871012 | 50387102 | 50,587,700 | 50,587,700 | 50,500,000 | 50,500,000 | 50,500,000 | 50,500,000 | 0 | 50,500,000 | 2024-03-25 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 87,700 | 0.17 % | |
801 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17479012 | 51852081 | 76,900,000 | 76,900,000 | 38,406,720 | 38,406,720 | 38,406,720 | 38,406,720 | 38,406,720 | 38,406,720 | 2024-07-15 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 38,493,280 | 50.06 % | |
802 | 2024 | KPHP SUKAMARA LAMANDAU | Belanja Jasa Konsultansi Pengawasan Arsitektur - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17716012 | 52516259 | 20,140,000 | 19,883,025 | 19,801,290 | 19,801,290 | 19,608,150 | 0 | 0 | 0 | 2024-10-25 | 338,710 | 1.68 % | |||
803 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 6 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17290012 | 51240595 | 30,927,300 | 30,927,300 | 30,858,000 | 30,858,000 | 30,858,000 | 30,858,000 | 30,858,000 | 30,858,000 | 2024-06-10 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 69,300 | 0.22 % | |
804 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17441012 | 51852351 | 44,050,000 | 44,050,000 | 43,916,800 | 43,916,800 | 43,916,800 | 43,916,800 | 43,916,800 | 43,916,800 | 2024-07-06 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 133,200 | 0.3 % | |
805 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Perencanaan pagar pengaman | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16037012 | 51493316 | 139,920,000 | 99,987,200 | 99,850,000 | 99,850,000 | 99,800,000 | 99,800,000 | 100 | 99,800,000 | 2024-04-29 | Roa Solution | 92.337.883.0-711.000 | 40,070,000 | 28.64 % | |
806 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17413012 | 51201152 | 55,230,000 | 55,230,000 | 55,119,000 | 55,119,000 | 55,119,000 | 55,119,000 | 55,119,000 | 55,119,000 | 2024-06-27 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.2 % | |
807 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pekerjaan Taman Smart Green House Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17636012 | 52365915 | 78,000,000 | 78,000,000 | 77,631,180 | 77,631,180 | 77,631,180 | 77,631,180 | 77,631,180 | 77,631,180 | 2024-09-06 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 368,820 | 0.47 % | |
808 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI GEDUNG KANTOR LAMA UPTPPD KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17427012 | 49932954 | 37,100,000 | 37,099,999 | 37,050,000 | 37,050,000 | 36,413,550 | 36,413,550 | 36,413,550 | 36,413,550 | 2024-07-03 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 50,000 | 0.13 % | |
809 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG KEPALA SEKOLAH/PIMPINAN DAN PEMBANGUNAN RUANG GURU SMAN 2 KATINGAN TENGAH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17879012 | 53267713 | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,900,000 | 0 | 0 | 0 | 2024-11-06 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 100,000 | 0.1 % | |
810 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Supervisi Rehabilitasi Jaringan Irigasi D.I.R. Unit Mentaren II Kabupaten Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15695012 | 46342386 | 100,000,000 | 100,000,000 | 99,822,300 | 99,822,300 | 99,783,450 | 99,783,450 | 0 | 99,783,450 | 2024-02-07 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 177,700 | 0.18 % | |
811 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembuatan Pagar dan Penataan Halaman SMAN 4 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15865012 | 50729854 | 48,000,000 | 48,000,000 | 47,796,600 | 47,796,600 | 47,796,600 | 47,796,600 | 47,796,600 | 47,796,600 | 2024-03-22 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 203,400 | 0.42 % | |
812 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Sarana dan Prasarana UPT.KPHL Kapuas Kahayan dan RPH Anjir Kalampan - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17210012 | 51747920 | 79,740,000 | 79,739,958 | 79,610,310 | 79,610,310 | 78,805,560 | 78,805,560 | 78,805,560 | 78,805,560 | 2024-06-04 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 129,690 | 0.16 % | |
813 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAN 3 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15908012 | 50771836 | 35,000,000 | 35,000,000 | 34,944,500 | 34,944,500 | 34,944,500 | 34,944,500 | 0 | 34,944,500 | 2024-04-03 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 55,500 | 0.16 % | |
814 | 2024 | Dinas Pendidikan | Jasa Konsultansi Pengawasan Pembangunan Kantin, Ruang Keterampilan, Ruang Pembelajaran KHusus, Ruang Tata Usaha, Ruang UKS, Selasar Penghubung SLB Negeri Kuala Kurun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17501012 | 52082362 | 50,390,280 | 50,366,250 | 50,366,250 | 50,366,250 | 50,366,250 | 50,366,250 | 50,366,000 | 50,366,250 | 2024-07-18 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 24,030 | 0.05 % | |
815 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Peningkatan Jalan Teratai 5, Jalur 5 dan Sekitarnya, Kelurahan Ketapang, Kecamatan Mentawa Baru Ketapang, Kotawaringin Timur, Provinsi Kalimantan Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 16115012 | 49607729 | 186,400,000 | 186,397,000 | 185,726,219 | 185,726,219 | 185,585,000 | 185,585,000 | 100 | 185,585,000 | 2024-05-20 | 673,781 | 0.36 % | |||
816 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAN 4 Tanah Siang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15887012 | 50730498 | 65,000,000 | 65,000,000 | 64,500,000 | 64,500,000 | 64,500,000 | 64,500,000 | 0 | 64,500,000 | 2024-03-28 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 500,000 | 0.77 % | |
817 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Kuin Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15676012 | 46521572 | 160,000,000 | 160,000,000 | 159,891,775 | 159,891,775 | 159,784,179 | 159,780,000 | 0 | 159,780,000 | 2024-01-05 | 108,225 | 0.07 % | |||
818 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya -Rehab Kantor | Pengadaan Langsung | Pekerjaan Konstruksi | 17904012 | 53355646 | 197,500,000 | 197,500,000 | 197,222,500 | 197,222,500 | 197,200,527 | 0 | 0 | 0 | 2024-11-08 | CV.MAHAPUTRA BANGUN NUSANTARA | 03.271.635.9-711.000 | 277,500 | 0.14 % | |
819 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI GEDUNG ARSIP UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17742012 | 49932333 | 45,000,000 | 44,899,500 | 44,844,000 | 44,844,000 | 44,444,400 | 0 | 0 | 0 | 2024-10-16 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 156,000 | 0.35 % | |
820 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 3 Ruang SMAN 4 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16193012 | 50726405 | 80,000,000 | 80,000,000 | 79,996,590 | 79,996,590 | 79,996,590 | 79,996,590 | 79,996,590 | 79,996,590 | 2024-05-28 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 3,410 | 0 % | |
821 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Drainase) | Pengadaan Langsung | Jasa Lainnya | 17588012 | 52036015 | 65,000,000 | 10,000,000 | 9,834,600 | 9,834,600 | 9,812,400 | 9,812,400 | 9,812,400 | 9,812,400 | 2024-08-15 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 55,165,400 | 84.87 % | |
822 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI PARKIR KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17255012 | 49955641 | 11,110,000 | 11,100,000 | 10,933,500 | 10,933,500 | 10,589,400 | 10,589,400 | 10,589,400 | 10,589,400 | 2024-06-03 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 176,500 | 1.59 % | |
823 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Parkiran | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17869012 | 53276985 | 5,568,500 | 5,568,500 | 5,538,000 | 5,538,000 | 5,538,000 | 0 | 0 | 0 | 2024-11-04 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 30,500 | 0.55 % | |
824 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pemeliharaan/Rehabilitasi Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17437012 | 49420051 | 70,407,000 | 70,400,000 | 70,096,500 | 70,096,500 | 68,986,500 | 68,986,500 | 68,986,500 | 68,986,500 | 2024-07-04 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 310,500 | 0.44 % | |
825 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi WC SMAN 3 Maliku 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17770012 | 52877692 | 30,000,000 | 30,000,000 | 29,889,000 | 29,889,000 | 29,889,000 | 0 | 0 | 0 | 2024-10-16 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,000 | 0.37 % | |
826 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16068012 | 50526052 | 21,041,000 | 21,041,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 2024-05-06 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 41,000 | 0.19 % | |
827 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Rungan Barat (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15843012 | 50388423 | 41,239,700 | 41,239,700 | 39,900,000 | 39,900,000 | 39,900,000 | 39,900,000 | 0 | 39,900,000 | 2024-03-25 | 1,339,700 | 3.25 % | |||
828 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pembangunan Lanjutan Jalan Menuju Sekolah SMAN 1 Tamban Catur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17817012 | 52897813 | 40,000,000 | 40,000,000 | 39,922,300 | 39,922,300 | 39,922,300 | 39,922,300 | 39,922,300 | 39,922,300 | 2024-10-28 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 77,700 | 0.19 % | |
829 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Rumah Dinas RTA Milono KM. 5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15680012 | 46855535 | 45,000,000 | 44,906,000 | 44,640,315 | 44,640,315 | 44,640,315 | 44,640,315 | 44,640,315 | 44,640,315 | 2024-01-11 | CV. KRUF STUDIO ENGINEERING | 81.075.394.7-711.000 | 359,685 | 0.8 % | |
830 | 2024 | Sekretariat DPRD | Jasa Konsultansi Perencanaan Spesifikasi: Bangunan Gedung Sederhana Renovasi Gedung Komisi DPRD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17819012 | 52978241 | 100,000,000 | 99,999,999 | 95,682,000 | 95,682,000 | 94,572,000 | 0 | 0 | 0 | 2024-10-25 | ROTASI DESIGN CONSULTANT | 90.011.802.7-711.000 | 4,318,000 | 4.32 % | |
831 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pembangunan RKB SMAN 3 Palangka Raya 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17752012 | 52880378 | 90,000,000 | 90,000,000 | 89,993,250 | 89,993,250 | 89,993,250 | 0 | 0 | 0 | 2024-10-16 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 6,750 | 0.01 % | |
832 | 2024 | Dinas Perkebunan | Pengadaan Karpet Ruang Kepala Dinas Perkebunan Provinsi Kalimantan Tengah (DPPA-Oktober) | Pengadaan Langsung | Pengadaan Barang | 17910012 | 53359794 | 64,503,950 | 63,750,000 | 63,686,250 | 63,686,250 | 63,591,900 | 0 | 0 | 0 | 2024-11-08 | Gunung Terang Abadi | 50.584.730.1-714.000 | 817,700 | 1.27 % | |
833 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Pengawasan Pembangunan Jaringan Instalasi Air Bersih | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17567012 | 51985613 | 35,000,000 | 34,900,000 | 34,503,240 | 34,503,240 | 34,443,300 | 34,443,300 | 34,443,300 | 34,443,300 | 2024-08-08 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 496,760 | 1.42 % | |
834 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI PARKIR KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15733012 | 49831172 | 19,998,000 | 17,673,050 | 17,427,000 | 17,427,000 | 16,994,100 | 16,994,100 | 16,994,100 | 16,994,100 | 2024-03-07 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 2,571,000 | 12.86 % | |
835 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Lab IPA SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17323012 | 51398623 | 39,000,000 | 39,000,000 | 38,940,000 | 38,940,000 | 38,940,000 | 38,940,000 | 38,940,000 | 38,940,000 | 2024-06-14 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 60,000 | 0.15 % | |
836 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Pelabuhan Tambat/Sandar UPT.KPHP Barito Hilir - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17678012 | 52528447 | 21,406,000 | 21,405,700 | 21,277,590 | 21,277,590 | 21,066,690 | 0 | 0 | 0 | 2024-10-02 | 128,410 | 0.6 % | |||
837 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KURUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16031012 | 49203740 | 15,393,500 | 15,315,491 | 15,300,000 | 15,300,000 | 15,040,500 | 15,040,500 | 15,040,500 | 15,040,500 | 2024-05-01 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 93,500 | 0.61 % | |
838 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMKS PGRI SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17418012 | 51358944 | 21,260,000 | 21,210,000 | 21,147,840 | 21,147,840 | 21,147,840 | 21,147,840 | 21,147,840 | 21,147,840 | 2024-06-28 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 112,160 | 0.53 % | |
839 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Biologi SMK NEGERI 1 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16055012 | 50541253 | 55,423,000 | 55,423,000 | 55,312,000 | 55,312,000 | 55,312,000 | 55,312,000 | 55,312,000 | 55,312,000 | 2024-05-06 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.2 % | |
840 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Asrama Kalteng Putra Putri Yogyakarta | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16086012 | 51587965 | 25,000,000 | 25,000,000 | 24,886,211 | 24,886,211 | 24,727,470 | 24,727,470 | 24,727,470 | 24,727,470 | 2024-05-20 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 113,789 | 0.46 % | |
841 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Aksesibilitas SLBN 2 Pangkalan Bun. SLBN Kuala Kurun, SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17854012 | 53031749 | 15,000,000 | 14,990,550 | 14,990,550 | 14,990,550 | 14,990,550 | 0 | 0 | 0 | 2024-11-02 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 9,450 | 0.06 % | |
842 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15929012 | 50545551 | 22,912,000 | 22,912,000 | 22,856,500 | 22,856,500 | 22,856,500 | 22,856,500 | 22,856,500 | 22,856,500 | 2024-04-01 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 55,500 | 0.24 % | |
843 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Timang (Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17313012 | 51238319 | 38,880,600 | 38,880,600 | 38,739,000 | 38,739,000 | 38,739,000 | 38,739,000 | 38,739,000 | 38,739,000 | 2024-06-13 | 141,600 | 0.36 % | |||
844 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Gunung Bintang Awai (Pembangunan Rg. Lab. Kimia, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17233012 | 51153997 | 41,673,400 | 41,673,400 | 41,669,400 | 41,669,400 | 41,669,400 | 41,669,400 | 0 | 41,669,400 | 2024-05-30 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 4,000 | 0.01 % | |
845 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16075012 | 50547129 | 17,367,000 | 17,367,000 | 17,311,500 | 17,311,500 | 17,311,500 | 17,311,500 | 17,311,500 | 17,311,500 | 2024-05-06 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 55,500 | 0.32 % | |
846 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Palangka Raya (Pembangunan Rg. Baru (RKB), Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15875012 | 50409521 | 38,535,800 | 38,535,800 | 38,485,000 | 38,485,000 | 38,485,000 | 38,485,000 | 0 | 38,485,000 | 2024-04-02 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 50,800 | 0.13 % | |
847 | 2024 | Badan Keuangan dan Aset Daerah | Perencanaan Pemeliharaan Rumah Dinas Jl. RTA. Miono Km. 6,5 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15725012 | 49544867 | 20,000,000 | 20,000,000 | 19,946,700 | 19,946,700 | 19,946,700 | 19,946,700 | 19,946,700 | 19,946,700 | 2024-02-24 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 53,300 | 0.27 % | |
848 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas ( 3 Ruang ) SMKN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16197012 | 51738249 | 20,000,000 | 20,000,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 2024-05-24 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 111,000 | 0.56 % | |
849 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Palangka Raya (Pembangunan Rg. Lab. Kimia) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17282012 | 51240210 | 30,927,300 | 30,927,300 | 30,771,900 | 30,771,900 | 30,771,900 | 30,771,900 | 30,771,900 | 30,771,900 | 2024-06-12 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 155,400 | 0.5 % | |
850 | 2024 | Badan Pendapatan Daerah | Pengawasan Arsitektur Perkerjaan Pembangunan Ruang Pantry Kantor Induk UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17648012 | 52497977 | 8,500,000 | 8,436,000 | 8,410,000 | 8,410,000 | 8,091,900 | 8,091,900 | 8,091,900 | 8,091,900 | 2024-09-13 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 90,000 | 1.06 % | |
851 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI KANTOR UPTPPD KUALA KURUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17223012 | 49953914 | 25,920,000 | 25,918,500 | 25,752,000 | 25,752,000 | 25,219,200 | 25,219,200 | 25,219,200 | 25,219,200 | 2024-05-29 | 168,000 | 0.65 % | |||
852 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pembangunan/Peningkatan Jalan Inspeksi D.I.R. Handil Sohor Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15688012 | 46519132 | 160,000,000 | 160,000,000 | 159,909,255 | 159,909,255 | 159,809,355 | 159,800,000 | 0 | 159,800,000 | 2024-01-18 | 90,745 | 0.06 % | |||
853 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS,Ruang Bimbingan Konseling(BK),Toilet(Jamban)beserta sanitasinya SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16063012 | 50543972 | 26,605,000 | 26,605,000 | 26,506,800 | 26,506,800 | 26,506,800 | 26,506,800 | 26,506,800 | 26,506,800 | 2024-05-06 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 98,200 | 0.37 % | |
854 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Ayam petelur dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10021413000 | 53545261 | 11,318,750 | 11,318,750 | 11,219,747 | 11,219,747 | 11,219,658 | 0 | 0 | 0 | 2024-11-30 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 99,003 | 0.87 % | |
855 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer,Laboratorium Bahasa SMK NEGERI 1 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17531012 | 51213107 | 37,520,000 | 37,520,000 | 37,466,720 | 37,466,720 | 37,466,720 | 37,466,720 | 37,466,720 | 37,466,720 | 2024-07-25 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 53,280 | 0.14 % | |
856 | 2024 | Sekretariat DPRD | jasa konsultasi perencanaan Pengaspalan Keliling Halaman Kantor Sekretariat DPRD Prov Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17660012 | 49289853 | 138,017,399 | 99,995,460 | 99,717,960 | 99,717,960 | 98,052,960 | 98,052,960 | 98,052,960 | 98,052,960 | 2024-09-20 | CV. KRUF STUDIO ENGINEERING | 81.075.394.7-711.000 | 38,299,439 | 27.75 % | |
857 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Rehabilitasi Ruang Kantor SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17833012 | 52898548 | 25,000,000 | 25,000,000 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 24,839,136 | 2024-10-28 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 160,864 | 0.64 % | |
858 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Pematang Karau (Rehabilitasi Rg. Kelas) 4 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17228012 | 51183864 | 34,836,600 | 34,836,600 | 34,831,800 | 34,831,800 | 34,831,800 | 34,831,800 | 0 | 34,831,800 | 2024-05-31 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 4,800 | 0.01 % | |
859 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Jalan Produksi/Jalan Usaha Tani di IPBH Keruing | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17774012 | 52970804 | 16,052,480 | 16,052,480 | 15,995,100 | 15,995,100 | 15,873,000 | 0 | 0 | 0 | 2024-10-16 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 57,380 | 0.36 % | |
860 | 2024 | Badan Pendapatan Daerah | Perencanaan Renovasi Ruang Kantor UPTPPD Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17370012 | 51957019 | 45,900,000 | 33,522,000 | 33,300,000 | 33,300,000 | 32,656,200 | 32,656,200 | 32,656,200 | 32,656,200 | 2024-06-26 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 12,600,000 | 27.45 % | |
861 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Ruang Guru, Ruang Kepala Sekolah, Ruang keterampilan, Ruang Pembelajaran Khusus, Ruang Perpustakaan, Ruang Tata Usaha SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17330012 | 51911713 | 61,168,100 | 61,161,000 | 61,149,900 | 61,149,900 | 61,149,900 | 61,149,900 | 0 | 61,149,900 | 2024-07-01 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 18,200 | 0.03 % | |
862 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Biologi, Pembangunan Rg OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17352012 | 51154969 | 43,838,500 | 43,838,500 | 43,800,000 | 43,800,000 | 43,800,000 | 43,800,000 | 43,800,000 | 43,800,000 | 2024-07-15 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 38,500 | 0.09 % | |
863 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Gunung Bintang Awai (Pembangunan Rg. Lab. Kimia, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15821012 | 50377691 | 59,117,700 | 59,117,700 | 59,090,544 | 59,090,544 | 59,090,544 | 59,090,544 | 0 | 59,090,544 | 2024-03-21 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 27,156 | 0.05 % | |
864 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Gedung Hatchery Pada Kegiatan Pengembangan Ayam Kalimantan Super (Kalper) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17578012 | 52123235 | 15,885,000 | 15,885,000 | 15,562,200 | 15,562,200 | 15,429,000 | 15,429,000 | 15,429,000 | 15,429,000 | 2024-08-06 | 322,800 | 2.03 % | |||
865 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 1 Belantika Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16152012 | 51423179 | 19,000,000 | 19,000,000 | 18,981,000 | 18,981,000 | 18,981,000 | 18,981,000 | 18,981,000 | 18,981,000 | 2024-05-22 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 19,000 | 0.1 % | |
866 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Timpah (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17355012 | 51239090 | 45,729,400 | 45,729,400 | 45,698,700 | 45,698,700 | 45,698,700 | 45,698,700 | 45,698,700 | 45,698,700 | 2024-07-03 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 30,700 | 0.07 % | |
867 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN TANDON AIR UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15902012 | 49246741 | 9,792,012 | 9,768,000 | 9,573,750 | 9,573,750 | 9,351,750 | 9,351,750 | 9,351,750 | 9,351,750 | 2024-03-28 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 218,262 | 2.23 % | |
868 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Pembangunan Rumah Genset dan Tower Air UPT. KPHP Murung Raya - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17721012 | 52839871 | 23,687,000 | 23,686,800 | 23,499,810 | 23,499,810 | 23,027,505 | 0 | 0 | 0 | 2024-10-10 | 187,190 | 0.79 % | |||
869 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet (Jamban)6 Ruang beserta sanitasinya SMK NEGERI 2 PALANGKARAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15915012 | 50540151 | 24,470,000 | 24,470,000 | 24,414,500 | 24,414,500 | 24,414,500 | 24,414,500 | 24,414,500 | 24,414,500 | 2024-04-01 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 55,500 | 0.23 % | |
870 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Bangunan Gedung - Rehab Loket Ruang Kamboja | Pengadaan Langsung | Pekerjaan Konstruksi | 17595012 | 52174219 | 50,000,000 | 50,000,000 | 49,832,937 | 49,832,937 | 49,494,950 | 49,494,950 | 49,494,950 | 49,494,950 | 2024-08-21 | CV.KARYA DAJABA PUTRA | 02.978.026.9-711.000 | 167,063 | 0.33 % | |
871 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17866012 | 53276836 | 17,775,000 | 17,775,000 | 17,715,600 | 17,715,600 | 17,715,600 | 0 | 0 | 0 | 2024-11-04 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 59,400 | 0.33 % | |
872 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 10 Palangka Raya (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16134012 | 51239929 | 55,540,300 | 55,540,300 | 55,315,000 | 55,315,000 | 55,315,000 | 55,315,000 | 0 | 55,315,000 | 2024-05-21 | 225,300 | 0.41 % | |||
873 | 2024 | Dinas Kesehatan | Pengadaan Jasa Konsultansi Pengawasan Rehab Rumah Dinas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17870012 | 51439879 | 24,000,000 | 24,000,000 | 23,995,000 | 23,995,000 | 23,976,000 | 23,976,000 | 23,976,000 | 23,976,000 | 2024-11-04 | 5,000 | 0.02 % | |||
874 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (2 Ruang) SMKN 1 Pandih Batu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16149012 | 51573319 | 25,000,000 | 25,000,000 | 24,940,000 | 24,940,000 | 24,940,000 | 24,940,000 | 24,940,000 | 24,940,000 | 2024-05-22 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 60,000 | 0.24 % | |
875 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pemeliharaan/Rehabilitasi Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17525012 | 49420052 | 40,724,000 | 40,724,000 | 40,650,000 | 40,650,000 | 40,165,350 | 40,165,350 | 40,165,350 | 40,165,350 | 2024-07-22 | 74,000 | 0.18 % | |||
876 | 2024 | Badan Pendapatan Daerah | Perencanaan Pembangunan Selasar Penyambung antar Bangunan kantor UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17545012 | 52151620 | 25,500,000 | 25,499,998 | 25,435,650 | 25,435,650 | 25,185,900 | 25,185,900 | 25,185,900 | 25,185,900 | 2024-07-26 | CV. MEGAH JAYA CONSULTAN | 73.659.733.7-711.000 | 64,350 | 0.25 % | |
877 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Kuala Kurun (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17307012 | 51238707 | 29,081,400 | 29,081,400 | 29,000,000 | 29,000,000 | 29,000,000 | 29,000,000 | 29,000,000 | 29,000,000 | 2024-06-12 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 81,400 | 0.28 % | |
878 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Jalan Produksi/Jalan Usaha Tani di IPB Basarang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17682012 | 52671203 | 14,045,920 | 14,045,920 | 14,030,000 | 14,030,000 | 13,997,100 | 13,997,100 | 13,997,100 | 13,997,100 | 2024-09-30 | 15,920 | 0.11 % | |||
879 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Lanjutan Pembangunan SMAN 2 Puruk Cahu (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15965012 | 50729901 | 40,000,000 | 40,000,000 | 39,500,000 | 39,500,000 | 39,500,000 | 39,500,000 | 0 | 39,500,000 | 2024-04-05 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 500,000 | 1.25 % | |
880 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika,Laboratorium SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17481012 | 51851605 | 76,900,000 | 76,900,000 | 76,376,700 | 76,376,700 | 76,376,700 | 76,376,700 | 76,376,700 | 76,376,700 | 2024-07-15 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 523,300 | 0.68 % | |
881 | 2024 | Dinas Penanaman Modal dan Pelayanan Terpadu Satu Pintu | Belanja Jasa Konsultansi Perencanaan Renovasi Parkir, Pagar, Kantin, Rumah Penjaga dan Gudang Kantor DPMPTSP Provinsi Kalimantan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16006012 | 51312153 | 84,146,000 | 84,138,000 | 84,027,000 | 84,027,000 | 83,971,500 | 83,971,500 | 0 | 83,971,500 | 2024-05-16 | Roa Solution | 92.337.883.0-711.000 | 119,000 | 0.14 % | |
882 | 2024 | Satuan Polisi Pamong Praja | Perencanaan Belanja Modal Bangunan Gedung Kantor | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15952012 | 49577932 | 38,520,000 | 38,520,000 | 38,228,600 | 38,228,600 | 37,864,875 | 0 | 0 | 0 | 2024-04-03 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 291,400 | 0.76 % | |
883 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Perencanaan Bangunan Pagar UPT.KPHL Kapuas Kahayan - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17269012 | 51802829 | 108,292,000 | 99,997,125 | 99,858,653 | 99,858,653 | 99,184,328 | 99,184,328 | 99,184,328 | 99,184,328 | 2024-06-11 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 8,433,348 | 7.79 % | |
884 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Supervisi Penyediaan Prasarana, Sarana, dan Utilitas Umum di Permukiman untuk menunjang Fungsi Permukiman Wilayah VII | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16118012 | 50877462 | 100,000,000 | 99,999,900 | 99,833,400 | 99,833,400 | 99,567,000 | 99,567,000 | 99,567,000 | 99,567,000 | 2024-05-20 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 166,600 | 0.17 % | |
885 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Tamiyang Layang (Rehabilitasi Rg. Kelas, Pembangunan Rg. BK ) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17230012 | 51156087 | 60,739,800 | 60,739,800 | 60,739,200 | 60,739,200 | 60,739,200 | 60,739,200 | 0 | 60,739,200 | 2024-05-31 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 600 | 0 % | |
886 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 2 Paju Epat (Pembangunan Rg. Lab. Biologi, Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15836012 | 50387609 | 69,830,700 | 69,830,700 | 69,799,908 | 69,799,908 | 69,799,908 | 69,799,908 | 0 | 69,799,908 | 2024-03-21 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 30,792 | 0.04 % | |
887 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0018 Pengawasan Dapur Umum, Bengkel, Rumah Panen | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17558012 | 47771153 | 49,820,000 | 49,740,000 | 49,550,400 | 49,550,400 | 49,000,000 | 49,000,000 | 49,000,000 | 49,000,000 | 2024-07-30 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 269,600 | 0.54 % | |
888 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 4 Palangka Raya (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17261012 | 51240069 | 30,977,300 | 30,977,300 | 30,636,000 | 30,636,000 | 30,636,000 | 30,636,000 | 0 | 30,636,000 | 2024-06-04 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 341,300 | 1.1 % | |
889 | 2024 | Dinas Kehutanan | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor atau Bangunan Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15806012 | 49887466 | 81,213,000 | 81,212,000 | 81,102,705 | 81,102,705 | 80,530,500 | 80,530,500 | 80,530,500 | 80,530,500 | 2024-03-18 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 110,295 | 0.14 % | |
890 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Sanaman Mantikei (Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. Guru) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15787012 | 50392548 | 69,211,800 | 69,211,800 | 69,139,900 | 69,139,900 | 69,139,900 | 69,139,900 | 0 | 69,139,900 | 2024-03-15 | CV. PENDANG JAYA RAYA ENGINEERING | 01.662.432.2-711.000 | 71,900 | 0.1 % | |
891 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Pengawasan Rehab/Rehabilitasi Bangunan Laboratorium UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17608012 | 51460048 | 20,140,000 | 20,140,000 | 20,120,098 | 20,120,098 | 20,110,425 | 20,110,425 | 20,110,425 | 20,110,425 | 2024-08-19 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 19,902 | 0.1 % | |
892 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Ruang Kepala Sekolah SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17248012 | 51398646 | 28,500,000 | 28,500,000 | 28,416,000 | 28,416,000 | 28,416,000 | 28,416,000 | 28,416,000 | 28,416,000 | 2024-05-31 | Nusantara Mitra Konsultan | 50.725.407.6-711.000 | 84,000 | 0.29 % | |
893 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SUKAMARA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15793012 | 49207879 | 13,582,500 | 13,538,300 | 13,475,400 | 13,475,400 | 13,220,100 | 13,220,100 | 13,220,100 | 13,220,100 | 2024-03-15 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 107,100 | 0.79 % | |
894 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0008.5.1.02.02.08.0018 Pengawasan Revitalisasi tambak sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17609012 | 47773196 | 25,600,000 | 24,993,000 | 24,930,600 | 24,930,600 | 24,500,000 | 24,500,000 | 24,500,000 | 24,500,000 | 2024-08-21 | CITRA MULTI CONSULTANT | 01.576.343.6-711.000 | 669,400 | 2.61 % | |
895 | 2024 | Dinas Pemuda dan Olahraga | Beban Jasa Konsultansi Pengawasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17698012 | 52690083 | 109,550,000 | 99,722,400 | 99,500,400 | 99,500,400 | 99,000,900 | 99,000,900 | 99,000,900 | 99,000,900 | 2024-09-30 | KARYAMANDIRI MITRAUTAMA INDAHDESIGN | 63.313.382.2-711.000 | 10,049,600 | 9.17 % | |
896 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultansi Perencanaan Pembangunan Gudang Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17852012 | 52921898 | 27,962,100 | 27,962,000 | 27,800,000 | 27,800,000 | 27,799,506 | 27,799,506 | 27,799,506 | 27,799,506 | 2024-10-31 | 162,100 | 0.58 % | |||
897 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Rumah Dinas SMKN 2 Bataguh | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16157012 | 51424995 | 25,000,000 | 25,000,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 24,950,000 | 2024-05-22 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 50,000 | 0.2 % | |
898 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0018 Pengawasan Lanjutan Rehab Garansi, Rehab Atap aula Kantor, Rehab Atap Sayap kanan- kiri kantor, Rehab Halaman dan jalan kantor, Rehab Halaman dan jalan kantor, Rehab Plafond Luar Ruang Bidang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17473012 | 52047958 | 70,000,000 | 69,999,000 | 69,874,500 | 69,874,500 | 69,400,000 | 69,400,000 | 69,400,000 | 69,400,000 | 2024-07-11 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 125,500 | 0.18 % | |
899 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Kelas Baru SMKS MIFTAHUSSALAM | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16181012 | 51427630 | 29,750,000 | 29,750,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 29,748,000 | 2024-05-22 | Roa Solution | 92.337.883.0-711.000 | 2,000 | 0.01 % | |
900 | 2024 | Sekretariat DPRD | jasa konsultasi pengawasan Pengaspalan Keliling Halaman Kantor Sekretariat DPRD Prov Kalteng,Jasa Konsultansi Pengawasan Spesifikasi: Bangunan Gedung Sederhana Renovasi Gedung Komisi DPRD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17857012 | 49289856;52978553 | 192,011,599 | 99,999,999 | 99,900,000 | 99,900,000 | 98,457,000 | 0 | 0 | 0 | 2024-11-01 | Roa Solution | 92.337.883.0-711.000 | 92,111,599 | 47.97 % | |
901 | 2024 | Dinas Kesehatan | Pengadaan Jasa Konsultansi Perencanaan Rehab Rumah Dinas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15996012 | 51439825 | 36,000,000 | 36,000,000 | 35,742,000 | 35,742,000 | 35,631,000 | 35,631,000 | 0 | 35,631,000 | 2024-04-26 | BORNEO TEHNIK UTAMA | 03.134.789.1-711.000 | 258,000 | 0.72 % | |
902 | 2024 | Badan Pendapatan Daerah | Pengawasan Penataan Halaman Kantor UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17746012 | 52650120 | 27,000,000 | 26,973,000 | 26,917,500 | 26,917,500 | 26,451,300 | 0 | 0 | 0 | 2024-10-16 | ROTASI DESIGN CONSULTANT | 90.011.802.7-711.000 | 82,500 | 0.31 % | |
903 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17477012 | 51358631 | 29,400,000 | 29,400,000 | 29,346,720 | 29,346,720 | 29,346,720 | 29,346,720 | 29,346,720 | 29,346,720 | 2024-07-15 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 53,280 | 0.18 % | |
904 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Perencana- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Kantor Ruang Penyusunan Program | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17790012 | 52993236 | 21,890,000 | 21,890,000 | 21,750,450 | 21,750,450 | 21,750,450 | 0 | 0 | 0 | 2024-10-18 | 139,550 | 0.64 % | |||
905 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Komputer,Laboratorium Bahasa SMK NEGERI 1 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17493012 | 51229367 | 51,350,000 | 51,350,000 | 51,326,400 | 51,326,400 | 51,326,400 | 51,326,400 | 51,326,400 | 51,326,400 | 2024-07-15 | Roa Solution | 92.337.883.0-711.000 | 23,600 | 0.05 % | |
906 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PENATAAN HALAMAN BELAKANG UPTPPD MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16023012 | 49254192 | 63,000,000 | 48,118,500 | 48,074,100 | 48,074,100 | 47,175,000 | 47,175,000 | 47,175,000 | 47,175,000 | 2024-04-29 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 14,925,900 | 23.69 % | |
907 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet (Jamban) SMK NEGERI 2 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15852012 | 50394249 | 4,819,767 | 4,819,767 | 4,784,100 | 4,784,100 | 4,784,100 | 4,784,100 | 4,784,100 | 4,784,100 | 2024-03-25 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 35,667 | 0.74 % | |
908 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Zona Selamat Sekolah (ZOSS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17622012 | 51282398 | 25,000,000 | 25,000,000 | 24,978,330 | 24,978,330 | 24,978,330 | 24,978,330 | 24,978,330 | 24,978,330 | 2024-08-29 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 21,670 | 0.09 % | |
909 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pembuatan Gapura Pintu Gerbang SMAN 1 Pulau Malan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17835012 | 52899026 | 20,000,000 | 20,000,000 | 19,791,300 | 19,791,300 | 19,791,300 | 19,791,300 | 19,791,300 | 19,791,300 | 2024-10-26 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 208,700 | 1.04 % | |
910 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Bintang Awai (Pembangunan Rg. Kelas Baru (RKB) Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17243012 | 51153815 | 39,089,600 | 39,089,600 | 39,016,500 | 39,016,500 | 39,016,500 | 39,016,500 | 0 | 39,016,500 | 2024-05-30 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 73,100 | 0.19 % | |
911 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pembangunan Pagar SMAN 3 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17771012 | 52878740 | 50,000,000 | 50,000,000 | 49,833,500 | 49,833,500 | 49,833,500 | 0 | 0 | 0 | 2024-10-16 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 166,500 | 0.33 % | |
912 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Arut Utara (Rehabilitasi Rg. Kelas, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17285012 | 51239551 | 36,556,600 | 36,556,600 | 36,408,000 | 36,408,000 | 36,408,000 | 36,408,000 | 36,408,000 | 36,408,000 | 2024-06-07 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 148,600 | 0.41 % | |
913 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Belanti I Kabupaten Pulang Pisau | Pengadaan Langsung | Pekerjaan Konstruksi | 15683012 | 46525062 | 170,000,000 | 170,000,000 | 169,890,225 | 169,890,225 | 169,790,592 | 169,790,000 | 0 | 169,790,000 | 2024-01-18 | CV. ARTHA CAPRICORNUS | 01.922.068.0-711.000 | 109,775 | 0.06 % | |
914 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Toilet (Jamban)1 Ruang beserta sanitasinya SMKS KARSA MULYA PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17410012 | 51172055 | 4,130,000 | 4,130,000 | 4,107,800 | 4,107,800 | 4,107,800 | 4,107,800 | 4,107,800 | 4,107,800 | 2024-06-27 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 22,200 | 0.54 % | |
915 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Rehab Aula SMAN 1 Kurun (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15910012 | 50729016 | 40,000,000 | 40,000,000 | 39,889,000 | 39,889,000 | 39,889,000 | 39,889,000 | 0 | 39,889,000 | 2024-04-03 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,000 | 0.28 % | |
916 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Sukamara | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15984012 | 49438315 | 99,822,867 | 99,822,000 | 99,716,850 | 99,716,850 | 99,715,000 | 99,715,000 | 0 | 99,715,000 | 2024-04-20 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 106,017 | 0.11 % | 3 |
917 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Fasilitas Keselamatan Jalan Ruas Jalan Provinsi Di Kabupaten Katingan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17727012 | 52869776 | 96,460,000 | 96,460,000 | 95,682,000 | 95,682,000 | 95,682,000 | 95,682,000 | 0 | 95,682,000 | 2024-10-12 | CV. HASTAREKA EKAKARSA | 01.854.622.6-711.000 | 778,000 | 0.81 % | 3 |
918 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Pembangunan Green House Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17331012 | 49991946 | 80,000,000 | 80,000,000 | 79,591,995 | 79,591,995 | 79,342,800 | 79,342,800 | 79,342,800 | 79,342,800 | 2024-06-19 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 408,005 | 0.51 % | |
919 | 2024 | Badan Pendapatan Daerah | Pengawasan Pelebaran Bangunan Ruang Cek Fisik UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17743012 | 52648279 | 10,500,000 | 10,478,400 | 10,450,650 | 10,450,650 | 10,178,700 | 0 | 0 | 0 | 2024-10-16 | 49,350 | 0.47 % | |||
920 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa (Perhotelan) SMKN 3 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16139012 | 51418316 | 25,000,000 | 25,000,000 | 24,944,500 | 24,944,500 | 24,944,500 | 24,944,500 | 24,944,500 | 24,944,500 | 2024-05-22 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 55,500 | 0.22 % | |
921 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Kotawaringin Lama (Rehabilitasi Rg. Lab. Biologi, Rehabilitasi Rg. Kepala Sekolah/Pimpinan, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17215012 | 51239616 | 32,810,000 | 32,810,000 | 32,578,500 | 32,578,500 | 32,578,500 | 32,578,500 | 0 | 32,578,500 | 2024-05-29 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 231,500 | 0.71 % | |
922 | 2024 | Dinas Perdagangan dan Perindustrian | Pengadaan Jasa Konsultansi Pengawasan Rehabilitasi Bangunan Rumah Kemasan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17594012 | 51216833 | 52,125,045 | 52,125,045 | 52,114,500 | 52,114,500 | 52,003,500 | 0 | 0 | 0 | 2024-08-13 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 10,545 | 0.02 % | |
923 | 2024 | Dinas Kehutanan | Belanja Jasa Konsultansi Pengawasan Arsitektur - Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15901012 | 49887473 | 26,475,000 | 26,475,000 | 26,423,000 | 26,423,000 | 25,807,500 | 25,807,500 | 25,807,500 | 25,807,500 | 2024-03-28 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 52,000 | 0.2 % | |
924 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Arut Utara (Rehabilitasi Rg. Kelas, Pembangunan Rg. UKS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15789012 | 50392793 | 51,831,800 | 51,831,798 | 51,504,000 | 51,504,000 | 51,504,000 | 51,504,000 | 0 | 51,504,000 | 2024-03-21 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 327,800 | 0.63 % | |
925 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Bahasa SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17532012 | 51230168 | 25,670,000 | 25,670,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 25,641,000 | 2024-07-25 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 29,000 | 0.11 % | |
926 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Tenaga Pendampingan Pemutakhiran Dokumen SSK 1 | Pengadaan Langsung | Jasa Konsultansi Perorangan | 15708012 | 47521031 | 80,000,000 | 80,000,000 | 79,997,700 | 79,997,700 | 79,900,000 | 79,900,000 | 79,900,000 | 79,900,000 | 2024-02-23 | Yoki Indra Kuncoro | 71.885.488.8-711.000 | 2,300 | 0 % | |
927 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan WC 2 Unit SMAN 1 Rungan Gunung Mas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15955012 | 50727502 | 26,000,000 | 26,000,000 | 25,940,000 | 25,940,000 | 25,940,000 | 25,940,000 | 0 | 25,940,000 | 2024-04-19 | 60,000 | 0.23 % | |||
928 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pemeliharaan Rutin D.I.R. Bagendang IV Kabupaten Kotawaringin Timur | Pengadaan Langsung | Pekerjaan Konstruksi | 15686012 | 46520306 | 160,000,000 | 160,000,000 | 159,901,621 | 159,901,621 | 159,800,850 | 159,800,000 | 0 | 159,800,000 | 2024-01-18 | 98,379 | 0.06 % | |||
929 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Pembangunan Toilet(Jamban)beserta sanitasinya SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17411012 | 51202686 | 33,710,000 | 33,710,000 | 33,633,000 | 33,633,000 | 33,633,000 | 33,633,000 | 33,633,000 | 33,633,000 | 2024-06-27 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 77,000 | 0.23 % | |
930 | 2024 | Sekretariat DPRD | jasa konsultasi pengawasan Pengaspalan Keliling Halaman Kantor Sekretariat DPRD Prov Kalteng | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17688012 | 49289856 | 92,011,599 | 92,004,126 | 91,754,376 | 91,754,376 | 91,099,476 | 0 | 0 | 0 | 2024-10-03 | 257,223 | 0.28 % | |||
931 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (8 Ruang) SMKN 4 Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16174012 | 51424939 | 99,000,000 | 99,000,000 | 98,833,500 | 98,833,500 | 98,833,500 | 98,833,500 | 98,833,500 | 98,833,500 | 2024-05-22 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 166,500 | 0.17 % | |
932 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan,1).Rehab Ruang Kelas SMKN 3 KUALA KAPUAS,2).Rehabilitasi Gudang Produksi SMKN 2 BATAGUH,3).Pembangunan Toilet Beserta Sanitasinya SMKS GKE MANDOMAI | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17809012 | 52613300 | 42,459,000 | 42,459,000 | 42,407,000 | 42,407,000 | 42,407,000 | 0 | 0 | 0 | 2024-10-25 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 52,000 | 0.12 % | |
933 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SERUYAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17646012 | 49720900 | 7,942,500 | 7,941,499 | 7,869,900 | 7,869,900 | 7,425,900 | 7,425,900 | 7,425,900 | 7,425,900 | 2024-09-13 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 72,600 | 0.91 % | |
934 | 2024 | Badan Pendapatan Daerah | .PEKERJAAN PENGAWASAN RENOVASI RUANG PAJAK KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17541012 | 49960741 | 43,780,000 | 43,756,200 | 43,711,800 | 43,711,800 | 43,312,200 | 43,312,200 | 43,312,200 | 43,312,200 | 2024-07-26 | Roa Solution | 92.337.883.0-711.000 | 68,200 | 0.16 % | |
935 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI GARASI RUMAH DINAS ESSELON UPTPPD PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15740012 | 49824504 | 10,866,000 | 10,865,790 | 10,545,000 | 10,545,000 | 10,323,000 | 10,323,000 | 10,323,000 | 10,323,000 | 2024-03-11 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 321,000 | 2.95 % | |
936 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Pulang Pisau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16144012 | 51421805 | 20,000,000 | 20,000,000 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 19,944,500 | 2024-05-22 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 55,500 | 0.28 % | |
937 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Komputer,Bahasa SMK NEGERI 1 PANGKALAN BUN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16056012 | 50541480 | 37,019,000 | 37,019,000 | 36,908,000 | 36,908,000 | 36,908,000 | 36,908,000 | 36,908,000 | 36,908,000 | 2024-05-06 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 111,000 | 0.3 % | |
938 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Screen House | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16205012 | 51720530 | 57,240,000 | 57,240,000 | 57,129,000 | 57,129,000 | 57,054,000 | 57,054,000 | 57,054,000 | 57,054,000 | 2024-05-29 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 111,000 | 0.19 % | |
939 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Kantin, Ruang Keterampilan, Ruang Pembelajaran KHusus, Ruang Tata Usaha, Ruang UKS, Selasar Penghubung SLB Negeri Kuala Kurun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17326012 | 51911767 | 62,987,850 | 62,981,400 | 62,925,900 | 62,925,900 | 62,925,900 | 62,925,900 | 0 | 62,925,900 | 2024-07-01 | CV. PROTECT JASA CONSULTANT | 01.407.748.1-711.000 | 61,950 | 0.1 % | |
940 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pemeliharaan/Rehabilitasi Gedung Kantor dan Bangunan Lainnya -Rehab WC | Pengadaan Langsung | Pekerjaan Konstruksi | 17905012 | 53355830 | 78,900,000 | 78,900,000 | 78,553,186 | 78,553,186 | 78,500,010 | 0 | 0 | 0 | 2024-11-08 | CV. MULTI TATA KARYA | 71.905.824.0-711.000 | 346,814 | 0.44 % | |
941 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 1 KATINGAN KUALA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17239012 | 51735800 | 82,630,000 | 82,630,000 | 82,408,000 | 82,408,000 | 82,408,000 | 82,408,000 | 0 | 82,408,000 | 2024-05-30 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 222,000 | 0.27 % | |
942 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE UPTPPD KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16019012 | 49196120 | 28,976,000 | 28,975,995 | 28,900,000 | 28,900,000 | 28,437,645 | 28,437,645 | 28,437,645 | 28,437,645 | 2024-04-29 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 76,000 | 0.26 % | |
943 | 2024 | Dinas Sosial | Perencanaan Pembatas Antar Bangsal Klien UPT PSBL Pambelum | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15971012 | 49435003 | 68,900,000 | 68,860,800 | 68,213,940 | 68,213,940 | 67,880,940 | 67,880,940 | 67,880,940 | 67,880,940 | 2024-04-17 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 686,060 | 1 % | |
944 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMASANGAN PAVING BLOK HALAMAN AULA UTAMA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16188012 | 49188273 | 40,000,000 | 39,738,000 | 39,571,500 | 39,571,500 | 39,005,400 | 39,005,400 | 39,005,400 | 39,005,400 | 2024-05-22 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 428,500 | 1.07 % | |
945 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Kimia,Laboratorium Fisika SMK NEGERI 2 NANGA BULIK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17539012 | 51213613 | 76,920,000 | 76,920,000 | 76,823,100 | 76,823,100 | 76,823,100 | 76,823,100 | 76,823,100 | 76,823,100 | 2024-07-25 | Roa Solution | 92.337.883.0-711.000 | 96,900 | 0.13 % | |
946 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Sanaman Mantikei (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17264012 | 51239529 | 38,595,300 | 38,595,300 | 38,540,000 | 38,540,000 | 38,540,000 | 38,540,000 | 0 | 38,540,000 | 2024-06-05 | CV Kasuma Jaya Engineering | 01.700.370.8-711.000 | 55,300 | 0.14 % | |
947 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pembangunan Pagar SMAN 3 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17822012 | 52898255 | 30,000,000 | 30,000,000 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 29,911,200 | 2024-10-28 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 88,800 | 0.3 % | |
948 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Kuala Kurun (Pembangunan Rg. Kelas Baru (RKB)) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16207012 | 51238686 | 39,609,200 | 39,609,200 | 39,609,000 | 39,609,000 | 39,609,000 | 39,609,000 | 0 | 39,609,000 | 2024-05-28 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 200 | 0 % | |
949 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMA Garing Tarantang (Rehabilitasi Rg. Tata Usaha, Pembangunan Rg. Perpustakaan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17245012 | 51239190 | 37,287,000 | 37,287,000 | 36,737,670 | 36,737,670 | 36,737,670 | 36,737,670 | 0 | 36,737,670 | 2024-05-31 | 549,330 | 1.47 % | |||
950 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pengecoran Jalan Menuju Sekolah SMAN 1 Tamban Catur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15812012 | 50729114 | 96,000,000 | 96,000,000 | 95,850,000 | 95,850,000 | 95,850,000 | 95,850,000 | 95,850,000 | 95,850,000 | 2024-03-18 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 150,000 | 0.16 % | |
951 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehabilitasi Ruang Kelas (1 Ruang) dengan tingkat kerusakan minimal sedang SMK NEGERI 5 PALANGKA RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15918012 | 50540553 | 9,443,000 | 9,443,000 | 9,409,700 | 9,409,700 | 9,409,700 | 9,409,700 | 9,409,700 | 9,409,700 | 2024-04-01 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 33,300 | 0.35 % | |
952 | 2024 | Dinas Perumahan, Kawasan Permukiman dan Pertanahan | Peningkatan Jalan Damai dan Sekitarnya, Desa Cempaka Mulia Timur, Kecamatan Cempaga, Kabupaten Kotawaringin Timur, Provinsi Kalimantan Tengah | Pengadaan Langsung | Pekerjaan Konstruksi | 16116012 | 49565233 | 186,400,000 | 186,391,000 | 186,089,526 | 186,089,526 | 185,798,000 | 185,798,000 | 100 | 185,798,000 | 2024-05-20 | CV GATRA MEGA | 02.676.179.1-711.000 | 310,474 | 0.17 % | |
953 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI GEDUNG KANTOR UPTPPD KASONGAN | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17399012 | 49934979 | 25,000,000 | 24,999,999 | 24,900,000 | 24,900,000 | 24,650,325 | 24,650,325 | 24,650,325 | 24,650,325 | 2024-07-03 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 100,000 | 0.4 % | |
954 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan WC SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17332012 | 51911699 | 12,500,000 | 12,448,650 | 12,448,650 | 12,448,650 | 12,448,650 | 12,448,650 | 12,448,650 | 12,448,650 | 2024-08-14 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 51,350 | 0.41 % | |
955 | 2024 | Dinas Pendidikan | PERENCANAAN PEMBANGUNAN RUANG KELAS SMAN 1 KAMIPANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17873012 | 53267712 | 100,000,000 | 100,000,000 | 99,900,000 | 99,900,000 | 99,900,000 | 0 | 0 | 0 | 2024-11-06 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 100,000 | 0.1 % | |
956 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0018 Pengawasan Pagar Pengaman Keliling Tambak | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17555012 | 52151470 | 100,700,000 | 99,960,000 | 99,300,000 | 99,300,000 | 99,000,000 | 99,000,000 | 99,000,000 | 99,000,000 | 2024-07-26 | PT. ANDAL CENDANAKA | 01.489.452.1-711.000 | 1,400,000 | 1.39 % | |
957 | 2024 | Badan Keuangan dan Aset Daerah | Belanja Modal Aset Tidak Berwujud - Sistem Aplikasi Penatausahaan BMD Prov. Kalteng (SiPeKa) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10011043000 | 53424637 | 99,850,000 | 99,844,500 | 99,789,000 | 99,789,000 | 99,289,500 | 99,289,500 | 99,289,500 | 99,289,500 | 2024-11-21 | CV. Anugrah Teknik Raya | 99.127.164.4-711.000 | 61,000 | 0.06 % | |
958 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Penyediaan dan Pemeliharaan Sarana Prasarana pada UPT.KPHP Mentaya Hulu Seruyan Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17797012 | 52987927 | 39,890,000 | 39,889,600 | 39,830,000 | 39,830,000 | 39,588,150 | 0 | 0 | 0 | 2024-10-22 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 60,000 | 0.15 % | |
959 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Pengadaan Bahan-Bahan Pelatihan DBH-DR Melalui Pelatihan Tata Boga, Anyaman Rotan, Pengolahan Ikan, Pengolahan Jamur Tiram dan Pengolahan Pakan Ternak | Pengadaan Langsung | Pengadaan Barang | 17909012 | 53371337 | 87,000,000 | 86,930,011 | 86,765,370 | 86,765,370 | 86,765,370 | 0 | 0 | 0 | 2024-11-08 | CV. DEDIKASI KARYA DELANTARA | 90.527.413.0-711.000 | 234,630 | 0.27 % | |
960 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang SLB YPLB Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17333012 | 51911687 | 10,000,000 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 9,995,550 | 2024-08-14 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 4,450 | 0.04 % | |
961 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAN 1 Kotawaringin Lama (Rehabilitasi Rg. Lab. Kimia, Rehabilitasi Rg. Perpustakaan, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15791012 | 50393189 | 48,193,100 | 48,193,100 | 47,841,000 | 47,841,000 | 47,841,000 | 47,841,000 | 0 | 47,841,000 | 2024-03-21 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 352,100 | 0.73 % | |
962 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 LAMANDAU | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16070012 | 50544714 | 21,041,000 | 21,041,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 21,000,000 | 2024-05-06 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 41,000 | 0.19 % | |
963 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih ( SMKN 1 Kumai) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15715012 | 49713439 | 25,000,000 | 25,000,000 | 24,950,000 | 24,950,000 | 24,950,000 | 0 | 0 | 0 | 2024-02-23 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 50,000 | 0.2 % | |
964 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE KANTOR UPTPPD MURUNG RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16022012 | 49191281 | 28,976,000 | 28,715,700 | 28,493,700 | 28,493,700 | 27,616,800 | 27,616,800 | 27,616,800 | 27,616,800 | 2024-04-29 | PT.TABENGAN INDAH DESIGN | 02.618.309.5-711.000 | 482,300 | 1.66 % | |
965 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Rehabilitasi Laboratorium IPA 2 Ruang SMAN 7 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15897012 | 50766788 | 30,000,000 | 30,000,000 | 29,900,000 | 29,900,000 | 29,900,000 | 29,900,000 | 0 | 29,900,000 | 2024-03-28 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 100,000 | 0.33 % | |
966 | 2024 | Dinas Pemberdayaan Masyarakat dan Desa | Perencanaan Bangunan Mushola DPMD | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15867012 | 51050071 | 72,000,000 | 72,000,000 | 71,817,000 | 71,817,000 | 71,484,000 | 71,484,000 | 0 | 71,484,000 | 2024-03-26 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 183,000 | 0.25 % | |
967 | 2024 | KPHL GERBANG BARITO | Beban Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - Perencana Kandang Kambing - Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16122012 | 49971020 | 28,620,000 | 28,620,000 | 28,313,880 | 28,313,880 | 27,814,380 | 27,814,380 | 27,814,380 | 27,814,380 | 2024-06-25 | GEO DINAMIKA UTAMA | 01.576.437.6-711.000 | 306,120 | 1.07 % | |
968 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultan Perencanaan Pembangunan Green House Kota P. Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17895012 | 53297651 | 57,240,000 | 57,240,000 | 57,109,500 | 57,109,500 | 57,109,500 | 57,109,500 | 57,109,500 | 57,109,500 | 2024-11-07 | ROTASI DESIGN CONSULTANT | 90.011.802.7-711.000 | 130,500 | 0.23 % | |
969 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Konsultan Pengawasan Perluasan SPAM Jaringan Perpipaan Kota Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15986012 | 51420541 | 35,049,000 | 35,000,000 | 34,176,900 | 34,176,900 | 34,176,900 | 34,176,900 | 34,176,900 | 34,176,900 | 2024-04-19 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 872,100 | 2.49 % | |
970 | 2024 | Dinas Perpustakaan dan Arsip | Jasa Konsultansi Perencanaan Gedung Kafe Literasi | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15991012 | 51257176 | 59,073,000 | 59,073,000 | 58,800,030 | 58,800,000 | 58,700,000 | 58,700,000 | 58,700,000 | 58,700,000 | 2024-05-06 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 272,970 | 0.46 % | |
971 | 2024 | Badan Keuangan dan Aset Daerah | Pengawasan Pemeliharaan Asrama Mahasiswa Kalteng di Jakarta Timur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15978012 | 51421909 | 20,000,000 | 20,000,000 | 19,900,000 | 19,900,000 | 19,900,000 | 19,900,000 | 19,900,000 | 19,900,000 | 2024-04-20 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 100,000 | 0.5 % | |
972 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Penataan dan Penimbunan Halaman SMAN 2 Kahayan Tengah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17763012 | 52879929 | 40,000,000 | 40,000,000 | 39,760,200 | 39,760,200 | 39,760,200 | 0 | 0 | 0 | 2024-10-16 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 239,800 | 0.6 % | |
973 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Rungan Barat (Pembangunan Rg. Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17217012 | 51238823 | 33,118,600 | 33,118,600 | 33,100,200 | 33,100,200 | 33,100,200 | 33,100,200 | 0 | 33,100,200 | 2024-05-29 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 18,400 | 0.06 % | |
974 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Pelabuhan Tambat/Sandar UPT.KPHL Gerbang Barito - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17700012 | 52528448 | 21,406,000 | 21,405,700 | 21,350,000 | 21,350,000 | 20,959,298 | 0 | 0 | 0 | 2024-10-02 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 56,000 | 0.26 % | |
975 | 2024 | Dinas Kehutanan | Beban Jasa Konsultansi Pengawasan Bangunan Sarana dan Prasarana UPT. KPHP Kapuas Tengah - Penyediaan dan Pemeliharaan Sarana Prasarana Operasionalisasi KPH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17714012 | 52528450 | 25,128,000 | 25,127,900 | 25,106,258 | 25,106,258 | 24,828,758 | 0 | 0 | 0 | 2024-10-10 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 21,743 | 0.09 % | |
976 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang Laboratorium Biologi SMK NEGERI 1 SEMATU JAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17440012 | 51851990 | 38,460,000 | 38,459,999 | 38,350,500 | 38,350,500 | 38,350,500 | 38,350,500 | 38,350,500 | 38,350,500 | 2024-07-06 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 109,500 | 0.28 % | |
977 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16029012 | 49202880 | 13,500,000 | 13,423,496 | 13,400,000 | 13,400,000 | 13,120,200 | 13,120,200 | 13,120,200 | 13,120,200 | 2024-05-01 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 100,000 | 0.74 % | |
978 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Kumai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16146012 | 51422769 | 20,000,000 | 20,000,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 19,889,000 | 2024-05-22 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 111,000 | 0.56 % | |
979 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Kandang Rusa UPT BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16040012 | 51460047 | 45,275,000 | 45,275,000 | 45,100,077 | 45,100,077 | 44,377,800 | 44,377,800 | 44,377,800 | 44,377,800 | 2024-04-30 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 174,923 | 0.39 % | |
980 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih ( SMAN 1 Parenggean) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15714012 | 49713440 | 15,000,000 | 15,000,000 | 14,950,000 | 14,950,000 | 14,950,000 | 0 | 0 | 0 | 2024-02-23 | CV.KAHAYAN CIPTA BERSAMA | 02.538.820.8-711.000 | 50,000 | 0.33 % | |
981 | 2024 | Dinas Energi dan Sumber Daya Mineral | Pemeliharaan/Rehabilitasi Sarana dan Prasarana Gedung Kantor atau Bangunan Lainnya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15692012 | 48888375 | 188,991,000 | 99,000,000 | 98,500,000 | 98,500,000 | 98,500,000 | 98,500,000 | 98,500,000 | 98,500,000 | 2024-02-15 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 90,491,000 | 47.88 % | |
982 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Pengawasan Screen House | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17513012 | 51720770 | 40,280,000 | 40,279,999 | 40,096,227 | 40,096,227 | 39,960,000 | 39,960,000 | 39,960,000 | 39,960,000 | 2024-07-26 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 183,773 | 0.46 % | |
983 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Rehabilitasi Ruang Kelas SMAN 2 Maliku | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17784012 | 52880424 | 40,000,000 | 40,000,000 | 39,715,467 | 39,715,467 | 39,715,467 | 0 | 0 | 0 | 2024-10-17 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 284,533 | 0.71 % | |
984 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS,Ruang Bimbingan Konseling(BK) SMKS PGRI SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17412012 | 51358987 | 17,550,000 | 17,550,000 | 17,496,720 | 17,496,720 | 17,496,720 | 17,496,720 | 17,496,720 | 17,496,720 | 2024-06-27 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 53,280 | 0.3 % | |
985 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang SLBN 1 Palangka Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17343012 | 51911816 | 12,750,000 | 12,749,460 | 12,716,000 | 12,716,000 | 12,716,000 | 12,716,000 | 12,716,000 | 12,716,000 | 2024-08-12 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 34,000 | 0.27 % | |
986 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PERENCANAAN RENOVASI GEDUNG ARSIP UPTPPD SAMPIT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17543012 | 52151560 | 78,750,000 | 78,749,998 | 78,643,500 | 78,643,500 | 78,255,000 | 78,255,000 | 78,255,000 | 78,255,000 | 2024-07-26 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 106,500 | 0.14 % | |
987 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0005 Perencanaan Pembuatan Sekat Ruang Podcast, Rehab Halaman dan jalan kantor, Rehab Jendela Kantor, Rehab Lantai Teras, Lantai Lobby dan Jalan Disabilitas, Rehab Pagar Kantor, Rehab Tiang Bendera (1 Paket) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16038012 | 51477528 | 100,000,000 | 99,889,000 | 99,800,000 | 99,800,000 | 99,100,000 | 99,100,000 | 100 | 99,100,000 | 2024-04-29 | Roa Solution | 92.337.883.0-711.000 | 200,000 | 0.2 % | |
988 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Lanjutan penataan Halaman SMAN 1 Kasongan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17827012 | 52897728 | 65,000,000 | 65,000,000 | 64,935,000 | 64,935,000 | 64,935,000 | 0 | 0 | 0 | 2024-10-27 | CV. BATUAH RAYA KONSULTAN | 19.890.506.9-711.000 | 65,000 | 0.1 % | |
989 | 2024 | Badan Pendapatan Daerah | PEKERJAAN PENGAWASAN RENOVASI PLAFON DAN TANGGA KANTOR INDUK | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17818012 | 49957080 | 17,972,500 | 17,926,500 | 17,871,000 | 17,871,000 | 17,538,000 | 0 | 0 | 0 | 2024-10-30 | 101,500 | 0.56 % | |||
990 | 2024 | Dinas Pendidikan | Perencanaan Pengadaan Sarana Air Bersih SMAN 3 Puruk Cahu | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17672012 | 52610382 | 30,000,000 | 30,000,000 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 29,950,020 | 2024-09-26 | CV. PUTRA BAHARI ENGINEERING | 75.242.556.1-711.000 | 49,980 | 0.17 % | |
991 | 2024 | Badan Pendapatan Daerah | Pengawasan Pembangunan Ruang Tunggu Cek Fisik Mobil | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17580012 | 52200424 | 18,240,000 | 18,209,550 | 18,165,150 | 18,165,150 | 17,954,250 | 17,954,250 | 17,954,250 | 17,954,250 | 2024-08-06 | CV. BAHARI ENGINEERING CONSULTANT | 02.809.277.3-711.000 | 74,850 | 0.41 % | |
992 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Dusun Utara (Pembangunan Lab. Biologi) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17309012 | 51153428 | 32,583,200 | 32,583,200 | 32,488,035 | 32,488,035 | 32,488,035 | 32,488,035 | 32,488,035 | 32,488,035 | 2024-06-13 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 95,165 | 0.29 % | |
993 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan Pagar dan Parkir SMAN 6 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15829012 | 50770118 | 75,000,000 | 75,000,000 | 74,503,200 | 74,503,200 | 74,503,200 | 74,503,200 | 0 | 74,503,200 | 2024-03-21 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 496,800 | 0.66 % | |
994 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Kandang Pada Kegiatan Pengadaan Ternak Ayam Buras, Pakan dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10026896000 | 52123216 | 11,649,000 | 11,649,000 | 11,638,350 | 11,638,350 | 11,638,350 | 0 | 0 | 0 | 2024-12-07 | 10,650 | 0.09 % | |||
995 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Rehabilitasi Ruang Laboratorium Komputer,Rehabilitasi Ruang Multimedia,Rehabilitasi Toilet(Jamban) SMK NEGERI 1 MUARA TEWEH | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17421012 | 51196816 | 27,790,000 | 27,780,000 | 27,713,400 | 27,713,400 | 27,713,400 | 27,713,400 | 27,713,400 | 27,713,400 | 2024-06-28 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 76,600 | 0.28 % | |
996 | 2024 | Dinas Sosial | Perencanaan Rehabilitasi Wisma DAMANG LEMAN dan H. IKAP Pada UPT. PSBR Majar Tabela | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17891012 | 53322197 | 75,150,000 | 75,067,000 | 74,291,434 | 74,291,434 | 71,862,288 | 71,862,288 | 71,862,288 | 71,862,288 | 2024-11-13 | CV. ACE TAKABEYA | 02.676.279.9-711.000 | 858,566 | 1.14 % | |
997 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya (Perencanaan Parkir Kendaraan Bermotor Kantor) | Pengadaan Langsung | Jasa Lainnya | 10006250000 | 53444696 | 202,500,000 | 24,952,800 | 24,464,400 | 24,464,400 | 24,087,000 | 0 | 0 | 0 | 2024-11-14 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 178,035,600 | 87.92 % | |
998 | 2024 | Badan Pendapatan Daerah | Perencanaan Pelebaran Bangunan Ruang Cek Fisik UPTPPD Pangkalan Bun | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17544012 | 52151602 | 17,850,000 | 17,849,999 | 17,782,200 | 17,782,200 | 17,526,900 | 17,526,900 | 17,526,900 | 17,526,900 | 2024-07-26 | CV. ATMAJAYA BANGUN CONSULTANT | 84.926.720.8-711.000 | 67,800 | 0.38 % | |
999 | 2024 | Dinas Pendidikan | Pekerjaan Perencanaan Pembangunan Pagar SMAN 1 Gunung Bintang Awai | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17779012 | 52878667 | 87,000,000 | 87,000,000 | 86,800,000 | 86,800,000 | 86,800,000 | 0 | 0 | 0 | 2024-10-17 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 200,000 | 0.23 % | |
1000 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembuatan Rumah Genset SMKN 1 PANGKALAN LADA - SMKN 1 LAMANDAU - SMKN 1 SEBANGAU KUALA - SMKN 1 BANAMA TINGANG - SMKN 1 TIMPAH - SMKN 1 MANDAU TELAWANG - SMKN 2 BATAGUH - SMKN 1 MENTAYA HILIR SELATAN - SMKN 1 BUKIT SANTUAI - SMKN 1 GUNUNG PUREI - SMKN 1 KATINGAN KUALA - SMKN 1 DELANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17812012 | 52021306 | 19,920,000 | 19,920,000 | 19,869,000 | 19,869,000 | 19,869,000 | 0 | 0 | 0 | 2024-10-25 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 51,000 | 0.26 % | |
1001 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Toilet dan Rehab Ruang Praktik Siswa SMKN 1 Lamandau | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16166012 | 51424298 | 46,500,000 | 46,500,000 | 46,442,400 | 46,442,400 | 46,442,400 | 46,442,400 | 46,442,400 | 46,442,400 | 2024-05-22 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 57,600 | 0.12 % | |
1002 | 2024 | Badan Kepegawaian Daerah | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15912012 | 49241357 | 40,410,306 | 40,290,000 | 40,001,625 | 40,001,625 | 39,668,625 | 39,668,625 | 39,668,625 | 39,668,625 | 2024-03-28 | 408,681 | 1.01 % | |||
1003 | 2024 | Badan Penanggulangan Bencana dan Pemadam Kebakaran | Belanja Jasa Konsultansi Pengawasan Arsitektur (Pengawasan Bangunan Parkir Lingkungan Kantor) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17641012 | 52036017 | 52,000,000 | 14,000,000 | 13,875,000 | 13,875,000 | 13,841,700 | 13,841,700 | 13,841,700 | 13,841,700 | 2024-09-10 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 38,125,000 | 73.32 % | |
1004 | 2024 | Dinas Pendidikan | Pekerjaan Pengawasan Pembangunan RKB SMAN 3 Palangka Raya 2 Ruang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17831012 | 52898443 | 75,000,000 | 75,000,000 | 74,980,500 | 74,980,500 | 74,980,500 | 0 | 0 | 0 | 2024-10-27 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 19,500 | 0.03 % | |
1005 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Gunung Timang (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. UKS, Pembangunan Rg. BK) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17349012 | 51184582 | 39,009,500 | 39,009,500 | 38,850,000 | 38,850,000 | 38,850,000 | 38,850,000 | 38,850,000 | 38,850,000 | 2024-06-26 | 159,500 | 0.41 % | |||
1006 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0018 Pengawasan Interior Ruang Dinas | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17843012 | 53100090 | 46,000,000 | 46,000,000 | 45,954,000 | 45,954,000 | 45,600,000 | 45,600,000 | 45,600,000 | 45,600,000 | 2024-10-30 | CV.BETANG TEKNOSINDO KONSULTAN | 02.437.786.3-711.000 | 46,000 | 0.1 % | |
1007 | 2024 | Dinas Pendidikan | Jasa Konsultansi Perencanaan Pembangunan Ruang Kelas Baru SLBN Laung Tuhup | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17329012 | 51911719 | 73,795,500 | 73,787,250 | 73,731,750 | 73,731,750 | 73,731,750 | 73,731,750 | 0 | 73,731,750 | 2024-07-01 | CV. KARYA PERDANA KONSULTAN | 01.854.518.6-711.000 | 63,750 | 0.09 % | |
1008 | 2024 | Dinas Tenaga Kerja dan Transmigrasi | Jasa Konsultansi Pengawasan- Pemeliharaan/Rehabilitasi Sarana dan Prasarana Pendukung Gedung Kantor- Rehab Kantor Ruang Penyusunan Program | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17865012 | 53269934 | 17,910,000 | 17,910,000 | 17,893,200 | 17,893,200 | 17,859,900 | 0 | 0 | 0 | 2024-11-04 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 16,800 | 0.09 % | |
1009 | 2024 | Badan Penghubung | Belanja Jasa Konsultansi Pengawasan Arsitektur | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15994012 | 50432357 | 100,700,000 | 99,950,000 | 99,699,090 | 99,699,090 | 99,050,850 | 0 | 0 | 0 | 2024-04-19 | CV. KRISOPRAS DESIGN KONSULTAN | 02.676.463.9-711.000 | 1,000,910 | 0.99 % | |
1010 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAN 1 Tanah Siang Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15963012 | 50730149 | 72,000,000 | 72,000,000 | 71,500,000 | 71,500,000 | 71,500,000 | 71,500,000 | 0 | 71,500,000 | 2024-04-05 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 500,000 | 0.69 % | |
1011 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Praktik Siswa SMKN 1 Telawang | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16156012 | 51423894 | 19,000,000 | 19,000,000 | 18,922,300 | 18,922,300 | 18,922,300 | 18,922,300 | 18,922,300 | 18,922,300 | 2024-05-22 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 77,700 | 0.41 % | |
1012 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 2 Tewah (Pembangunan Rg. Kelas Baru (RKB), Pembangunan Rg. Lab. Komputer) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16088012 | 51238916 | 39,746,300 | 39,746,300 | 39,700,000 | 39,700,000 | 39,700,000 | 39,700,000 | 0 | 39,700,000 | 2024-05-07 | CV.WIBAWA DESIGN KONSULTAN | 75.248.843.7-711.000 | 46,300 | 0.12 % | |
1013 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan RKB 2 Ruang SMAN 4 Kahayan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15909012 | 50772040 | 35,000,000 | 35,000,000 | 34,933,400 | 34,933,400 | 34,933,400 | 34,933,400 | 0 | 34,933,400 | 2024-04-03 | CV. Unika Citra Mandiri | 02.539.043.6-711.000 | 66,600 | 0.19 % | |
1014 | 2024 | Dinas Pendidikan | Jasa Konsultasi Pengawasan Pembangunan Ruang Kelas Baru SLBN 3 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17511012 | 52082540 | 83,946,240 | 83,472,000 | 83,250,000 | 83,250,000 | 83,250,000 | 83,250,000 | 83,250,000 | 83,250,000 | 2024-07-18 | 696,240 | 0.83 % | |||
1015 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Pemeliharaan Alat Kantor dan Rumah Tangga - Pemeliharaan Mesin Laundry Washer Extractor | Pengadaan Langsung | Jasa Lainnya | 17466012 | 51975355 | 104,000,000 | 103,950,000 | 103,896,000 | 103,896,000 | 103,785,000 | 103,785,000 | 103,785,000 | 103,785,000 | 2024-07-22 | 104,000 | 0.1 % | |||
1016 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehabilitasi Ruang Kelas (3 Ruang ) SMK NEGERI 1 KUALA KAPUAS | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15846012 | 50467738 | 44,361,000 | 44,361,000 | 44,289,000 | 44,289,000 | 44,289,000 | 44,289,000 | 44,289,000 | 44,289,000 | 2024-03-25 | CV. CENDRAWASIH MITRA PRATAMA | 03.229.883.8-711.000 | 72,000 | 0.16 % | |
1017 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Kandang Pada kegiatan Pengadaan Ternak Ayam petelur dan Pembangunan Kandang untuk kabupaten Murung Raya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 10026893000 | 52123218 | 10,060,500 | 10,060,500 | 10,059,930 | 10,059,930 | 10,056,600 | 0 | 0 | 0 | 2024-12-07 | 570 | 0.01 % | |||
1018 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Rehab Ruang Kelas (3 Ruang) SMKN 1 Katingan Kuala | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16168012 | 51423665 | 25,000,000 | 25,000,000 | 24,905,650 | 24,905,650 | 24,905,650 | 24,905,650 | 24,905,650 | 24,905,650 | 2024-05-22 | CV. Palangka Widyajasa Konsultan | 02.437.615.4-711.000 | 94,350 | 0.38 % | |
1019 | 2024 | Dinas Kelautan dan Perikanan | 3.25.04.1.05.0004.5.1.02.02.08.0005 Perencanaan Pembangunan Laboratorium | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17897012 | 53305583 | 50,000,000 | 50,000,000 | 49,672,500 | 49,672,500 | 49,300,000 | 49,300,000 | 49,300,000 | 49,300,000 | 2024-11-07 | 327,500 | 0.66 % | |||
1020 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan SMAN 1 Awang Lapai (Pembangunan Rg. Lab. Komputer, Pembangunan Rg. Kepala Sekolah/Pimpinan) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17271012 | 51155168 | 40,137,100 | 40,137,100 | 40,137,000 | 40,137,000 | 40,137,000 | 40,137,000 | 0 | 40,137,000 | 2024-06-05 | CV. PRATAMA HUMA DESIGN | 99.430.054.9-711.000 | 100 | 0 % | |
1021 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Perencanaan Pembangunan Mushola Km. 38 | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17634012 | 52365937 | 60,000,000 | 60,000,000 | 59,889,000 | 59,889,000 | 59,718,000 | 59,718,000 | 59,718,000 | 59,718,000 | 2024-09-17 | CV. MULTI KARYA RANCANG MANDIRI | 76.998.800.7-711.000 | 111,000 | 0.19 % | |
1022 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Pembangunan Ruang Laboratorium Kimia,Fisika SMK NEGERI 1 MIHING RAYA | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17241012 | 51735757 | 86,900,000 | 86,900,000 | 86,789,000 | 86,789,000 | 86,789,000 | 86,789,000 | 0 | 86,789,000 | 2024-05-30 | CV. UTUS DAMABA CONSULTANT | 03.229.884.6-711.000 | 111,000 | 0.13 % | |
1023 | 2024 | Dinas Pendidikan | Paket Pekerjaan Pengawasan Pembangunan Pembuatan Pagar dan Penataan Halaman SMAN 4 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17300012 | 51398991 | 36,000,000 | 36,000,000 | 35,819,700 | 35,819,700 | 35,819,700 | 35,819,700 | 35,819,700 | 35,819,700 | 2024-06-11 | CV. PIJARAYA INERSIA | 99.117.785.8-711.000 | 180,300 | 0.5 % | |
1024 | 2024 | Dinas Pendidikan | Jasa Konsultasi Pengawasan Pembangunan Kantin, Ruang Guru, Ruang Kepsek, Ruang keterampilan, Ruang pembelajaran khusus, ruang perpustakaan ruang tata usaha, ruang UKS dan selasar penghubung SLBN 3 Sampit | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17510012 | 52082529 | 68,783,040 | 68,514,750 | 68,292,750 | 68,292,750 | 68,292,750 | 68,292,750 | 68,292,000 | 68,292,750 | 2024-07-18 | 490,290 | 0.71 % | |||
1025 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pembangunan WC 2 Unit SMAN 4 Buntok | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16196012 | 50726813 | 24,325,000 | 24,325,000 | 24,320,100 | 24,320,100 | 24,320,100 | 24,320,100 | 24,320,100 | 24,320,100 | 2024-05-28 | CV. TALINDO KONSULTAN | 84.303.935.5-711.000 | 4,900 | 0.02 % | |
1026 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Instalasi Air Bersih (Grenteng) Pada Kegiatan Pengembangan Apartemen Ayam Broiler | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17579012 | 52123230 | 21,180,000 | 21,180,000 | 21,069,000 | 21,069,000 | 20,979,000 | 20,979,000 | 20,979,000 | 20,979,000 | 2024-08-06 | CV. LISTRA ARCDIMENSI | 02.539.113.7-711.000 | 111,000 | 0.52 % | |
1027 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Belanja Jasa Konsultansi Perencanaan Rehab Ruang Direktur dan Wadir | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 16060012 | 51500653 | 20,000,000 | 19,980,000 | 19,600,380 | 19,600,380 | 15,046,050 | 15,046,050 | 15,046,050 | 15,046,050 | 2024-05-28 | CV. Trakat Antero Hariara | 40.804.831.2-711.000 | 399,620 | 2 % | |
1028 | 2024 | Dinas Pendidikan | Jasa Konsultan Perencanaan Penataan Halaman dan Rehab Ruang Kelas (3 Ruang)SMKN 1 Gunung Purei | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16171012 | 51426936 | 69,200,000 | 69,200,000 | 69,055,700 | 69,055,700 | 69,055,700 | 69,055,700 | 69,055,700 | 69,055,700 | 2024-05-22 | CV.CIPTA UTAMA DESIGN | 02.539.056.8-711.000 | 144,300 | 0.21 % | |
1029 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Konsultan Pengawasan Pembangunan Tempat Parkir Kantor UPT. BPMPPHMT | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17606012 | 51460043 | 7,562,975 | 7,562,975 | 7,449,109 | 7,449,109 | 7,446,990 | 7,446,990 | 7,446,990 | 7,446,990 | 2024-08-16 | cv.karya betang mandiri konsultan | 03.134.794.1-711.000 | 113,866 | 1.51 % | |
1030 | 2024 | Dinas Perhubungan | Pengawasan Pengadaan dan Pemasangan Rambu Sungai di Sungai Samba dan Katingan | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15976012 | 51271850 | 67,376,704 | 67,375,335 | 67,321,500 | 67,321,500 | 67,237,140 | 67,237,140 | 67,237,140 | 67,237,140 | 2024-06-27 | CV. KATIGA RANCANG PUTERA | 02.618.593.4-711.000 | 55,204 | 0.08 % | |
1031 | 2024 | RSUD dr. Doris Sylvanus (APBD) | Pengawasan Pembangunan Sarana Prasarana Jaringan Air Limbah | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17566012 | 51985822 | 35,000,000 | 34,900,000 | 34,305,660 | 34,305,660 | 34,254,600 | 34,254,600 | 34,254,600 | 34,254,600 | 2024-08-08 | CV. Bukit Indah Konsultan | 12.843.721.7-711.000 | 694,340 | 1.98 % | |
1032 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan Pos jaga SMAN 6 Palangka Raya (APBD) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 15828012 | 50770327 | 8,000,000 | 8,000,000 | 7,936,500 | 7,936,500 | 7,936,500 | 7,936,500 | 0 | 7,936,500 | 2024-03-21 | CV.BETANG ENGINEERING | 01.407.698.8-711.000 | 63,500 | 0.79 % | |
1033 | 2024 | Dinas Pendidikan | Jasa Konsultan Pengawasan Pembangunan Ruang UKS, Ruang Bimbingan Konseling(BK) SMK NEGERI 1 TELAWANG | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17533012 | 51358879 | 17,600,000 | 17,600,000 | 17,571,300 | 17,571,300 | 17,571,300 | 17,571,300 | 17,571,300 | 17,571,300 | 2024-07-25 | CV. HIGH TECH DIRGANTARA | 03.134.865.9-711.000 | 28,700 | 0.16 % | |
1034 | 2024 | Dinas Pendidikan | Paket Pekerjaan Perencanaan SMAS Muhammadiyah Kasongan (Rehabilitasi Rg. Kelas, Pembangunan Rg. OSIS) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 15803012 | 50391507 | 59,337,700 | 59,337,700 | 59,229,600 | 59,229,600 | 59,229,600 | 59,229,600 | 59,229,600 | 59,229,600 | 2024-03-15 | CV. Marvon Karya Arsimetris | 02.978.473.3-711.000 | 108,100 | 0.18 % | |
1035 | 2024 | Dinas Kelautan dan Perikanan | 3.25.01.1.09.0009.5.1.02.02.08.0018 Pengawasan Pembuatan Sekat Ruang Podcast, Rehab Halaman dan jalan kantor, Rehab Jendela Kantor, Rehab Lantai Teras, Lantai Lobby dan Jalan Disabilitas, Rehab Pagar Kantor, Rehab Tiang Bendera (1 Paket) | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17474012 | 52047972 | 70,000,000 | 69,999,000 | 69,874,500 | 69,874,500 | 69,500,000 | 69,500,000 | 69,500,000 | 69,500,000 | 2024-07-11 | CV. HAYATI KONSULTAN | 42.745.143.0-711.000 | 125,500 | 0.18 % | |
1036 | 2024 | KPHL GERBANG BARITO | Beban Jasa Konsultansi Perencanaan Arsitektur-Jasa Arsitektur Lainnya - BUDIDAYA IKAN/AGROSILVOFISHERY- Pembudidayaan Hasil Hutan Bukan Kayu dengan tidak Mengurangi Fungsi Pokoknya | Pengadaan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16120012 | 49971019 | 68,900,000 | 68,900,000 | 68,448,150 | 68,448,150 | 67,837,650 | 67,837,650 | 67,837,650 | 67,837,650 | 2024-06-25 | CV.EASTERN BANGUN PERKASA | 70.396.056.7-711.000 | 451,850 | 0.66 % | |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2024 | Dinas Kebudayaan dan Pariwisata | Penyusunan Dokumen Analisis Dampak Lalu Lintas (ANDALALIN) Pembangunan Kawasan Wisata Sabangau Park | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Non Konstruksi | 17659012 | 52087806 | 300,000,000 | 300,000,000 | 299,782,140 | 299,782,140 | 298,394,640 | 298,394,640 | 298,394,640 | 298,394,640 | 2024-09-23 | CV. SEIPUTRA PERSADA | 02.539.098.0-711.000 | 217,860 | 0.07 % | |
2 | 2024 | Dinas Lingkungan Hidup | Senjata Lain-Lain | Penunjukan Langsung | Pengadaan Barang | 17291012 | 51541250 | 1,040,000,000 | 1,021,200,000 | 0 | 0 | 0 | 1,020,090,000 | 1,020,090,000 | 1,020,090,000 | 2024-07-16 | 1,040,000,000 | 100 % | |||
3 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pembangunan RSUD Kelas B di Wilayah Barat Provinsi Kalimantan Tengah (Lanjutan)(Tahap 3) | Penunjukan Langsung | Pekerjaan Konstruksi | 15999012 | 51116873 | 197,520,000,000 | 195,009,800,000 | 194,970,797,184 | 194,970,797,000 | 194,886,500,000 | 194,886,500,000 | 0 | 0 | 2024-04-26 | 2,549,202,816 | 1.29 % | |||
4 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pembangunan RSUD Kelas B di Wilayah Barat Provinsi Kalimantan Tengah (Lanjutan)(Tahap 3) | Penunjukan Langsung | Pekerjaan Konstruksi | 15999012 | 51116873 | 197,520,000,000 | 195,009,800,000 | 194,970,797,184 | 194,970,797,000 | 194,886,500,000 | 194,886,500,000 | 155,909,200,000 | 194,886,500,000 | 2024-04-26 | 2,549,202,816 | 1.29 % | |||
5 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Pembuatan Master Plan Kawasan Rumah Sakit Provinsi Kalimantan Tengah | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 10011329000 | 52656421 | 1,678,709,000 | 1,303,147,000 | 1,300,015,350 | 1,300,015,350 | 1,296,685,350 | 0 | 0 | 0 | 2024-11-19 | 378,693,650 | 22.56 % | |||
6 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Gedung/Rumah Pelindung Vertical Dryer Kab. Pulang Pisau | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17218012 | 49360182 | 147,000,000 | 146,976,000 | 146,565,510 | 146,565,510 | 145,466,610 | 145,466,610 | 0 | 0 | 2024-05-30 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 434,490 | 0.3 % | |
7 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Gedung/Rumah Pelindung Vertical Dryer Kab. Pulang Pisau | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17218012 | 49360182 | 147,000,000 | 146,976,000 | 146,565,510 | 146,565,510 | 145,466,610 | 145,466,610 | 145,466,610 | 145,466,610 | 2024-05-30 | CV. TIKA KREATIF DESAIN KONSULTAN | 02.809.318.5-711.000 | 434,490 | 0.3 % | |
8 | 2024 | Dinas Kesehatan | Konsultan Perencanaan Pembangunan RSUD Kelas B Di Wilayah Barat Provinsi Kalimantan Tengah - Tahapan Pengawasan Berkala Tahap III | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17565012 | 50987285 | 1,100,000,000 | 1,001,871,570 | 920,594,040 | 920,594,040 | 909,494,040 | 0 | 0 | 0 | 2024-08-05 | 179,405,960 | 16.31 % | |||
9 | 2024 | Dinas Pekerjaan Umum dan Penataan Ruang | Study Kelayakan dan DED Pembangunan Rumah Sakit Provinsi di Kota Palangka Raya | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 17397012 | 51972049 | 1,464,375,000 | 1,464,375,000 | 1,460,368,725 | 1,460,300,000 | 1,455,700,000 | 1,455,700,000 | 1,455,700,000 | 1,455,700,000 | 2024-06-28 | 4,006,275 | 0.27 % | |||
10 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Silo (Penyimpanan Bahan Pangan) Kapasitas 1.000 Ton (Kab. Pulpis dan Kotim) | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16016012 | 49360193 | 350,000,000 | 349,883,000 | 349,202,670 | 349,202,670 | 348,429,000 | 348,429,000 | 0 | 0 | 2024-04-25 | 797,330 | 0.23 % | |||
11 | 2024 | Dinas Tanaman Pangan, Hortikultura dan Peternakan | Jasa Konsultansi Perencanaan Pembangunan Silo (Penyimpanan Bahan Pangan) Kapasitas 1.000 Ton (Kab. Pulpis dan Kotim) | Penunjukan Langsung | Jasa Konsultansi Badan Usaha Konstruksi | 16016012 | 49360193 | 350,000,000 | 349,883,000 | 349,202,670 | 349,202,670 | 348,429,000 | 348,429,000 | 348,429,000 | 348,429,000 | 2024-04-25 | 797,330 | 0.23 % | |||
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Non Tender | Kode RUP | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Non Tender | NPWP Penyedia Pemenang Non Tender | Nama Penyedia Pemenang Non Tender | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |