| 1 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASANBPEMBANGUNAN PAPAN NAMA KANTOR UPTPPD MURUNG RAYA |
|
|
10006735000
|
49682748 |
APBD |
7,942,500 |
7,941,499 |
7,869,900 |
7,869,900
|
7,514,700 |
7,514,700 |
7,514,700
|
7,514,700
|
2024-11-15 |
2024-11-29 |
CV.EASTERN BANGUN PERKASA |
70.396.056.7-711.000 |
72,600
|
0.91 %
|
10.4 |
| 2 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KURUN |
|
|
10006794000
|
49718725 |
APBD |
9,001,500 |
9,000,000 |
8,991,000 |
8,991,000
|
8,591,400 |
8,591,400 |
8,591,400
|
8,591,400
|
2024-11-15 |
2024-11-29 |
CV. UTUS DAMABA CONSULTANT |
03.229.884.6-711.000 |
10,500
|
0.12 %
|
10.4 |
| 3 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN GUDANG KANTOR BAPENDA |
|
|
15728012
|
49258772 |
APBD |
67,500,000 |
67,293,750 |
67,071,750 |
67,071,750
|
66,361,350 |
66,361,350 |
66,361,350
|
66,361,350
|
2024-03-15 |
2024-03-25 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
428,250
|
0.63 %
|
10.4 |
| 4 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAGAR DEPAN DAN SAMPING KANAN UPTPPD SAMPIT |
|
|
15730012
|
49198243 |
APBD |
32,598,000 |
30,870,950 |
30,691,500 |
30,691,500
|
30,125,400 |
30,125,400 |
30,125,400
|
30,125,400
|
2024-03-11 |
2024-03-20 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
1,906,500
|
5.85 %
|
10.4 |
| 5 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN TOILET UMUM AULA UTAMA BAPENDA PROV.KAL-TENG |
|
|
15731012
|
49248464 |
APBD |
48,000,000 |
47,913,150 |
47,619,000 |
47,619,000
|
46,964,100 |
46,964,100 |
46,964,100
|
46,964,100
|
2024-03-11 |
2024-03-20 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
381,000
|
0.79 %
|
10.4 |
| 6 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI KANTOR UPTPPD KUALA KURUN |
|
|
15732012
|
49828623 |
APBD |
45,360,000 |
44,716,905 |
44,244,600 |
44,244,600
|
43,323,300 |
43,323,300 |
43,323,300
|
43,323,300
|
2024-03-07 |
2024-03-20 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
1,115,400
|
2.46 %
|
10.4 |
| 7 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI PARKIR KANTOR INDUK |
|
|
15733012
|
49831172 |
APBD |
19,998,000 |
17,673,050 |
17,427,000 |
17,427,000
|
16,994,100 |
16,994,100 |
16,994,100
|
16,994,100
|
2024-03-07 |
2024-03-20 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
2,571,000
|
12.86 %
|
10.4 |
| 8 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI GEDUNG UPTPPD PANGKALAN BUN |
|
|
15738012
|
49826772 |
APBD |
36,220,000 |
36,198,039 |
35,464,500 |
35,464,500
|
35,064,900 |
35,064,900 |
35,064,900
|
35,064,900
|
2024-03-07 |
2024-03-20 |
CV. ACE TAKABEYA |
02.676.279.9-711.000 |
755,500
|
2.09 %
|
10.4 |
| 9 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI GARASI RUMAH DINAS ESSELON UPTPPD PANGKALAN BUN |
|
|
15740012
|
49824504 |
APBD |
10,866,000 |
10,865,790 |
10,545,000 |
10,545,000
|
10,323,000 |
10,323,000 |
10,323,000
|
10,323,000
|
2024-03-11 |
2024-03-20 |
CV. ACE TAKABEYA |
02.676.279.9-711.000 |
321,000
|
2.95 %
|
10.4 |
| 10 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI RUANGAN LANTAI 1 DAN RUANGAN SEKRETARIAT |
|
|
15742012
|
49833275 |
APBD |
88,424,000 |
88,402,759 |
88,236,259 |
88,236,259
|
87,470,359 |
87,470,359 |
87,470,359
|
87,470,359
|
2024-03-11 |
2024-03-20 |
CV. UTUS DAMABA CONSULTANT |
03.229.884.6-711.000 |
187,741
|
0.21 %
|
10.4 |
| 11 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI RUANG PAJAK KANTOR INDUK |
|
|
15743012
|
49834659 |
APBD |
76,616,400 |
76,582,554 |
76,471,554 |
76,471,554
|
75,528,062 |
75,528,062 |
75,528,062
|
75,528,062
|
2024-03-11 |
2024-03-20 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
144,846
|
0.19 %
|
10.4 |
| 12 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI PLAFON DAN TANGGA KANTOR INDUK |
|
|
15744012
|
49831359 |
APBD |
32,350,000 |
32,325,281 |
32,214,000 |
32,214,000
|
31,537,181 |
31,537,181 |
31,537,181
|
31,537,181
|
2024-03-07 |
2024-03-20 |
CV. UTUS DAMABA CONSULTANT |
03.229.884.6-711.000 |
136,000
|
0.42 %
|
10.4 |
| 13 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI MUSOLAH DAN AULA KANTOR INDUK |
|
|
15745012
|
49830795 |
APBD |
42,500,000 |
42,456,390 |
42,345,390 |
42,345,390
|
41,657,190 |
41,657,190 |
41,657,190
|
41,657,190
|
2024-03-07 |
2024-03-20 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
154,610
|
0.36 %
|
10.4 |
| 14 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN SIRING DAN PAGAR UPTPPD SERUYAN |
|
|
15746012
|
49212314 |
APBD |
113,643,750 |
99,945,788 |
99,834,788 |
99,834,788
|
99,213,188 |
99,213,188 |
99,213,188
|
99,213,188
|
2024-03-15 |
2024-03-25 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
13,808,963
|
12.15 %
|
10.4 |
| 15 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE, KANOPI PENYAMBUNG KANTOR-GUDANG ARSIP UPTPPD SUKAMARA |
|
|
15748012
|
49189732 |
APBD |
49,500,000 |
49,498,849 |
49,284,000 |
49,284,000
|
48,695,700 |
48,695,700 |
48,695,700
|
48,695,700
|
2024-03-07 |
2024-03-20 |
CV. PUTRA BAHARI ENGINEERING |
75.242.556.1-711.000 |
216,000
|
0.44 %
|
10.4 |
| 16 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SAMPIT |
|
|
15760012
|
49206656 |
APBD |
13,582,500 |
13,538,300 |
13,530,900 |
13,530,900
|
13,109,100 |
13,109,100 |
13,109,100
|
13,109,100
|
2024-03-07 |
2024-03-20 |
CV.EASTERN BANGUN PERKASA |
70.396.056.7-711.000 |
51,600
|
0.38 %
|
10.4 |
| 17 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD PANGKALAN BUN |
|
|
15762012
|
49206089 |
APBD |
13,582,500 |
13,505,000 |
13,364,400 |
13,364,400
|
13,075,800 |
13,075,800 |
13,075,800
|
13,075,800
|
2024-03-11 |
2024-03-20 |
CV. CENDRAWASIH MITRA PRATAMA |
03.229.883.8-711.000 |
218,100
|
1.61 %
|
9.2 |
| 18 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD NANGA BULIK |
|
|
15763012
|
49205578 |
APBD |
13,582,500 |
13,505,000 |
13,331,100 |
13,331,100
|
13,064,700 |
13,064,700 |
13,064,700
|
13,064,700
|
2024-03-22 |
2024-03-29 |
CV. LISTRA ARCDIMENSI |
02.539.113.7-711.000 |
251,400
|
1.85 %
|
10.4 |
| 19 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN TOILET WAJIB PAJAK UPTPPD NANGA BULIK |
|
|
15764012
|
49250209 |
APBD |
17,204,500 |
17,105,100 |
16,994,100 |
16,994,100
|
16,572,300 |
16,572,300 |
16,572,300
|
16,572,300
|
2024-03-15 |
2024-03-25 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
210,400
|
1.22 %
|
10.4 |
| 20 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD NANGA BULIK |
|
|
15765012
|
49208240 |
APBD |
42,900,000 |
42,818,250 |
42,390,900 |
42,390,900
|
41,785,950 |
41,785,950 |
41,785,950
|
41,785,950
|
2024-03-28 |
2024-04-12 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
509,100
|
1.19 %
|
10.4 |
| 21 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SUKAMARA |
|
|
15793012
|
49207879 |
APBD |
13,582,500 |
13,538,300 |
13,475,400 |
13,475,400
|
13,220,100 |
13,220,100 |
13,220,100
|
13,220,100
|
2024-03-15 |
2024-03-25 |
CV. CENDRAWASIH MITRA PRATAMA |
03.229.883.8-711.000 |
107,100
|
0.79 %
|
10.4 |
| 22 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SERUYAN |
|
|
15795012
|
49207360 |
APBD |
13,582,500 |
13,505,000 |
13,503,150 |
13,503,150
|
13,286,700 |
13,286,700 |
13,286,700
|
13,286,700
|
2024-03-15 |
2024-03-25 |
CV.EASTERN BANGUN PERKASA |
70.396.056.7-711.000 |
79,350
|
0.58 %
|
10.4 |
| 23 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN TANDON AIR UPTPPD PANGKALAN BUN |
|
|
15902012
|
49246741 |
APBD |
9,792,012 |
9,768,000 |
9,573,750 |
9,573,750
|
9,351,750 |
9,351,750 |
9,351,750
|
9,351,750
|
2024-03-28 |
2024-04-12 |
CV. PUTRA BAHARI ENGINEERING |
75.242.556.1-711.000 |
218,262
|
2.23 %
|
10.4 |
| 24 |
2024 |
Badan Pendapatan Daerah |
Perkerjaan Perencanaan Penataan Halaman Aula Utama Bapenda Tahap 4 |
|
|
15905012
|
49114037 |
APBD |
81,000,000 |
80,952,300 |
80,375,100 |
80,375,100
|
79,675,800 |
79,675,800 |
79,675,800
|
79,675,800
|
2024-03-28 |
2024-04-12 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
624,900
|
0.77 %
|
10.4 |
| 25 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD SUKAMARA |
|
|
15907012
|
49211291 |
APBD |
52,800,000 |
52,700,036 |
51,953,550 |
51,953,550
|
51,629,430 |
51,629,430 |
51,629,430
|
51,629,430
|
2024-03-28 |
2024-04-12 |
CV. PUTRA BAHARI ENGINEERING |
75.242.556.1-711.000 |
846,450
|
1.6 %
|
10.4 |
| 26 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN RUANG TUNGGU CEK FISIK MOBIL |
|
|
16017012
|
49211993 |
APBD |
32,832,000 |
32,648,930 |
32,458,250 |
32,458,250
|
32,230,756 |
32,230,756 |
32,230,756
|
32,230,756
|
2024-04-29 |
2024-05-13 |
CV. DAKSA RESWARA PRAKASA |
65.529.585.5-711.000 |
373,750
|
1.14 %
|
10.4 |
| 27 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN GEDUNG ARSIP UPTPPD PALANGKA RAYA |
|
|
16018012
|
49197483 |
APBD |
86,761,976 |
81,813,632 |
81,400,879 |
81,400,879
|
81,173,273 |
81,173,273 |
81,173,273
|
81,173,273
|
2024-04-29 |
2024-05-13 |
CV. DAKSA RESWARA PRAKASA |
65.529.585.5-711.000 |
5,361,097
|
6.18 %
|
10.4 |
| 28 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE UPTPPD KASONGAN |
|
|
16019012
|
49196120 |
APBD |
28,976,000 |
28,975,995 |
28,900,000 |
28,900,000
|
28,437,645 |
28,437,645 |
28,437,645
|
28,437,645
|
2024-04-29 |
2024-05-13 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
76,000
|
0.26 %
|
10.4 |
| 29 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI TOTAL RUMAH DINAS STAF UPTPPD BARITO SELATAN |
|
|
16020012
|
49834785 |
APBD |
32,670,440 |
32,670,439 |
32,600,000 |
32,600,000
|
31,968,000 |
31,968,000 |
31,968,000
|
31,968,000
|
2024-04-29 |
2024-05-13 |
KARYAMANDIRI MITRAUTAMA INDAHDESIGN |
63.313.382.2-711.000 |
70,440
|
0.22 %
|
10.4 |
| 30 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI GEDUNG KANTOR UPTPPD KASONGAN |
|
|
16021012
|
49824839 |
APBD |
43,750,000 |
43,698,936 |
43,650,000 |
43,650,000
|
43,027,023 |
43,027,023 |
43,027,023
|
43,027,023
|
2024-05-01 |
2024-05-10 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
100,000
|
0.23 %
|
10.4 |
| 31 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN DRAINASE KANTOR UPTPPD MURUNG RAYA |
|
|
16022012
|
49191281 |
APBD |
28,976,000 |
28,715,700 |
28,493,700 |
28,493,700
|
27,616,800 |
27,616,800 |
27,616,800
|
27,616,800
|
2024-04-29 |
2024-05-13 |
PT.TABENGAN INDAH DESIGN |
02.618.309.5-711.000 |
482,300
|
1.66 %
|
10.4 |
| 32 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PENATAAN HALAMAN BELAKANG UPTPPD MUARA TEWEH |
|
|
16023012
|
49254192 |
APBD |
63,000,000 |
48,118,500 |
48,074,100 |
48,074,100
|
47,175,000 |
47,175,000 |
47,175,000
|
47,175,000
|
2024-04-29 |
2024-05-13 |
PT.TABENGAN INDAH DESIGN |
02.618.309.5-711.000 |
14,925,900
|
23.69 %
|
10.4 |
| 33 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAAN PERENCANAAN PEMBANGUNAN PAGAR LANJUTAN UPTPPD MURUNG RAYA |
|
|
16024012
|
49187791 |
APBD |
101,681,250 |
98,790,000 |
98,457,000 |
98,457,000
|
97,563,450 |
97,563,450 |
97,563,450
|
97,563,450
|
2024-04-29 |
2024-05-13 |
PT.TABENGAN INDAH DESIGN |
02.618.309.5-711.000 |
3,224,250
|
3.17 %
|
10.4 |
| 34 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI GEDUNG KANTOR LAMA UPTPPD KAPUAS |
|
|
16025012
|
49824737 |
APBD |
64,925,000 |
64,924,973 |
64,800,000 |
64,800,000
|
64,265,485 |
64,265,485 |
64,265,485
|
64,265,485
|
2024-05-01 |
2024-05-10 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
125,000
|
0.19 %
|
10.4 |
| 35 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD MURUNG RAYA |
|
|
16027012
|
49204514 |
APBD |
13,582,500 |
13,504,993 |
13,480,000 |
13,480,000
|
13,231,200 |
13,231,200 |
13,231,200
|
13,231,200
|
2024-05-01 |
2024-05-10 |
CV.EASTERN BANGUN PERKASA |
70.396.056.7-711.000 |
102,500
|
0.75 %
|
10.4 |
| 36 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BARITO TIMUR |
|
|
16028012
|
49199689 |
APBD |
13,582,500 |
13,504,993 |
13,400,000 |
13,400,000
|
13,120,200 |
13,120,200 |
13,120,200
|
13,120,200
|
2024-05-01 |
2024-05-10 |
CV. CENDRAWASIH MITRA PRATAMA |
03.229.883.8-711.000 |
182,500
|
1.34 %
|
10.4 |
| 37 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KAPUAS |
|
|
16029012
|
49202880 |
APBD |
13,500,000 |
13,423,496 |
13,400,000 |
13,400,000
|
13,120,200 |
13,120,200 |
13,120,200
|
13,120,200
|
2024-05-01 |
2024-05-10 |
CV. LISTRA ARCDIMENSI |
02.539.113.7-711.000 |
100,000
|
0.74 %
|
10.4 |
| 38 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BUNTOK |
|
|
16030012
|
49200311 |
APBD |
13,582,500 |
13,504,993 |
13,500,000 |
13,500,000
|
13,231,200 |
13,231,200 |
13,231,200
|
13,231,200
|
2024-05-01 |
2024-05-10 |
CV. CENDRAWASIH MITRA PRATAMA |
03.229.883.8-711.000 |
82,500
|
0.61 %
|
10.4 |
| 39 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KURUN |
|
|
16031012
|
49203740 |
APBD |
15,393,500 |
15,315,491 |
15,300,000 |
15,300,000
|
15,040,500 |
15,040,500 |
15,040,500
|
15,040,500
|
2024-05-01 |
2024-05-10 |
CV.EASTERN BANGUN PERKASA |
70.396.056.7-711.000 |
93,500
|
0.61 %
|
10.4 |
| 40 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN GUDANG KANTOR BAPENDA |
|
|
16182012
|
49701640 |
APBD |
40,000,000 |
39,948,900 |
39,615,900 |
39,615,900
|
38,922,150 |
38,922,150 |
38,922,150
|
38,922,150
|
2024-05-29 |
2024-06-08 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
384,100
|
0.96 %
|
10.4 |
| 41 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMASANGAN PAVING BLOK HALAMAN AULA UTAMA |
|
|
16188012
|
49188273 |
APBD |
40,000,000 |
39,738,000 |
39,571,500 |
39,571,500
|
39,005,400 |
39,005,400 |
39,005,400
|
39,005,400
|
2024-05-22 |
2024-06-07 |
PT.TABENGAN INDAH DESIGN |
02.618.309.5-711.000 |
428,500
|
1.07 %
|
10.4 |
| 42 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE, KANOPI PENYAMBUNG KANTOR-GUDANG ARSIP UPTPPD SUKAMARA |
|
|
17219012
|
49687870 |
APBD |
30,000,000 |
29,900,094 |
29,750,255 |
29,750,255
|
29,100,794 |
29,100,794 |
29,100,794
|
29,100,794
|
2024-05-29 |
2024-06-13 |
CV. WAHANA KARYA DESIGN |
02.292.590.3-711.000 |
249,745
|
0.83 %
|
10.4 |
| 43 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD SUKAMARA |
|
|
17220012
|
49721716 |
APBD |
32,000,000 |
31,900,092 |
31,842,494 |
31,842,494
|
31,365,194 |
31,365,194 |
31,365,194
|
31,365,194
|
2024-05-29 |
2024-06-13 |
CV. WAHANA KARYA DESIGN |
02.292.590.3-711.000 |
157,506
|
0.49 %
|
10.4 |
| 44 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAGAR DEPAN DAN SAMPING KANAN UPTPPD SAMPIT |
|
|
17221012
|
49714080 |
APBD |
19,062,000 |
18,925,500 |
18,814,500 |
18,814,500
|
18,337,200 |
18,337,200 |
18,337,200
|
18,337,200
|
2024-05-29 |
2024-06-08 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
247,500
|
1.3 %
|
10.4 |
| 45 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI KANTOR UPTPPD KUALA KURUN |
|
|
17223012
|
49953914 |
APBD |
25,920,000 |
25,918,500 |
25,752,000 |
25,752,000
|
25,219,200 |
25,219,200 |
25,219,200
|
25,219,200
|
2024-05-29 |
2024-06-08 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
168,000
|
0.65 %
|
10.4 |
| 46 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI PARKIR KANTOR INDUK |
|
|
17255012
|
49955641 |
APBD |
11,110,000 |
11,100,000 |
10,933,500 |
10,933,500
|
10,589,400 |
10,589,400 |
10,589,400
|
10,589,400
|
2024-06-03 |
2024-06-18 |
CV. PRATAMA HUMA DESIGN |
99.430.054.9-711.000 |
176,500
|
1.59 %
|
10.4 |
| 47 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE KANTOR UPTPPD MURUNG RAYA |
|
|
17256012
|
49693368 |
APBD |
16,944,000 |
16,927,500 |
16,872,000 |
16,872,000
|
16,272,600 |
16,272,600 |
16,272,600
|
16,272,600
|
2024-06-03 |
2024-06-18 |
CV. PRATAMA HUMA DESIGN |
99.430.054.9-711.000 |
72,000
|
0.42 %
|
10.4 |
| 48 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Penataan Halaman ( Penimbunan ) Halaman Kantor UPTPPD Buntok |
|
|
17369012
|
51957090 |
APBDP |
23,543,000 |
23,542,999 |
23,450,000 |
23,450,000
|
23,026,395 |
23,026,395 |
23,026,395
|
23,026,395
|
2024-06-26 |
2024-07-12 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
93,000
|
0.4 %
|
10.4 |
| 49 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Renovasi Ruang Kantor UPTPPD Palangka Raya |
|
|
17370012
|
51957019 |
APBDP |
45,900,000 |
33,522,000 |
33,300,000 |
33,300,000
|
32,656,200 |
32,656,200 |
32,656,200
|
32,656,200
|
2024-06-26 |
2024-07-12 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
12,600,000
|
27.45 %
|
10.4 |
| 50 |
2024 |
Badan Pendapatan Daerah |
Belanja Modal Bangunan Kantor ( Perencanaan Pemasangan Paving Blok Area UPTPPD Palangka Raya ) |
|
|
17371012
|
51956964 |
APBDP |
74,931,750 |
55,050,450 |
54,772,950 |
54,772,950
|
53,818,350 |
53,818,350 |
53,818,350
|
53,818,350
|
2024-06-26 |
2024-07-12 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
20,158,800
|
26.9 %
|
10.4 |
| 51 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAGAR LANJUTAN UPTPPD MURUNG RAYA |
|
|
17398012
|
49716639 |
APBD |
59,606,250 |
59,534,850 |
59,312,850 |
59,312,850
|
58,463,700 |
58,463,700 |
58,463,700
|
58,463,700
|
2024-06-28 |
2024-07-12 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
293,400
|
0.49 %
|
10.4 |
| 52 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI GEDUNG KANTOR UPTPPD KASONGAN |
|
|
17399012
|
49934979 |
APBD |
25,000,000 |
24,999,999 |
24,900,000 |
24,900,000
|
24,650,325 |
24,650,325 |
24,650,325
|
24,650,325
|
2024-07-03 |
2024-07-17 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
100,000
|
0.4 %
|
10.4 |
| 53 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI TOTAL RUMAH DINAS STAF UPTPPD BARITO SELATAN |
|
|
17402012
|
49961204 |
APBD |
19,104,360 |
19,104,360 |
19,000,000 |
19,000,000
|
18,484,275 |
18,484,275 |
18,484,275
|
18,484,275
|
2024-07-03 |
2024-07-17 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
104,360
|
0.55 %
|
10.4 |
| 54 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN DRAINASE UPTPPD KASONGAN |
|
|
17426012
|
49694303 |
APBD |
16,944,000 |
16,943,999 |
16,900,000 |
16,900,000
|
16,594,500 |
16,594,500 |
16,594,500
|
16,594,500
|
2024-07-03 |
2024-07-17 |
CV. KATIGA RANCANG PUTERA |
02.618.593.4-711.000 |
44,000
|
0.26 %
|
10.4 |
| 55 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI GEDUNG KANTOR LAMA UPTPPD KAPUAS |
|
|
17427012
|
49932954 |
APBD |
37,100,000 |
37,100,000 |
37,050,000 |
37,050,000
|
36,413,550 |
36,413,550 |
36,413,550
|
36,413,550
|
2024-07-03 |
2024-07-17 |
CV. KATIGA RANCANG PUTERA |
02.618.593.4-711.000 |
50,000
|
0.13 %
|
10.4 |
| 56 |
2024 |
Badan Pendapatan Daerah |
Belanja Modal Bangunan Gedung Kantor ( Perencanaan Penataan Halaman Kantor UPTPPD Sampit ) |
|
|
17428012
|
51957360 |
APBDP |
74,250,000 |
74,162,985 |
73,829,985 |
73,829,985
|
72,880,935 |
72,880,935 |
72,880,935
|
72,880,935
|
2024-07-03 |
2024-07-17 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
420,015
|
0.57 %
|
10.4 |
| 57 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN TANDON AIR UPTPPD PANGKALAN BUN |
|
|
17434012
|
49722036 |
APBD |
7,500,000 |
7,464,974 |
7,369,832 |
7,369,832
|
7,086,782 |
7,086,782 |
7,086,782
|
7,086,782
|
2024-07-03 |
2024-07-17 |
CV. WAHANA KARYA DESIGN |
02.292.590.3-711.000 |
130,168
|
1.74 %
|
10.4 |
| 58 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI GEDUNG UPTPPD PANGKALAN BUN |
|
|
17435012
|
49953444 |
APBD |
21,180,000 |
21,172,082 |
20,978,369 |
20,978,369
|
20,118,119 |
20,118,119 |
20,118,119
|
20,118,119
|
2024-07-03 |
2024-07-17 |
CV. WAHANA KARYA DESIGN |
02.292.590.3-711.000 |
201,631
|
0.95 %
|
10.4 |
| 59 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI RUANGAN LANTAI 1 DAN RUANGAN SEKRETARIAT |
|
|
17519012
|
49960506 |
APBD |
50,528,000 |
50,505,000 |
50,449,500 |
50,449,500
|
49,683,600 |
49,683,600 |
49,683,600
|
49,683,600
|
2024-07-22 |
2024-08-06 |
CV. Marvon Karya Arsimetris |
02.978.473.3-711.000 |
78,500
|
0.16 %
|
10.4 |
| 60 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN PEMBANGUNAN BAK SAMPAH DAN SEPTICTANK UPTPPD PALANGKA RAYA |
|
|
17523012
|
49189038 |
APBD |
7,537,500 |
7,536,345 |
7,477,515 |
7,477,515
|
7,113,657 |
7,113,657 |
7,113,657
|
7,113,657
|
2024-07-22 |
2024-08-06 |
ROTASI DESIGN CONSULTANT |
90.011.802.7-711.000 |
59,985
|
0.8 %
|
10.4 |
| 61 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Pembangunan Ruang Pantry Kantor Samsat Pangkalan Bun |
|
|
17524012
|
52118669 |
APBDP |
14,450,000 |
14,339,091 |
14,257,395 |
14,257,395
|
13,697,400 |
13,697,400 |
13,697,400
|
13,697,400
|
2024-07-22 |
2024-08-06 |
CV. Unika Citra Mandiri |
02.539.043.6-711.000 |
192,605
|
1.33 %
|
10.4 |
| 62 |
2024 |
Badan Pendapatan Daerah |
.PEKERJAAN PENGAWASAN RENOVASI RUANG PAJAK KANTOR INDUK |
|
|
17541012
|
49960741 |
APBD |
43,780,000 |
43,756,200 |
43,711,800 |
43,711,800
|
43,312,200 |
43,312,200 |
43,312,200
|
43,312,200
|
2024-07-26 |
2024-08-10 |
Roa Solution |
92.337.883.0-711.000 |
68,200
|
0.16 %
|
10.4 |
| 63 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PERENCANAAN RENOVASI GEDUNG ARSIP UPTPPD SAMPIT |
|
|
17543012
|
52151560 |
APBDP |
78,750,000 |
78,749,999 |
78,643,500 |
78,643,500
|
78,255,000 |
78,255,000 |
78,255,000
|
78,255,000
|
2024-07-26 |
2024-08-10 |
CV. TALINDO KONSULTAN |
84.303.935.5-711.000 |
106,500
|
0.14 %
|
10.4 |
| 64 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Pelebaran Bangunan Ruang Cek Fisik UPTPPD Pangkalan Bun |
|
|
17544012
|
52151602 |
APBDP |
17,850,000 |
17,850,000 |
17,782,200 |
17,782,200
|
17,526,900 |
17,526,900 |
17,526,900
|
17,526,900
|
2024-07-26 |
2024-08-10 |
CV. ATMAJAYA BANGUN CONSULTANT |
84.926.720.8-711.000 |
67,800
|
0.38 %
|
10.4 |
| 65 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Pembangunan Selasar Penyambung antar Bangunan kantor UPTPPD Pangkalan Bun |
|
|
17545012
|
52151620 |
APBDP |
25,500,000 |
25,499,999 |
25,435,650 |
25,435,650
|
25,185,900 |
25,185,900 |
25,185,900
|
25,185,900
|
2024-07-26 |
2024-08-10 |
CV. MEGAH JAYA CONSULTAN |
73.659.733.7-711.000 |
64,350
|
0.25 %
|
10.4 |
| 66 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Pembangunan Ruang Loket UPTPPD Pangkalan Bun |
|
|
17546012
|
52151643 |
APBDP |
42,500,000 |
42,500,000 |
42,424,200 |
42,424,200
|
42,191,100 |
42,191,100 |
42,191,100
|
42,191,100
|
2024-07-26 |
2024-08-10 |
ROTASI DESIGN CONSULTANT |
90.011.802.7-711.000 |
75,800
|
0.18 %
|
10.4 |
| 67 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Penataan Halaman Kantor UPTPPD Pangkalan Bun |
|
|
17547012
|
52151703 |
APBDP |
46,070,000 |
46,069,999 |
45,998,400 |
45,998,400
|
45,732,000 |
45,732,000 |
45,732,000
|
45,732,000
|
2024-07-26 |
2024-08-10 |
CV. BAHARI ENGINEERING CONSULTANT |
02.809.277.3-711.000 |
71,600
|
0.16 %
|
10.4 |
| 68 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN TOILET WAJIB PAJAK UPTPPD NANGA BULIK |
|
|
17551012
|
49722538 |
APBD |
10,060,500 |
10,056,600 |
9,945,600 |
9,945,600
|
9,729,150 |
9,729,150 |
9,729,150
|
9,729,150
|
2024-07-31 |
2024-08-14 |
CV. PRATAMA HUMA DESIGN |
99.430.054.9-711.000 |
114,900
|
1.14 %
|
11.2 |
| 69 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN-PENAMBAHAN RUANG KANTOR UPTPPD NANGA BULIK |
|
|
17552012
|
49721332 |
APBD |
26,000,000 |
25,974,000 |
25,308,000 |
25,308,000
|
24,769,650 |
24,769,650 |
24,769,650
|
24,769,650
|
2024-07-31 |
2024-08-14 |
CV. PRATAMA HUMA DESIGN |
99.430.054.9-711.000 |
692,000
|
2.66 %
|
10.4 |
| 70 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN TOILET UMUM AULA UTAMA BAPENDA PROV.KAL-TENG |
|
|
17553012
|
49722110 |
APBD |
28,500,000 |
28,460,400 |
28,194,000 |
28,194,000
|
27,544,650 |
27,544,650 |
27,544,650
|
27,544,650
|
2024-07-31 |
2024-08-14 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
306,000
|
1.07 %
|
10.4 |
| 71 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SUKAMARA |
|
|
17572012
|
49720999 |
APBD |
7,942,500 |
7,941,499 |
7,900,000 |
7,900,000
|
7,536,900 |
7,536,900 |
7,536,900
|
7,536,900
|
2024-08-05 |
2025-05-23 |
CV. LISTRA ARCDIMENSI |
02.539.113.7-711.000 |
42,500
|
0.54 %
|
9.2 |
| 72 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD PANGKALAN BUN |
|
|
17573012
|
49720303 |
APBD |
7,942,500 |
7,941,499 |
7,850,000 |
7,850,000
|
7,425,900 |
7,425,900 |
7,425,900
|
7,425,900
|
2024-08-05 |
2024-08-20 |
CV. CENDRAWASIH MITRA PRATAMA |
03.229.883.8-711.000 |
92,500
|
1.16 %
|
10.4 |
| 73 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN GEDUNG ARSIP UPTPPD PALANGKA RAYA |
|
|
17574012
|
49697035 |
APBD |
49,578,312 |
49,428,300 |
49,417,200 |
49,417,200
|
49,189,650 |
49,189,650 |
49,189,650
|
49,189,650
|
2024-08-05 |
2024-08-20 |
CV. TALINDO KONSULTAN |
84.303.935.5-711.000 |
161,112
|
0.32 %
|
10.4 |
| 74 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Pembangunan Ruang Tunggu Cek Fisik Mobil |
|
|
17580012
|
52200424 |
APBDP |
18,240,000 |
18,209,550 |
18,165,150 |
18,165,150
|
17,954,250 |
17,954,250 |
17,954,250
|
17,954,250
|
2024-08-06 |
2024-08-15 |
CV. BAHARI ENGINEERING CONSULTANT |
02.809.277.3-711.000 |
74,850
|
0.41 %
|
10.4 |
| 75 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN SIRING DAN PAGAR UPTPPD SERUYAN |
|
|
17598012
|
49721775 |
APBD |
66,618,750 |
66,499,999 |
66,250,000 |
66,250,000
|
64,602,000 |
64,602,000 |
64,602,000
|
64,602,000
|
2024-08-14 |
2024-08-26 |
CV. UTUS DAMABA CONSULTANT |
03.229.884.6-711.000 |
368,750
|
0.55 %
|
10.4 |
| 76 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PENATAAN HALAMAN BELAKANG UPTPPD MUARA TEWEH |
|
|
17599012
|
49722722 |
APBD |
36,000,000 |
35,853,000 |
35,520,000 |
35,520,000
|
34,698,600 |
34,698,600 |
34,698,600
|
34,698,600
|
2024-08-14 |
2024-08-26 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
480,000
|
1.33 %
|
10.4 |
| 77 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMASANGAN PAVING BLOK HALAMAN AULA UTAMA |
|
|
17600012
|
49686564 |
APBD |
23,750,000 |
23,587,500 |
23,365,500 |
23,365,500
|
22,677,300 |
22,677,300 |
22,677,300
|
22,677,300
|
2024-08-14 |
2024-08-26 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
384,500
|
1.62 %
|
10.4 |
| 78 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD NANGA BULIK |
|
|
17611012
|
49719441 |
APBD |
7,942,500 |
7,941,499 |
7,869,900 |
7,869,900
|
7,514,700 |
7,514,700 |
7,514,700
|
7,514,700
|
2024-08-23 |
2024-09-05 |
CV. LISTRA ARCDIMENSI |
02.539.113.7-711.000 |
72,600
|
0.91 %
|
10.4 |
| 79 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Pemasangan Paving Blok Area UPT Palangka Raya |
|
|
17613012
|
52307669 |
APBDP |
44,077,500 |
32,745,000 |
31,857,000 |
31,857,000
|
31,246,500 |
31,246,500 |
31,246,500
|
31,246,500
|
2024-08-23 |
2024-09-05 |
CV. PRATAMA HUMA DESIGN |
99.430.054.9-711.000 |
12,220,500
|
27.73 %
|
10.4 |
| 80 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PENATAAN HALAMAN AULA UTAMA BAPENDA TAHAP 4 |
|
|
17645012
|
49722644 |
APBD |
48,000,000 |
47,896,500 |
47,397,000 |
47,397,000
|
46,664,400 |
46,664,400 |
46,664,400
|
46,664,400
|
2024-09-13 |
2024-09-26 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
603,000
|
1.26 %
|
10.4 |
| 81 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SERUYAN |
|
|
17646012
|
49720900 |
APBD |
7,942,500 |
7,941,499 |
7,869,900 |
7,869,900
|
7,425,900 |
7,425,900 |
7,425,900
|
7,425,900
|
2024-09-13 |
2024-09-26 |
CV. LISTRA ARCDIMENSI |
02.539.113.7-711.000 |
72,600
|
0.91 %
|
10.4 |
| 82 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD SAMPIT |
|
|
17647012
|
49720767 |
APBD |
7,942,500 |
7,941,499 |
7,925,400 |
7,925,400
|
7,481,400 |
7,481,400 |
7,481,400
|
7,481,400
|
2024-09-13 |
2024-09-26 |
CV. CENDRAWASIH MITRA PRATAMA |
03.229.883.8-711.000 |
17,100
|
0.22 %
|
10.4 |
| 83 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Arsitektur Perkerjaan Pembangunan Ruang Pantry Kantor Induk UPTPPD Pangkalan Bun |
|
|
17648012
|
52497977 |
APBDP |
8,500,000 |
8,436,000 |
8,410,000 |
8,410,000
|
8,091,900 |
8,091,900 |
8,091,900
|
8,091,900
|
2024-09-13 |
2024-09-26 |
CV. UTUS DAMABA CONSULTANT |
03.229.884.6-711.000 |
90,000
|
1.06 %
|
10.4 |
| 84 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Semenisasi Halaman Kantor UPTPPD Barito Timur |
|
|
17649012
|
52495135 |
APBDP |
34,246,500 |
25,974,000 |
25,863,000 |
25,863,000
|
25,130,400 |
25,130,400 |
25,130,400
|
25,130,400
|
2024-09-13 |
2024-09-26 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
8,383,500
|
24.48 %
|
10.4 |
| 85 |
2024 |
Badan Pendapatan Daerah |
Perencanaan Pembangunan Rumah Dinas UPTPPD Barito Timur |
|
|
17650012
|
52495090 |
APBDP |
58,650,000 |
58,635,750 |
57,498,000 |
57,498,000
|
56,598,900 |
56,598,900 |
56,598,900
|
56,598,900
|
2024-09-13 |
2024-09-26 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
1,152,000
|
1.96 %
|
11.2 |
| 86 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI GARASI RUMAH DINAS ESSELON UPTPPD PANGKALAN BUN |
|
|
17683012
|
49835671 |
APBD |
6,354,000 |
6,353,991 |
6,304,043 |
6,304,043
|
6,181,943 |
6,181,943 |
6,181,943
|
6,181,943
|
2024-09-27 |
2024-10-11 |
CV. WAHANA KARYA DESIGN |
02.292.590.3-711.000 |
49,957
|
0.79 %
|
10.4 |
| 87 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Penataan Halaman Kantor UPTPPD Sampit |
|
|
17706012
|
52644943 |
APBD |
45,000,000 |
44,721,695 |
44,500,045 |
44,500,045
|
43,389,689 |
43,389,689 |
43,389,689
|
43,389,689
|
2024-10-02 |
2024-10-11 |
CV. Trakat Antero Hariara |
40.804.831.2-711.000 |
499,955
|
1.11 %
|
10.4 |
| 88 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI GEDUNG ARSIP UPTPPD SAMPIT |
|
|
17742012
|
49932333 |
APBD |
45,000,000 |
44,899,500 |
44,844,000 |
44,844,000
|
44,444,400 |
44,444,400 |
44,444,400
|
44,444,400
|
2024-10-16 |
2024-10-29 |
CV. BAHARI ENGINEERING CONSULTANT |
02.809.277.3-711.000 |
156,000
|
0.35 %
|
10.4 |
| 89 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Pelebaran Bangunan Ruang Cek Fisik UPTPPD Pangkalan Bun |
|
|
17743012
|
52648279 |
APBD |
10,500,000 |
10,478,400 |
10,450,650 |
10,450,650
|
10,178,700 |
10,178,700 |
10,178,700
|
10,178,700
|
2024-10-16 |
2024-10-29 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
49,350
|
0.47 %
|
10.4 |
| 90 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Pembangunan Selasar Penyambung Antar Bangunan Kantor UPTPPD Pangkalan Bun |
|
|
17744012
|
52649203 |
APBD |
15,000,000 |
14,985,000 |
14,974,001 |
14,974,001
|
14,518,800 |
14,518,800 |
14,518,800
|
14,518,800
|
2024-10-16 |
2024-10-29 |
CV. TALINDO KONSULTAN |
84.303.935.5-711.000 |
25,999
|
0.17 %
|
10.4 |
| 91 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Pembangunan Ruang Loket UPTPPD Pangkalan Bun |
|
|
17745012
|
52649838 |
APBD |
25,000,000 |
24,919,500 |
24,864,000 |
24,864,000
|
24,575,400 |
24,575,400 |
24,575,400
|
24,575,400
|
2024-10-16 |
2024-10-29 |
CV. ATMAJAYA BANGUN CONSULTANT |
84.926.720.8-711.000 |
136,000
|
0.54 %
|
9.2 |
| 92 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Penataan Halaman Kantor UPTPPD Pangkalan Bun |
|
|
17746012
|
52650120 |
APBD |
27,000,000 |
26,973,000 |
26,917,500 |
26,917,500
|
26,451,300 |
26,451,300 |
26,451,300
|
26,451,300
|
2024-10-16 |
2024-10-29 |
ROTASI DESIGN CONSULTANT |
90.011.802.7-711.000 |
82,500
|
0.31 %
|
10.4 |
| 93 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN BAK SAMPAH DAN SEPTICTANK UPTPPD PALANGKA RAYA |
|
|
17765012
|
49686815 |
APBD |
4,187,500 |
4,187,499 |
4,107,000 |
4,107,000
|
3,873,900 |
3,873,900 |
3,873,900
|
3,873,900
|
2024-10-16 |
2024-10-29 |
CV. MEGAH JAYA CONSULTAN |
73.659.733.7-711.000 |
80,500
|
1.92 %
|
10.4 |
| 94 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BARITO TIMUR |
|
|
17802012
|
49717101 |
APBD |
7,942,500 |
7,941,499 |
7,869,900 |
7,869,900
|
7,259,400 |
7,259,400 |
7,259,400
|
7,259,400
|
2024-11-01 |
2024-11-15 |
CV. LISTRA ARCDIMENSI |
02.539.113.7-711.000 |
72,600
|
0.91 %
|
10.4 |
| 95 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Penataan Halaman ( Penimbunan ) Halaman Kantor UPTPPD Buntok |
|
|
17805012
|
53063514 |
APBDP |
13,000,000 |
12,999,999 |
12,900,000 |
12,900,000
|
12,687,855 |
12,687,855 |
12,687,855
|
12,687,855
|
2024-10-30 |
2024-11-14 |
KARYAMANDIRI MITRAUTAMA INDAHDESIGN |
63.313.382.2-711.000 |
100,000
|
0.77 %
|
10.4 |
| 96 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI MUSOLAH DAN AULA KANTOR INDUK |
|
|
17806012
|
49955029 |
APBD |
25,000,000 |
24,999,999 |
24,850,000 |
24,850,000
|
24,685,013 |
24,685,013 |
24,685,013
|
24,685,013
|
2024-10-30 |
2024-11-14 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
150,000
|
0.6 %
|
10.4 |
| 97 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD BUNTOK |
|
|
17815012
|
49717415 |
APBD |
7,942,500 |
7,941,499 |
7,881,000 |
7,881,000
|
7,492,500 |
7,492,500 |
7,492,500
|
7,492,500
|
2024-11-01 |
2024-11-15 |
CV. LISTRA ARCDIMENSI |
02.539.113.7-711.000 |
61,500
|
0.77 %
|
10.4 |
| 98 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN PEMBANGUNAN PAPAN NAMA KANTOR UPTPPD KUALA KAPUAS |
|
|
17816012
|
49718322 |
APBD |
7,500,000 |
7,499,999 |
7,425,900 |
7,425,900
|
7,048,500 |
7,048,500 |
7,048,500
|
7,048,500
|
2024-11-01 |
2024-11-15 |
CV. CENDRAWASIH MITRA PRATAMA |
03.229.883.8-711.000 |
74,100
|
0.99 %
|
10.4 |
| 99 |
2024 |
Badan Pendapatan Daerah |
PEKERJAAN PENGAWASAN RENOVASI PLAFON DAN TANGGA KANTOR INDUK |
|
|
17818012
|
49957080 |
APBD |
17,972,500 |
17,926,500 |
17,871,000 |
17,871,000
|
17,538,000 |
17,538,000 |
17,538,000
|
17,538,000
|
2024-10-30 |
2024-11-14 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
101,500
|
0.56 %
|
10.4 |
| 100 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Pembangunan Rumah Dinas UPTPPD Barito Timur |
|
|
17844012
|
53193784 |
APBDP |
34,500,000 |
34,382,250 |
34,132,500 |
34,132,500
|
33,466,500 |
33,466,500 |
33,466,500
|
33,466,500
|
2024-10-30 |
2024-11-14 |
CV. PRATAMA HUMA DESIGN |
99.430.054.9-711.000 |
367,500
|
1.07 %
|
10.4 |
| 101 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Renovasi Ruang Kantor UPTPPD Palangka Raya |
|
|
17845012
|
53155890 |
APBDP |
27,000,000 |
20,035,500 |
19,924,500 |
19,924,500
|
19,341,750 |
19,341,750 |
19,341,750
|
19,341,750
|
2024-10-30 |
2024-11-14 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
7,075,500
|
26.21 %
|
10.4 |
| 102 |
2024 |
Badan Pendapatan Daerah |
Pengawasan Semenisasi Halaman Kantor UPTPPD Barito Timur |
|
|
17846012
|
53193661 |
APBDP |
20,145,000 |
15,429,000 |
15,318,000 |
15,318,000
|
14,674,200 |
14,674,200 |
14,674,200
|
14,674,200
|
2024-11-01 |
2024-11-15 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
4,827,000
|
23.96 %
|
10.4 |