| 1 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pemeliharaan Rutin D.I.R. Samuda Besar Kabupaten Kotawaringin Timur |
|
|
15674012
|
46521924 |
APBD |
160,000,000 |
160,000,000 |
159,876,634 |
159,876,634
|
159,704,763 |
159,700,000 |
0
|
159,700,000
|
2024-01-05 |
2024-01-29 |
CV. AGAPE KARYA |
01.576.239.6-711.000 |
123,366
|
0.08 %
|
12 |
| 2 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pemeliharaan Rutin D.I.R. Samuda Kecil Kabupaten Kotawaringin Timur |
|
|
15675012
|
46521768 |
APBD |
160,000,000 |
160,000,000 |
159,898,545 |
159,898,545
|
159,808,721 |
159,800,000 |
0
|
159,800,000
|
2024-01-05 |
2024-01-29 |
CV. HALAJUR BATUAH |
95.382.560.1-711.000 |
101,455
|
0.06 %
|
12 |
| 3 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pemeliharaan Rutin D.I.R. Kuin Kabupaten Kotawaringin Timur |
|
|
15676012
|
46521572 |
APBD |
160,000,000 |
160,000,000 |
159,891,775 |
159,891,775
|
159,784,179 |
159,780,000 |
0
|
159,780,000
|
2024-01-05 |
2024-01-29 |
CV. CITRA WAHANA UTAMA |
01.766.833.6-712.000 |
108,225
|
0.07 %
|
12 |
| 4 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pemeliharaan Rutin D.I.R. Bahaur I Kabupaten Pulang Pisau |
|
|
15677012
|
46522391 |
APBD |
170,000,000 |
170,000,000 |
169,893,275 |
169,893,275
|
169,805,842 |
169,800,000 |
0
|
169,800,000
|
2024-01-05 |
2024-01-29 |
CV.MAULANA ABADI |
02.809.446.4-711.000 |
106,725
|
0.06 %
|
12 |
| 5 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pemeliharaan Rutin D.I.R. Bahaur II Kabupaten Pulang Pisau |
|
|
15678012
|
46522762 |
APBD |
170,000,000 |
170,000,000 |
169,835,326 |
169,835,326
|
169,747,893 |
169,000,000 |
0
|
169,000,000
|
2024-01-05 |
2024-01-29 |
CV.ANUGRAH ALAM INDO RAYA (AIR) |
72.282.377.0-714.000 |
164,674
|
0.1 %
|
12 |
| 6 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pemeliharaan Rutin D.I.R. Belanti I Kabupaten Pulang Pisau |
|
|
15683012
|
46525062 |
APBD |
170,000,000 |
170,000,000 |
169,890,225 |
169,890,225
|
169,790,592 |
169,790,000 |
0
|
169,790,000
|
2024-01-18 |
2024-01-31 |
CV. ARTHA CAPRICORNUS |
01.922.068.0-711.000 |
109,775
|
0.06 %
|
12 |
| 7 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pemeliharaan Rutin D.I.R. Unit Tahai Kabupaten Pulang Pisau |
|
|
15684012
|
46525184 |
APBD |
170,000,000 |
170,000,000 |
169,870,963 |
169,870,963
|
169,770,294 |
169,770,000 |
0
|
169,770,000
|
2024-01-18 |
2024-01-31 |
Anugrah Karya Perkasa |
80.202.544.5-711.000 |
129,038
|
0.08 %
|
12 |
| 8 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pemeliharaan Rutin D.I.R. Basawang Kabupaten Kotawaringin Timur |
|
|
15685012
|
46521079 |
APBD |
160,000,000 |
160,000,000 |
159,760,303 |
159,760,303
|
159,621,938 |
159,620,000 |
0
|
159,620,000
|
2024-01-18 |
2024-01-31 |
CV. RIMA JAYA |
01.407.576.6-711.000 |
239,697
|
0.15 %
|
12 |
| 9 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pemeliharaan Rutin D.I.R. Bagendang IV Kabupaten Kotawaringin Timur |
|
|
15686012
|
46520306 |
APBD |
160,000,000 |
160,000,000 |
159,901,621 |
159,901,621
|
159,800,850 |
159,800,000 |
0
|
159,800,000
|
2024-01-18 |
2024-01-31 |
kasuma bangun lestari |
40.913.412.9-711.000 |
98,379
|
0.06 %
|
12 |
| 10 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pemeliharaan Rutin D.I.R. Bagendang II Kabupaten Kotawaringin Timur |
|
|
15687012
|
46519828 |
APBD |
160,000,000 |
160,000,000 |
159,759,518 |
159,759,518
|
159,637,621 |
159,637,000 |
0
|
159,637,000
|
2024-01-18 |
2024-01-31 |
CV. MITRA GENERASI MANDIRI |
74.969.738.9-711.000 |
240,482
|
0.15 %
|
12 |
| 11 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pembangunan/Peningkatan Jalan Inspeksi D.I.R. Handil Sohor Kabupaten Kotawaringin Timur |
|
|
15688012
|
46519132 |
APBD |
160,000,000 |
160,000,000 |
159,909,255 |
159,909,255
|
159,809,355 |
159,800,000 |
0
|
159,800,000
|
2024-01-18 |
2024-01-31 |
CV. BARTIM DUTA PERKASA, PUSAT TAMPA |
53.453.728.7-714.000 |
90,745
|
0.06 %
|
12 |
| 12 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Supervisi Rehabilitasi Jaringan Irigasi D.I.R. Kuala Jelai I Kabupaten Sukamara |
|
|
15693012
|
46342654 |
APBD |
100,000,000 |
100,000,000 |
99,888,900 |
99,888,900
|
99,844,500 |
99,844,500 |
0
|
99,844,500
|
2024-02-07 |
2024-02-29 |
CV. Palangka Widyajasa Konsultan |
02.437.615.4-711.000 |
111,100
|
0.11 %
|
12 |
| 13 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Supervisi Rehabilitasi Jaringan Irigasi D.I.R. Maliku Baru Kabupaten Pulang Pisau |
|
|
15694012
|
46342586 |
APBD |
100,000,000 |
100,000,000 |
99,822,300 |
99,822,300
|
99,783,450 |
99,783,450 |
0
|
99,783,450
|
2024-02-07 |
2024-02-29 |
CV. Unika Citra Mandiri |
02.539.043.6-711.000 |
177,700
|
0.18 %
|
12 |
| 14 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Supervisi Rehabilitasi Jaringan Irigasi D.I.R. Unit Mentaren II Kabupaten Pulang Pisau |
|
|
15695012
|
46342386 |
APBD |
100,000,000 |
100,000,000 |
99,822,300 |
99,822,300
|
99,783,450 |
99,783,450 |
0
|
99,783,450
|
2024-02-07 |
2024-02-29 |
CV. Unika Citra Mandiri |
02.539.043.6-711.000 |
177,700
|
0.18 %
|
12 |
| 15 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Tenaga Pendampingan Pemutakhiran Dokumen SSK 1 |
|
|
15708012
|
47521031 |
APBD |
80,000,000 |
80,000,000 |
79,997,700 |
79,997,700
|
79,900,000 |
79,900,000 |
79,900,000
|
79,900,000
|
2024-02-23 |
2024-03-15 |
Yoki Indra Kuncoro |
71.885.488.8-711.000 |
2,300
|
0 %
|
10.4 |
| 16 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Tenaga Pendampingan Pemutakhiran Dokumen SSK 2 |
|
|
15709012
|
47521034 |
APBD |
80,000,000 |
80,000,000 |
79,997,700 |
79,997,700
|
79,900,000 |
79,900,000 |
79,900,000
|
79,900,000
|
2024-02-23 |
2024-03-15 |
Gusti Iqbal |
92.227.204.2-711.000 |
2,300
|
0 %
|
11.2 |
| 17 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Tenaga Pendampingan Implementasi Dokumen SSK 1 |
|
|
15710012
|
47521033 |
APBD |
80,000,000 |
80,000,000 |
79,997,700 |
79,997,700
|
79,900,000 |
79,900,000 |
79,900,000
|
79,900,000
|
2024-02-23 |
2024-03-15 |
hanyang tiup |
79.562.938.5-711.000 |
2,300
|
0 %
|
11.2 |
| 18 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Tenaga Pendampingan Implementasi Dokumen SSK 2 |
|
|
15711012
|
47521028 |
APBD |
80,000,000 |
80,000,000 |
79,975,500 |
79,975,500
|
79,900,000 |
79,900,000 |
79,900,000
|
79,900,000
|
2024-02-23 |
2024-03-15 |
MARDINO RUKITA |
16.699.748.6-711.000 |
24,500
|
0.03 %
|
11.2 |
| 19 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Tenaga Pendampingan Pembinaan dan Evaluasi Kinerja Infrastruktur Air Minum di Provinsi Kalimantan Tengah 1 |
|
|
15712012
|
47521032 |
APBD |
80,000,000 |
80,000,000 |
79,958,850 |
79,958,850
|
79,900,000 |
79,900,000 |
79,900,000
|
79,900,000
|
2024-02-23 |
2024-03-15 |
Toman Ryan Wijaya Nababan |
84.644.933.8-952.000 |
41,150
|
0.05 %
|
11.2 |
| 20 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Tenaga Pendampingan Pembinaan dan Evaluasi Kinerja Infrastruktur Air Minum di Provinsi Kalimantan Tengah 2 |
|
|
15713012
|
47521029 |
APBD |
80,000,000 |
80,000,000 |
79,986,600 |
79,986,600
|
79,900,000 |
79,900,000 |
79,900,000
|
79,900,000
|
2024-02-23 |
2024-03-15 |
Erinstia Gustanty |
90.746.165.1-711.000 |
13,400
|
0.02 %
|
11.2 |
| 21 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Konsultan Pengawasan Perluasan SPAM Jaringan Perpipaan Kab. Barito Timur |
|
|
15985012
|
51420509 |
APBD |
64,817,000 |
64,800,000 |
64,657,500 |
64,657,500
|
64,657,500 |
64,657,500 |
64,657,500
|
64,657,500
|
2024-04-19 |
2024-05-13 |
CV. PUTRA BAHARI ENGINEERING |
75.242.556.1-711.000 |
159,500
|
0.25 %
|
11.2 |
| 22 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Konsultan Pengawasan Perluasan SPAM Jaringan Perpipaan Kota Palangka Raya |
|
|
15986012
|
51420541 |
APBD |
35,049,000 |
35,000,000 |
34,176,900 |
34,176,900
|
34,176,900 |
34,176,900 |
34,176,900
|
34,176,900
|
2024-04-19 |
2024-05-13 |
CV. PUTRA BAHARI ENGINEERING |
75.242.556.1-711.000 |
872,100
|
2.49 %
|
11.2 |
| 23 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Kapuas |
|
|
15987012
|
51422947 |
APBD |
70,678,000 |
70,678,000 |
69,796,800 |
69,796,800
|
69,796,800 |
69,796,800 |
68,796,800
|
69,796,800
|
2024-04-19 |
2024-05-13 |
CV. ACE TAKABEYA |
02.676.279.9-711.000 |
881,200
|
1.25 %
|
11.2 |
| 24 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Kotawaringin Timur |
|
|
15988012
|
51422982 |
APBD |
69,267,000 |
69,267,000 |
68,378,220 |
68,378,220
|
68,376,000 |
68,376,000 |
68,376,000
|
68,376,000
|
2024-04-19 |
2024-05-13 |
CV. ACE TAKABEYA |
02.676.279.9-711.000 |
888,780
|
1.28 %
|
11.2 |
| 25 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Konsultan Pengawasan Pembangunan WC dan Septictank Rumah Tangga (Individual) di Kab. Pulang Pisau |
|
|
15989012
|
51422962 |
APBD |
72,054,000 |
72,000,000 |
71,700,450 |
71,700,450
|
71,700,000 |
71,700,000 |
71,700,000
|
71,700,000
|
2024-04-19 |
2024-05-13 |
CV. LISTRA ARCDIMENSI |
02.539.113.7-711.000 |
353,550
|
0.49 %
|
11.2 |
| 26 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pembangunan RSUD Kelas B di Wilayah Barat Provinsi Kalimantan Tengah (Lanjutan)(Tahap 3) |
|
|
15999012
|
51116873 |
APBD |
197,520,000,000 |
195,009,800,000 |
194,970,797,184 |
194,970,797,000
|
194,886,500,000 |
194,886,500,000 |
0
|
0
|
2024-04-26 |
2024-05-30 |
PT.Sinar Cerah Sempurna |
02.652.984.2-331.000 |
2,549,202,816
|
1.29 %
|
11.2 |
| 27 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pembangunan RSUD Kelas B di Wilayah Barat Provinsi Kalimantan Tengah (Lanjutan)(Tahap 3) |
|
|
15999012
|
51116873 |
APBD |
197,520,000,000 |
195,009,800,000 |
194,970,797,184 |
194,970,797,000
|
194,886,500,000 |
194,886,500,000 |
155,909,200,000
|
194,886,500,000
|
2024-04-26 |
2024-05-30 |
PT.Sinar Cerah Sempurna |
02.652.984.2-331.000 |
2,549,202,816
|
1.29 %
|
11.2 |
| 28 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Study Kelayakan dan DED Pembangunan Rumah Sakit Provinsi di Kota Palangka Raya |
|
|
17397012
|
51972049 |
APBD |
1,464,375,000 |
1,464,375,000 |
1,460,368,725 |
1,460,300,000
|
1,455,700,000 |
1,455,700,000 |
1,455,700,000
|
1,455,700,000
|
2024-06-28 |
2024-07-30 |
Griya Agra Saguna |
03.260.579.2-061.000 |
4,006,275
|
0.27 %
|
11.2 |
| 29 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Konsultan Pengawasan Pembangunan/Peningkatan Khatolic Center Palangka Raya |
|
|
17603012
|
52260415 |
APBD |
100,000,000 |
100,000,000 |
99,944,400 |
99,944,400
|
99,900,000 |
99,900,000 |
99,900,000
|
99,900,000
|
2024-08-16 |
2024-08-29 |
CV. MAYANG ENGINEERING |
02.292.848.5-711.000 |
55,600
|
0.06 %
|
11.2 |
| 30 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Kalibrasi Alat laboratorium |
|
|
17718012
|
50510065 |
APBD |
117,925,000 |
113,775,000 |
113,553,000 |
113,553,000
|
111,222,000 |
111,222,000 |
0
|
111,222,000
|
2024-10-16 |
2024-10-28 |
PT. PANAIRSAN PRATAMA |
01.955.337.9-039.000 |
4,372,000
|
3.71 %
|
10.4 |
| 31 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Konsultansi Pengawasan Pagar Kantor UPT Lab. Bahan Konstruksi Palangka Raya dan Pagar Rujab DPUPR di Jl. Muhammad Wongso Kab. Kobar |
|
|
16095012
|
49800589 |
APBD |
38,904,000 |
38,904,000 |
38,561,067 |
38,561,067
|
38,500,000 |
0 |
0
|
0
|
2024-05-08 |
2024-05-31 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
342,933
|
0.88 %
|
|
| 32 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Konsultansi Pengawasan Pemeliharaan Gedung Kantor DPUPR Pro. Kalteng |
|
|
16093012
|
49772646 |
APBD |
85,000,000 |
85,000,000 |
84,800,000 |
84,800,000
|
84,800,000 |
0 |
0
|
0
|
2024-05-08 |
2024-05-31 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
200,000
|
0.24 %
|
|
| 33 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Pembuatan Master Plan Kawasan Rumah Sakit Provinsi Kalimantan Tengah |
|
|
10011329000
|
52656421 |
APBDP |
1,678,709,000 |
1,303,147,000 |
1,300,015,350 |
1,300,015,350
|
1,296,685,350 |
0 |
0
|
0
|
2024-11-19 |
2024-12-02 |
Griya Agra Saguna |
03.260.579.2-061.000 |
378,693,650
|
22.56 %
|
|
| 34 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Konsultan Supervisi Pembangunan/Peningkatan Sarana dan Prasarana Pendukung Gedung Kejaksaan Tinggi Kalimantan Tengah (Lanjutan) |
|
|
10003799000
|
53011833 |
APBDP |
150,263,000 |
100,000,000 |
99,943,012 |
99,943,012
|
99,900,000 |
0 |
0
|
0
|
2024-11-11 |
2024-11-22 |
CV. KARYA PERDANA KONSULTAN |
01.854.518.6-711.000 |
50,319,988
|
33.49 %
|
|
| 35 |
2024 |
Dinas Pekerjaan Umum dan Penataan Ruang |
Perencanaan Pagar Kantor UPT Lab. Bahan Konstruksi Palangka Raya dan Pagar Rujab DPUPR di Jl. Muhammad Wongso Kab. Kobar |
|
|
15759012
|
49800590 |
APBD |
65,048,000 |
65,048,000 |
64,500,000 |
64,500,000
|
64,500,000 |
0 |
0
|
0
|
2024-03-15 |
2024-04-08 |
CV. TALINDO KONSULTAN |
84.303.935.5-711.000 |
548,000
|
0.84 %
|
|