| 1 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Bangunan Gedung Kantor - Pekerjaan Penambahan Main Distribution Panel (MDP) Gedung IKR |
|
|
10004301000
|
52983404 |
APBDP |
66,000,000 |
65,447,778 |
65,370,000 |
65,370,000
|
64,907,250 |
64,907,250 |
64,907,250
|
64,907,250
|
2024-11-13 |
2024-11-22 |
CV.PATRIA TEHNIK |
03.134.923.6-711.000 |
630,000
|
0.95 %
|
12 |
| 2 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Jaringan Listrik - Pekerjaan Instalasi Listrik AC (Air Conditioner) Gedung IKR |
|
|
10011278000
|
52983251 |
APBDP |
189,000,000 |
188,878,190 |
188,500,000 |
188,500,000
|
187,584,450 |
187,584,450 |
187,584,450
|
187,584,450
|
2024-11-20 |
2024-11-29 |
CV.SINAR TERANG |
02.292.356.9-711.000 |
500,000
|
0.26 %
|
12 |
| 3 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Modal Kursi Tunggu Pasien dan Lemari Besi Arsip Cabinet |
|
|
15992012
|
49708318 |
APBD |
141,046,830 |
140,000,000 |
111,000,000 |
111,000,000
|
89,500,000 |
89,500,000 |
89,500,000
|
89,500,000
|
2024-04-24 |
2024-05-06 |
CV.KARYA DAJABA PUTRA |
02.978.026.9-711.000 |
30,046,830
|
21.3 %
|
12 |
| 4 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Modal Kursi Rapat, Kursi Lipat, Meja Konseling, Meja Pantry Instalasi Gizi dan Sofa |
|
|
15993012
|
49708316 |
APBD |
154,462,870 |
149,850,000 |
148,753,875 |
148,753,875
|
128,760,000 |
128,760,000 |
128,760,000
|
128,760,000
|
2024-04-22 |
2024-05-03 |
CV.YJS.CORP |
39.758.430.1-711.000 |
5,708,995
|
3.7 %
|
12 |
| 5 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Perencanaan Pembangunan Sarana Prasarana Jaringan Air Limbah |
|
|
16001012
|
51389703 |
APBD |
50,000,000 |
49,900,000 |
48,307,200 |
48,307,200
|
44,422,200 |
44,422,200 |
44,422,200
|
44,422,200
|
2024-05-04 |
2024-05-17 |
CV. HAYATI KONSULTAN |
42.745.143.0-711.000 |
1,692,800
|
3.39 %
|
12 |
| 6 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Perencanaan Pembangunan Jaringan Instalasi Air Bersih |
|
|
16002012
|
51390485 |
APBD |
50,000,000 |
49,900,000 |
49,206,300 |
49,206,300
|
44,599,800 |
44,599,800 |
44,599,800
|
44,599,800
|
2024-05-03 |
2024-05-16 |
CV. Bukit Indah Konsultan |
12.843.721.7-711.000 |
793,700
|
1.59 %
|
12 |
| 7 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Jasa Konsultansi Perencanaan Rehab Loket Ruang Kamboja |
|
|
16050012
|
51500522 |
APBD |
5,000,000 |
4,999,000 |
4,995,000 |
4,995,000
|
4,062,600 |
4,062,600 |
4,062,600
|
4,062,600
|
2024-05-22 |
2024-06-03 |
CV. Unika Citra Mandiri |
02.539.043.6-711.000 |
5,000
|
0.1 %
|
12 |
| 8 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Jasa Konsultansi Perencanaan Rehab Plafon, Pemasangan Interior dan Ornamen Lobby Admin Lt. 1 |
|
|
16054012
|
51068929 |
APBD |
20,000,000 |
19,980,000 |
19,700,280 |
19,700,280
|
15,739,800 |
15,739,800 |
15,739,800
|
15,739,800
|
2024-05-28 |
2024-06-10 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
299,720
|
1.5 %
|
12 |
| 9 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Jasa Konsultansi Perencanaan Pemeliharaan Pengecatan Bangunan Gedung Admin RSUD dr. Doris Sylvanus |
|
|
16057012
|
51069199 |
APBD |
20,000,000 |
19,500,000 |
19,400,000 |
19,400,000
|
19,228,800 |
19,228,800 |
19,228,800
|
19,228,800
|
2024-05-21 |
2024-05-31 |
CV.KAHAYAN CIPTA BERSAMA |
02.538.820.8-711.000 |
600,000
|
3 %
|
11.2 |
| 10 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Jasa Konsultansi Perencanaan Rehab Ruang Rapat Direksi |
|
|
16058012
|
51500676 |
APBD |
10,000,000 |
9,602,000 |
9,500,490 |
9,500,490
|
6,832,050 |
6,832,050 |
6,832,050
|
6,832,050
|
2024-05-28 |
2024-06-10 |
CV. TALINDO KONSULTAN |
84.303.935.5-711.000 |
499,510
|
5 %
|
12 |
| 11 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Jasa Konsultansi Perencanaan Rehab Ruang Direktur dan Wadir |
|
|
16060012
|
51500653 |
APBD |
20,000,000 |
19,980,000 |
19,600,380 |
19,600,380
|
15,046,050 |
15,046,050 |
15,046,050
|
15,046,050
|
2024-05-28 |
2024-06-10 |
CV. Trakat Antero Hariara |
40.804.831.2-711.000 |
399,620
|
2 %
|
12 |
| 12 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Jasa Konsultansi Perencanaan Pemeliharaan Penyekatan dan Pemasangan Interior Gedung IBS Lt. 2 |
|
|
16176012
|
51500498 |
APBD |
5,000,000 |
4,999,000 |
4,995,000 |
4,995,000
|
4,073,700 |
4,073,700 |
4,073,700
|
4,073,700
|
2024-06-03 |
2024-06-12 |
CV. Unika Citra Mandiri |
02.539.043.6-711.000 |
5,000
|
0.1 %
|
11.2 |
| 13 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Jaringan Listrik - Pemeliharaan Jaringan Listrik Ruang Anggrek |
|
|
17272012
|
51686768 |
APBD |
65,000,000 |
64,088,500 |
63,221,000 |
63,221,000
|
62,999,000 |
62,999,000 |
62,999,000
|
62,999,000
|
2024-06-10 |
2024-06-21 |
CV Berkat Sekumpul |
94.152.629.5-711.000 |
1,779,000
|
2.74 %
|
11.2 |
| 14 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Alat Kantor dan Rumah Tangga - Pemeliharaan Mesin Laundry Washer Extractor |
|
|
17466012
|
51975355 |
APBD |
104,000,000 |
103,950,000 |
103,896,000 |
103,896,000
|
103,785,000 |
103,785,000 |
103,785,000
|
103,785,000
|
2024-07-22 |
2024-08-01 |
PT. MEDIKA NUTRIMED ASADTEK |
66.812.737.6-731.000 |
104,000
|
0.1 %
|
12 |
| 15 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Jaringan Listrik - Belanja Perakitan Panel Pembagi Beban |
|
|
17467012
|
51999729 |
APBD |
198,000,000 |
197,753,000 |
197,576,781 |
197,576,781
|
197,298,060 |
197,298,060 |
197,298,060
|
197,298,060
|
2024-08-08 |
2024-08-19 |
CV.ANAIS TEKNIK |
02.292.605.9-711.000 |
423,219
|
0.21 %
|
12 |
| 16 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Jaringan Listrik - Belanja Instalasi Listrik Lab Kultur, UPS Linae dan OK IBS Kamar 1 |
|
|
17471012
|
51999713 |
APBD |
120,000,000 |
119,449,500 |
118,392,933 |
118,392,933
|
118,298,250 |
118,298,250 |
118,298,250
|
118,298,250
|
2024-08-14 |
2024-08-28 |
CV.ANAIS TEKNIK |
02.292.605.9-711.000 |
1,607,067
|
1.34 %
|
12 |
| 17 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Jaringan Listrik - Belanja Jumper Genset Unit 2 1000kVA ke ATS Unit 1 650kVA |
|
|
17472012
|
52019548 |
APBD |
200,000,000 |
199,999,000 |
199,954,512 |
199,954,512
|
198,704,208 |
198,704,208 |
198,704,208
|
198,704,208
|
2024-07-23 |
2024-08-05 |
CV.ANAIS TEKNIK |
02.292.605.9-711.000 |
45,488
|
0.02 %
|
12 |
| 18 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Pengawasan Pemeliharaan berupa Pengecatan Bangunan Gedung Admin RSUD dr. Doris Sylvanus |
|
|
17487012
|
51985655 |
APBD |
12,000,000 |
11,900,000 |
11,880,000 |
11,880,000
|
11,655,000 |
11,655,000 |
11,655,000
|
11,655,000
|
2024-07-25 |
2024-08-05 |
CV.WIBAWA DESIGN KONSULTAN |
75.248.843.7-711.000 |
120,000
|
1 %
|
12 |
| 19 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Pemeliharaan berupa Pengecatan Bangunan Gedung Admin RSUD dr. Doris Sylvanus |
|
|
17488012
|
51985664 |
APBD |
200,000,000 |
199,966,700 |
199,578,250 |
199,578,250
|
199,284,000 |
199,284,000 |
199,284,000
|
199,284,000
|
2024-07-25 |
2024-08-05 |
CV. GATRA MEGAH |
90.383.566.8-711.000 |
421,750
|
0.21 %
|
11.2 |
| 20 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Instalasi Pembangkit Listrik Lainnya - Belanja Pemeliharaan Genset Doosan 650 kVa |
|
|
17559012
|
52117607 |
APBD |
200,000,000 |
199,515,000 |
198,201,600 |
198,201,600
|
196,825,200 |
196,825,200 |
196,825,200
|
196,825,200
|
2024-07-31 |
2024-08-12 |
PT. DEKA MULTI ENGINEERING |
20.106.314.6-711.000 |
1,798,400
|
0.9 %
|
12 |
| 21 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Pengawasan Pembangunan Sarana Prasarana Jaringan Air Limbah |
|
|
17566012
|
51985822 |
APBD |
35,000,000 |
34,900,000 |
34,305,660 |
34,305,660
|
34,254,600 |
34,254,600 |
34,254,600
|
34,254,600
|
2024-08-08 |
2024-08-19 |
CV. Bukit Indah Konsultan |
12.843.721.7-711.000 |
694,340
|
1.98 %
|
12 |
| 22 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Pengawasan Pembangunan Jaringan Instalasi Air Bersih |
|
|
17567012
|
51985613 |
APBD |
35,000,000 |
34,900,000 |
34,503,240 |
34,503,240
|
34,443,300 |
34,443,300 |
34,443,300
|
34,443,300
|
2024-08-08 |
2024-08-19 |
CV. HAYATI KONSULTAN |
42.745.143.0-711.000 |
496,760
|
1.42 %
|
12 |
| 23 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Pengawasan Rehabilitasi ICU RS |
|
|
17568012
|
51839722 |
APBD |
100,000,000 |
99,877,000 |
99,411,600 |
99,411,600
|
98,973,150 |
98,973,150 |
98,973,150
|
98,973,150
|
2024-08-08 |
2024-08-16 |
CV. HAYATI KONSULTAN |
42.745.143.0-711.000 |
588,400
|
0.59 %
|
12 |
| 24 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Jasa Konsultansi Pengawasan - Pengawasan Rehab Loket Ruang Kamboja |
|
|
17584012
|
52174218 |
APBD |
3,000,000 |
3,000,000 |
2,997,000 |
2,997,000
|
2,442,000 |
2,442,000 |
2,442,000
|
2,442,000
|
2024-08-21 |
2024-08-30 |
CV. Palangka Widyajasa Konsultan |
02.437.615.4-711.000 |
3,000
|
0.1 %
|
12 |
| 25 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Jasa Konsultansi Pengawasan Pemeliharaan Penyekatan dan Pemasangan Interior Gedung IBS Lt. 2 |
|
|
17585012
|
52174190 |
APBD |
3,000,000 |
3,000,000 |
2,997,000 |
2,997,000
|
2,269,950 |
2,269,950 |
2,269,950
|
2,269,950
|
2024-08-16 |
2024-08-26 |
CV. Palangka Widyajasa Konsultan |
02.437.615.4-711.000 |
3,000
|
0.1 %
|
12 |
| 26 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Bangunan Gedung - Rehab Loket Ruang Kamboja |
|
|
17595012
|
52174219 |
APBD |
50,000,000 |
50,000,000 |
49,832,937 |
49,832,937
|
49,494,950 |
49,494,950 |
49,494,950
|
49,494,950
|
2024-08-21 |
2024-08-30 |
CV.KARYA DAJABA PUTRA |
02.978.026.9-711.000 |
167,063
|
0.33 %
|
12 |
| 27 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Berupa Penyekatan dan Pemasangan Interior Gedung IBS Lt. 2 |
|
|
17596012
|
52174208 |
APBD |
50,000,000 |
49,950,000 |
49,895,136 |
49,895,136
|
49,519,500 |
49,519,500 |
49,519,500
|
49,519,500
|
2024-08-16 |
2024-08-26 |
CV.KARYA DAJABA PUTRA |
02.978.026.9-711.000 |
104,864
|
0.21 %
|
11.2 |
| 28 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Bangunan Gedung - Rehab Plafon, Pemasangan Interior dan Ornamen Lobby Admin Lt. 1 |
|
|
17701012
|
52174229 |
APBD |
200,000,000 |
200,000,000 |
199,940,000 |
199,940,000
|
199,500,000 |
199,500,000 |
199,500,000
|
199,500,000
|
2024-10-18 |
2024-10-28 |
CV Balian Krisindu |
96.306.568.5-711.000 |
60,000
|
0.03 %
|
12 |
| 29 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Jasa Konsultansi Pengawasan - Pengawasan Rehab Plafon, Pemasangan Interior dan Ornamen Lobby Admin Lt. 1 |
|
|
17702012
|
52174226 |
APBD |
12,000,000 |
12,000,000 |
11,950,260 |
11,950,260
|
11,710,500 |
11,710,500 |
11,710,500
|
11,710,500
|
2024-10-18 |
2024-10-28 |
CV.BETANG TEKNOSINDO KONSULTAN |
02.437.786.3-711.000 |
49,740
|
0.41 %
|
11.2 |
| 30 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Bangunan Gedung - Rehab Ruang Rapat Direksi |
|
|
17703012
|
52174260 |
APBD |
100,000,000 |
100,000,000 |
99,950,000 |
99,950,000
|
98,500,000 |
98,500,000 |
98,500,000
|
98,500,000
|
2024-10-18 |
2024-10-28 |
CV. NADIRA BERKAH JAYA |
41.232.390.9-711.000 |
50,000
|
0.05 %
|
12 |
| 31 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Jasa Konsultansi Pengawasan - Pengawasan Rehab Ruang Rapat Direksi |
|
|
17704012
|
52174254 |
APBD |
6,000,000 |
6,000,000 |
5,900,000 |
5,900,000
|
5,794,200 |
5,794,200 |
5,794,200
|
5,794,200
|
2024-10-18 |
2024-10-28 |
CV. EXSYS ENGINEER |
62.324.547.9-711.000 |
100,000
|
1.67 %
|
12 |
| 32 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Pemeliharaan Bangunan Gedung - Rehab Ruang Direktur |
|
|
17711012
|
52763600 |
APBDP |
200,000,000 |
200,000,000 |
199,945,000 |
199,945,000
|
199,630,000 |
199,630,000 |
199,630,000
|
199,630,000
|
2024-10-16 |
2024-10-25 |
CV. ASANA KARYA |
71.140.245.3-711.000 |
55,000
|
0.03 %
|
12 |
| 33 |
2024 |
RSUD dr. Doris Sylvanus (APBD) |
Belanja Jasa Konsultansi Pengawasan Rehab Ruang Direktur |
|
|
17712012
|
52763643 |
APBDP |
12,000,000 |
12,000,000 |
11,900,033 |
11,900,033
|
11,766,000 |
11,766,000 |
11,766,000
|
11,766,000
|
2024-10-16 |
2024-10-25 |
CV. Trakat Antero Hariara |
40.804.831.2-711.000 |
99,968
|
0.83 %
|
12 |